1 |
[en] AN ANALYSIS OF PRACTICES IN APPLYING SCRUM ON LARGE PROJECTS / [pt] UMA ANÁLISE DE PRÁTICAS NA APLICAÇÃO DE SCRUM EM PROJETOS DE GRANDE PORTEEVANDRO OLIVEIRA DAS FLORES 25 July 2012 (has links)
[pt] Na literatura disponível hoje, encontram-se exemplos da utilização do
Scrum em projetos e times pequenos, deixando um questionamento sobre a
possibilidade de utilização desta metodologia em projetos e/ou times grandes.
Esta dissertação tem por objetivo examinar casos práticos de empresas conhecidas
onde foi utilizado Scrum em projetos grandes, enfatizando as dificuldades
encontradas ao longo de todo processo e as soluções adotadas, destacando as
práticas que levaram os projetos a obter sucesso. / [en] In today s writings, there are many examples of using Scrum in small teams
and projects, leaving a knowledge gap about the possibility of applying Scrum in
big teams and large projects. This work aims at presenting case studies in known
companies where Scrum has been applied in large projects, emphasizing the
roadblocks found throughout the process, and the solutions adopted, highlighting
the practices that lead the projects to success.
|
2 |
[en] MANAGEMENT MODEL IN THE EBX GROUP COMPANIES: AN ASSESSMENT WITH THE STRATEGIC PLANNING / [pt] O MODELO DE GESTÃO DAS EMPRESAS DO GRUPO EBX: UMA AVALIAÇÃO DO EFETIVO ALINHAMENTO AO PLANEJAMENTO ESTRATÉGICODIEGO ARAUJO DE LUCENA HENRIQUES LIMA 29 June 2012 (has links)
[pt] Este trabalho tem como objetivo abordar o modelo de gestão, a interação
entre os conceitos de planejamento estratégico, gestão de projetos e portfólio e
entender como essa interação ocorre nas empresas do Grupo EBX. Analisa,
também, em que medida o gerenciamento reflete o direcionamento traçado no
planejamento estratégico de cada empresa. Foram estabelecidas quatro
proposições, que segundo a literatura estudada seriam os alicerces para o perfeito
desdobramento da estratégia definida e os projetos gerenciados nas organizações:
a) uma efetiva execução do planejamento estratégico de uma organização depende
da qualidade da própria estratégia formulada; b) a organização deve seguir a
estratégia e não o inverso; c) a estratégia deve envolver diretamente as pessoas; e
d) a estratégia depende da implementação de iniciativas capazes de transformar a
organização para os desafios futuros (melhoria de processos internos). Foram
entrevistados oito executivos de diferentes empresas do Grupo EBX durante o
primeiro semestre de 2011. A análise do conteúdo das entrevistas possibilitou a
conclusão, juntamente com a literatura, da situação do Grupo EBX acerca do tema
e de suas práticas de gestão da estratégia dos seus empreendimentos. O resultado
da pesquisa sugere algumas ações a serem traçadas. A principal conclusão é a de
que, a partir das proposições formuladas, a estratégia não foi efetivamente
desdobrada para todos os níveis das empresas, tampouco suportada como deveria,
gerando, em alguns casos, um desalinhamento entre os projetos gerenciados e o
plano de negócios de cada empreendimento. / [en] This work aims to address management model, the interaction between the
concepts of strategic planning, project management and portfolio management
and understand how this interaction occurs in the EBX Group organizations. It
also analyzes how the management reflects the direction outlined in the strategic
planning of each company. Four propositions were established for this paper,
which according to the literature studied would be the perfect foundation for the
unfolding of the strategy defined and project management in organizations: a) an
effective implementation of the strategic planning of an organization depends on
the quality of its strategy set, b) the organization should follow the strategy and
not the reverse; c) the strategy must involve people directly, and d) the strategy
depends on the implementation of initiatives to transform the organization for
future challenges (improving internal processes). Interviews were done with eight
executives from different companies of the EBX Group, during the first semester
of 2011. The content analysis of the interviews allowed the conclusion, together
with the literature, the situation of the EBX Group on the subject and its practical
management strategy for their enterprises. The survey results suggest some
actions to be traced. The main conclusion is that, from the propositions
formulated, the strategy has not been effectively deployed to all levels of
companies or supported as it should, leading in some cases, a misalignment
between the managed projects and business plan of each enterprise.
|
3 |
[en] THE DYNAMICS IN A LARGE SCALE TECHNOLOGY PROJECT / [pt] A DINÂMICA EM UM PROJETO DE TECNOLOGIA DE GRANDE PORTEFABIANO SANNINO 24 July 2006 (has links)
[pt] Este trabalho apresenta um estudo de Dinâmica de Sistema
como uma
ferramenta de apoio às decisões da gerência de um projeto,
procurando
demonstrar sua utilização e aplicação em um projeto de
implementação
tecnológica de grande porte. O trabalho visa possibilitar
que a gestão do projeto
possua uma ferramenta de análise que proporcione a
antecipação das
interferências existentes nos projetos, como a necessidade
de adição de recursos,
ingerência nas decisões do projeto, alterações de escopo e
solicitação de
atividades adicionais não relacionadas diretamente ao
projeto. A análise da
dinâmica requer a manipulação de muitas variáveis,
necessitando de ferramentas
que auxilie a gerência do projeto na sua visão e
compreensão do projeto como um
todo. Com a técnica proposta, gerentes, tomadores de
decisão e gestores em geral
poderão analisar as variáveis de um processo e suas
dependências no projeto.
Inicialmente, o trabalho apresenta uma parte teórica
relacionada à Dinâmica de
Sistemas apresentando um breve histórico da técnica e
informações conceituais.
Em seguida discorre sobre implementações de projetos de
Enterprise Resource
Planning (ERP), suas principais características, modelos
conceituais, fases,
principais produtos existentes e estruturação da equipe
necessária para o projeto.
Seqüencialmente apresentamos os principais modelos causais
e formais de gestão
de projetos, realizando uma aplicação baseada nos
conceitos de implementação de
ERP, demonstrando o funcionamento das principais
influências existentes. / [en] This work presents a study of the System Dynamic as a
support tool for
decisions of the project leadership, demonstrating its use
and application in a
large-scale technology implementation project. Its
objective is to make possible
for the project management to have an analysis tool that
provides the anticipation
of the projects existent interferences, such as the need
of additional resources,
project decisions failures, scope changes, requests for
additional activities not
directly related to the project. The dynamic analysis
requires the manipulation of
many variables and needs a tool that supports the project
leadership in their vision
and better understanding of the overall project. With the
proposed technique,
project leadership, decision makers and managers in
general can analyze the
variables of a process and their dependencies. First, the
work describes the theory
related to System Dynamic, presenting a brief technique
history and conceptual
information. After that, it explains about Enterprise
Resource Planning (ERP)
implementation projects, their main characteristics,
conceptual models, phases,
main products and the required organizational structure.
Afterwards, it introduces
the main project management hard (formal) and soft
(causal) models, applying the
system dynamic based on the ERP implementation concepts
and demonstrating
the existing influences.
|
4 |
[en] MULTI-PROJECT MANAGEMENT THROUGH THE CRITICAL CHAIN METHODOLOGY: EFFECTS OF CAPACITY BUFFER AND OF THE CRITERIA TO PRIORITIZE ACTIVITIES / [pt] GESTÃO DE MÚLTIPLOS PROJETOS POR MEIO DA METODOLOGIA DA CADEIA CRÍTICA: EFEITOS DO BUFFER DE CAPACIDADE E DOS CRITÉRIOS PARA PRIORIZAR ATIVIDADESNICOLE SUCLLA FERNANDEZ 05 May 2009 (has links)
[pt] Este trabalho trata da gestão de múltiplos projetos mediante a metodologia
da Cadeia Crítica e Gestão de Buffers (Critical Chain and Buffer Management
CC/BM). Concentra-se na análise e entendimento dos efeitos que as abordagens
mais usuais para dimensionamento dos buffers de capacidade (Capacity Buffers
BC) e definição dos critérios de priorização de atividades têm sobre os objetivos
da empresa e dos próprios projetos. O estudo baseia-se num problema-exemplo
apresentado por Pritsker B. et al. (1969.). Para facilitar a análise, esse exemplo se
caracteriza por uma estrutura simples, mas que apresenta interdependências
relevantes para o estudo dos conflitos de compartilhamento de recursos entre
projetos. Analisam-se as abordagens de todos juntos, projetos sucessivos e do
recurso gargalo, propostas por Newbold (1998) para planejamento conjunto de
projetos simultâneos. Tais abordagens são implementadas através das ferramentas
de programação de projetos Prochain & Pipeline. A partir dos programas
(schedules) resultantes, analisam-se as características e deficiências de cada
abordagem. Ademais, tais resultados permitem identificar certas condições e
efeitos conflitantes no dimensionamento dos BC e no critério de priorização de
atividades utilizado nas implementações típicas da metodologia. Tais observações
criaram a necessidade de complementar a análise mediante a simulação
probabilística da etapa de execução dos projetos. A pesquisa explica a diferença
entre os efeitos dos critérios de priorização dinâmica e estática, esclarece a
interação entre os buffers de capacidade e buffers de projeto. Ela ainda analisa os
efeitos de dimensionar os BCs, para todos os projetos, como uma mesma
porcentagem da carga do recurso e ilustra os trade-offs entre estabilidade do
sistema e o makespan dos projetos. / [en] This research addresses the management of multiple simultaneous projects
through the application of the Critical Chain and Buffers Management (CC/BM)
methodology. The focus is on the analysis and interpretation of the effects that
the more usual approaches for Capacity Buffers (CB) sizing and criteria to
prioritize activities have on the companys and on the projects own objectives.
The study is based on the problem-example presented by Pritsker B. et al. (1969.)
For simplifying the analysis, this example is characterized by a simple structure
that, nevertheless, presents interdependences significant for the study of conflicts
created by sharing resources between simultaneous projects. The approaches for
simultaneous projects management, presented by Newbold (1998) are analyzed,
namely: the all together, the successive projects and the strategic resource.
Their implementations are made using the Prochain & Pipeline multi-project
management tools. From the resulting schedules, the characteristics and
deficiencies of each approach are analyzed. Furthermore, these results allow the
identification of certain conditions and conflicting effects in the BC sizing and in
the criteria used to prioritize activities in the typical methodology
implementations. Such observations led to the necessity of complementing the
analysis with the aid of probabilistic simulation of the projects execution stage.
The research explains the differences between the effects of dynamic and static
prioritization, elucidates the interaction between the capacity and the project
buffers. It also examines the effects of using the same percentage of the resource
load for sizing the BCs for all the projects, and illustrates the trade-offs between
the system stability and the projects makespan.
|
5 |
[pt] AVALIAÇÃO E MONITORAMENTO DE PROJETOS DE FORTALECIMENTO DE CADEIAS DE VALOR DA SOCIOBIODIVERSIDADE: ESTUDO DE CASO DO PROGRAMA REDD EARLY MOVERS EM MATO GROSSO / [en] EVALUATION AND MONITORING OF SOCIO-BIODIVERSITY VALUE CHAIN STRENGTHENING: CASE STUDY OF THE REDD EARLY MOVERS PROGRAM IN MATO GROSSOMARIANA MELO GOGOLA 07 October 2024 (has links)
[pt] O Brasil está no centro do debate sobre a importância da bioeconomia e seu papel
no desenvolvimento sustentável. O país, com sua vasta diversidade biocultural, abriga
20 por cento das espécies do planeta, com mais da metade de seu território coberto por
vegetação nativa. O agroextrativismo emerge como uma estratégia para integrar
produtos da sociobiodiversidade aos mercados, estimulando o desenvolvimento
econômico local, a conservação da biodiversidade e o consumo sustentável. Neste
contexto, o fortalecimento de cadeias de valor da sociobiodiversidade representa uma
alternativa ao modelo predatório atual e tem sido cada vez mais discutido no âmbito de
projetos de cooperação internacional, a exemplo do Programa Redução das Emissões
por Desmatamento e Degradação florestal (REDD) Early Movers de Mato Grosso
(REM MT) que apoia organizações de base da agricultura familiar e de povos e
comunidades tradicionais. O Programa REM MT, contratou 21 projetos com esta
finalidade no primeiro semestre de 2023 e prevê a execução de cerca de R$ 40 M em 12
meses. Essas iniciativas representam um grande desafio em termos de monitoramento e
avaliação, processos cruciais para o êxito dos projetos. Sendo assim, este trabalho
identifica e avalia procedimentos e ferramentas de M(e)A do Programa REM MT e o
contrapõe com outros programas socioambientais análogos em curso no país.
Compreender quais os procedimentos e instrumentos utilizados em outros programas
permite a elaboração de uma proposta de monitoramento adequada e possibilita a
proposição de eventuais melhorias em processos já estabelecidos. / [en] Brazil is central to the discussion on the significance of bioeconomy and its role
in sustainable development. With its extensive biocultural diversity, the nation hosts
20 percent of the world s species, over half of its territory is enveloped by native vegetation.
Agroextractivism emerges as a strategic approach to integrate socio-biodiversity
products into markets, fostering local economic growth, biodiversity conservation, and
sustainable consumption. In this milieu, the reinforcement of socio-biodiversity value
chains stands as an alternative to the prevailing predatory model and is increasingly
deliberated within international cooperation projects, exemplified by the REDD Early
Movers Program in Mato Grosso (REM MT), which bolsters grassroots organizations
in family farming and traditional communities. The REM MT Program initiated 21
projects for this cause in the first half of 2023 and anticipates a budget execution of
approximately R$ 40 million within 12 months. These endeavors pose considerable
challenges in terms of monitoring and evaluation, pivotal for project success.
Consequently, this study discerns and appraises the M(and)E methodologies and tools of
the REM MT Program, juxtaposing them with analogous socio-environmental
initiatives underway in Brazil. Grasping the methodologies and tools employed in other
endeavors facilitates the formulation of an apt monitoring proposal and opens avenues
for potential enhancements in established procedures.
|
6 |
[en] CORPORATE SOCIAL PROJECTS IN BRAZIL: DIFFERENT LENSES FOR UNDERSTANDING MANAGEMENT MODELS AND THEIR IMPLICATIONS / [pt] PROJETOS SOCIAIS DE EMPRESAS NO BRASIL: DIFERENTES LENTES PARA COMPREENDER OS MODELOS DE GESTÃO E SUAS IMPLICAÇÕESRENATA BUARQUE GOULART COUTINHO 24 January 2006 (has links)
[pt] No meio empresarial brasileiro, a discussão sobre a
responsabilidade
social das empresas e sobre a ética na condução dos
negócios vem ganhando
espaço crescente. Apesar do conceito de responsabilidade
social abranger as
relações da organização com seus diversos públicos de
interesse (stakeholders),
no Brasil é a dimensão dos investimentos sociais a que
mais espaço tem
ocupado na agenda empresarial. Reallizou-se uma
investigação dos modelos de
gestão adotados por empresas no Brasil na condução de seus
projetos sociais,
buscando avaliar a influência e a combinação de diferentes
fatores para a
efetividade e a sustentabilidade dos resultados. Para tal,
construiu-se um
arcabouço conceitual adequado à análise dos projetos
sociais de empresas, no
contexto brasileiro, ao mesmo tempo em que se traçou um
panorama indicativo
das práticas de gestão destes projetos, analisando-os à
luz do arcabouço
desenvolvido. A pesquisa de campo foi composta de
levantamento por meio de
questionário, entrevistas em profundidade, análise
documental e estudos de
caso. Os dados coletados foram analisados sob diferentes
óticas, de forma a se
obter uma visão multifacetada do fenômeno em estudo. A
análise quantitativa
das respostas ao questionário, foi complementada com os
dados provenientes
das entrevistas. Posteriormente, foram construídos dois
estudos de caso, a partir
da combinação de dados de naturezas distintas sobre
projetos selecionados. Os
resultados sinalizaram que a combinação entre o tipo de
projeto, o modelo de
gestão e a configuração institucional - esta última
formada pela empresa ou
empresas investidoras, instituição operadora, organizações
parceiras,
articulações com o poder público e articulações com outros
projetos - influencia
os resultados e a sustentabilidade. Os resultados da
pesquisa sugeriram, ainda,
algumas alterações no arcabouço conceitual inicialmente
proposto. O arcabouço
resultante tem potencial para ser utilizado tanto na
condução de pesquisas
empíricas sobre projetos sociais, quanto como ferramenta
de gestão. O
detalhamento de dimensões e indicadores oferece a
possibilidade de analisar a
adequação entre o modelo de gestão adotado, as
características do projeto e
sua configuração institucional, além permitir refletir
sobre as inter-relações de
diversos fatores e de suas implicações para as medidas de
desempenho do
projeto. / [en] Corporate social responsibility and business ethics issues
have been
gaining increasing visibility amongst the Brazilian
entrepreneurial environment. In
Brazil, the social investment dimension captures most of
the flare in the
enterprise agenda. However, the comprehensive view of
social responsibility
includes the relations between the organizations and
different stakeholder
groups. An investigation of different social project
management models used by
Brazilian companies was undertaken, aiming at evaluating
the influence and the
combined effects of diverse factors on the effectiveness
and sustainability of the
projects` results. A conceptual framework for corporate
social project analysis
was postulated for the Brazilian context, and then used as
the basis for an
evaluation of project management practices. The field
research activities
comprised application of a questionnaire, in depth
interviews, document analysis,
and case studies. The data were analyzed under different
perspectives, so as to
provide a multidimensional view of the studied phenomenon.
The quantitative
analysis of the questionnaire data was complemented by
data provided by the
interviews. Two case studies were developed, as a result
of the combination of
data provided by selected projects. The results indicate
that interactions between
the type of project, management model, and institutional
configuration
(enterprises or investing entities, operative institution,
partner organizations,
associations with the public sector and with other
projects) influence projects`
results and sustainability. The results also led to
modifications of the conceptual
framework originally proposed. The resulting framework has
great potential to be
used either guiding empirical research or as management
tools for social
projects. The detailed analysis of different dimensions
and indicators enable an
evaluation of the fitness of the adopted management model
to project`s
characteristics and its institutional configuration, as
well as allowing a reflection
about the inter-relations of several factors and their
implications on the
performance of the project.
|