• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 43
  • 12
  • Tagged with
  • 55
  • 55
  • 26
  • 21
  • 16
  • 14
  • 14
  • 14
  • 12
  • 12
  • 9
  • 8
  • 7
  • 7
  • 6
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
51

3D-modellering av en plattrambro i Tekla Structures : Arbetsmetod av en fallstudie / 3D modeling of a slab-fram bridge in Tekla Structures : Methodology of a case-study

Namdar, Sahar, Hernodh, Olle January 2013 (has links)
Detta examensarbete ämnar besvara huruvida Tekla Structures kan fungera som ett lämpligt 3D-modelleringsprogram för konstruktionsgruppen Nyanläggning och Bro inom Grontmij Sverige. Med goda erfarenheter av Building Information Modeling, s.k. BIM, och 3D-modellering inom andra delar av Grontmij så fanns en önskan att optimera gruppens arbetsprocesser med den senaste kunskapen inom området. Arbetet har fokuserat på att praktiskt modellera en fallstudie baserat på ett av Grontmij tidigare genomfört anläggningsprojekt. För att säkerställa fallstudiens representativitet valdes en plattrambro med stor mängd armering som ansågs ha en komplex geometri vilket potentiellt skulle fördelaktigt kunna representeras i 3D. Vid skapandet av 3D-modellen och tillhörande ritningar delades processen in i tre steg; modellering, detaljering samt visualisering. Uppbyggandet av 3D- modellen påvisade unika för- och nackdelar i varje steg där också nedlagd arbetstid jämfördes med fallstudieprojektets tidplan. Resultaten visade att stegen modellering och detaljering (armering) uppvisade stora fördelar i relation till tidsåtgång. För steget visualisering, skapandet av 2D-ritningar enligt rapportens nomenklatur, var slutsatsen den omvända. Grontmij Nyanläggning och Bro rekommenderas därför att selektivt integrera Tekla Structures fördelar i sin framtida arbetsprocess samt fortsätta utvärdera programmet inom andra relaterade områden. / This thesis intends to answer whether Tekla Structures can function as a suitable 3D modeling software for the department of Transportation & Mobility within Grontmij Sweden. Given positive experiences from Building Information Modeling, so called BIM, and 3D modeling in other areas of Grontmij there was a desire to optimize the work processes of the department with the latest knowledge in the field. This report focuses on practical modeling of a case study, based on one of Grontmij’s previously conducted construction projects. To ensure a representative case study, a heavily reinforced slab-frame bridge was selected which was considered to have a complex geometry that potentially would be advantageously represented in 3D. The process of creating the 3D model and associated drawings was divided into three stages; modeling, detailing, and visualization. The construction of the 3D model demonstrated unique advantages and disadvantages in each stage where also this thesis’ work plan was compared with the case study’s time plan. The results showed that the steps modeling and detailing (reinforcing) showed benefits in relation to the time spent. For the visualization step, i.e. the creation of 2D drawings according to the terminology of this report, the conclusion was the opposite. Grontmij’s Transportation & Mobility department is therefore recommended to selectively integrate Tekla Structures’ advantages into their future work process and continue to evaluate the program in other related fields.
52

Kundnyttan av Tekla Structures som verktyg i broprojektering / The Customer Value of Tekla Structures as a Tool in Bridge Planning

Nilsson, Erik, Alizadeh Goidaragh, Safiyeh January 2013 (has links)
Byggbranschen är inne i en övergångsfas mellan 2D och 3D. BIM, som arbetsmetod, och 3D-modeller blir allt vanligare. I broprojekt är dock efterfrågan på dessa modeller låg. På WSP i Stockholm används 3D-modelleringprogrammet Tekla Structures i stor utsträckning på flera avdelningar. Önskemål finns om att utöka användningen av programmet även inom broprojektering. För att det ska bli möjligt krävs en större efterfrågan hos företagets kunder. Detta examensarbete har till syfte att ur kundens synvinkel utvärdera Tekla Structures som verktyg samt vilken nytta kunden har av Tekla-modeller. För att kunna belysa ämnet ur detta perspektiv har intervjuer gjorts med olika kunder till WSP. Deras behov och syn på BIM och Tekla Structures i brosammanhang har kartlagts och analyserats. Aspekter som kunden lyft fram i intervjuerna har fungerat som plattform för analys av en 3D-modell som konstruerats med hjälp av Tekla Structures samt två redan projekterade broar, modellerade i samma program. Analysen visar att kundnyttan av att använda Tekla-modeller i broprojekt är stor men för att möjliggöra hantering av modellerna krävs stora insatser. Utvärdering av programvaran visar även dess starka respektive svaga sidor. Resultatet av arbetet redovisas i rapportens följande sidor. / The building industry is going trough a transitional stage, from 2D to 3D. BIM, as a working method, and 3D models are becoming more common. In bridge project however, the demand for 3D models is low. At WSP in Stockholm the 3D modelling program Tekla Structures is widely used in several departments. There is a desire to expand the usage of the program also when it comes to bridge planning. To make that possible a bigger request by the customers is required. The purpose of this thesis is to evaluate Tekla Structure as a tool from a customer perspective and to analyse the customer values by using Tekla models. To shed light on this issue interviews have been made with different customers of WSP. The customers’ needs and their reflections on BIM and Tekla Structures in bridge projects are mapped out and analysed. Aspects reached by the customers have served as a basis for analyse of a 3D model, built up in Tekla Structures, as well as two bridges – already modelled in the same program. The analysis shows that there is a big customer value by using Tekla models in bridge projects, but to enable management models great efforts are required. An evaluation of the software also shows both strengths and weaknesses. In the following pages the result is presented.
53

Neck mobility, Grazing habits, and intraspecific combat behaviour in the Giant Pleistocene horned Turtle Meiolania Platyceps

Jannel, Andréas January 2015 (has links)
Meiolania platyceps is the stratigraphically youngest, and osteologically best-known members of the enigmatic Paleogene-Holocene testudinatan clade Meiolaniidae. This study generated digital reconstructions of intervertebral mobility using the complete cervical series of M. platyceps as a functional model for inferring feeding habits in giant meiolaniid taxa. A combined photogrammetric and CT data approach was used to compile surface meshes for each individual vertebra, which were then scaled, articulated, and animated to visualise maximal movement through segments radiating from the dorsoventral and mediolateral planes. The results show that M. platyceps was incapable of any kind of neck retraction, which is not surprising given the massive skull and prong-like squamosal horns. In addition, impeded dorsal flexibility via the vertebral processes and projecting anterior margin of the carapace suggests that browsing would have been difficult. Indeed, the neck of M. platyceps was best capable of downward mobility allowing the skull to tilt forward. This presumably brought the muzzle into a grazing position and allowed the animal to feed upon low growing herbaceous vegetation, ferns and palm fruits. Because of the insularity and the skull configuration of this aberrant turtle, an intraspecific combat behaviour has also been suggested in the reconstruction of the lifestyle of M. platyceps. / Meiolania platyceps, en stor behornad sköldpadda som levde under Pleistocen, är en av de yngsta och osteologiskt mest välkända medlemmarna av den enigmatiska Paleogen-Holocena gruppen av testudinata sköldpaddor, dit familjen Meiolaniidae hör. Genom att digitalt rekonstruera exemplarets kompletta nacke, inklusive samtliga halsryggens kotor, kunde artens matvanor såväl som dess potentiella stridsbeteende mellan individer inom arten beskrivas. De individuella kotorna fogades samman genom att kombinera fotogrammetri med CT-data, och efter att ha justerat deras respektive storlekar samt artikulerat dem kunde kotornas maximala rörelsevidd animeras såväl dorsoventralt som mediolateralt. Den mjukvaran som användes för detta var framförallt 3D Studio Max, dock i mindre utsträckning även Agisoft Photoscan Geomagic. Resultatet från de 3D-modeller som genererats i denna undersökning stöder hypotesen att M. platyceps saknade förmågan att dra in dess huvud och hals i skalet, vilket inte är helt överraskande med tanke på dess massiva skalle och utstickande squamosala horn. Skillnaden i hur nacken böjs ventralt jämfört med dorsalt tyder dock på att denna sköldpaddas betningstekniker varit desto mer utvecklade, särskilt eftersom vegetationen under denna tid bestod till största delen av palmer. Skallens position och konfiguration hos detta märkliga djur ger ytterligare information om artens beteende, och det verkar som att intraspecifika slagsmål kan ha förekommit hos M. platyceps. / Meiolania platyceps est l’un des derniers et mieux connus membre de l’énigmatique clade des Meiolaniidae de la période du Paléogène-Holocène. Notre étude fut de générer des reconstructions digitales de la mobilité intervertébrale en utilisant la série complète de cervicales de M. platyceps en tant que modèle fonctionnel afin d’inférer le comportement alimentaires du taxon des meiolanides. Une combinaison de données photogrammétriques et de scannes fut utilisée afin de compiler des surfaces en 3D pour chaque vertèbre, mises à l’échelle, articulées et animées afin de visualiser les mouvements optimaux selon les plans dorsoventral et mediolateral. Les résultats montrent nettement que M. platyceps était incapable de rétracter son cou, ce qui n’est pas surprenant considérant sa tête massive et ses impressionnantes cornes. Qui plus est, la flexibilité dorsale, entravée par les apophyses vertébrales et la marge antérieure de la carapace, suggère que le « browsing » aurait été difficile. En effet, le cou de M. platyceps était mieux à même d’une mobilité ventrale permettant au crâne de basculer vers l'avant. Ce qui aurait entraîné le museau dans une position de « grazing » et aurait permis à l’animal de se nourrir de végétation herbacée, de fougères et de fruits de palmiers. En raison de l'insularité et de la configuration du crâne de cette tortue aberrante, un comportement de combat intraspécifique a également été suggéré dans la reconstruction de la vie de M. platyceps.
54

Hinder och åtgärder för ökatanvändning av BIM i byggbranschen / Challenges and actions for increased use of BIM inthe construction industry

Moffed, Shahad, Khayoon, Hiba January 2023 (has links)
The construction industry faces common challenges in managing project information andcommunication, with a lack of communication costing the industry up to 60 billion SEKannually. To address these issues and improve efficiency, the industry has begunimplementing a digital approach, exemplified by Building Information Modelling (BIM). The purpose of this study is to enhance understanding of the use of digital tools (BIM) intoday's construction projects, specifically focusing on the design, construction, andmanagement phases, with an emphasis on Building Information Modelling (BIM). The study aims to specify the difficulties encountered in BIM usage and identify measuresthat can facilitate its implementation in construction projects. These goals are achievedthrough interviewing BIM coordinators, designers, architects, and facility managers,examining their work process and challenges related to the implementation of BIM inconstruction projects. Furthermore, the study analyzes the educational aspect forconstruction technology students. The results indicate that students have different perspectives on BIM, which may be dueto their basic education and lack of experience. It is important for students to obtain amore comprehensive understanding of BIM and the associated digital tools during theireducation to adapt to 3D modeling in their professional lives. The study proposesmeasures to enhance education, providing future professionals with a betterunderstanding of BIM and 3D design. Finally, the results demonstrate that BIM is valuable for the construction industry, withbenefits such as efficiency, cost reduction, and improved collaboration. Currently, 3Dmodeling is the most common level of BIM usage, while the 4D and 5D approaches thatoffer time and cost dimensions are less common. Many stakeholders have not yet fullyutilized BIM's full potential due to lack of knowledge, licenses, and educational needs inthese areas. / Aktörer i byggbranschen står inför gemensamma utmaningar gällande hantering avprojektinformation och kommunikation. Brister på kommunikation kostar byggbranschenupp till 60 miljarder SEK årligen. För att lösa dessa problem och förbättra effektivitetenhar branschen börjat implementera digitala arbetssätt där Byggnads InformationsModellering (BIM) är ett exempel. BIM används för att samla in, samordna ochkommunicera information digitalt genom att koppla information till en gemensam modell, vilket ger möjlighet till att undvika fel och effektivisera processerna inom ett byggprojekt. Syftet med studien är att öka förståelsen för användningen av digitala verktyg inomdagens byggprojekt, under projekterings-, produktions- och förvaltningskedet. Studienavser också att belysa faktorer som påverkar användningen av digitala verktyg, medsärskilt fokus på BIM. Studiens mål är att specificera de svårigheter som uppstår vid användningen av BIM, och att identifiera åtgärder som kan underlätta implementeringen av BIM i byggprojekt. Dessutom undersöks vikten av att integrera digitalisering och BIM i utbildningen avstudenter inom byggteknik. Målet uppfylls genom att intervjua BIM-samordnare, projektörer, konstruktörer, arkitekter och förvaltare, och undersöka deras arbetsprocesseroch utmaningar vid implementeringen av BIM, samt genom att analyserautbildningsaspekten för studenter inom byggteknik. Resultatet visar att studenter inom byggteknik har olika syn på BIM, vilket kan bero påolika grundläggande utbildning och brist på erfarenhet. Det är viktigt att studenternaerhåller en mer omfattande förståelse för BIM och de tillhörande digitala verktygen undersin utbildning för att kunna anpassa sig till 3D-projektering i yrkeslivet. Slutligen visar resultatet att BIM är värdefull för byggbranschen, med fördelar someffektivitet, kostnadsminskning och förbättrat samarbete. Idag är 3D-modellering den vanligaste nivån för användning av BIM, medan arbetssätten 4D och 5D, som erbjudertids- och kostnadsdimensioner, är mindre vanliga. Många aktörer har ännu inte utnyttjatBIMs fulla potential på grund av brist på kunskap och licenser samt att det finnsutbildningsbehov inom just dessa.
55

Jämförelse av punktmoln genererade med terrester laserskanner och drönar-baserad Structure-from-Motion fotogrammetri : En studie om osäkerhet och kvalitet vid detaljmätning och 3D-modellering / Comparison of Point Clouds Generated by Terrestrial Laser Scanning and Structure-from-Motion Photogrammetry with UAVs : A study on uncertainty and quality in detailed measurement and 3D modeling

Nyberg, Emil, Wolski, Alexander January 2024 (has links)
Fotogrammetri är en viktig metod för att skapa 3D-representationer av terräng och strukturer, men utmaningar kvarstår när det gäller noggrannheten på grund av faktorer som bildkvalitet, kamerakalibrering och positionsdata. Användningen av drönare för byggnadsdetaljmätning möjliggör snabb och kostnadseffektiv datainsamling, men noggrannheten kan påverkas av bildkvalitet och skuggning. Avhandlingen syftar till att jämföra noggrannheten och kvaliteten hos punktmoln genererade med två olika tekniker: terrester laserskanning (TLS) och struktur-från-rörelse (SfM) fotogrammetri med drönare. För att testa båda metodernas osäkerhet och noggrannhet vid detaljmätning av bostäder. Genom att utföra mätningar på en villa har data samlats in med både TLS och drönare utrustade med 48 MP kamera, samt georeferering med markstöd (GCP). SfM-punktmoln bearbetades med Agisoft Metashape. Jämförelser gjordes mellan SfM- och TLS-punktmoln avseende täckning, lägesskillnad och lägesosäkerhet. Genom att följa riktlinjer från HMK - Terrester Laserskanning och tillämpa HMK Standardnivå 3 säkerställs hög noggrannhet i mätningarna. Kontroll av lägesosäkerhet av båda punktmolnen resulterade i en lägesosäkerhet som understeg toleranser satta enligt HMK - Terrester laserskanner Standardnivå 3.  Kontrollen av lägesosäkerheten visade att kvadratiska medelfelet(RMSE) i plan och höjd var 0.011m respektive 0.007m för TLS-punktmolnet, och 0.02m respektive 0.015m för drönar-SfM-punktmolnet, vilket låg under toleransen enligt HMK- Terrester Detaljmätning 2021. Resultaten tyder på att Structure-from-Motion fotogrammetri med drönare kan generera punktmoln med god detaljrikedom, inte lika noggrann som med terrester laserskanner på sin lägsta inställning. TLS uppvisade mindre osäkerhet enligt kontrollen av lägesosäkerhet, ungefär en halvering av RMSE i både plan och höjd. I studien framgick det att TLS presterar sämre vid svåråtkomliga ytor med skymd sikt och ogynnsamma infallsvinklar, där effekten blir en lägre punkttäthet för punktmolnet. Vid gynnsamma förhållanden erbjuder TLS en högre noggrannhet och detaljnivå jämfört med SfM punktmoln. Enligt M3C2 punktmoln analys, med TLS punktmolnet som referens, antydde det att SfM punktmolnet genererade största felen vid takfot samt vid buskage. De större felen vid takfot tyder på att SfM presterar sämre gällande detaljnivå och fel vid buskageområdet varierar inte från det som dokumenterats om fotogrammetriska fel vid mappning av vegetation. SfM kan utföra en effektiv datainsamling för större samt svåråtkomliga ytor men kräver lång bearbetningstid med diverse hjälpmedel för att uppnå hög noggrannhet. TLS kräver istället en lång datainsamlingsprocess men kan generera ett detaljerat och noggrant punktmoln direkt utan långa bearbetningsprocesser. Val av metod styrs därmed baserat på specifika projektkrav. Långsiktiga implikationer inkluderar förbättrad effektivitet och säkerhet inom bygg- och anläggningsprojekt, samt potentialen för kostnadsbesparingar och mer detaljerade inspektioner. / Photogrammetry is a crucial method for creating 3D representations of terrain and structures, yet challenges remain regarding accuracy due to factors such as image quality, camera calibration, and positional data. The use of drones for building detail measurements enables rapid and cost-effective data collection, but accuracy can be affected by image quality and shading. This thesis aims to compare the accuracy and quality of point clouds generated using two different techniques: terrestrial laser scanning (TLS) and Structure-from-Motion (SfM) photogrammetry with drones. The objective is to test the uncertainty and accuracy of both methods in residential surveying. Data collection was performed on a villa using both TLS and a drone equipped with a 48 MP camera, along with georeferencing with ground control points (GCP). SfM point clouds were processed with Agisoft Metashape. Comparisons were made between SfM and TLS point clouds in terms of coverage, positional difference, and positional uncertainty. By following guidelines from HMK - Terrester laserskanning 2021 and applying HMK Standard Level 3, high measurement accuracy was ensured. Positional uncertainty checks of both point clouds resulted in positional uncertainty within tolerances set by HMK - Terrestrial Laser Scanning Standard Level 3. The positional uncertainty, with a sample of 41 points showed that the root mean square error (RMSE) in plane and height was 0.011m and 0.007m respectively for the TLS point cloud, and 0.02m and 0.015m for the drone-SfM point cloud, both within the tolerance according to HMK - Terrestrial Detail Measurement 2021. The results suggest that Structure-from-Motion photogrammetry with drones can generate point clouds with good detail, although not as accurate as terrestrial laser scanning at its lowest setting. TLS showed less uncertainty according to the positional uncertainty check, with approximately half the RMSE in both plan and height. The study found that TLS performs worse on difficult-to-access surfaces with obstructed views and unfavorable angles, resulting in lower point cloud density. Under favorable conditions, TLS offers higher accuracy and detail compared to SfM point clouds. According to M3C2 point cloud analysis, using the TLS point cloud as a reference, SfM point clouds showed the largest errors at eaves and shrubbery. The larger errors at eaves indicate that SfM performs worse in terms of detail level, and errors in the shrubbery area are consistent with documented photogrammetric errors in vegetation mapping. SfM can effectively collect data for larger and difficult-to-access areas but requires extensive processing time with various aids to achieve high accuracy. Conversely, TLS requires a long data collection process but can generate a detailed and accurate point cloud directly without lengthy processing. The choice of method thus depends on specific project requirements. Long-term implications include improved efficiency and safety in construction and infrastructure projects, as well as potential cost savings and more detailed inspections.

Page generated in 0.0685 seconds