• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 19
  • 1
  • Tagged with
  • 20
  • 20
  • 14
  • 12
  • 11
  • 10
  • 8
  • 7
  • 6
  • 6
  • 6
  • 5
  • 5
  • 4
  • 4
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Modellering av krökta vangstycken iTekla Structures

Svensson, Lisa, Thurén, Josefine January 2017 (has links)
I detta examensarbete har en studie utförts för att ta fram och jämföra metoder att modellera krökta vangstycken av stål med komplexa geometrier i programmet Tekla Structures. Avgränsningen för studien har varit att jämföra två metoder: Metod 1 använder verktygen Complex Polybeam Creation i kombination med Surface Generation Between Polybeams i Tekla, och Metod 2 trappverktyget Spiral Staircase. En vindeltrappa från projektet Patienten och Princeton, Sankt Eriks ögonsjukhus i Hagastaden, har använts för att testa de komplexa geometrier som denna vindeltrappa medför. Utifrån detta har Tutorials av de båda metoderna skapats, för att läsaren enkelt ska kunna följa och genomföra samma steg. Resultatet av examensarbetet är att båda metoderna fungerar för modellering, beroende på vilken typ av geometri som skapas. Efter modellering med trappverktyget Spiral Staircase gick det inte att ta fram korrekta tillverkningsritningar av de horisontella plåtarna, till skillnad från Metod 1. Slutsatsen av studien är att vid enbart snabb modellering av cirkulära geometrier samt framtagning av tillverkningsritningar för vertikala krökta plåtar, kan med fördel Metod 2 användas. Däremot vid framtagning av tillverkningsritningar av komplexa och icke cirkulära geometrier lämpar sig Metod 1 bäst. / In this thesis, a study has been conducted to develop and compare methods of modeling curved stringer made of steel with complex geometries in the Tekla Structures program. The delimitation of the study has been to compare two methods: Method 1 uses the Complex Polybeam Creation tools in combination with Surface Generation Between Polybeams in Tekla, and Method 2 uses the tool Spiral Staircase. A spiral staircase from the project Patienten and Princeton, Sankt Eriks Eye Hospital in Hagastaden, Stockholm, has been used to test the complex geometries that this spiral staircase entails. Based on this, Tutorials of the two methods have been created, so that the reader can easily follow and implement the same steps. The result of this thesis is that both methods work for modeling, depending on the type of geometry that is created. After modeling with the tool Spiral Staircase, correct manufacturing drawings of the horizontal plates could not be obtained, unlike Method 1. The conclusion of the study is that with only rapid modeling of circular geometries as well as production of manufacturing drawings for vertical curved plates, Method 2 can be used with advantage. However, in the production of manufacturing drawings of complex and non-circular geometries, Method 1 is best suited.
2

BIM jämfört med 2D-CAD vid projektering : En jämförelse mellan Tekla Structures och   traditionell 2D-CAD vid projektering av grundkonstruktioner

Vengelin, Alexander, Dolovac, Demir January 2018 (has links)
I denna studie jämförs BIM-programmet Tekla Structures med   traditionell 2D-CAD vid projektering av grundläggningen till två olika flerbostadshus.   I de två olika projekten, projekt Årevägen och projekt Bergbanan användes   2D-CAD när ritningsunderlag och armeringsförteckningar skapades. I denna   studie skapas samma underlag istället med hjälp av BIM och programmet Tekla   Structures. Studien bygger på ritningsunderlag, armeringsförteckningar och en   sammanställning över antal timmar som spenderats vid projekteringen av   grundläggningen i de två olika projekten. Syftet med studien är att undersöka   förbättringsmöjligheter i projekteringsfasen vid användning av BIM-program   jämfört med traditionella 2D-CAD-program. Resultatet ska visa var nytta i   form av tidsvinster kan finnas under projekteringsfasen. Studiens   tillvägagångssätt bygger på kvantitativ metodik och variabler som studeras är   tidsvinst eller tidsförlust i timmar. Studien avgränsades till enbart   grundläggningen i de båda projekten och ingen hänsyn tas till ekonomiska   konsekvenser eller hur andra aktörer i projekten påverkas av de   tidsskillnader som uppstår. I studien undersöks den tidsskillnad som uppstår   vid upprättande av konstruktionsritningar för grundläggningen i respektive   projekt, den tidsskillnad som uppstår vid revidering konstruktionsritningarna   och den tidsskillnad som uppstår vid upprättande och revidering av   armeringsförteckningarna. Studiens resultat visar att det tidigt i   projekteringsfasen krävs mer tid och resurser när BIM används jämfört med   2D-CAD. Detta resultat avspeglas även i tidigare studier på området.   Tidsvinsterna med BIM uppstår istället under projekteringens senare del när   ritningsunderlaget ska revideras. Även vid upprättande och revidering av   armeringsförteckningarna i de båda projekten uppstod tidsvinster vid   användande av BIM. Resultatet leder till slutsatsen att BIM och traditionell   2D-CAD bör jämföras utifrån ett helhetsperspektiv. BIM är 3D-modellering men   representerar också ett sätt att skapa och bearbeta information. Den stora fördelen   med BIM är   informationen som lagras i BIM-modellen och på   vilket sätt   informationen sedan kan utnyttjas. Slutligen menar vi att BIM visar stor   potential att effektivisera projekteringsfasen. Nyckeln till tidsvinster är   att nyttja all den information som kan knytas till en BIM-modell på ett   effektivt sätt. / In this study, the BIM-compatible program Tekla Structures is compared   with traditional 2D-CAD when designing the foundation for two different   construction projects. In the two different projects, Årevägen and project   Bergbanan, 2D-CAD was used when drawings and reinforcement lists were   created. In this study, the same drawings and reinforcement lists were   created instead using BIM and Tekla Structures. The study is based on   drawings, reinforcement lists and a summary of the number of hours spent in   the design of the foundation in the two different projects. The purpose of   the study is to investigate improvement opportunities in the design phase   when using BIM programs compared to traditional 2D CAD programs. The results will show if benefits, in terms of time gains may exist   during the design phase. The study approach is based on quantitative   methodology and the variables studied were time gained or time lost in hours.   The study was limited to the foundation only in the two projects, and no   account is taken of financial consequences or how other participants in the   projects are affected by the time differences that occur. The study examines   the time difference that appears when drawing up construction drawings for   the foundation of each project, the time difference that appears in the   revision of the drawings and also the time difference that appears when   establishing and revising the reinforcement lists. The study's results show   that early in the design phase, more time and resources are needed when BIM   is used in comparison with 2D CAD. This result is also reflected in previous   studies in the field, the benefits in terms of time savings with BIM instead   occur during the later part of the design phase when the drawings are to be   revised. When establishing and revising the reinforcement lists in both   projects, time gains appears when using BIM. The result leads to the   conclusion that BIM and traditional 2D CAD should be compared from an overall   perspective. BIM is 3D modeling but also represents a way to create and   process information, and the major advantage of BIM is the information stored   in the BIM model and how the information can then be used. Finally, we   conclude that BIM shows great potential for streamlining the design phase, in   addition, the key to time gains is to utilize all the information that can be   linked to a BIM model effectively. / <p>Betyg 2018-06-05</p>
3

Jämförelse mellan BIM­­-verktygen Revit Structure och Tekla Structures

Isaksson, Jonas, Werborg, Mathias January 2011 (has links)
No description available.
4

Optimering av fackverksmodellering : Ett makro för Tekla Structures

Josefsson, Oscar, Hagström, Dan January 2013 (has links)
This project is the result of a cooperation between HalmstadUniversity and EABAB. The aim of the project was to create a macro that would help EABAB automate the process of designing steel trusses. When run in Microsoft Excel, the macro imports and processes coordinates from a calculator program. The data is then imported into the Building Information Modelling software Tekla Structures, which creates a 3D structural model of the steel truss. The macro saves much time in the project planning process and also helps minimize the risk of design flaws caused by human error.
5

Automatiserad projektering av gång- och cykelbro- med parameterstyrd dimensionering via Grasshopper / Design Automation of Pedestrial Bridge - Using Parametric Design through Grasshopper

Fintling, Nils, Ling, Johan January 2018 (has links)
En projekteringsprocess av en konstruktion kan ofta delas in i två delar, dimensionering ochprojektering. Dimensioneringen utförs enligt för konstruktionen gällande normkrav ochprojekteringen följer sina egna normer samt den dimensionering som är utförd.Även om 2D-projektering fortfarande är vanligt förekommande i projekteringen har BIMmodelleringblivit allt vanligare och värdet av att lagra information i en modell ses alltmersom en nytta i ett projekt.BIM-modelleringen bygger på parameterstyrning av objekt och egentligen finns inga gränserför vilka parametrar som ska ingå i ett objekt.En av de senaste utvecklingarna i projekteringsprocessen är den visuella programmeringensom ger användare möjlighet att styra parametrar till en BIM-modell med hjälp av ett visuelltskript kopplat till BIM-modelleringsverktyget.Det här arbetet syftar på att visa hur ett skript kan driva modelleringen med hjälp avprojektspecifika indata genom att dimensionering av objekt integreras i programmeringen.Med hjälp av programmeringen kan även dimensioneringen redovisas i en annanprogramvara.Resultatet visar att det är fullt möjligt att skapa en modell med hjälp av objektspecifika indataoch att parametrar kan styras med integrerad dimensionering i ett skript skapat med visuellprogrammering. / A design process of a construction can often be divided into two parts, structural design anddrawing. The structural design is made with current standard requirements for theconstruction while the drawing has its own standard requirements along with the results fromthe dimensioning to follow.Even if 2D- drawing still is common in design of a project, BIM-modelling has become morefrequently used and the value of storing information in a model is see more and more as abenefit in a project.The BIM-modelling is based on parametric design of objects and there are actually no limitsto which parameters that should be a part of an object.One of the most recent developments in the design process is the visual programming whichgives users the opportunity to guide parameters in a BIM-model through a visual scriptconnected to the BIM-modelling tool.This work is aiming to show how a script can push the modelling by using project specificinput and perform structural design of load bearing members integrated in the script. With theuse of the script, results can also be verified in another software.Result is showing that it is possible to create a structurally designed model by using only afew object specific inputs and that parameters can be controlled in a script made with visualprogramming.
6

En modern projekteringsprocess : Utveckling av en effektiv arbetsmetod för konstruktörer vid projektering med BIM-verktyg / A modern structural design process : Development of an effective work method for structural engineers during the design process with BIM-tools

Andersson, Dennis, Wirenstrand, Martin January 2013 (has links)
Utvecklingen av BIM har senaste åren tagit fart och många länder, inklusive Sverige har bland annat påbörjat en process mot gemensam struktur inom byggsektorn genom att standardisera informationshantering och processer (Nilsson, 2013). Denna utveckling innebär nya möjligheter för aktörerna i byggprocessen men också problematik då denna intensiva IT-utveckling möter en till synes konservativ bransch (Statskontoret, 2009:6). Syftet med föreliggande examensarbete är att utforma en moderniserad arbetsmetod för konstruktören som integrerar dennes BIM-verktyg i projekteringsprocessen. En förståelse för hur konstruktörens arbete ser ut idag skall utrönas, samt vilka möjligheter och svårigheter som denna aktör upplever. Det som framkom i studien var att trots den intensiva utvecklingen av BIM som varit de senaste åren tillämpas fortfarande traditionella processer, då förståelse för en mer omfattande inledande arbetsinsats ännu inte riktigt finns. Ökade krav ställs också på konstruktörens byggtekniska kompetens då det är svårare att “fuska” i objektbaserade modeller. Den kvalitativa studien påvisade ett konservativt synsätt där utvecklingen av konstruktörens roll med hjälp av exempelvis färdiga komponenter från olika leverantörer i Tekla Structures sågs snarare som problematisk än fördelaktig. Det framkom även att vikten bör ligga på samordning i projekten, där mer än krocktester borde tas i beaktning och att granskning borde ske i ett tidigare skede samt utföras mer kontinuerligt. I den praktiska tillämpningen av Tekla Structures upptäcktes också flera möjligheter till granskning och samordning av ett projekt. Det behov av standardiserad BIM som konkretiserades i teoriavsnittet bekräftades också av respondenterna i form av önskan om en gemensam struktur i modellerna. Examensarbetet resulterade i en arbetsmodell för hur konstruktören bör arbeta vid BIM-projektering och vilka förutsättningar som efterfrågas för att möjliggöra detta arbetssätt. En viktig del i detta är att definiera ett väl strukturerat och tydligt arbetssätt som uppnås genom klara mål. Centralt för varje BIM-projekt är att utse en BIM-samordnare var uppgift är att följa upp arbetet mot de satta målen och säkerställer en enhetlig projektering bland projektörerna. BIM erfordrar en helhetsförståelse vid projektering för att tillgodose de nya krav som ställs. / The development of BIM has in recent years gained momentum and many countries, including Sweden, have begun a process towards common structure in the sector of construction by standardizing information and processes (Nilsson, 2013). This development provides new opportunities for participants in the process of construction but also problems when the intensive IT- development meets a seemingly conservative industry (Statskontoret, 2009:6). The aim of this thesis is to design a modernized working process for the structural engineer that integrates BIM tools in the design process. An understanding of how the constructional engineer's work looks today is determined, and the possibilities and difficulties that the designer is experiencing. The findings in this study were that, despite the intensive development of BIM in recent years traditional processes are still applied, since an understanding of a higher initial effort does not yet exist. Increased demands are also put on the structural engineer's technical competence in structural engineering since it´s harder to "cheat" in the object-based models. The qualitative study demonstrated a conservative approach where the development of the structural engineer's role by means such as finished components from different vendors in Tekla Structures was seen as more problematic than beneficial. It also emerged that the most effort should be in the coordination of the project, in which more than clash detector tests should be taken into consideration and that the review should take place at an earlier stage and performed more consistently. In the practical use of Tekla Structures several opportunities to review and coordinate a project was found. The need for standardized BIM as concretized in the theory section was also confirmed by the respondents in terms of the desire for a common structure in the models. The work resulted in a working model for how the structural engineer should work with BIM and the conditions requested to allow this approach. An important part of this is to define a well-structured and clear way of working that is achieved through clear goals. Central to each BIM project is to appoint a BIM Coordinator whose task is following up the work towards the defined goals and ensuring united design among the workers. BIM requires a comprehensive understanding of the design to meet the new requirements.
7

Automatisering av LCA - och LCC - beräkningar för anläggningskonstruktioner : Ett verktyg för hänsynstagande av miljö och kostnad i tidigt projekteringsskede / Automation of LCA and LCC calculations for civil works

Linder, Andreas, Lundberg, Emil January 2019 (has links)
Vid projektering av ett byggnadsverk är det viktigt att ta hänsyn till miljöpåverkan och kostnader under hela konstruktionens livslängd. Detta görs genom så kallade livscykelanalyser (LCA) och livscykelkostnadsanalyser (LCC-analys). En LCA berör miljöaspekter och potentiell miljöpåverkan genom en produkts hela livscykel d.v.s. ”från vaggan till graven”. I en LCC-analys summeras investeringskostnad samt kostnader för drift och underhåll under produktens livslängd. BIM 3D-modelleringsverktyg används för att modellera flertal olika byggkonstruktioner. Det optimala vore om det gick att utnyttja de kraftfulla BIM-verktygen tillfullo och kunna använda den information som redan finns i modellerna för att utföra LCA och LCC-analyser. Önskvärt vore om det även gick att koppla till företagsinterna moduler, t.ex. i detta projekt Trafikverkets Klimatkalkyl (ett verktyg som baseras på den vedertagna metoden för LCA). Syftet med examensarbetet är att integrera kostnad och miljöpåverkan i tidigt projekteringsskede genom automatisering av koppling mellan BIM-program och LCA-/LCC-verktyg. Genom automatisering av denna process kan optimering av konstruktioner effektiviseras. Ett Excelark har skapats genom programmering i Visual Basic for Applications (VBA) som hämtar materialmängder från antingen Tekla Structures, Excel eller genom manuell inmatning och sedan generar LCA- och LCC-rapporter. Dessa har sedan jämförts med tidigare genomförda LCA och LCCanalyser för att säkerställa utfallets reliabilitet. Resultatet av arbetet visar att framtagna LCA- och LCC-rapporter kan bidra till en effektivare projekteringsprocess för optimering av konstruktioner med hänsyn till miljö och kostnad. Excelarkets användarvänliga uppbyggnad gör det möjligt för personer med begränsad kunskap inom LCA och LCC att göra mer hållbara val vid projektering av en konstruktion. Detta bidrar till att främja hållbarhetstänk i företag och uppmuntrar anställda att arbeta mot ett gemensamt mål om en koldioxidneutral infrastruktursektor. / While carrying out structural design work, it is important to take into consideration the environmental impacts and costs throughout the life time of the structure. This is done through life cycle assessment (LCA) and life cycle cost analysis (LCC analysis), respectively. LCA addresses the environmental aspects and potential environmental impacts throughout a product’s life cycle i.e. from cradle to grave. An LCC analysis summarizes the investment cost and costs for operation and maintenance during the life time of the product. BIM 3D modeling tool are used for modeling several different types of buildings and civil works. Ideally, digital information readily available through these powerful BIM tools, should be reused to perform LCA and LCC analyses. It would also be beneficial if it was possible to connect it to a company’s internal systems for instance in this study, the Swedish Transport Administration's “Klimatkalkyl” (a tool based on the method for LCA). The purpose of the thesis project is to integrate cost and environmental impact into the early design phase through an automated connection between BIM programs and LCA / LCC tools. By automating this process, optimization of structures can be made more efficient. An Excel sheet has been created through programming in Visual Basic for Applications (VBA) which retrieves quantities from either Tekla Structures, Excel or manual input and then generates LCA and LCC reports. These have then been compared with existing LCA and LCC analyses to ensure the program's quality. The result of the work shows that produced LCA and LCC reports can contribute to a more efficient structural design process for optimizing structures regarding environmental impacts and investment cost. The Excel sheet's user-friendly structure also enables people with limited knowledge in LCA and LCC to make more sustainable choices when undertaking structural design tasks. This helps to promote sustainable thinking in companies and encourages employees to work towards a common goal of a carbon-neutral infrastructure sector.
8

En granskning av IFC-exporter från Tekla Structures / An examination of IFC-exports from Tekla Structures

Sanna, Karemsijan, Kasabian, Maral January 2019 (has links)
Idag tillämpas BIM (Building Information Modeling) som ett ledande verktyg inom byggprojektering och möjliggör lösningar som är hållbara och optimerade mellan olika discipliner för att effektivt hantera informationsflöden. Vid överföring av data mellan programvaror används ett neutralt filformat, IFC (Industry Foundation Classes). Detta filformat exporteras från 3Dmodelleringsprogrammet Tekla Structures. Syftet med detta examensarbete är att granska orsaken till saknad information vid IFC-export från Tekla Structures. Studien innefattar en fallstudie, komparativ studie samt intervjuer. I fallstudien studeras inställningarna för en IFC-export från en komplex modell i Tekla Structures. Den komparativa studien berör två samordningsprogram Solibri Model Checker och Navisworks Manage, som sedan ställs mot varandra. Det som undersöks är hur IFC-filer lämpar sig i samordningsprogrammen. Intervjuerna har legat till grund och har gett tydliga riktlinjer under arbetets gång. Resultatet av denna studie tyder på att orsakerna kring saknad information i IFC-filer är den mänskliga faktorn och bristande kunskaper av inställningarna i en IFC-export. Ytterligare resultat är jämförelsen mellan samordningsprogrammen som visar att båda är lämpade för IFC-formatet. Genom den komparativa studien har det visat att Solibri lämpar sig bättre för IFC-exporter från Tekla Structures. Med hänsyn till examensarbetets resultat är den mänskliga faktorn avgörande för informationsförluster. Den mänskliga faktorn utgör att det råder bristande kommunikation samt bristande kunskap om IFC-exporter. / Today, BIM (Building Information Modeling) is applied as a leading tool in structural design and modeling and enables solutions that are sustainable and optimized between different disciplines to effectively manage information flows. In connection with transfers between software’s a neutral file format, IFC (Industry Foundation Classes), is used. This file format is exported from the 3D-modeling program Tekla Structures. The purpose of this thesis is to examine the reason for missing information on IFC exports from Tekla Structures. The study includes a case study, comparative study and interviews In the case study, the settings for an IFC- export are studied from a complex 3D- model in Tekla Structures. The comparative study concerns two coordination programs Solibri Model Checker and Navisworks Manage, which are compared against each other. What is examined is how IFC- files are suitable in the coordination programs. The interviews have given clear guidelines during the work. The results indicate that the causes of missing information in IFC -files are the human factor and the lack of knowledge of the settings of an IFC- export. Additional to the results that was achieved are the comparison between the coordination programs shows that both programs are suitable for the IFCformat. The difference between the coordination programs is how one of them signalized the format better than the other Regarding the results, the human factor is crucial for the information loss. The human factor has shown that the lack of communication and knowledge of IFC- exports is a reason for the information loss. Through the comparative study, it has also been shown that Solibri is better suited for IFCexports from Tekla Structures.
9

En jämförelse mellan Tekla Structures och Civil 3D i krökta betongkonstruktioner / A comparison between Tekla Structures and Civil 3D in curved concrete structures

Abdali, Yasser, Holm, Lovisa January 2017 (has links)
Inom byggbranschen talas det idag mycket om BIM (Building Information Modelling). Det finns ettbehov av att komma ifrån skräddarsydda 2D-ritningar och istället använda sig av informationsrika 3Dmodellersom brukas genom hela konstruktionens livscykel. Denna utveckling har länge pågått inomhuskonstruktion, men i anläggningssektorn är detta arbetssätt svårare att implementera.Svårigheten att få in ett mer BIM-orienterat arbetssätt inom anläggning beror dels på att mångaprogramvaror inte är tillräckligt utvecklade för att kunna skapa informationsrika och tillförlitligamodeller av konstruktioner med komplexa geometrier, så som broar.I takt med att Trafikverket, som är den största beställaren i Sverige, börjar ställa krav på 3D måstebåde tekniken och människans arbetssätt utvecklas.Syftet med detta examensarbete är att genom en fallstudie undersöka hur lämpade programmen TeklaStructures och AutoCAD Civil 3D är för att utföra en 3D-modell av en dubbelkrökt bro. Programmenställs sedan mot varandra i en avslutande jämförelse där fördelar och nackdelar presenteras.Studien har gjort det tydligt att BIM inte bara handlar om att skapa en informationsrik modell, utan omett arbetssätt som helt och hållet förändrar byggsektorn till att arbeta mer samordnat och effektivt.Jämförelsen mellan de två berörda programvarorna i denna studie visar att de båda har styrkor ochsvagheter men att båda lämpar sig bra för vårt ändamål. Dock skiljer de sig åt i detaljeringsgrad ochhur bra förmåga de har att vara till hjälp för att arbeta med BIM i större utsträckning. / Within the construction industry, there is a lot of discussion around BIM (Building InformationModelling). There is a need to move away from customized 2D-drawings and instead focus oninformative models which can be used throughout the whole cycle of construction. This developmenthas been ongoing within house construction, but this approach is harder to implement within thefacility sector.The difficulty in implementing a more BIM-oriented approach within construction is partly due tosoftware currently not being fully developed to create informative and reliable models of constructionswith complex geometries, such as bridges.Since Trafikverket, the largest construction developer within Sweden, has started to place a largerdemand on 3D there is a need for both technology and human resource to develop.The aim of this dissertation is to present a case study investigating the suitability of the software TeklaStructure and AutoCAD Civil 3D to perform a 3D-model of a double-curved bridge. The two pieces ofsoftware will be contrasted in a final comparison whereby both pros and cons will be presented.The study has made it clear that BIM is not just about creating an informative model, but it is alsoabout an approach which has the ability to completely change the construction sector to work morecollaboratively and effectively.The comparison between the two relevant software in this study shows that they both have strengthsand weaknesses and are suitable for our purpose. However, they differ in how detailed models theycan create and how well they have the ability to work with BIM to a greater extent.
10

Parametriserad projektering av plattrambroar : Koppling mellan Rhinoceros och Grasshopper / Parametric design of slab frame bridges : Connection between Rhinoceros and Grasshopper

Saliba, Johannes, Özkanat, Merve January 2020 (has links)
Det här projektet syftade till att studera och införa ett skript för parametriserad modellering av en bro i programmen Rhinoceros och Grasshopper. Skriptet skapades genom visuella programmeringskomponenter och brokonstruktionen som modellerades i detta projekt var en plattrambro. Parametrisk design är ett verktyg som skapar modeller med hjälp av olika förutsättningar kallade parametrar. Dessa parametrar kan ändras direkt i programmen som även ändrar modellen. Detta underlättar redigeringsprocessen av modeller i projekt samt gör det möjligt för flera variationer av samma konstruktionstyp att hanteras i ett och samma skript. I detta projekt användes även Tekla Structures vilket är ett kraftfullt BIM-verktyg som klarar av att modellera och räkna på hus- och anläggningskonstruktioner. Rhinoceros-Grasshopper kopplas till Tekla med programmets eget plug-in, kallad Tekla live-link. Ett flertal intervjuer har genomförts med experter inom området för input om hur programmen används idag, inom de olika byggföretagen, samt hur långt modellering med parametrar har kommit. Resultatet av detta examensarbete visar att parametriserad modellering främst är användbart vid redigeringar av modeller. Den modellerade konstruktionen programmeras på ett sätt där alla dess ingående delar hänger ihop. Då kan redigeringar på specifika delar göras utan att behöva ändra/modellera de resterande delarna på nytt. Detta gör att mindre arbete behöver läggas på redigeringar. Vid projekt med mindre konstruktioner eller enkla geometrier är program som Tekla ett snabbare och smidigare verktyg än Rhinoceros då programmering av skript kan ta mycket tid. Arbetet som har genomförts i detta examensarbete visar dock att det kan vara lämpligt att använda parametriserad modellering vid projekt med större eller mer komplicerade konstruktioner. / The purpose of this thesis was to study and implement a script for a parametric modelling of a bridge in Rhinoceros 3D Grasshopper. The script was done with visualized programming components and the structure was a slab frame bridge. Parametric design is a tool that create models with the use of different prerequisites called parameters. These parameters can be changed directly in the script which in turn changes the model. This makes the editing process of the model easier and allows for greater variations of the same structure to be handled within the same script. In this project, Tekla Structures was used which is a powerful BIM tool that can be used for design and analyses of various structures. Rhinoceros Grasshopper was connected to Tekla Structures with their own plugin, called Tekla live link. Several interviews have been conducted with experts and experienced people in the subject for input on how the programs are used today in the building branch as well as how far parametric design has come. The results of this thesis shows that parametric design is useful mostly when it comes to redactions of an already existing model. The designed structures are programmed in such a way that all their different components are connected. This allows for edits and redactions to be made on one specific component without having to change or redesign the rest. This saves time during the designing part of a project. Although, when it comes to smaller scaled projects or structures with simple geometries,using programs such as Tekla Structures is still faster and easier as opposed to using Rhinoceros Grasshopper. This is because programming and creating a script can take a lot of time and is very complicated at times. However, the result of this thesis shows that it could be wise to use parametric programming when it comes to larger projects and/or more complicated structures.

Page generated in 0.0642 seconds