• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 159
  • Tagged with
  • 159
  • 159
  • 107
  • 105
  • 97
  • 67
  • 58
  • 55
  • 53
  • 38
  • 38
  • 36
  • 33
  • 32
  • 27
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
151

Estudo do acoplamento elétrico-energético no planejamento da operação de curto-curtíssimo prazo utilizando FPOCA / The study of electric-energetic coupling in the short-shortest term operation planning using FPOCA

Luiz Giovani Lopes Rodrigues 15 December 2003 (has links)
Este trabalho traz um estudo inicial do acoplamento elétrico-energético no planejamento da operação de curto-curtíssimo prazo utilizando Fluxo de Potência Ótimo em Corrente Alternada (FPOCA) com o objetivo de averiguar possíveis desvios entre o planejamento energético e o planejamento elétrico. É feita uma análise da influência dos aspectos elétricos do sistema de transmissão no planejamento energético de curto prazo utilizando-se um FPOCA, juntamente com a minimização do custo da geração e das perdas na transmissão. A minimização do custo da geração é feita através de uma otimização do sistema hidrotérmico utilizando-se um Programa de Otimização de Sistema Hidrotérmico (POSH) baseado em um algoritmo simplex convexo e na aplicação da teoria de fluxo em rede, enquanto que a minimização das perdas na transmissão é feita utilizando-se um FPOCA baseado no método Dual-Newton. Estas ferramentas permitem analisar a necessidade de ajustes para compatibilizar a otimização energética e a otimização elétrica de um sistema eletroenergético, e buscar um planejamento \"ótimo\" que atenda os planejamentos energético e elétrico. Dessa forma, a interface elétrico-energética se torna mais \"forte\", pois as metas de geração obtidas pelo planejamento de curto prazo que serão passadas para o planejamento de curtíssimo prazo, já incluem o efeito dos aspectos elétricos do sistema. Isto proporciona um controle dos desvios da trajetória \"ótima\" do sistema, o que contribui para melhorar a otimização global do planejamento da operação eletroenergética. / This work brings a beginning study of the electric-energetic coupling in the short-shortest term operation planning using Optimal Power Flow in Alternate Current (OPFAC) aiming to inquire possible mismatches between the energetic planning and the eletric planning. It is made an analysis of the electrical aspects influence in the short term energetic planning using OPFAC together with the minimization of generation cost and the transmission losses. The generation cost minimization is made for the hidrothermal system optimization using a Hydrothermal System Optimization Program (POSH) based on a convex simplex algorithm and the application of the network flow theory, while the transmission losses minimization is made using an OPFAC based on the Dual-Newton method. These tools allow to analyze the necessity of adjustments to make compatible the energetic optimization and the electric optimization of the power system, and to search an \"optimal\" planning that attends both the energetic planning and electric planning. Like this, the electric-energetic interface becomes strongest, therefore the generation goals gotten by the short-term planning, that will be passed to the shortest-term planning, already includes the effect of the electric system aspects. These one provide the mismatches control in the optimal trajectory of the system and it contributes to improve the global optimization of power system operation planning. The analyzed system is the 440 kV Equivalent System of CESP (Energetic Company of São Paulo), with 53 bus, being 7 generation bus, 85 transmission lines and 48 transformers.
152

Estudo de técnicas eficientes para a resolução do problema de fluxo de potência para sistemas de distribuição radial / Study of efficient techniques for the resolution of power flow problem for distribution radial systems

Marcus Rodrigo Carvalho 02 June 2006 (has links)
Este trabalho descreve uma abordagem do método primal-dual barreira logarítmica (MPDBL) associado ao método de Newton modificado para a resolução do problema de fluxo de potência para sistemas de distribuição radial. Também foi realizado um estudo comparativo com duas técnicas clássicas de solução do problema de fluxo potência para redes de distribuição radial. São os métodos: Backward/Forward Sweep e o método proposto por M. Baran e F. Wu, que é baseado na técnica de Newton-Raphson. Este método utiliza uma matriz Jacobiana modificada que atende a característica radial dos sistemas de distribuição. Nos testes comparativos serão considerados todos os parâmetros do sistema. Os algoritmos de solução serão analisados em suas propriedades de convergência e será realizado um teste de robustez. Os resultados dos testes realizados em 4 sistemas (4, 10, 34 e 70 barras) e o teste comparativo entre os métodos evidenciam a melhor metodologia na solução do problema de fluxo de potência para sistemas radiais / This work describes an approach on primal-dual logarithmic barrier method (PDLBM) associate to the method of Newton modified for the resolution of the problem of power flow for radial distribution systems. Also a comparative study with two classic techniques of solution of the flow problem was carried through power for nets of radial distribution. They are the methods: Backward/Forward Sweep and the method considered for M. Baran and F. Wu, that is based on the technique of Newton-Raphson. This method uses modified Jacobiana matrix that takes care of the radial characteristic of the distribution systems. In the comparative tests all will be considered the parameters of the system. The solution algorithms will be analyzed in its properties of convergence and will be carried through a robustness test. The results of the tests carried through in 4 systems (4, 10, 34 and 70 bus) and the comparative test between the methods evidence the best methodology in the solution of the problem of power flow for radial systems
153

Metodologia para representação de sistemas de transmissão em corrente contínua multiterminais no problema de fluxo de potência

Vasconcelos, Leandro Almeida 23 October 2014 (has links)
Submitted by Renata Lopes (renatasil82@gmail.com) on 2016-02-11T10:37:14Z No. of bitstreams: 1 leandroalmeidavasconcelos.pdf: 2921811 bytes, checksum: acf68048e9da96cbcc9355d4ebc70813 (MD5) / Approved for entry into archive by Adriana Oliveira (adriana.oliveira@ufjf.edu.br) on 2016-02-26T11:53:39Z (GMT) No. of bitstreams: 1 leandroalmeidavasconcelos.pdf: 2921811 bytes, checksum: acf68048e9da96cbcc9355d4ebc70813 (MD5) / Made available in DSpace on 2016-02-26T11:53:39Z (GMT). No. of bitstreams: 1 leandroalmeidavasconcelos.pdf: 2921811 bytes, checksum: acf68048e9da96cbcc9355d4ebc70813 (MD5) Previous issue date: 2014-10-23 / CAPES - Coordenação de Aperfeiçoamento de Pessoal de Nível Superior / A tecnologia HVDC (High Voltage Direct Current) possui características que a tornam especialmente atrativa para determinadas aplicações em transmissão de energia elétrica. Além disso, pode-se verificar a partir do estudo de utilização desse tipo de tecnologia no mundo que existe uma tendência e perspectiva de utilização crescente nos Sistemas Elétricos de Potência. Desta forma, torna-se cada vez mais importante dispor de técnicas que possibilitem a inclusão dos modelos destes equipamentos em programas de análise de redes de forma eficiente, principalmente no fluxo de potência, com a finalidade de permitir a correta modelagem da rede como um todo nos estudos de planejamento da expansão e operação. A transmissão em corrente contínua vem se tornando amplamente reconhecida no que tange as suas vantagens no transporte de grandes blocos de energia a grandes distâncias, no transporte de potência entre parques eólicos offshore para terra, na interconexão de sistemas com frequências não compatíveis, em travessias subaquáticas, dentre outras questões que a tornam técnica e economicamente viável em algumas situações. Nesse contexto, este trabalho tem por principal objetivo desenvolver e implementar uma metodologia genérica para a representação de Sistemas de Transmissão HVDC Multiterminais no problema de fluxo de potência. Neste sentido, tal metodologia é baseada na solução simultânea de um sistema de equações não lineares composto pelas representações em regime permanente das redes C.C. e C.A., utilizando-se o método de Newton-Raphson para sua solução. A partir deste contexto, são apresentadas as equações que representam a resposta de regime permanente dos conversores, da rede C.C. e das estratégias de controle aplicáveis a esses sistemas. Além disso, são apresentadas as principais configurações existentes de conversores HVDC, suas características e como é feita sua modelagem em regime permanente e no problema de Fluxo de Potência. A metodologia proposta é validada através do estudo de sistemas tutoriais e sistemas teste encontrados como referência na literatura especializada. Os resultados apresentados demonstram que a metodologia proposta é capaz de representar de forma satisfatória os modelos de sistemas HVDC Multiterminais nos estudos de regime permanente em Sistemas Elétricos de Potência. / High Voltage Direct Current (HVDC) technology has characteristics that make it especially attractive for certain transmission applications. Furthermore, it is possible to notice that there is a trend and prospect of increased use of this technology in Electric Power Systems around the world. In this context, it has been increasingly important to have techniques that efficiently include these equipment models in network analysis programs, especially in power flow, in order to allow a correct modeling of the network in studies of expansion planning and operation. The direct current transmission is becoming widely recognized by their advantages in transporting large blocks of power over long distances, to transport power from offshore wind farms to land, in asynchronous interconnection of systems, in underwater crossings, and other issues that make it technically and economically feasible in some situations. In this context, this thesis has the objective to develop and implement a generic methodology for the representation of HVDC Multi-Terminal Systems in the power flow problem. In this sense, this methodology is based on the simultaneous solution of a system of nonlinear equations that represent, in steady state studies, the DC and AC networks, using the Newton-Raphson method to solve the problem. Equations that represent the steady state response of the converters, the DC network and control strategies are presented. In addition, it will be presented the main settings of HVDC converters, their characteristics and how their modelling are set forth in the Power Flow problem. The proposed methodology is validated by studying tutorial and test systems found in the literature. The results show that the proposed methodology is able to represent satisfactorily models of HVDC Multi-Terminal Systems in studies of steady state in Electric Power Systems.
154

Impacto da representação da rede elétrica no planejamento da operação de médio prazo

Souza, Heverton Reis 28 February 2014 (has links)
Submitted by Renata Lopes (renatasil82@gmail.com) on 2016-02-11T12:29:20Z No. of bitstreams: 1 hevertonreissouza.pdf: 2039435 bytes, checksum: 82a19bf494e9ac400021280fb64ec1ae (MD5) / Rejected by Adriana Oliveira (adriana.oliveira@ufjf.edu.br), reason: Renata, bom dia! Por favor, confirme se não tem acento no Júnior: Silva Junior, Ivo Chaves da on 2016-02-26T11:58:58Z (GMT) / Submitted by Renata Lopes (renatasil82@gmail.com) on 2016-02-26T12:02:02Z No. of bitstreams: 1 hevertonreissouza.pdf: 2039435 bytes, checksum: 82a19bf494e9ac400021280fb64ec1ae (MD5) / Approved for entry into archive by Adriana Oliveira (adriana.oliveira@ufjf.edu.br) on 2016-03-03T13:38:08Z (GMT) No. of bitstreams: 1 hevertonreissouza.pdf: 2039435 bytes, checksum: 82a19bf494e9ac400021280fb64ec1ae (MD5) / Made available in DSpace on 2016-03-03T13:38:08Z (GMT). No. of bitstreams: 1 hevertonreissouza.pdf: 2039435 bytes, checksum: 82a19bf494e9ac400021280fb64ec1ae (MD5) Previous issue date: 2014-02-28 / CAPES - Coordenação de Aperfeiçoamento de Pessoal de Nível Superior / O Sistema Interligado Nacional (SIN) possui características peculiares que o torna diferente de qualquer outro no mundo, como por exemplo, predominância de usinas hidrelétricas e uma extensa rede de transmissão. Estas características, aliadas a incerteza nas afluências futuras, conduz a necessidade da realização de vários estudos na área de planejamento da operação. O planejamento da operação energética tem por objetivo determinar metas de geração hidráulica e térmica, de forma a atender o mercado consumidor de energia, com confiabilidade e economicidade, utilizando da melhor forma possível os recursos energéticos disponíveis. Para este propósito são utilizados modelos matemáticos que buscam a minimização do custo total esperado de operação do sistema, dentro de um determinado horizonte de planejamento, utilizando diferentes níveis de detalhamento. O objetivo principal deste trabalho é avaliar alguns impactos da modelagem do sistema elétrico no problema de planejamento da operação de médio prazo. Neste sentido, o sistema de transmissão é representado em sua forma completa, através de equações não lineares que modelam os fluxos de potência ativa e reativa em cada circuito que compõe o sistema elétrico. Além disso, são considerados os limites de tensão nas barras, assim como o limite de carregamento dos circuitos para cada patamar de carga. As usinas hidrelétricas e termelétricas são representadas de forma individualizada, e a função de produtibilidade é modelada através de polinômios de quarto grau. O modelo proposto utiliza Funções de Custo Futuro (FCF) pré-calculadas por um programa de planejamento da operação de médio/longo prazo, baseado em sistemas equivalentes de energia. Neste trabalho foram utilizadas as FCF produzidas pelo programa Modelo de Despacho Hidrotérmico (MDDH), desenvolvido pela UFJF. Entretanto, é importante destacar que outro modelo de decisão estratégica, baseado em sistemas equivalentes de energia, poderia ser adotado para gerar as FCF utilizadas neste trabalho. A metodologia proposta neste trabalho foi avaliada através do estudo de casos tutoriais e de médio porte, objetivando demonstrar os impactos da representação do sistema de transmissão no custo total esperado de operação do sistema e diferenças na estratégia de operação do mesmo. / The Brazilian Interconnected System has unique characteristics that make it different of any other in the world, such as predominance of hydroelectric power plants and an extensive transmission system. These features, combined with uncertainty in future inflows, leads to necessity of conducting several studies on planning of the operation. The energy operation planning aims to determine targets for hydraulic and thermal generation to meet the consumer energy market with reliability and economy, as well as possible using the available energy resources. For this purpose mathematical models that aims to minimize the expected total cost of the system operation, within a given planning horizon, using different levels of detail are used. The main objective of this work is to evaluate some impacts of the transmission system modeling in the long-term operation planning problem. In this sense, the transmission system is included in its complete form, using nonlinear equations that model the active and reactive power flow in the electrical system. In addition, some operation limits are considered, such as bus voltage limits and power flow limits in the transmission lines and transformers, for each load level. The hydroelectric and thermoelectric plants are represented in an individual form and the producibility function is modeled by fourth degree polynomials. The proposed model uses cost-to-go functions calculated from a long term operation planning program based on equivalent energy systems. In this work the cost-to-go functions produced by MDDH program were used. This program was developed by the Federal University of Juiz de Fora (UFJF). However, it is important to point out that any other model of strategic decision, based on equivalent energy systems, could be used to generate the cost-to-go functions. The proposed methodology is evaluated and validated through the study of medium scale systems and tutorial systems. The main objective is to demonstrate the impact of the detailed transmission system modeling in the total system operating expected total cost and identify differences in operation strategy.
155

Despacho ativo com restrição na transmissão via método de barreira logarítmica / Active despach with transmission restriction using logarithmic barrier method

Leandro Sereno Pereira 16 December 2002 (has links)
Este trabalho apresenta uma abordagem do método da função barreira logarítmica (MFBL) para a resolução do problema de fluxo de potência ótimo (FPO). A pesquisa fundamenta-se metodologicamente na função barreira logarítmica e nas condições de primeira ordem de Karush-Kuhn-Tucker (KKT). Para a solução do sistema de equações resultantes das condições de estacionaridade, da função Lagrangiana, utiliza-se o método de Newton. Na implementação computacional utiliza-se técnicas de esparsidade. Através dos resultados numéricos dos testes realizados em 5 sistemas (3, 8, 14, 30 e 118 barras) evidencia-se o potencial desta metodologia na solução do problema de FPO. / This work describes an approach on logarithmic barrier function method to solving the optimal power flow (OPF) problem. Search was based on the logarithmic barrier function and first order conditions of Karush-Kuhn-Tucker (KKT). To solve the equation system, obtained from the stationary conditions of the Lagrangian function, is used the Newton method. Implementation is performed using sparsity techniques. The numerical results, carried out in five systems (3, 8, 14, 30 and 118 bus), demonstrate the reliability of this approach in the solution OPF problem.
156

Metodologia para alocação discreta e assimétrica de capacitores em sistemas elétricos de distribuição visando redução de desequilíbrio / Methodology for discret and asymmetric allocation of capacitor banks in distribution electrical systems aiming reduction of unbalance

Santos, Ricardo Viol dos 27 August 2015 (has links)
Submitted by Renata Lopes (renatasil82@gmail.com) on 2017-04-25T18:26:00Z No. of bitstreams: 1 ricardovioldossantos.pdf: 2585437 bytes, checksum: 897e63c2118d5c0e74581bbdb80ccb38 (MD5) / Approved for entry into archive by Adriana Oliveira (adriana.oliveira@ufjf.edu.br) on 2017-04-26T12:23:14Z (GMT) No. of bitstreams: 1 ricardovioldossantos.pdf: 2585437 bytes, checksum: 897e63c2118d5c0e74581bbdb80ccb38 (MD5) / Made available in DSpace on 2017-04-26T12:23:14Z (GMT). No. of bitstreams: 1 ricardovioldossantos.pdf: 2585437 bytes, checksum: 897e63c2118d5c0e74581bbdb80ccb38 (MD5) Previous issue date: 2015-08-27 / CAPES - Coordenação de Aperfeiçoamento de Pessoal de Nível Superior / Buscando corrigir aspectos relacionados à qualidade de energia, bancos de capacitores em derivação são utilizados em alimentadores primários dos sistemas de distribuição. A busca pela melhor forma de alocação constitui um problema complexo de natureza matemática combinatória, ao incluir critérios técnicos conflitantes e restrições do sistema. Este problema não tem solução trivial, tornando-se importante a formulação de metodologias para auxiliar nessa tarefa. Neste trabalho, é proposta uma metodologia para alocação de bancos de capacitores em derivação em nós do sistema elétrico, com possibilidade de alocação desequilibrada, considerando sua natureza discreta, com objetivo de minimizar desequilíbrios de tensão e custos de alocação, baseada em aplicação de algoritmo genético. Foram consideradas também restrições tais como limites de correntes nos alimentadores, limites de tensão para a conformidade com as faixas adequadas de tensão padronizadas pelos órgãos competentes e a disponibilidade de bancos. / Seeking for correcting issues related to power quality, shunt capacitor banks are used in primary feeders of distribution systems. The search for the best allocation is a complex problem of combinatorial mathematical nature, including conflicting technical criteria and constraints of the system. This problem has nontrivial solution, making important the development of methodologies to assist in this task. In this work, it is proposed a methodology for allocation of shunt capacitor banks in electric system nodes, with the possibility of unbalanced allocation, considering its discrete nature, with the purpose of minimizing voltage imbalances and allocating costs, based on genetic algorithm application. Restrictions such as limits of current feeders, voltage limits for compliance with the appropriate standard voltage ranges and the availability of capacitor banks were considered.
157

Otimização natural multiobjetivo como ferramenta para desvio mínimo de pontos de operação considerando restrições de segurança

Freire, Rene Cruz 29 June 2017 (has links)
Submitted by Patrícia Cerveira (pcerveira1@gmail.com) on 2017-06-13T15:56:56Z No. of bitstreams: 1 Rene_Cruz_Freire.pdf: 5170376 bytes, checksum: 8c6b6dd8986d23b53ae99ba90dd69ef5 (MD5) / Approved for entry into archive by Biblioteca da Escola de Engenharia (bee@ndc.uff.br) on 2017-06-29T16:38:47Z (GMT) No. of bitstreams: 1 Rene_Cruz_Freire.pdf: 5170376 bytes, checksum: 8c6b6dd8986d23b53ae99ba90dd69ef5 (MD5) / Made available in DSpace on 2017-06-29T16:38:47Z (GMT). No. of bitstreams: 1 Rene_Cruz_Freire.pdf: 5170376 bytes, checksum: 8c6b6dd8986d23b53ae99ba90dd69ef5 (MD5) / Coordenação de Aperfeiçoamento de Pessoal de Nível Superior / Um dos temas de alta relevância para a sociedade atual é a qualidade do suprimento de energia elétrica, que deve ser ininterrupto, seguro e econômico. Para tal, é primordial que o sistema de potência esteja preparado para um possível defeito de algum equipamento da rede, mantendo a operação dentro dos patamares seguros, evitando os blecautes e todas as suas consequências para a sociedade. Isso pode ser feito através do redespacho das unidades geradoras, de modo a encontrar um ponto de operação que concilie segurança e economicidade, dois objetivos conflitantes, enquanto busca se afastar o mínimo possível do ponto de operação previamente estabelecido, via planejamento eletroenergético, para o sistema de potência em questão. Trata-se de uma abordagem multiobjetiva do Fluxo de Potência Ótimo com Restrições de Segurança (FPORS) que pode ser solucionada com uma abordagem de Computação Evolucionária (CE) com viés multiobjetivo. Neste trabalho, foram implementadas e comparadas duas meta-heurísticas evolutivas multiobjetivo: Nondominated Sorting Genetic Algorithm II (NSGA-II) e o Multi-objective Evolutionary Particle Swarm Optimization (MOEPSO). Os resultados dessas heurísticas também foram comparados com a abordagem mono-objetivo do mesmo problema. Os algoritmos foram implementados no MATLAB® e testados em um sistema-teste que simula as condições do Sistema Interligado Nacional (SIN). As heurísticas multiobjetivo foram comparadas através da metodologia de análise da Fronteira de Pareto (FP), onde é analisado qual método concilia melhor os objetivos de economia e segurança. Na primeira análise o NSGA-II saiu-se melhor, entretanto após a implementação de melhorias no algoritmo, o MOEPSO mostrou desempenho superior na segunda análise. Nas duas análises, o viés multiobjetivo mostrou-se superior ao mono-objetivo, na comparação através do critério de agregação de objetivos. Em relação ao tempo de simulação de cada método, o MOEPSO foi superior na primeira análise, já na segunda análise foi implementado um refinamento baseado no Fluxo de Potência Linearizado no FPORS, que baixou o tempo de simulação das duas heurísticas multiobjetivas em comparação com a primeira análise, e o MOEPSO teve o menor tempo de simulação. Na comparação com o viés mono-objetivo, apenas o NSGA-II teve tempo médio de simulação maior que o método mono-objetivo na primeira análise. Na segunda análise, todas as heurísticas multiobjetivo possuíam tempo de simulação menores que o método mono-objetivo. / One of the topics of high relevance to the today’s society is the quality of electric power supply, which must be uninterrupted, safe and economical. To this end, it is essential that the power system be prepared for a possible defect of some equipment from the network while maintaining operation within safe levels, avoiding blackouts and all its consequences for society. This can be done by redispatch of generating units, in order to find an operation point which conciliate security and economy, two conflicting objectives, while seeking to depart as little as possible of the operation point previously established in the energy planning for the power system in question. This is a multi-objective approach to Security Constrained Optimal Power Flow (SCOPF) that can be solved with an approach of Evolutionary Computation with multi-objective bias. In this work we were implemented and compared two multi-objective evolutionary meta-heuristics: Nondominated Sorting Genetic Algorithm II (NSGA-II) and Multi-objective Evolutionary Particle Swarm Optimization (MOEPSO). The results of these heuristics were also compared with mono-objective approach to the same problem. The algorithms were implemented in MATLAB® and tested in a test-case that simulates the conditions of the Brazilian Sistema Interligado Nacional (National Interconnected System). The multi-objective heuristics were compared using the analysis methodology of the Pareto Frontier, where is analyzed which method is better to conciliate the economy and security objectives. In the first analysis the NSGA-II fared better, but after the implementation of improvements in the algorithm, the MOEPSO showed superior performance in the second analisys. In both analyzes, the multi-objective bias was superior to the mono-objective bias, in the comparison through objectives aggregation criteria. Concerning the simulation time of each method, the MOEPSO was superior in the first analysis, but in the second analysis was implemented a refinement based on DC Load Flow, which lowered the simulation time of the two multi-objective heuristics compared with the first analysis, and the MOEPSO had the shortest time simulation. Compared to the mono-objective bias, only the NSGA-II had an average time simulation greater than the mono-objective method in the first analysis. In the second analysis, all multi-objectives heuristics had simulation time smaller than the mono-objective method.
158

Desenvolvimento de índices baseados em equivalentes de Thévenin para avaliação de segurança de tensão de sistemas elétricos de potência

Costa, Jhonatan Nascimento da 27 February 2015 (has links)
Submitted by Renata Lopes (renatasil82@gmail.com) on 2015-12-16T16:23:08Z No. of bitstreams: 1 jhonatannascimentodacosta.pdf: 4337030 bytes, checksum: 25cf98ccb23a326195b9a1a90c7d43df (MD5) / Approved for entry into archive by Adriana Oliveira (adriana.oliveira@ufjf.edu.br) on 2015-12-17T11:06:06Z (GMT) No. of bitstreams: 1 jhonatannascimentodacosta.pdf: 4337030 bytes, checksum: 25cf98ccb23a326195b9a1a90c7d43df (MD5) / Made available in DSpace on 2015-12-17T11:06:06Z (GMT). No. of bitstreams: 1 jhonatannascimentodacosta.pdf: 4337030 bytes, checksum: 25cf98ccb23a326195b9a1a90c7d43df (MD5) Previous issue date: 2015-02-27 / CAPES - Coordenação de Aperfeiçoamento de Pessoal de Nível Superior / Neste trabalho são propostos dois índices eficientes baseados em Equivalentes de Thévenin para avaliação da segurança de tensão de Sistemas Elétricos de Potência de grande porte. Estes índices são denominados de Índice de Estabilidade de Tensão e Índice de Perda de Controle de Tensão e baseiam-se na característica de máxima transferência de potência de circuitos elétricos lineares. Neste sentido, propõe-se uma nova metodologia para a estimação da impedância de Thévenin baseada na técnica de Análise de Sensibilidade da matriz Jacobiana do problema de Fluxo de Potência. O Índice de Estabilidade de Tensão proposto pode ser calculado para todas as barras do sistema em um dado ponto de operação, fornecendo uma estimativa rápida do ponto de vista computacional da Margem de Carregamento e uma indicação das barras críticas do sistema. Por outro lado, o Índice de Perda de Controle de Tensão é calculado somente para as barras do tipo PV, fornecendo uma indicação dos geradores críticos para o controle de tensão da região em análise. Os índices propostos são avaliados através do estudo de sistemas tutoriais, de sistemas de médio porte e de um sistema de grande porte baseado no Sistema Interligado Nacional brasileiro. Sempre que possível procura-se validar os resultados obtidos através de comparações com as técnicas do vetor tangente do Método da Continuação e de menor Margem de Potência Reativa das Curvas V-Q, que são técnicas já consagradas para análise de estabilidade de tensão de Sistemas Elétricos de Potência. / In this work are proposed two efficient indexes based on Thévenin equivalent for assessment of voltage safety of large Electric Power Systems. These indexes are called Voltage Stability Index and Voltage Control Loss Index and are based on the characteristic of maximum power transfer of linear electrical circuits. In this sense, we propose a new methodology to estimate the Thévenin impedance based on the Sensitivity Analysis technique of the Jacobian matrix of power flow problem. The Voltage Stability Index proposed can be calculated for all system buses at a given operating point, providing a quick estimate of the computational point of view of the Loading Margin and an indication of the critical buses of the system. On the other hand, the Voltage Control Loss Index is calculated only for the PV type buses and provides an indication of the critical generators for control of voltage of the region in analisys. The proposed indexes are evaluated by studying tutorials systems, medium size systems and a large system based on the brazilian National Interconnected System. Whenever possible looking up validate the results obtained through comparisons with the techniques of the tangent vector of the Continuation Method and of the smaller Reactive Power Margin of the V-Q curves, which already are established techniques of voltage stability analysis of Electric Power Systems.
159

Estudo dos impactos de um sistema fotovoltaico conectado à rede elétrica utilizando análises QSTS / Study of a grid-connected photovoltaic system impacts using QSTS analysis

Bastos, Camila Bianka Silva 27 February 2015 (has links)
Made available in DSpace on 2016-12-12T20:27:38Z (GMT). No. of bitstreams: 1 Camila Bianka Silva Bastos.pdf: 1963598 bytes, checksum: bee88eacc3f6e3c327425297316a691d (MD5) Previous issue date: 2015-02-27 / Coordenação de Aperfeiçoamento de Pessoal de Nível Superior / This dissertation presents a study of the operation of two different three-phase grid-connected test-grids with the connection of a 1MWp photovoltaic system. Two analysis methods are used to evaluate the impacts of this photovoltaic systeM, these methods being conventional static analysis and the analysis known as Quasi-Static Time-Series Analysis. Despite the fact that all grids have unique characteristics, it is important to use test-grids, which simulate the real grid characteristics, to analyze the kinds of problems that can occur and then look for alternatives, if necessary. The impacts evaluated are related to the system losses, minimized with the allocation study of the generation on the grid, voltage profile and tap position curve, when automatic load tap changers are used. It was verified that the photovoltaic system interconnection point is the most influenced one after its connection to the grid. The Quasi-Static Time-Series Analysis allow the correct evaluation of the load-generation interaction, running the time series power flow through estimated data for the load and irradiance curves during 168 hours. The conventional static analysis only considers critical operation conditions, like minimum and maximum load, and no generation or maximum generation, and does not evaluate different case scenarios that occur in reality. The photovoltaic systems can bring many advantages to the electric systems, like the improvement on the final consumer voltage profile, line losses reduction, and also environmental impacts reduction. However, with the increase of distributed photovoltaic generation on the electrical grid, it s necessary to be aware of the impacts that this may cause by performing interconnection studies. / Esta dissertação apresenta um estudo da operação de uma rede teste trifásica de média tensão com a interligação de um sistema fotovoltaico de 1,0 MWp. Dois métodos de análise são utilizados para avaliar os impactos deste sistema fotovoltaico, sendo estes métodos as análises estáticas convencionais eas análises conhecidas como Quasi-Static Time-Series Analysis. Apesar de cada rede elétrica apresentar características únicas, é importante a utilização de sistemas testes, que simulam as características de sistemas reais, para analisar que tipos problemas podem surgir e então buscar alternativas, se necessário. Os impactos avaliados se referem às perdas no sistema, minimizadas com a correta alocação da geração, perfil de tensão e curva de posição do tap, no caso de transformador com comutação automática de tap. Contata-se que o ponto de conexão do sistema fotovoltaico é o mais influenciado pela sua conexão à rede. As análises QSTS possibilitam avaliar corretamente a iteração entre carga e geração, efetuando o fluxo de potência consecutivo através de dados estimados para as curvas de carga e de irradiância solar ao longo de 168 horas. Já as análises convencionais consideram apenas condições críticas de operação, como por exemplo, carga leve ou nominal e geração nula ou máxima, não avaliando então diferentes cenários de operação que ocorrem na prática. Os sistemas fotovoltaicos podem trazer muitos benefícios aos sistemas elétricos, como melhoria do perfil de tensão de atendimento ao consumidor, redução de perdas nas linhas, além da redução nos impactos ambientais. Entretanto, com o aumento de geração fotovoltaica distribuída na rede, é necessário estar atento aos impactos que isto pode causar através de estudos de interconexão.

Page generated in 0.0435 seconds