• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 39
  • 7
  • 5
  • 3
  • Tagged with
  • 54
  • 38
  • 30
  • 30
  • 30
  • 23
  • 20
  • 19
  • 15
  • 14
  • 14
  • 13
  • 12
  • 12
  • 12
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
21

Wirksamkeit von WRRL-Maßnahmen: Umsetzung der Wasserrahmenrichtlinie in Sachsen – Wirksamkeit von WRRL-Maßnahmen – Makrozoobenthos

Neumann, Jürgen, Große, Norbert, Berg, Kristin 25 April 2017 (has links)
Die Studie zur Wirksamkeit von Maßnahmen zur kleinräumigen Verbesserung von sächsischen Fließgewässern zeigt, dass Untersuchungszeiträume von weniger als fünf Jahren nur begrenzte Aussagen zulassen. Für den Wehrrückbau an der Bobritzsch konnten positive Effekte nachgewiesen werden. Die Ergebnisse weiterer vier Maßnahmen waren nicht eindeutig. Die Untersuchung vermittelt Hinweise auf lokale Faktoren, die bei der Planung und Umsetzung von Maßnahmen in Fließgewässern beachtet werden sollten. Für Fachleute ergeben sich aus der Studie weitere Datengrundlagen, die wissenschaftlich aufbereitet und damit weiterverwendbar sind.
22

Risikobetrachtungen im Wasserbau unter Berücksichtigung der Zuverlässigkeit von Verschlussorganen

Pohl, Reinhard 05 March 2007 (has links)
Within the framework of risk assessment and risk management, determination of the failure probability of dams plays an important role. In this paper, the probabilistic approach to hydraulic failure elaborated by the author in the nineties will be developed further and refined. Furthermore, it is shown how the random event “gate failure” can be taken into account when calculating the overtopping probability of barrages. / Im Rahmen von Risikobetrachtungen spielt die Bestimmung der Überflutungswahrscheinlichkeit eine wichtige Rolle. Im vorliegenden Beitrag wird der probabilistische Ansatz, welcher in den neunziger Jahren vom Autor erarbeitet worden ist, weiterentwickelt und modifiziert. Außerdem wird gezeigt, wie das zufällige Ereignis „Versagen von Verschlüssen“ in die Berechnung der Überflutungswahrscheinlichkeit von Stauanlagen einbezogen werden kann.
23

Maßnahmenplanung gemäß EG-WRRL Kleine Spree: Maßnahmenplanung gemäß EG-WRRL am Beispiel des durch den Braunkohlenbergbau beeinflussten Fließgewässer-Wasserkörpers Kleine Spree: Erweiterte Grundlagenermittlung und Alternativenuntersuchung

Järschel, Theresa, Willecke, Jörg 27 March 2012 (has links)
Mit landschaftsplanerischen und wasserbaulichen Maßnahmen soll die Kleine Spree gemäß EG-WRRL einen guten Zustand erreichen. Das 40 km lange Nebengewässer der Spree ist stark vom Braunkohlenbergbau beeinflusst. Der Bericht beschreibt und bewertet den Ist-Zustand der Kleinen Spree, analysiert die Defizite und leitet die Maßnahmen für einen guten ökologischen Zustand ab. Für die Gewässerabschnitte wurden Pläne zur Renaturierung im Maßstab von 1:10.000 erstellt. Sie basieren auf dem Strahlquellen- und Trittsteinprinzip, bei dem ökologisch gute und sehr gute Abschnitte so im Gewässerverlauf platziert werden, dass die Strahlwirkung das gesamte Gewässer umfasst.
24

Fischartenschutz bei Wasserbau und Unterhaltungsmaßnahmen: Leitfaden für fischartenschutzgerechten Wasserbau und Gewässerunterhaltung im Freistaat Sachsen

Füllner, Gert, Bild, Angela, George, Volker, Kolbe, Ulrike, Signer, Jean, Völker, Fabian 01 February 2022 (has links)
Sachsen ist ein an Fließgewässern reiches Land. Wasserbau- und Gewässerunterhaltung sind in unseren Flüssen regelmäßig erforderlich. Gründe dafür können z. B. Hochwasserschutz, oder der Rückbau von Wanderhindernissen sein. Der Leitfaden informiert über die fischereirechtlichen Bestimmungen, die bei Bau- und Unterhaltungsmaßnahmen in und an Gewässern zu beachten sind. An Hand praktischer Beispiele wird erklärt, wie Bauherren und Gewässerunterhaltungspflichtige negative Effekte auf die Fischartengemeinschaft bei Eingriffen in die Gewässer so weit als möglich minimieren können. Redaktionsschluss: 30.09.2021
25

Pumpstationen mit Heberauslässen - ein Beitrag zur Intensivierung der Be- und Entwässerung in der Landwirtschaft

Bollrich, Gerhard 22 May 2013 (has links) (PDF)
Mit der Intensivierung der landwirtschaftlichen Produktion gewinnen Pumpstationen für die Be- und Entwässerung landwirtschaftlicher Nutzflächen zunehmend an Bedeutung. Zur Beseitigung schädlicher Bodennässe werden offene Gräben oder Dränrohrleitungen angelegt, welche das Wasser bei nicht vorhandener Vorflut einem Entwässerungsschöpfwerk zuleiten. Dieses Schöpfwerk fördert das Wasser aus einem Speicherraum (Mahlbusen) in den Vorfluter. In der DDR sind zahlreiche derartige Entwässerungsschöpfwerke vorhanden. (...)
26

Die Ausbildung von Wasserbauingenieuren in der DDR

Martin, Helmut, Pohl, Reinhard 11 February 2015 (has links) (PDF)
Bis 1990 ging die politische, soziale, wirtschaftliche und technische Entwicklung in beiden deutschen Staaten mehr als 40 Jahre getrennte Wege. Das trifft auch für die Ausbildung von Wasserbauingenieuren zu. Die Autoren unternehmen den Versuch, das Bild der zugehörigen Entwicklung im Osten Deutschlands nachzuzeichnen. Sie konzentrieren sich dabei auf die Technische Universität Dresden als den Hauptstandort der damaligen universitären Wasserbauausbildung in der DDR. Im vorliegenden Aufsatz werden die Tatsachen, die Probleme und das Erreichte dargestellt und besprochen. / More than 40 years the political, social, economic and technical development in the two German states went different ways until 1990. This also applies to the education of civil engineers in the field of hydraulic engineering. The author undertakes the attempt to trace a picture of the related development in East Germany. During the GDR-period the Dresden University of Technology was the major place for university education of hydraulic engineers (GDR = German Democratic Republic).
27

A management system to optimize reservoir control in the case of floods

Pohl, Reinhard, Bornschein, Antje 11 February 2015 (has links) (PDF)
Many multipurpose reservoirs are situated in the low mountain range of Germany. Most of them are necessary for drinking water supply and flood protection as well. Other utilizations are recreation, water power and the downstream low water regulation during dry seasons. The operation rules of the reser-voirs have to be optimized to meet the different requirements of use. One tool within this framework is a management system for river basins including all reservoirs and their specific operation rules affecting the downstream reaches. As an optimization objective for instance the minimization of inundation risks can be defined. In this case the risk can be defined as hydraulic and hydrologic safety of the reservoir itself and the risk due to inundation and damaging in the downstream regions. Considering the European Water Framework Directive the ecological aspect of reservoir management is one more point in the optimization process. To es-tablish a pilot project the software TALSIM will be applied to river catchments in the ore mountains (Saxony).
28

The education of hydraulic engineers in the GDR

Pohl, Reinhard 11 February 2015 (has links) (PDF)
More than 40 years the political, social, economic and technical development in the two German states went different ways until 1990. This also applies to the education of civil engineers in the field of hydraulic engineering. The author undertakes the attempt to trace a picture of the related development in East Germany. During the GDR-period the Dresden University of Technology was the major place for university education of hydraulic engineers (GDR = German Democratic Republic). This is why the development of the education in Dresden and its relations to the hydro practice will be mainly considered here. In this paper the facts, the problems and the achievements are told and discussed. / Bis 1990 ging die politische, soziale, wirtschaftliche und technische Entwicklung in beiden deutschen Staaten mehr als 40 Jahre getrennte Wege. Das trifft auch für die Ausbildung von Wasserbauingenieuren zu. Die Autoren unternehmen den Versuch, das Bild der zugehörigen Entwicklung im Osten Deutschlands nachzuzeichnen. Sie konzentrieren sich dabei auf die Technische Universität Dresden als den Hauptstandort der damaligen universitären Wasserbauausbildung in der DDR. Im vorliegenden Aufsatz werden die Tatsachen, die Probleme und das Erreichte dargestellt und besprochen.
29

Die Ausbildung von Wasserbauingenieuren in der DDR

Martin, Helmut, Pohl, Reinhard January 2010 (has links)
Bis 1990 ging die politische, soziale, wirtschaftliche und technische Entwicklung in beiden deutschen Staaten mehr als 40 Jahre getrennte Wege. Das trifft auch für die Ausbildung von Wasserbauingenieuren zu. Die Autoren unternehmen den Versuch, das Bild der zugehörigen Entwicklung im Osten Deutschlands nachzuzeichnen. Sie konzentrieren sich dabei auf die Technische Universität Dresden als den Hauptstandort der damaligen universitären Wasserbauausbildung in der DDR. Im vorliegenden Aufsatz werden die Tatsachen, die Probleme und das Erreichte dargestellt und besprochen. / More than 40 years the political, social, economic and technical development in the two German states went different ways until 1990. This also applies to the education of civil engineers in the field of hydraulic engineering. The author undertakes the attempt to trace a picture of the related development in East Germany. During the GDR-period the Dresden University of Technology was the major place for university education of hydraulic engineers (GDR = German Democratic Republic).
30

A management system to optimize reservoir control in the case of floods

Pohl, Reinhard, Bornschein, Antje January 2006 (has links)
Many multipurpose reservoirs are situated in the low mountain range of Germany. Most of them are necessary for drinking water supply and flood protection as well. Other utilizations are recreation, water power and the downstream low water regulation during dry seasons. The operation rules of the reser-voirs have to be optimized to meet the different requirements of use. One tool within this framework is a management system for river basins including all reservoirs and their specific operation rules affecting the downstream reaches. As an optimization objective for instance the minimization of inundation risks can be defined. In this case the risk can be defined as hydraulic and hydrologic safety of the reservoir itself and the risk due to inundation and damaging in the downstream regions. Considering the European Water Framework Directive the ecological aspect of reservoir management is one more point in the optimization process. To es-tablish a pilot project the software TALSIM will be applied to river catchments in the ore mountains (Saxony).

Page generated in 0.0634 seconds