Spelling suggestions: "subject:"gestão dde projeto"" "subject:"gestão dee projeto""
341 |
Gestão dos resíduos sólidos urbanos com geração de energia : o Projeto Ecoparque de Porto AlegreRibeiro, Lauro André January 2008 (has links)
A destinação final dos resíduos sólidos urbanos se tornou um problema cada vez mais difícil de ser resolvido. Muitos projetos de valorização energética dos resíduos sólidos urbanos vêm sendo implementados com sucesso no tratamento em diversos países. Visando desenvolver uma experiência semelhante em Porto Alegre, a Centrais Elétricas Brasileiras S.A. (ELETROBRÁS), a Companhia de Geração Térmica de Energia Elétrica (CGTEE) e a Prefeitura Municipal de Porto Alegre (representada pelo Departamento Municipal de Limpeza Urbana - DMLU) realizaram um estudo, finalizado em novembro de 2004, que atestou a viabilidade técnica, econômica, ambiental e social de uma planta de tratamento de resíduos por digestão anaeróbia denominada Projeto Ecoparque. Desde então, o projeto encontra-se engavetado. Se o projeto concebido para o município de Porto Alegre apresentava viabilidade, tinha instituições dispostas a viabilizá-lo, sua implantação amenizaria o problema da destinação dos resíduos sólidos urbanos, por que não foi implementado? Para elucidar essa questão, realizou-se uma revisão na literatura seguida de entrevistas com roteiro semiestruturado com os principais atores envolvidos no desenvolvimento do projeto e com os tomadores de decisão, para verificar os possíveis entraves deste projeto. Foram entrevistadas nove pessoas que trabalharam no Projeto Ecoparque ou possuem conhecimento sobre gestão de resíduos urbanos. A pesquisa identificou como principais entraves as questões de ordem política e de falta de conhecimento sobre a destinação dos resíduos em Porto Alegre. / The final destination of municipal solid waste has become a problem to be solved. Many projects of municipal solid waste energetic valorization have been implemented with success in many countries. Seeking to develop a similar experience in Porto Alegre, Centrais Elétricas Brasileiras S.A. (ELETROBRÁS), CGTEE and The Porto Alegre City Hall (represented by DMLU – Municipal Urban Solid Waste Department) carried a study, finished in November 2004, that showed technical, economical, social and environmental viability of building a plant to treat municipal solid waste through anaerobic digestion named Ecoparque Project. Since then the project is halted. If the concieved project for Porto Alegre presented viability, had institutions ready to put the project into practice, it would soothe the final destination of waste problem, why it was not implemented? To clarify this question, it was made a literature revision followed by interviews with the main actors involed with the development of the project and with the decision makers, to verify possible obstacles of this project. Nine people were interviewed in this research because they worked on this Ecoparque Project or because they have knowledge about municipal solid waste management. Results shown that political reasons and lack of public information had an important role in halting this project.
|
342 |
Os anos 30 no século XXIFélix, Márcio Luiz Mourilhe January 2004 (has links)
Made available in DSpace on 2009-11-18T19:01:04Z (GMT). No. of bitstreams: 0
Previous issue date: 2004 / The main objective of the present study is to identify witch administration tools can be used by the managers to accelerate the change process, increasing the productivity of process and people of Information Technology area. It also studied the administration tools of first three decades of XX century, when the Fordist paradigm was strongly present, and the last three decades of the same century, called Flexibilization period, still be applied to manage an IT area of large company witch their processes are totally based on software and computers. The study has an empirical section based on a case study of Information Technology area of Infoglobo Comunicações, where mean processes were changed to comply with new quality and productivity standards defined by the company's board. / Tendo em vista as mudanças nos processos das organizações, e na forma de gestão e gerência das equipes para acompanharem tais mudanças, o objetivo desta dissertação é identificar quais ferramentas da administração podem ser utilizadas pelos gestores para facilitar este processo de mudança, aumentando a produtividade das pessoas e processos de uma área de Tecnologia da Informação (TI). Adicionalmente, nesta dissertação, busca-se verificar se as ferramentas de administração das três primeiras décadas do século XX, período em que o paradigma Fordista se fazia muito presente, e das três últimas décadas deste mesmo século, período marcado pelo paradigma da Flexibilização, ainda são utilizadas para gestão da área de TI de uma empresa em que todo o seu processo produtivo está baseado em sistemas e equipamentos controlados por computadores. O estudo é fundamentado por uma seção empírica, na qual se relata um caso real, focalizando as transformações ocorridas na área de TI da empresa Infoglobo Comunicações, onde processos importantes da área foram alterados para adequar a produtividade e qualidade dos serviços prestados pela área aos novos patamares definidos pela Diretoria da empresa.
|
343 |
A influência da complexidade sociopolítica relacionada aos stakeholders na gestão de projetos de tecnologia: estudo de caso em uma instituição financeiraVieira, Tatiana Paula da Costa 24 November 2016 (has links)
Submitted by Tatiana Paula da Costa Vieira (tatianapcv@yahoo.com.br) on 2016-12-16T00:41:57Z
No. of bitstreams: 1
Dissertação_Tatiana Vieira_VRevisadafinal_1412.pdf: 2153650 bytes, checksum: fb9f1231ce9b692ffdfa100d51f0067e (MD5) / Approved for entry into archive by Fabiana da Silva Segura (fabiana.segura@fgv.br) on 2016-12-16T13:59:10Z (GMT) No. of bitstreams: 1
Dissertação_Tatiana Vieira_VRevisadafinal_1412.pdf: 2153650 bytes, checksum: fb9f1231ce9b692ffdfa100d51f0067e (MD5) / Made available in DSpace on 2016-12-16T14:45:51Z (GMT). No. of bitstreams: 1
Dissertação_Tatiana Vieira_VRevisadafinal_1412.pdf: 2153650 bytes, checksum: fb9f1231ce9b692ffdfa100d51f0067e (MD5)
Previous issue date: 2016-11-24 / This study of explanatory case, included in the project management department, has as the main goals which are and who are the stakeholders of the systemic development projects of the financial institutution being studied, which are and how the extent indicators of the socialpolitical complexity impact the management conplexity of the projects and which actions were taken by the projects managers to mitigate the complexity related to these indicators, using mainly, as a theoric reference, seminal publications referred to the stakeholders and the project management complexity. In order to achieve this goal, deeply semi-organized interviews were done with 15 professionals who work with the technology in this institution, analysis of internal and external public documents and observation. The results show that the project management team, suppliers and trade partner, operation managers, other interested parts, portfolio managers, programming managers and the project office were not totally recognized by all the interviewed people. Moreover, it was verified all the indicators of the social-political complexity related to stakeholders (existence of hidden agenda, power conflicts, confliting priorities and requeriments among the projects, resistence, interference and litlle committal from the interest parts in the project and existence of a sênior management support) influence the complexity in the project management and indicating the existance of the social-political dimension complexity in these kinds of projects. Lastly, it was also verfied that the project managers are able to use some actions to soften the impacts of this complexity caused by the stakeholders, such as: allocate full time resource in the project, determine roles and responsabilities to the involved people in the project, scale the problems to the sponsor or superior competence, determine sharing goals among the project stakeholders. / Este estudo de caso exploratório, contido no campo de gestão de projetos, teve como principal objetivo compreender quais são e como são os possíveis perfis dos stakeholders dos projetos de desenvolvimento sistêmico da instituição financeira estudada, de que forma a dimensão de complexidade sociopolítica, impacta a complexidade de gestão destes projetos e quais ações foram tomadas pelos gerentes dos projetos para mitigar a esta dimensão de complexidade. Para atingir este objetivo, foram realizadas entrevistas semiestruturadas em profundidade com 15 profissionais que atuam em projetos de tecnologia da instituição, análise de documentos internos e externos, públicos, stakeholders e observação. Os resultados encontrados demonstraram que a equipe de gerenciamento dos projetos, fornecedores e parceiros comerciais, gerentes de operações, outras partes interessadas; gerente de portfólio, gerente de programa e o escritório de projetos não foram plenamente reconhecidos por todos os entrevistados. Além disto, verificou-se que todos os indicadores da complexidade sociopolítica relacionados aos stakeholders impactam a complexidade na gestão de projetos e indicando a existência da dimensão de complexidade sociopolítica nestes tipos de projetos. Por fim, também se verificou que os gestores de projeto podem empregar um conjunto de ações para mitigar os impactos da complexidade causada pelos stakeholders, tais como: alocar recurso em período integral no projeto, determinar papéis e responsabilidades aos envolvidos no projeto, escalar os problemas para o sponsor ou uma alçada superior, estabelecer metas compartilhadas entre os stakeholders do projeto, paralisar ou encerrar o projeto e realizar alinhamento sobre os objetivos do projeto entre os stakeholders.
|
344 |
Propostas para aceleração de duas metas em atraso da agenda 2012: programa de metas do município de São PauloFreitas, João Paulo N. Sabino de, Marin, Pedro de Lima, Prado, Fernanda Vianna, Zago, Marina Fontão 19 August 2011 (has links)
Submitted by Fernanda Prado (feprado@gmail.com) on 2011-09-06T13:48:04Z
No. of bitstreams: 1
MPGPP_Agenda_2012_Trabalho Final Pós Banca.pdf: 1424881 bytes, checksum: 78d824456bf1909f154e1102588b3190 (MD5) / Approved for entry into archive by Gisele Isaura Hannickel (gisele.hannickel@fgv.br) on 2011-09-06T13:51:40Z (GMT) No. of bitstreams: 1
MPGPP_Agenda_2012_Trabalho Final Pós Banca.pdf: 1424881 bytes, checksum: 78d824456bf1909f154e1102588b3190 (MD5) / Approved for entry into archive by Gisele Isaura Hannickel (gisele.hannickel@fgv.br) on 2011-09-06T13:52:13Z (GMT) No. of bitstreams: 1
MPGPP_Agenda_2012_Trabalho Final Pós Banca.pdf: 1424881 bytes, checksum: 78d824456bf1909f154e1102588b3190 (MD5) / Made available in DSpace on 2011-09-06T13:54:11Z (GMT). No. of bitstreams: 1
MPGPP_Agenda_2012_Trabalho Final Pós Banca.pdf: 1424881 bytes, checksum: 78d824456bf1909f154e1102588b3190 (MD5)
Previous issue date: 2011-08-19 / The objective of this paper is to suggest alternatives for the acceleration of two goals within the São Paulo City Goals Program („2012 Agenda‟): goal number 78 (implementation of 2 training centers for recycling cooperative members) and goal number 80 (creation of 1,000 Voluntary Collection Points for recycled material). At the beginning of this paper the reported level of completion was 0%. The diagnosis detected flaws in the execution process as well as in the design and monitoring phases. A set of recommendations were then designed in order to achieve the selected goals. The paper highlights necessary actions, managers, deadlines, budget impacts and risks. These recommendations include improvements in the monitoring system (with more frequent updates), the use of timelines to assist the execution process and the creation of new structural alternatives for implementing the delayed goals. Additionally, the diagnosis allowed the conclusion that there is an absence of incentive mechanisms for public managers in the delivery of the Program‟s goals. In light of these conclusions, general recommendations were then proposed for the design of the new and subsequent Goals Program, inspired on performance based management experiences. / O presente trabalho tem por objetivo sugerir recomendações para a aceleração de execução de duas metas do Programa de Metas do Município de São Paulo ('Agenda 2012'): a meta de nº 78 (instalação de 2 centros de capacitação para cooperados em reciclagem) e a meta de nº 80 (instalação de 1000 Pontos de Entrega Voluntária de materiais recicláveis – PEVs). Ambas as metas encontravam-se, no início do trabalho, com 0% de execução. Após a coleta de informações, chegou-se ao diagnóstico, que detectou falhas tanto na etapa de execução, quanto nas etapas de formulação e monitoramento das metas. Entre essas falhas, destacam-se a falta de planejamento do órgão executor das metas, o insucesso de um modelo de parceria com o setor privado e problemas no próprio processo de formulação das metas. A partir do diagnóstico, foram traçadas recomendações referentes à aceleração de cada uma das metas analisadas, com a especificação de ações a serem tomadas, responsáveis, prazos, impacto orçamentário e riscos. Essas ações incluem o aperfeiçoamento do sistema de monitoramento, com atualizações mais frequentes e detalhadas, o estabelecimento de cronogramas para execução das metas com definição clara de responsáveis e a criação de novas alternativas para a execução que não envolvam, necessariamente, o modelo de parceria previamente adotado. Além disso, a partir do diagnóstico das 2 metas analisadas, conclui-se que faltam mecanismos que incentivem e facilitem o cumprimento das metas pelos agentes públicos. Diante dessas conclusões, foram elaboradas recomendações gerais, baseadas em modelos bem sucedidos de gestão para resultados, que poderão ser adotadas quando da formulação do próximo Programa de Metas da Prefeitura.
|
345 |
Desafios da implementação do plano de metas da cidade de São Paulo: os casos do Clube-Escola e do sistema de indicadores de desempenho e resultados da gestãoPortel, Renan, Risso, Melina Ingrid, Mesquita, Cíntia Garcia 30 August 2011 (has links)
Submitted by Renan Portel (renanportel@ig.com.br) on 2011-09-11T23:58:17Z
No. of bitstreams: 1
Desafios da implementação do Plano de Metas da Cidade de São Paulo.pdf: 587729 bytes, checksum: 971e5b11e0dd13e74ff190b6f1d84586 (MD5) / Approved for entry into archive by Suzinei Teles Garcia Garcia (suzinei.garcia@fgv.br) on 2011-09-12T13:07:51Z (GMT) No. of bitstreams: 1
Desafios da implementação do Plano de Metas da Cidade de São Paulo.pdf: 587729 bytes, checksum: 971e5b11e0dd13e74ff190b6f1d84586 (MD5) / Approved for entry into archive by Suzinei Teles Garcia Garcia (suzinei.garcia@fgv.br) on 2011-09-12T13:08:19Z (GMT) No. of bitstreams: 1
Desafios da implementação do Plano de Metas da Cidade de São Paulo.pdf: 587729 bytes, checksum: 971e5b11e0dd13e74ff190b6f1d84586 (MD5) / Made available in DSpace on 2011-09-12T13:10:20Z (GMT). No. of bitstreams: 1
Desafios da implementação do Plano de Metas da Cidade de São Paulo.pdf: 587729 bytes, checksum: 971e5b11e0dd13e74ff190b6f1d84586 (MD5)
Previous issue date: 2011-08-30 / This paper annalyses the contractual result in performance indicators applied to the civil servants of Sao Paulo training and development policy. The Public Management Office is the main body responsible for the human resource management process in the State Government of Sao Paulo. As so, its executive branch for training and development is the Government and Public Administration School under the Administration Development Foundation – Fundap. The definition of clear relationship rules between Fundap and the Public Management Office is key to the success on the civil servants training and development programs. It is suggested that theses parameters, goals, procedures and indicators embedding in a performance agreement between the two organizations. / A Prefeitura de São Paulo, com a aprovação da Emenda nº 30 à Lei Orgânica do Município de São Paulo, passou a ter um novo instrumento de planejamento: o Programa de Metas da Cidade de São Paulo, que para a gestão 2009-2012 é também chamado de Agenda 2012. Nela estão inseridas 223 metas que podem ser monitoradas pelo cidadão, através de relatórios semestrais disponibilizados na internet. O objetivo deste trabalho foi propor medidas de aceleração para cumprimento de duas metas que se encontram em atraso, são elas: a meta 216 que trata da criação de um sistema de indicadores desempenho e resultados da gestão e a meta 156 que cria 200 clubes–escola. A partir do diagnóstico dos possíveis entraves para execução das duas metas analisadas, bem como do levantamento de hipóteses sobre a ocorrência dos mesmos, foram apresentadas as medidas de aceleração para implementação das metas estudadas. Como referencial analítico, o estudo seguiu passos da metodologia de gerenciamento de projetos oferecida pelo Project Managment Institute (PMI) que foi adaptada ao contexto público.
|
346 |
Empredimientos habitacionales cooperativos : propuestas para la mejora del proceso de gestión estatal / Housing cooperatives projects: proposals for state management process improvementCamaño Capocasale, Andrea Fátima January 2011 (has links)
The topics relating to Latin American social housing requirements, has historically been a priority for governments social policies in such countries. In Uruguay, one of the programs promoted by the public sector to satisfy the demand for social housing to lower-income households, has been a venture managed by solidarity cooperative organizations. These cooperative organizations voluntarily associate families with a common housing need, to provide housing solutions through such a social and cultural organization called Housing Cooperative, which is shared ownership and democratically managed. For cooperative launch, the role played by social organizations and the government are crucial, particularly in process efficiency through which, the goal of social housing solutions can be achieved for involved families. This is the study purpose of this thesis, that intends contribute to public management processes improvement to enable housing cooperatives construction. Specially, the research goal is focused on a new approach for the state management process in Cooperative Housing projects, figured out as a Product Process Development, generating value in public actors’ interactions, seeking quality improvements opportunities for such projects. To meet this purpose, process loss value related to wasted time, were identified by process modeling tools, including benchmarks and value stream maps. The impact of time and information issues in loss value was investigated from the cooperative projects end-users point of view. The research was a case study approach and it was divided in two descriptive stages called phases. Phase A was aimed to describe the processes and define criteria for case-study selection. In Phase B was conducted the case studies properly, seeking to distinguish using different data and evidence source, the perceived value within the analyzed process. The main findings relate to the lack of overall process understanding. This vision successfully allows identify perceived creation or loss value, and non-value generation potential in these processes, mainly in social processes. Flow value loses in processes value stream were detected in time and quality of information issues. Given the results, actions are proposed for future value flow map improvement, as well as proposals for short and medium term acting in the main identified variables. / La temática relacionada a la atención de la necesidad de vivienda de interés social en América Latina ha sido una prioridad histórica en las políticas sociales de los gobiernos de muchos de sus países. En el Uruguay, uno de los programas impulsados desde la órbita pública para satisfacer la demanda de viviendas para sectores de población de menores ingresos, ha sido el emprendimiento habitacional gestionado bajo un sistema solidario organizado en forma de cooperativa. Estas asocian voluntariamente a familias con necesidades comunes de acceso a la vivienda, a través de una organización social y cultural que se materializa en una empresa denominada Cooperativa de Vivienda, de propiedad conjunta y controlada democráticamente. Para su surgimiento y formación resulta fundamental el papel que desempeñan las organizaciones sociales y el gobierno, especialmente en la eficiencia de los procesos a través de los cuales esta gestión permite alcanzar la meta de la vivienda social para las familias involucradas, siendo este último el objeto de estudio de la presente tesis. Este trabajo se propuso contribuir a la mejora de los procesos de gestión pública que viabilizan la construcción de viviendas cooperativas. En particular, se estableció como objetivo general de la investigación abordar desde una nueva perspectiva el proceso de gestión estatal de los Emprendimientos Habitacionales Cooperativos, entendiéndolos como un Proceso de Desarrollo del Producto generador de valor, en la fase de interacción con los actores del ámbito público, buscando identificar oportunidades de mejora y formular propuestas que tiendan a incrementar la calidad de estos emprendimientos. Para cumplir este objetivo, se mapearon los procesos para identificar las pérdidas relacionadas al tiempo, aplicando herramientas de modelaje del proceso, incluyendo modelos de referencia y mapas de flujo de valor; se investigó el impacto del tiempo en la pérdida de valor y el impacto de la información en la generación de valor, desde el punto de vista de los usuarios finales de los proyectos cooperativos. La investigación tuvo como método el estudio de casos y su desarrollo se dividió en dos etapas de carácter descriptivo. La Etapa A tuvo como objetivo la caracterización inicial de los procesos describiéndolos de forma genérica y la definición de criterios de selección de los casos. En la Etapa B se realizó el estudio de casos buscando distinguir, utilizando diferentes fuentes de evidencia, el valor percibido dentro del proceso analizado. Las principales conclusiones se relacionan a la necesidad de comprender el proceso de forma global. Esta visión viabilizó la identificación de la generación de valor percibido o la pérdida del mismo, la no generación de valor potencialmente existente en estos procesos, fundamentalmente en los procesos sociales, y las pérdidas en el flujo de valor; y condujo a detectar dos variables importantes: los tiempos de proceso y la calidad de información de los mismos. Frente a los resultados obtenidos se plantearon acciones a implementar en un mapa de flujo de valor futuro del proceso actual, así como propuestas a corto y mediano plazo actuando en las principales variables identificadas.
|
347 |
Gestão dos resíduos sólidos urbanos com geração de energia : o Projeto Ecoparque de Porto AlegreRibeiro, Lauro André January 2008 (has links)
A destinação final dos resíduos sólidos urbanos se tornou um problema cada vez mais difícil de ser resolvido. Muitos projetos de valorização energética dos resíduos sólidos urbanos vêm sendo implementados com sucesso no tratamento em diversos países. Visando desenvolver uma experiência semelhante em Porto Alegre, a Centrais Elétricas Brasileiras S.A. (ELETROBRÁS), a Companhia de Geração Térmica de Energia Elétrica (CGTEE) e a Prefeitura Municipal de Porto Alegre (representada pelo Departamento Municipal de Limpeza Urbana - DMLU) realizaram um estudo, finalizado em novembro de 2004, que atestou a viabilidade técnica, econômica, ambiental e social de uma planta de tratamento de resíduos por digestão anaeróbia denominada Projeto Ecoparque. Desde então, o projeto encontra-se engavetado. Se o projeto concebido para o município de Porto Alegre apresentava viabilidade, tinha instituições dispostas a viabilizá-lo, sua implantação amenizaria o problema da destinação dos resíduos sólidos urbanos, por que não foi implementado? Para elucidar essa questão, realizou-se uma revisão na literatura seguida de entrevistas com roteiro semiestruturado com os principais atores envolvidos no desenvolvimento do projeto e com os tomadores de decisão, para verificar os possíveis entraves deste projeto. Foram entrevistadas nove pessoas que trabalharam no Projeto Ecoparque ou possuem conhecimento sobre gestão de resíduos urbanos. A pesquisa identificou como principais entraves as questões de ordem política e de falta de conhecimento sobre a destinação dos resíduos em Porto Alegre. / The final destination of municipal solid waste has become a problem to be solved. Many projects of municipal solid waste energetic valorization have been implemented with success in many countries. Seeking to develop a similar experience in Porto Alegre, Centrais Elétricas Brasileiras S.A. (ELETROBRÁS), CGTEE and The Porto Alegre City Hall (represented by DMLU – Municipal Urban Solid Waste Department) carried a study, finished in November 2004, that showed technical, economical, social and environmental viability of building a plant to treat municipal solid waste through anaerobic digestion named Ecoparque Project. Since then the project is halted. If the concieved project for Porto Alegre presented viability, had institutions ready to put the project into practice, it would soothe the final destination of waste problem, why it was not implemented? To clarify this question, it was made a literature revision followed by interviews with the main actors involed with the development of the project and with the decision makers, to verify possible obstacles of this project. Nine people were interviewed in this research because they worked on this Ecoparque Project or because they have knowledge about municipal solid waste management. Results shown that political reasons and lack of public information had an important role in halting this project.
|
348 |
Estudo comparativo de caso de duas instituições tecnológicas em relação a gestão institucional de projetos de P&D.Skrobot, Luiz Claudio 11 August 2005 (has links)
Made available in DSpace on 2016-06-02T19:50:28Z (GMT). No. of bitstreams: 1
TeseLCS.pdf: 2067913 bytes, checksum: fe03f2f8092b1ff62a76fa171f4216c2 (MD5)
Previous issue date: 2005-08-11 / Studies comparing two technological institutes in Mercosul -The Industrial Technologic Institute, in Argentina, and the Technological Research Institute, in Brazil - focus on management projects in research and Development, in institutional level. Through the literature, it is identify, areas and subjects that allow the analyses of institutional management R&D projects (IMRDP). The history of the two institutes was study to identify the similarity and the differences of them. The field research is composed by an interview which was framed through literature subjects and documents in the following topics: general vision and IMRDP operations in the institutes; institutional management; process effectives results; people´s communication involved with projects and the institution; experiences acquired in the institutions. Of all interviews, one quarter was directed to high management, one quarter to functional gerency and two quarter to project managers. The discussion results, thanks to the methodology and schedule, determined that institutions did not have IMRDP, although both institutions considered the importance of its implementation. It was clear that the IMRDP structure, in any institution, have to consider the institutional culture, history, staff, structure and market, even though there are similar subjects and areas between the two institutions. / Estudo de casos comparativo de dois institutos tecnológicos em países do Mercosul o Instituto de Tecnologia Industrial (INTI), na Argentina e o Instituto de Pesquisa Tecnológica (IPT), no Brasil com foco na gestão de projetos de Pesquisa e Desenvolvimento (P&D), no nível institucional. Identifica na literatura áreas e temas pelos quais é possível analisar a Gestão Institucional de Projetos de P&D (GIPPD), para então voltar-se ao estudo da história das duas instituições, contextualizando-as e identificando pontos de identidade e diferenciação. Elabora uma pesquisa de campo utilizando-se de entrevista estruturada, a partir do mapeamento que resultou na solução gráfica representativa dos temas identificados no estudo da literatura e dos documentos: visão geral da GIPPD e seu funcionamento em cada instituição; estrutura organizacional; projetos de P&D e o planejamento institucional; Gestão Institucional; resultados efetivos dos processos; comunicação entre os atores dos projetos e a instituição e experiências adquiridas na instituição. As entrevistas foram dirigidas numa proporção de um quarto à Alta Direção (AD), um quarto aos Gerentes Funcionais (GF) e dois quartos aos Gerentes de Projeto (GP). A discussão dos resultados, facilitada pela metodologia e a tabela dinâmica empregadas, permitiu que se concluísse pela nãoexistência de uma GIPPD estruturada nas instituições estudadas, embora os entrevistados considerem válida a sua implantação nas suas organizações. Observa-se que a estruturação de GIPPD em qualquer instituição deverá levar em conta sua cultura institucional, sua história, seu quadro funcional, sua estrutura e seu mercado, no sentido amplo, embora elas venham a ter sempre um conjunto básico de áreas e temas comuns.
|
349 |
Gestão de portfólio de produtos/projetos e processo de desenvolvimento de produtos : diagnóstico em uma empresa de autopeças.Schelp, Mathias Xavier 15 June 2007 (has links)
Made available in DSpace on 2016-06-02T19:51:33Z (GMT). No. of bitstreams: 1
DissMXS.pdf: 2882142 bytes, checksum: 73132e53eca9b9f289933dbbeab4e511 (MD5)
Previous issue date: 2007-06-15 / To choose the right projects, to develop them fast, achieving high quality
patterns, and respecting the costs pressures. These are no questionable demands in the
actual market conditions. The utilization of Product Development Processes and
Portfolio Management are some of the main manners to achieve these goals. The
Product Development Process adopted in a specific organization should be essentially
aligned with the product-life-cycle. In addition, companies need to evaluate and make
decisions on the products / projects based in an overall view provided by the Portfolio
Management systematics and tools. This research focuses in these issues. The main
objective is to analyze the integration between the Product Development Process and
the Portfolio Management in a company from the automotive industry aimed at
identifying the best practices and improving opportunities. The research methodology is
the realization of a literature review followed by a case-study. The main result is the
proposal of a Portfolio decision model, and the realization of a case-study based on this
model proposal. The main contribution is to detail the Portfolio decisions, based in a
PDP model, along the product-life-cycle. / Escolher os produtos corretos e desenvolver estes produtos rapidamente,
atingindo exigentes padrões de qualidade e respeitando pressões por redução de custos,
são demandas comuns nas atuais condições de mercado. Uma das principais maneiras
nas organizações para atingir estes objetivos é a utilização de Processos de
Desenvolvimento de Produtos (PDP) e de Gestão de Portfólio (GP). É essencial que o
PDP adotado em uma determinada empresa esteja alinhado ao ciclo de vida de produto.
Adicionalmente, deve-se avaliar e decidir sobre os produtos / projetos conjuntamente
por meio da Gestão de Portfólio e da aplicação de suas ferramentas. Esta pesquisa trata
destas questões, tendo como objetivo geral analisar a integração entre a GP e o PDP
numa empresa de autopeças e procurando identificar algumas das principais
potencialidades e oportunidades de melhoria. O método utilizado para realização da
pesquisa foi uma revisão de literatura sobre os temas mencionados, seguido de um
estudo de caso em uma empresa do setor de automotivo. O principal resultado é a
apresentação de uma proposta de modelo de decisão de Portfólio elaborada a partir da
revisão bibliográfica, realizando-se o estudo de caso com base em tal proposta. A
principal contribuição do trabalho é o detalhamento das decisões de Portfólio que são
tomadas, com base em um modelo de PDP, ao longo do ciclo de vida de produto.
|
350 |
Um estudo de gestão de projetos cooperados baseado em projetos de software livre / Cooperated project management bued on free softwareFernandes, Jorge Manuel Lage 31 August 2009 (has links)
Made available in DSpace on 2016-12-01T19:18:48Z (GMT). No. of bitstreams: 1
jorge.pdf: 1548823 bytes, checksum: fdd8ee712ecd3eb26471f8ffbf7685a0 (MD5)
Previous issue date: 2009-08-31 / Coordenação de Aperfeiçoamento de Pessoal de Nível Superior / The organizations are facing a moment of deep social and economics transformations caused by the cooperation possibility based on the information and communication technologies. In this scenery, this research has the main objective of building a cooperated project management conceptual model based on the study of free software network based projects. Using a purpose of collecting evidences that helped the comprehension of the focused process, the study hás analyzed three free software development projects from different characteristics and sizes. The study was guided by a theoretical-empirical approach, which beyond the literature review, looked forward to verify the coherence with the reality to create a knowledge base for the cooperated project model construction. The research was bases on structured interviews, using a pre-defined questionnaire and the result interpretation that was made with the analysis of the subjects behavior, systematically collected and revalued during the investigation process. The research results helped to build an applicable management model for this type of projects, thus new studies are suggested to supply adequate technical base for its implantation / As organizações estão vivenciando um momento de profundas transformações sociais e econômicas, proporcionadas principalmente pela possibilidade cooperação baseada nas
tecnologias de informação e comunicação. Neste cenário, esta pesquisa tem como objetivo a criação de um modelo conceitual para gestão de projetos cooperados através do estudo de projetos em rede baseados no desenvolvimento de software livre. Com a finalidade de coletar fontes de evidência que auxiliassem na compreensão do processo focalizado, o estudo analisou três projetos de desenvolvimento de software livre de diferentes características e portes. A pesquisa utilizou uma abordagem empírica e teórica, na qual além da revisão de literatura sobre o assunto, procurou-se verificar a coerência com a realidade, para conceber um conjunto de informações que servissem de referência para a construção do modelo de gestão de projetos cooperados. O trabalho de pesquisa foi apoiado por entrevistas estruturadas, realizadas a partir de um questionário pré-definido e a interpretação dos resultados foi realizada na percepção dos significados dos comportamentos dos sujeitos, coletados sistematicamente e reavaliados durante todo o processo de investigação. Os resultados de pesquisa auxiliaram para construir um modelo de gestão aplicável a este tipo de projetos e desta forma sugerem-se novos estudos que aprofundem o tema, e que forneçam a base técnica adequada para sua implantação
|
Page generated in 0.0819 seconds