• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 296
  • 2
  • Tagged with
  • 299
  • 299
  • 299
  • 260
  • 137
  • 125
  • 79
  • 59
  • 52
  • 52
  • 49
  • 49
  • 42
  • 26
  • 25
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
111

Contribuição para o desenvolvimento de compósito cimento-madeira com materiais da região amazônica / Contribution for the cement-wood development composite with materials of the Amazon region

FONSECA, Fábio de Oliveira 06 1900 (has links)
Made available in DSpace on 2011-03-23T21:19:38Z (GMT). No. of bitstreams: 0 / Item created via OAI harvest from source: http://www.bdtd.ufpa.br/tde_oai/oai2.php on 2011-03-23T21:19:38Z (GMT). Item's OAI Record identifier: oai:bdtd.ufpa.br:280 / CAPES - Coordenação de Aperfeiçoamento de Pessoal de Nível Superior / This work intends to propose an application for tropical wood waste from wood industry as saw dust; from the region of Belem, in the fabrication of wood-cement composite. Due to the natural chemical incompatibility between wood and cement, this procedure results in a set retarding effect, with wood specie depending intensity. This by-effect can be beaten by using a procedure like additives, wood mineralization, accelerated carbonation and others. Analysis were made with axial compression strength at 28 days age data, for mortars made with 2, 3.5 and 5% wood content in mass; using cements type CP I and CP II; with and without Calcium Clorets-based set accelerator additive. Then, obtained data were statistically analyzed for evaluation on wood content and additive use over mechanical resistance. Most of existing researches uses reforesting species, being the tropical ones almost never studied. So, this work represents a pioneer effort in developing a cement-bonded wood composite with our regionally available materials and residues. / Este trabalho objetiva contribuir para a aplicação do resíduo do tecido lenhoso de espécies vegetais tropicais, na forma de serragem, proveniente da indústria madeireira do estado do Pará; da região metropolitana de Belém em particular; para a fabricação de compósito madeira-cimento. Devido à natural incompatibilidade química entre a madeira e o cimento, este procedimento resulta em um retardamento de pega, de intensidade dependente da espécie vegetal utilizada. Este efeito pode ser combatido com diversos processos, como por exemplo, a aditivação da mistura com aceleradores de pega, a mineralização da madeira, a carbonatação acelerada, dentre outros. As análises foram feitas a partir da resistência à compressão aos 28 dias para argamassas produzidas com teores de madeira de 2, 3,5 e 5% em massa; com cimento CP I e CP II, e ainda com e sem o uso de aditivo acelerador de pega a base de cloreto de cálcio. Assim sendo, os resultados obtidos foram analisados estatisticamente para que a influência do teor de madeira e da aditivação à base de cloreto de cálcio na resistência à compressão fosse avaliada. A maioria dos trabalhos existentes utiliza espécies de clima temperado, e de reflorestamento; pouco tendo sido avaliado para espécies de clima tropical. Neste sentido, o presente trabalho representa um esforço pioneiro no desenvolvimento de compósitos madeira-cimento para os materiais e resíduos disponíveis na região Amazônica.
112

Identificação dos fatores para o processo de formação e gestão de alianças estratégicas do tipo consórcio em pequenas e médias empresas construtoras: um estudo de caso / Identification of the factors for the formation process and management of strategical alliances of the small type trust in e average construction companies: a case study

SÁ, José Alberto Silva de 26 February 2004 (has links)
Made available in DSpace on 2011-03-23T21:19:39Z (GMT). No. of bitstreams: 0 / Item created via OAI harvest from source: http://www.bdtd.ufpa.br/tde_oai/oai2.php on 2011-03-23T21:19:39Z (GMT). Item's OAI Record identifier: oai:bdtd.ufpa.br:291 / A study done in societys consortium composed by small and medium building companies to execute sanitation works in the Marajó Island PA. The objective of the work is identifying factors for the formation and administration process of strategic alliances, consortium type. The research had descriptive characteristic, with synchronous perspective and organizational analysis level. It looked for describe and interpret analytics and politics considerations related to the phenomenon in question. Half-structured interviews were applied in the data collect and was used the content analysis method in the treatment of the information. The research allowed identifying a group of factors, amongst them: the complementarily perspective, the desire of the business qualification, the capacity to generate market opening, the organizational learning, the study of the strategically combination, the joint deliberation, the equality of the property and the conciliation of the business vision. / Estudo realizado em um consórcio de sociedades formado por pequenas e médias empresas construtoras para executar obras de saneamento na ilha do Marajó PA. O trabalho objetivou identificar fatores para o processo de formação e gestão de alianças estratégicas do tipo consórcio. A pesquisa teve caráter descritivo, com perspectiva sincrônica e nível de análise organizacional. Buscou descrever e interpretar as considerações analíticas e políticas relacionadas ao fenômeno em questão. Foram aplicadas entrevistas semi-estruturadas na coleta dos dados e utilizou-se o método de análise do conteúdo no tratamento das informações. A pesquisa permitiu identificar um conjunto de fatores, dentre eles: a perspectiva de complementaridade, o desejo da qualificação empresarial, a capacidade de gerar abertura de mercado, a aprendizagem organizacional, o estudo da combinação estratégica, a deliberação conjunta, a igualdade da propriedade e a conciliação das visões empresariais.
113

A manutenção do equilíbrio econômico de contratos de obras públicas empreitadas: parâmetros para o estudo de riscos vinculados a atrasos no encaixe do preço / The maintenance of the economic contract balance of public works you take over on a contract basis: parameters for the study of entailed risks the delays in the rabbet of the price

MATTOS, Renato Marinho Meira 12 January 2004 (has links)
Made available in DSpace on 2011-03-23T21:19:40Z (GMT). No. of bitstreams: 0 / Item created via OAI harvest from source: http://www.bdtd.ufpa.br/tde_oai/oai2.php on 2011-03-23T21:19:40Z (GMT). Item's OAI Record identifier: oai:bdtd.ufpa.br:307 / In the Civil Engineering field, one of the most important segments is the global piecework, the one that is made by an agreement and by the right and total price. Public works, that are meant to attend a public utility, and whose contracts are ruled by the 8.666/93 Law, are often bided this way. Article 58 of this Law determines that the economic-financial balance of these contracts must be kept. The theoric fundamentation concerns of public works concepts, the most important aspects of 8.666/93 Law, economic-financial analysis and risks analysis. This paper presents, also, a systematic and numeric simulation to piecework undertaking im Civil Engineering field. The goal of this paper is to create parameters for the establishment of protection margins for due-date extension, and respective price receiving, as determined by 8.666/93 Law, thus keeping the original balance. Based on 63 analyzed construction works, the economic-financial balance is verified, comparing the expected restricted return rate at the bidding moment, with the one that was actually obtained in the operation. From the deviation detected in the return rates between those two different moments, parameters for covering the referred risks are created by a simulation process and sensibility analysis. First, at the bidding moment, the restrict return mean rate is 9,45% a month. At the second moment, this rate falls to 5,16% a month. It represents, in mean, 45,39% of variation. The atractive mean rate based on the analysed public construction works is between 6% to 13% a month. The calculated parameters for due-date extension and respective price receiving is between 1,5% to 11,5% of price. Therefore, in the analysed public works, dont exist the economic-finacial maintaining balance. / Dentre os diversos segmentos do Setor da Construção Civil, um dos principais é o de obras por empreitada global, que são aquelas contratadas por preço certo e total. As obras públicas, que têm como finalidade atender a uma utilidade pública e cujos contratos são regidos pela Lei 8.666/93, são geralmente contratadas sob esse regime de execução. O artigo 58 desta Lei determina que deva ser mantido o equilíbrio econômicofinanceiro dos contratos celebrados com o Poder Público. A fundamentação teórica trata dos conceitos de obras públicas, dos principais aspectos da Lei 8.666/93, de análise econômico-financeira e de análise de riscos. Este trabalho apresenta também uma sistemática e uma simulação numérica para formação de preços para obras empreitadas de Construção Civil. O objetivo geral deste trabalho é a criação de parâmetros para o estabelecimento de margens de proteção para a dilatação do prazo e respectivos encaixes de preços, visando, como determina a Lei 8.666/93, a manutenção do equilíbrio original. Com base na análise dos resultados de 63 obras, verifica-se a manutenção do equilíbrio econômico-financeiro, comparando-se a taxa de retorno restrita esperada pelas empresas no momento das licitações com a realmente alcançada na operação. A partir dos desvios detectados nas taxas de retorno nesses dois momentos, cria-se, pelo processo de simulação e análise de sensibilidade, parâmetros para cobertura dos referidos riscos. No momento da licitação, a taxa de retorno restrita média das obras analisadas é de 9,45% ao mês. No segundo momento, essa taxa cai para em média para 5,16% ao mês. Isto representa, em média, uma variação de 45,39%. A taxa média de atratividade das obras públicas analisadas está dentro do intervalo de 6% a 13% ao mês. Como parâmetro de cobertura de riscos quanto aos desvios de prazo e encaixe do preço, tem-se o intervalo de 1,5% a 11,5% do preço. Portanto, entre as obras analisadas, não existe o equilíbrio econômico-financeiro.
114

Influência de três tipos de tratamentos físicos na resistência à compressão de compósitos cimento-madeira à base de resíduos de serraria / Influence of three types of physical treatment on compressive strength of composites cement-wood to the base of sawmill residues

LIMA, Alexandre Martins de 20 September 2005 (has links)
Made available in DSpace on 2011-03-23T21:19:48Z (GMT). No. of bitstreams: 0 / Item created via OAI harvest from source: http://www.bdtd.ufpa.br/tde_oai/oai2.php on 2011-03-23T21:19:48Z (GMT). Item's OAI Record identifier: oai:bdtd.ufpa.br:407 / In the present research work, the effect of the type of physical treatment in the resistance to compression of composites cement-wood was analyzed. Residues of variegated compositions (hardwood) collected at sawmills of the Metropolitan area of Belém were used, and the effects of the following treatments were studied: drying in stove, thermal bath and the mineralization with aluminum sulfate. The first step of the research was the survey of the theoretical references as support for the experimental program. Next, the constituent materials of the composite were characterized according to methods prescribed by the Brazilian Norms and after being homogenized, lab tests were carried out in the fresh state. The tests in the hardened state were driven in such a way that the mechanical characteristic observed for the evaluation of the effect of the referred treatments was the tensile strength. The results indicated that the used residues inhibit the hydration of the cement matrix, as well as they influence the resistance negatively the tensile strength. The residues treated with drying in stove provided the smallest resistances to the compression observed for the composites; the treatment of thermal bath and the treatment of mineralization presented better results. However, even presenting a slight difference among the medium values for the rupture tensions, they presented statistical equivalence, and they corroborated the statement that the treatment typology used in the residues is preponderant factor to mitigate the harmful effects of the extractives of the wood in the resistance to compression of the mortars. / Analisa o efeito de três tratamentos físicos empregados em resíduos de serraria no comportamento à compressão de compósitos cimentomadeira.Foi utilizado resíduo de composição variada (dicotiledôneas) coletado em serrarias da Zona Metropolitana de Belém, e estudou-se o efeito dos seguintes tratamentos: secagem em estufa, banho térmico e a mineralização com sulfato de alumínio. O aporte inicial da pesquisa foi o levantamento do referencial teórico como suporte para o programa experimental. Em seguida, os materiais constituintes do compósito foram caracterizados segundo as Normas Brasileiras vigentes, e depois de homogeneizados, foram conduzidos ensaios no estado fresco. Os ensaios no estado endurecido foram realizados de forma tal que a característica mecânica observada para a avaliação do efeito dos referidos tratamentos foi a resistência à compressão. Os resultados de tensão na compressão indicaram que os resíduos utilizados são inibitórios à hidratação do cimento, bem como influenciam negativamente a resistência à compressão; tais efeitos estão relacionados com a absorção de água pelos resíduos de madeira, e posterior liberação na matriz. Os resíduos tratados com secagem em estufa proporcionaram as menores resistências à compressão observadas para os compósitos confeccionados; o tratamento de banho térmico e o tratamento de mineralização apresentaram melhor desempenho que o primeiro, contudo, mostraram-se estatisticamente equivalentes a partir de 3 dias de idade, fazendo com que a instância decisória em utilizar um ou outro recaia sobre variáveis distintas do desempenho à compressão.
115

Avaliação do uso de lodos de estação de tratamento de água como matéria-prima na confecção de tijolos cerâmicos: estudo de caso - ETA Bolonha

MULLER, Elzelis de Aguiar 26 June 2009 (has links)
Submitted by Edisangela Bastos (edisangela@ufpa.br) on 2012-04-09T22:32:52Z No. of bitstreams: 2 Dissertacao_AvaliacaoUsoLodo.pdf: 5633870 bytes, checksum: 18cf173a3b562c94681dd7820fce0ac3 (MD5) license_rdf: 23898 bytes, checksum: e363e809996cf46ada20da1accfcd9c7 (MD5) / Approved for entry into archive by Edisangela Bastos(edisangela@ufpa.br) on 2012-04-09T22:35:23Z (GMT) No. of bitstreams: 2 Dissertacao_AvaliacaoUsoLodo.pdf: 5633870 bytes, checksum: 18cf173a3b562c94681dd7820fce0ac3 (MD5) license_rdf: 23898 bytes, checksum: e363e809996cf46ada20da1accfcd9c7 (MD5) / Made available in DSpace on 2012-04-09T22:35:23Z (GMT). No. of bitstreams: 2 Dissertacao_AvaliacaoUsoLodo.pdf: 5633870 bytes, checksum: 18cf173a3b562c94681dd7820fce0ac3 (MD5) license_rdf: 23898 bytes, checksum: e363e809996cf46ada20da1accfcd9c7 (MD5) Previous issue date: 2009 / O presente trabalho objetivou avaliar a possibilidade de incorporar o lodo da Estação de Tratamento de Água do Bolonha (RMB), na fabricação de tijolos cerâmicos para uso na construção civil. Duas unidades de desaguamento de lodo (UDL) foram implantadas e operacionalizadas na ETA Bolonha. Antes da confecção dos tijolos cerâmicos, o lodo da ETA Bolonha foi desaguado nas UDL’s que eram dotadas de manta permeável, e em seguida foram caracterizadas fisicamente e mineralogicamente. O lodo foi adicionado à massa cerâmica de uma indústria local para a produção de tijolos. Diversas proporções da mistura lodo e argila foram testadas com intuito de encontrar a proporção adequada para a produção de tijolos cerâmicos (10%, 12% e 20% de lodo de ETA à massa cerâmica). Ensaios de laboratório foram realizados para avaliar sua resistência, absorção de água, dimensões adequadas e aspecto visual. Não foi possível a incorporação de 20% de lodo à massa cerâmica devido à alta plasticidade e a dificuldade de fabricação dos tijolos cerâmicos, no entanto, as proporções de 10% e 12% de lodo de ETA foram as que tiveram resultados melhores quanto aos parâmetros de resistência, indicando que os tijolos cerâmicos podem ser produzidos com a incorporação de até 12% de lodo de ETA. / This study aimed to evaluate the possibility of incorporating the sludge in the water treatment station of Bolonha (RMB), in the manufacture of ceramic bricks for use in construction. Two units of flow of mud (UDL) were established and operationalized in the ETA Bolonha. Before the preparation of ceramic bricks, the mud flows were ETA Bologna in UDL's that were equipped with open collar, and then were characterized physically and mineralogically. The sludge was added to the ceramic body of a local industry for the production of bricks. Various proportions of silt and clay mixture were tested in order to find the appropriate proportion to the production of ceramic bricks (10%, 12% and 20% of sludge in the ceramic body ETA). Laboratory tests were conducted to assess its strength, water absorption, an appropriate size and visual appearance. It was not possible to incorporation of 20% of mud to ceramic body due to the high plasticity and the difficulty of manufacture of ceramic bricks, however, the proportions of 10% and 12% of sludge from ETA were the ones that had better results on the parameters of resistance, indicating that the ceramic bricks can be produced with the incorporation of up to 12% of sludge from ETA.
116

Modelagem do “tempo de execução” de obras civis: estudo de caso na Universidade Federal do Pará (UFPA) / Modeling the "time of execution" civil works: Case Study at the Federal University of Pará (UFPA)

COUTINHO, Lêda Sílvia de Aguiar Lédo 06 December 2010 (has links)
Submitted by Edisangela Bastos (edisangela@ufpa.br) on 2012-04-09T22:33:36Z No. of bitstreams: 2 Dissertacao_ModelagemTempoExecucao.pdf: 9983397 bytes, checksum: 7799f26cde2dae7e7a106ace38a5ab81 (MD5) license_rdf: 23898 bytes, checksum: e363e809996cf46ada20da1accfcd9c7 (MD5) / Approved for entry into archive by Edisangela Bastos(edisangela@ufpa.br) on 2012-04-09T22:36:22Z (GMT) No. of bitstreams: 2 Dissertacao_ModelagemTempoExecucao.pdf: 9983397 bytes, checksum: 7799f26cde2dae7e7a106ace38a5ab81 (MD5) license_rdf: 23898 bytes, checksum: e363e809996cf46ada20da1accfcd9c7 (MD5) / Made available in DSpace on 2012-04-09T22:36:22Z (GMT). No. of bitstreams: 2 Dissertacao_ModelagemTempoExecucao.pdf: 9983397 bytes, checksum: 7799f26cde2dae7e7a106ace38a5ab81 (MD5) license_rdf: 23898 bytes, checksum: e363e809996cf46ada20da1accfcd9c7 (MD5) Previous issue date: 2010 / O objetivo desta pesquisa é propor um modelo numérico prognóstico que trate a variável “tempo” de forma eficiente e eficaz, com a finalidade de atender às reais necessidades dos clientes-usuários e à sociedade em geral. Todavia, realizou-se um levantamento bibliográfico sobre gestão pública, no tocante a obras públicas, estatística e pesquisa operacional para sistema organizacional, visando à modelagem numérica. A pesquisa foi baseada em metodologias quantitativas, com ênfase na pesquisa operacional para o estudo das obras públicas executadas sob a gerência da Prefeitura (PCU) da Universidade Federal do Pará (UFPA). Para a elaboração da base de dados, foram coletados informações de obras, reformas e ampliações, executadas durante o período de 2006 a 2009, junto à Comissão Permanente de Licitação (CPL) e à Fundação de Amparo ao Desenvolvimento da Pesquisa (FADESP). Mediante as regressões lineares e, após as transformadas das funções, foram obtidos para o modelo prognóstico os parâmetros estatísticos: coeficiente de correlação (R), de 0,899; coeficiente de determinação (R²), de 0,808; coeficiente de determinação ajustado (R² ajustado), de 0,796; e erro padrão (Se), de 0,41. Esses parâmetros demonstram forte correlação linearizada entre as variáveis, indicando que 79,60% da variabilidade do tempo para executar uma obra pública é causada ou produzida pela variação, em conjunto, da área; do valor orçado; da capacidade técnica operacional da IFES; da capacidade operacional da empresa; da tipologia de serviço; e da estação do ano. Com os resultados obtidos, conclui-se que é possível aplicar e implementar o modelo prognóstico para execução de obras públicas, pois se obteve uma ferramenta potente em sua aplicação para as melhorias dos procedimentos administrativos, tanto na estrutura como no seu desempenho, cujo principal resultado é a previsão do tempo para execução do empreendimento público. / The aim of this research is to propose a numerical model that treats the variable time so efficient and effective in order to meet the real needs of customers, users and society in general. However, was performed a survey bibliographic on public management, in respect of public works, statistics and operational research to the organizational system, aiming to numerical modeling. The research was based on quantitative methodologies, with emphasis on operational research for the study of public works performed under the management of PCU/UFPA. In developing the database, information was collected construction, renovations and expansions, implemented during the period 2006 to 2009, with the Permanent Commission for Bidding (CPL) and the Foundation that support the Research Development (FADESP). By linear regressions and after the transformed functions were obtained for the model prediction the statistical parameters: correlation coefficient (R) of 0.899, the coefficient of determination (R²) of 0.808, the coefficient of determination (adjusted R²) of 0.796 and error standard (Se) of 0.41. These parameters show a strong linearized correlation between the variables, indicating that 79.60% of the variability of time to execute a public work is caused or produced by variations together the area, the budgeted value, the operational capacity of IFES; operational capacity of the company; the type of service, and the season. With the results, it was concluded that it is possible to apply and implement the prognostic model for public works, considering that it is a powerful tool in its application to improvement of administrative procedures, both in structure and in its performance, whose main result is forecast variable “time of execution” for the performance of public enterprise.
117

Cenários climáticos futuros: diagnóstico prospectivo do desempenho termoenergético de edifícios comerciais no Brasil para o século XXI

Casagrande, Bruna Gomes 19 August 2013 (has links)
Made available in DSpace on 2016-12-23T14:05:53Z (GMT). No. of bitstreams: 1 Bruna Gomes Casagrande.pdf: 1917905 bytes, checksum: e718bea85f7b6f30f9d853432b991194 (MD5) Previous issue date: 2013-08-19 / Conselho Nacional de Desenvolvimento Científico e Tecnológico / Ao mesmo tempo em que foram desenvolvidos no Brasil programas com a meta de racionalização do sistema energético nacional, motivados principalmente pelas crises enfrentadas pelo país, como o racionamento de 2001, estudos a respeito do comportamento do clima em escala mundial apresentaram avanços expressivos, acilitados pela evolução tecnológica e computacional. Entre as estratégias para contenção do desperdício da energia produzida está o consumo pelas edificações, uma vez que a adoção de sistemas construtivos adequados pode reduzir o consumo final de eletricidade. Tal constatação constitui um dos preceitos da arquitetura bioclimática, que preconiza a necessidade de adaptação do edifício ao clima local, sendo, para isso, imprescindível a compreensão dos fenômenos climáticos. Desta forma, o princípio que conduziu esta pesquisa foi o comportamento variável do clima, consenso para grande parte dos climatologistas, e suas consequências para as demandas energéticas futuras, particularmente durante o ciclo de vida planejado para cada edifício. Investigar o impacto das mudanças projetadas para o clima ao longo do século XXI no desempenho termoenergético de edificações comerciais artificialmente climatizadas localizadas em diferentes cidades do Brasil foi o principal objetivo deste estudo. Os procedimentos metodológicos foram divididos em quatro etapas, iniciando-se por uma ampla revisão bibliográfica sobre a temática central mudanças climáticas bem como os temas correlacionados, com especial ênfase para a associação entre conforto térmico e a questão energética. Na segunda etapa foram estabelecidos os mecanismos para preparação de arquivos climáticos futuros, incluindo-se a seleção de cidades para representação das diferentes condições geográficas do território brasileiro. Posteriormente foi efetuado o recorte do objeto, com a indicação dos parâmetros de controle e das variáveis em análise, designandose as características do edifício que não serão afetadas por intervenções futuras: percentual de abertura nas fachadas, dispositivos de proteção solar e orientação das maiores fachadas. A etapa final foi dedicada às simulações, realizadas no programa DesignBuilder a partir da configuração dos 192 modelos paramétricos. Os resultados da aplicação da metodologia, analisados quantitativa e qualitativamente, reproduziram, de forma generalizada, um aumento no consumo de 10,7% em 2020, 16,9% em 2050 e 25,6% em 2080, em relação ao consumo atual. Apesar da significância desse aumento, inclusive para o planejamento energético nacional, aumentos mais expressivos foram registrados em estudos internacionais, reforçando a necessidade de consideração dos fenômenos regionais na preparação de dados climáticos futuros neste tipo de pesquisa. Em Recife, a variação de parâmetros construtivos não provocou diferenças tão significativas nas taxas de aumento do consumo quanto nas outras cinco localidades, sendo que Brasília apresentou as maiores taxas de aumento. Considerando-se os edifícios de todas as cidades, a presença de dispositivos de proteção solar foi a variável com maior impacto para diminuição do consumo, e o edifício orientado a Leste e Oeste, com grandes aberturas desprotegidas, apresentou consumo significativamente superior aos outros modelos, atual e futuramente. Por fim, ao contrário da maioria dos resultados mensais observados, em Porto Alegre ocorreu uma diminuição no consumo em alguns meses de 2020 e 2050, ocasionada possivelmente pela diminuição dos períodos de utilização da climatização artificial para aquecimento / At the same time that programs were developed in Brazil with the goal of the national energy system rationalization, mainly motivated by the crisis faced by the country as in the rationing of 2001 studies of the climate s behavior on a global scale showed significant advances, facilitated by technological and computational development. One of the strategies for containment the waste energy produced is the energy consumption by buildings, since the adoption of appropriate constructive systems can reduce the final electricity consumption. This was a principle of bioclimatic architecture, which recommends an adaptation of the building to the local climate conditions, and for that, it is essential to understand the climate system. Therefore, the principle that guided the development of this research was the variable behavior of the climate, which is consensus for most climatologists, and its consequences for the future energy demands of buildings, particularly along the planned life cycle for each building. The main objective of this study was to investigate the impact of projected changes to the climate over the twenty-first century in the thermo energetic performance of commercial buildings artificially acclimatized located in different cities of Brazil. The methodological procedures were divided into four stages, initiating with an extensive literature review on the central theme climate change as well as related topics, with special emphasis on the relationship between thermal comfort and energy issue. In the second step mechanisms for preparing future climate files were established, including the selection of cities for representation of different geo-climatic conditions of the Brazilian territory. After that the definition of the object was performed, indicating the control parameters and variables in the analysis, assigning the characteristics of the building that will not be affected by future interventions window wall ratio, solar shading and orientation of the largest facades. The final step was dedicated to the simulations, performed in the program DesignBuilder from the configuration of the 192 parametric models. The results of applying the methodology, analyzed quantitatively and qualitatively, reproduced in generalized way an increase in energy consumption in buildings by 10.7% in 2020, 16.9% in 2050 and 25.6% in 2080, compared to current consumption. Although the significance of this increase, including the national energy planning, most significant increases were recorded in international studies, reinforcing the need for consideration of regional climate events in the preparation of future climate data in this type of research. In Recife, the variation of constructive parameters did not cause as significant differences in the rates of increase in consumption as the other five locations, and Brasilia had the highest rates of increase. Considering the buildings of all the cities, the presence of solar shading was the variable with the greatest impact on reducing energy consumption, and the building oriented east and west, with large unprotected openings, showed energy consumption significantly superior to other models, in all cities and periods. Finally, unlike most of monthly results observed, in Porto Alegre occurred a decrease in energy consumption in some months of 2020 and 2050, possibly caused by the reduction in time use of artificial air conditioning heating
118

Efeitos da temperatura do concreto fresco na sua trabalhabilidade / Effect of fresh concretetemperature on it's workability

Campos Neto, Tiago Ferreira 12 June 2015 (has links)
Submitted by Luciana Ferreira (lucgeral@gmail.com) on 2016-02-05T08:03:54Z No. of bitstreams: 2 Dissertação - Tiago Ferreira Campos Neto - 2015.pdf: 3471853 bytes, checksum: 35e5a04973ea3b1be09afd99f6dc94f1 (MD5) license_rdf: 23148 bytes, checksum: 9da0b6dfac957114c6a7714714b86306 (MD5) / Approved for entry into archive by Luciana Ferreira (lucgeral@gmail.com) on 2016-02-05T08:06:27Z (GMT) No. of bitstreams: 2 Dissertação - Tiago Ferreira Campos Neto - 2015.pdf: 3471853 bytes, checksum: 35e5a04973ea3b1be09afd99f6dc94f1 (MD5) license_rdf: 23148 bytes, checksum: 9da0b6dfac957114c6a7714714b86306 (MD5) / Made available in DSpace on 2016-02-05T08:06:27Z (GMT). No. of bitstreams: 2 Dissertação - Tiago Ferreira Campos Neto - 2015.pdf: 3471853 bytes, checksum: 35e5a04973ea3b1be09afd99f6dc94f1 (MD5) license_rdf: 23148 bytes, checksum: 9da0b6dfac957114c6a7714714b86306 (MD5) Previous issue date: 2015-06-12 / Coordenação de Aperfeiçoamento de Pessoal de Nível Superior - CAPES / The rheological properties... / As propriedades reológicas...
119

Análise experimental de pilares de concreto armado submetidos à flexo-compressão, reforçados com concreto auto-adensável e conectores metálicos / Experimental analysis of reinforced concrete columns subjected to flexion-compression, reinforced with self-compacting concrete and metal connectors

Rocha, Anderson Souza 27 November 2015 (has links)
Submitted by Cláudia Bueno (claudiamoura18@gmail.com) on 2016-03-09T18:17:57Z No. of bitstreams: 2 Dissertação - Anderson Souza Rocha - 2015.pdf: 7517938 bytes, checksum: 82b541aff42a5ea10a296bdc2f6c4074 (MD5) license_rdf: 23148 bytes, checksum: 9da0b6dfac957114c6a7714714b86306 (MD5) / Approved for entry into archive by Luciana Ferreira (lucgeral@gmail.com) on 2016-03-10T12:04:55Z (GMT) No. of bitstreams: 2 Dissertação - Anderson Souza Rocha - 2015.pdf: 7517938 bytes, checksum: 82b541aff42a5ea10a296bdc2f6c4074 (MD5) license_rdf: 23148 bytes, checksum: 9da0b6dfac957114c6a7714714b86306 (MD5) / Made available in DSpace on 2016-03-10T12:04:55Z (GMT). No. of bitstreams: 2 Dissertação - Anderson Souza Rocha - 2015.pdf: 7517938 bytes, checksum: 82b541aff42a5ea10a296bdc2f6c4074 (MD5) license_rdf: 23148 bytes, checksum: 9da0b6dfac957114c6a7714714b86306 (MD5) Previous issue date: 2015-11-27 / Coordenação de Aperfeiçoamento de Pessoal de Nível Superior - CAPES / The proposed research is based on the study of reinforcement columms in reinforced concrete, with the use of anchor bolts and fill with self-compacting concrete, by jacketing. In addition to the experimental studies, numerical simulation was performed using a computer program based on the finite element method, took into account the breaking loads, displacements and deformations which allows a careful study of reinforced columms. The experimental part of this work was based on the test five columms of reinforced concrete, submitted to straight flexion-compression, in order to assess the bond interface between the concrete substrate and reinforcement of concrete and confirm the efficiency of this technique commonly used for reinforcement. Two columms were used as reference, one with the original abutment dimensions (Reference Columm, cross section: 120 x 250 mm) and the other monolithic concreted with the section of enhanced piece (Monolithic Columm, cross section: 155 x 250 mm). The others received a layer of 35 mm thick concrete in the compressed self-compacting face. The preparation of the interface between the two materials, it will be carried with the scarification boreholes along this surface, which anchors were inserted responsible for reinforcement of concrete bond with the substrate. It can be concluded on the work developed that not only the quantity but especially the location of the connectors used for the connection between the two materials, are essential for a good result of resistance and failure mode. Despite the studs do not present break, there was the peeling of the reinforcement layer. The results obtained indicate the possibility of using this method in the structural reinforcement columms rehabilitation, as it showed an increase in bearing capacity of about four times compared to the column of reference. The results of numerical simulation were very satisfactory, because the behavior of the columms in relation to tensile strength, displacements and deformations, approached the experimental results, with minor differences. / A pesquisa proposta se baseia no estudo do reforço de pilares em concreto armado, com emprego de chumbadores e preenchimento com concreto auto adensável, por encamisamento. Além do estudos experimentais, foi feita uma simulação numérica, utilizando um programa computacional baseado no Método dos Elementos Finitos, levou-se em consideração as cargas de ruptura, deslocamentos e deformações o que possibilita um estudo criterioso dos pilares reforçados. A etapa experimental deste trabalho foi embasada no ensaio de cinco pilares de concreto armado, submetidos à flexo-compressão reta, com intuito de avaliar a interface de ligação entre o concreto do substrato e concreto do reforço e confirmar a eficiência desta técnica usualmente utilizada para reforço. Dois pilares foram usados como referência, sendo um com as dimensões originais do pilar (Pilar de Referência, seção transversal: 120 x 250 mm) e o outro monolítico concretado com a seção de uma peça reforçada (Pilar Monolítico, seção transversal: 155 x 250 mm). Os demais receberam uma camada de 35 mm de espessura de concreto auto-adensável na face comprimida. O preparo da interface entre os dois materiais, proceder-se-á com a escarificação e realização de furos ao longo desta superfície, onde foram inseridos chumbadores responsáveis pela ligação do concreto do reforço com o substrato. Pode-se concluir em trabalhos desenvolvidos que não só a quantidade, mas principalmente, a localização dos conectores utilizados na ligação entre os dois materiais, são imprescindíveis para um bom resultado de resistência e modo de ruptura. Apesar dos chumbadores não apresentarem ruptura, houve o desplacamento da camada do reforço. Os resultados obtidos confirmam a possibilidade da utilização deste método de reforço na reabilitação estrutural de pilares, pois apresentou um aumento da capacidade portante em aproximadamente quatro vezes em relação ao pilar de referência. Os resultados da simulação numérica foram muito satisfatórios, pois o comportamento dos pilares, em relação a carga de ruptura, deslocamentos e deformações, aproximaram dos resultados experimentais, com pequenas diferenças.
120

Gestão do projeto e sua interface com o canteiro de obras sob a ótica da preparação da execução de obras (PEO) / Design management and its interactions with the construction field under the perspective of the construction preparation and execution (PEO)

Arrotéia, Aline Valverde 26 September 2013 (has links)
Submitted by Jaqueline Silva (jtas29@gmail.com) on 2014-10-06T20:56:54Z No. of bitstreams: 3 Dissertação - Aline Valverde Arrotéia - 2013 (1).pdf: 19845597 bytes, checksum: a0771de1e645df07c152873e59f534e2 (MD5) Dissertação - Aline Valverde Arrotéia - 2013 (2).pdf: 17441990 bytes, checksum: b1f22aee78d803aedac8b5d5827fa31b (MD5) license_rdf: 23148 bytes, checksum: 9da0b6dfac957114c6a7714714b86306 (MD5) / Approved for entry into archive by Jaqueline Silva (jtas29@gmail.com) on 2014-10-06T20:57:05Z (GMT) No. of bitstreams: 3 Dissertação - Aline Valverde Arrotéia - 2013 (1).pdf: 19845597 bytes, checksum: a0771de1e645df07c152873e59f534e2 (MD5) Dissertação - Aline Valverde Arrotéia - 2013 (2).pdf: 17441990 bytes, checksum: b1f22aee78d803aedac8b5d5827fa31b (MD5) license_rdf: 23148 bytes, checksum: 9da0b6dfac957114c6a7714714b86306 (MD5) / Made available in DSpace on 2014-10-06T20:57:05Z (GMT). No. of bitstreams: 3 Dissertação - Aline Valverde Arrotéia - 2013 (1).pdf: 19845597 bytes, checksum: a0771de1e645df07c152873e59f534e2 (MD5) Dissertação - Aline Valverde Arrotéia - 2013 (2).pdf: 17441990 bytes, checksum: b1f22aee78d803aedac8b5d5827fa31b (MD5) license_rdf: 23148 bytes, checksum: 9da0b6dfac957114c6a7714714b86306 (MD5) Previous issue date: 2013-09-26 / Coordenação de Aperfeiçoamento de Pessoal de Nível Superior - CAPES / During the last twenty years the construction field in Brazil has evolved significantly in response to its market growing and competitiveness. However this evolving path has faced many obstacles such as cultural barriers and the lack of efforts to achieve quality at the Brazilian construction site. As one of the causes of this facts the lack of integration between construction and the designing process generates waste, pathologies, work redone and improvised changes originated by incompatible projects which were taken by incapacitated personnel at an inconvenient moment. At the same time, the great amount of information generated on the designing or construction phases is lost due to the lack of an effective coordination of these activities. From this scenario Souza (2001), has developed two management methods in her doctorate thesis named Preparation for the Execution of Buildings (known as PEO) and the Pro-active Coordination (known as CPA), these methods are based on the application of the processes adopted by the French construction industry on Brazilian construction sites. These methodologies aim to establish the integration of the project phases by a set of actions and activities implemented by a system of meetings where the main objective is to discuss the projects and the planning of the construction site seeking to obtain a better quality and better outcome on the productive process. These methodologies aim to bring expressive improvements on the productivity, as well as on the lowering of waste, on the settlement of goals, on planning actions in accordance with all the agents involved and mainly on the reduction of costs allied to higher quality standards. Thus is an objective of this research to implement the Preparation on the Execution of Buildings (PEO) seeking to understand the management of the designing process and its interface with the construction site. The methodology applied on the development of the analysis is classified as qualitative and it will be carried by the practical application of the research and the evaluation of its results. Thus, the study was divided into two stages, one of them intended for a pilot study of PEO in Company A, and the other to the implementation of PEO on the company B. This way, the method was developed from a system meetings entitled structured in three different stages: the release of PEO; the development of PEO and the completion of the intensive phase of PEO, which were performed over a period from two to three months. The data analysis was structured upon five main aspects which were evaluated during the implementation of the method on the studied companies. These aspects were: the actions taken during the PEO phase, the development of the actions and the participation of the agents; the internal structure of the companies analyzed; The management and design coordination and the contract form of the contractors, architects and engineers. The results obtained demonstrated the PEO method's effectiveness and viability while a booster on the improvement of project management. Therefore, it can be concluded that the PEO is feasible to be applied in building construction companies, since this method can contribute to the integration of the design phases and construction, as well as to the improvement of the communication between the agents involved in the building construction field. / Nos últimos 20 anos, o setor da construção civil no Brasil evoluiu significativamente em resposta ao crescimento da competitividade no mercado. Entretanto, nesse processo de evolução ainda têm sido encontradas barreiras culturais e organizacionais, e, sobretudo, dificuldades nos esforços à qualidade nos canteiros de obras brasileiros. Aliada a este quadro, a falta de integração entre as atividades de construir e projetar provoca uma série de desperdícios, patologias, retrabalhos e alterações improvisadas decorrentes de projetos não compatibilizados, ora por ausência de detalhes nos projetos, ora por decisões tomadas por pessoas não capacitadas em momentos inadequados. A partir dessa realidade, Souza (2001) desenvolveu dois métodos de gestão nomeados Preparação da Execução de Obras (PEO) e Coordenação Pró-Ativa (CPA) em sua tese de doutoramento, por meio da transposição desses métodos adotados na gestão da interface projeto-execução de obras na França para a realidade dos canteiros de obras brasileiros. Esses métodos visam à integração das etapas de projeto e obra a partir de um conjunto de ações e atividades realizadas por meio de reuniões sistematizadas voltadas à discussão do projeto, ao planejamento e à organização do futuro canteiro de obras, a fim de obter melhor qualidade e desempenho no processo produtivo. Dessa forma, este trabalho tem como objetivo geral implementar o método da preparação da execução de obras (PEO) a fim de avaliar a interface entre a gestão do processo de projeto e a execução do canteiro de obras. A metodologia adotada para o desenvolvimento deste trabalho é classificada como qualitativa, a qual foi realizada por meio de uma pesquisa-ação, e dividida em duas etapas diferentes, sendo uma destinada ao estudo piloto da PEO na empresa A, e a outra à implementação da PEO na empresa B. Deste modo, a aplicação do método foi desenvolvida a partir de um sistema de reuniões em três fases intituladas: lançamento da PEO; desenvolvimento da PEO e finalização da fase intensiva de PEO, as quais foram realizadas em um período entre dois e três meses. A análise de dados foi estruturada a partir de cinco aspectos principais, os quais foram avaliados durante a aplicação do método nas empresas estudadas, sendo eles: quanto às ações desenvolvidas na fase de PEO, quanto ao desenvolvimento das reuniões e a participação dos agentes; quanto à estrutura organizacional e departamental das empresas; quanto à gestão e a coordenação de projetos; e quanto ao formato de contratação dos projetistas e subempreiteiros. Os resultados obtidos com a realização deste trabalho comprovaram a eficácia do método da PEO e a sua viabilidade enquanto potencializador na melhoria da gestão da interface projeto-execução de obras. Portanto, pode-se concluir que a PEO é viável de ser aplicada em empresas de construção e incorporação de edifícios, uma vez que este método pode contribuir para a integração das etapas de projeto e execução, bem como na melhoria da comunicação e na interação entre os agentes envolvidos na produção de edifícios.

Page generated in 0.0369 seconds