• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 229
  • 89
  • 13
  • 10
  • 9
  • 6
  • 5
  • 5
  • 5
  • 5
  • 5
  • 4
  • 4
  • 4
  • 4
  • Tagged with
  • 398
  • 258
  • 164
  • 111
  • 98
  • 76
  • 67
  • 50
  • 49
  • 45
  • 44
  • 37
  • 37
  • 35
  • 33
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
191

Análise regulatória de casos de implementação de usinas hidrelétricas binacionais: levantamento histórico e projeções para o futuro. / Regulatory analysis of cases of bi-nacional hydroelectric plants implementation: historical survey and projections for the future.

Novoa Curihuentro, Sebastian Gonzalo 06 August 2015 (has links)
Os projetos hidrelétricos binacionais existentes têm exibido grandes resultados no que se refere à integração energética, principalmente pela forma com que os países membros vêm lidando com os investimentos de geração. Nesse sentido, com base em pesquisas documentais realizadas para a compreensão da evolução da regulação especialmente da integração de energia e potência dos empreendimentos e dos mercados elétricos dos países contratantes , assim como da regulação elétrica dos países envolvidos, o presente trabalho tem por objetivo apresentar alinhamentos regulatórios para o desenvolvimento de futuros projetos hidrelétricos binacionais. Parte das ferramentas apresentadas e dos arranjos previstos nos modelos é preexistente e, inclusive, alguns deles têm sido aplicados na regulação existente de projetos em desenvolvimento. Contudo, será apresentada uma forma articulada de utilização, mediante a criação de modelos que possam servir como alinhamentos gerais para melhor orientar os esforços para a realização de futuros projetos binacionais. Tudo isso sob a ótica da teoria de desenhos de mercado e da teoria do interesse privado, com o intuito de, consequentemente, facilitar a inclusão de empreendedores privados nesse tipo de iniciativa. / The existing binational hydroelectric projects have shown very good results when it comes to energy market integration, especially considering the way that countries deal with generation investments. Therefore, based on documentary research conducted to understand the evolution of the energy markets regulation particularly the way that the involved countries deal with the integration of the energy and power coming of the enterprises to their national energy markets , as well as the electrical regulation of such countries, this document intends to introduce regulatory alignments to guide the development of future binational hydroelectric projects. Some of the regulatory tools and arrangements presented as part of the models are pre-existing to this paper, and even some of them have been used on existing regulation of projects currently under development. However, an articulate way to use them will be presented, by creating models that can serve as general alignments to improve the accuracy of the efforts for the development of new binational hydroelectric projects. All this from the standpoint of the energy market designs theory and private interest theory, in order to facilitate the inclusion of private entrepreneurs in this kind of initiative.
192

A intervenção estatal no setor elétrico paulista: as grandes empresas e as grandes usinas  - 1953/1997 / State intervention in the electicity sector in São Paulo: large companies and large power plants - 1953/1997

Diniz, Renato de Oliveira 02 June 2011 (has links)
A Criação da CESP em 1966 e de suas antecessoras (USELPA, CHERP, e CELUSA), foi um fator decisivo para o desenvolvimento do ramo da construção hidrelétrica na engenharia brasileira: o planejamento e implantação das usinas, sistemas de transmissão e redes de distribuição demandou um intenso esforço da estatal, das empresas projetistas e das construtoras das usinas. Esse esforço traduziu-se, além da implantação do parque gerador, constituído por grandes centrais hidrelétricas, integrado, entre si e o mercado consumidor, por um conjunto de extensas linhas de transmissão; produziu experiências e conhecimentos que ainda hoje destacam a engenharia hidrelétrica brasileira no contexto internacional. Possibilitou a implantação da indústria de equipamento elétrico pesado, ainda que sob domínio de empresas de capital internacional; e o forte crescimento da indústria de material elétrico leve: e capitalizou e capacitou empresas privadas de construção civil pesada, muitas delas hoje constituídas como fortes grupos empresarias nacionais em processo de internacionalização. O conhecimento produzido não se resumiu às questões de engenharia e construção. Ao herdar as obras e projetos em execução por suas antecessoras, o corpo técnico da CESP precisou desenvolver a percepção de que construir uma grande usina pressupõe uma série de necessidades que, podem parecer apenas de como desenvolver a maior capacidade possível de produzir quilowatts/hora a partir da construção de uma barragem e de uma casa de máquinas. Desenvolveu-se métodos de trabalho que também deram conta das dimensões sociais, culturais, econômicas e ambientais de modo abrangente e complexo. O projeto das usinas de Urubupungá (Jupiá e Ilha Solteira), construídas distantes dos centros de consumo para os quais deveriam fornecer energia, previu a criação de um polo de desenvolvimento na região em que se instalava, o estabelecimento de novas vias de comunicação entre o então estado de Mato Grosso e o oeste paulista, e o desenvolvimento de estudos dos impactos sobre a natureza das áreas alagadas e na vida das populações ribeirinhas afetadas. / The founding of CESP, in 1966, and of its predecessors (USELPA, CHERP, and CELUSA), was a decisive factor for the development of the area of hydroelectric plant construction in Brazilian engineering. The planning and implementation of the plants, transmission systems, and distribution networks demanded intense efforts on the part of the State-owned company, of the design firms, and of the builders of the plants. Those efforts resulted in, not only the implementation of the widespread energy generating system, consisting of large hydroelectric plants that are integrated among themselves and the consumer market by an extensive complex of transmission lines, but they produced experiences and knowledge that continue to highlight Brazilian electrical engineering on the international scene. It established the heavy electrical equipment industry, although under the aegis of companies backed by international capital, resulting in strong growth for the light electrical materials industry. It also brought capital and capacity to private heavy construction companies, many of which are strong national corporate groups that are in the process of becoming international. The knowledge that was produced is not limited to engineering and construction issues. Upon inheriting the works and projects of its predecessors, which were already underway, CESPs technical staff was forced to perceive that building a large plant presupposes a whole series of needs that might seem, at first, to be related only to how to develop the largest capacity possible for producing kilowatts/hour by building a dam and a machine hall. Working methods were developed that also handled the social, cultural, economic, and environmental dimensions in a broad a complex manner. The project of Urubupungás Jupiá and Ilha Solteira plants, which were built far from the consumer markets they were to supply with energy, provided for the creation of a development hub in the region where they were installed, the establishment of new means of communication between the then-State of Mato Grosso and western State of São Paulo, and the performance of studies regarding impacts on Nature in the flooded areas and on the lives of the river dwellers, who were affected.
193

O planejado e o vivido: histórias de vida de moradores do Sertão Goiano / The planed and experiencied: life histories of residentes of Sertão Goiano

Araújo, Kalliandra de Moraes Santos 16 December 2014 (has links)
Esta dissertação é resultado de uma pesquisa com atingidos pela Usina Hidrelétrica Serra do Facão no sudeste de Goiás. Foram coletadas histórias de vida de moradores da zona rural de Goiás em dois momentos distintos. O primeiro em 2009, antes da instalação da barragem do rio São Marcos. O segundo momento das entrevistas foi pós o deslocamento compulsório, em 2012 e 2013, com a usina em funcionamento. Este intervalo entre as entrevista nos permitiu analisar o que foi planejado e o que foi efetivamente vivido por estes moradores do sertão goiano. Este empreendimento desapropriou 420 famílias, moradoras da zona rural em seis municípios: Catalão, Ipameri, Cristalina, Davinópolis, Campo Alegre de Goiás, em Goiás e Paracatu, no triângulo mineiro, Minas Gerais. Tomamos como recorte analítico as famílias remanescentes ou as famílias retornadas a terra, sendo assim, selecionamos seis histórias de vida que nos evidenciaram o que foi este processo de expulsão de suas terras de origem e as formas de reconstruir suas vidas agora não mais margeadas pelo rio. Os colaboradores foram mulheres e homens de distintas idades, todos moradores das beiras do rio São Marcos, localizados na zona rural do município de Campo Alegre de Goiás, que teve a maior área atingida e a maior quantidade de famílias desapropriadas. Por meio da História Oral, registarmos histórias de vida nas quais foram expostos os mecanismos de sobrevivência destes afogados. Transcriadas, as histórias de vida revelaram a complexidade deste cenário e demonstram a face perversa de expulsão do camponês de suas terras. Estes sujeitos tem outros conhecimentos para além do português letrado, que os permitiram reconfigurar a vida já tão dura pela lida na terra e pelos desmandos do estado. Revelou também que é preciso superar práticas autoritárias e de subordinação política na relação entre mediadores da barragem e camponeses, como uma das condições para uma nova retomada em suas vidas. / This dissertation is the result of a research about people affected by Serra do Facão Hydroelectric Dam at south-east Goiás. The histories of people who lived in the rural area were collected at two distinct times. First before the dams construction at São Marcos River in 2009. The second moment of interviews was after the mandatory move, in 2012 and 2013, with the power plant already producing. This time offset allowed us to analyze what had been planned and what the former residents of this area actually experienced. This venture expropriated 420 families living in the rural areas of six cities: Catalão, Ipameri, Cristalina, Davinópolis and Campo Alegre de Goiás in Goiás and Paracatu in Triângulo Mineiro region of Minas Gerais. As analytical approach taken cover the reminiscent families or families which returned to their land, so we selected six life stories what was this process of expulsion from their own land and ways of rebuilding their lives, now, no longer at the border of the river. The interviewed people were women and men of different ages, all residents of São Marcos river borders, in rural areas of the city of Campo Alegre de Goiás, the one with the largest affected area and dispossessed families as well. Through Oral History, we recorded their life stories in which the mechanisms of survival of those drowned were exposed. Transcreated, These guys have other knowledge beyond the literate Portuguese, which allowed them to reconfigure life already so hard for the land labor and government excesses. Also revealed that it is necessary to overcome authoritarian and political subordination in the relationship between mediators of the dam and peasants practices as a condition for a new resume in their lives.
194

Afluências agregadas na programação dinâmica estocástica aplicada ao planejamento da operação energética / Agregated inflows for stochastic dynamic programming applied to energetic operation planning

Scarcelli, Ricardo de Oliveira Camargo 22 August 2016 (has links)
O planejamento da operação energética em sistemas hidrotérmicos de potência com um único reservatório tem como objetivo determinar a participação de usinas hidrelétricas e térmicas de forma a garantir o suprimento de energia demandada ao menor custo operacional possível, dentro de restrições físicas e técnicas do modelo. Alguns fatores tornam a solução deste problema bastante complexa destacando a não linearidade e a não separabilidade temporal aditiva. O objetivo deste trabalho é apresentar uma nova abordagem com tratamento agregado das afluências, descrevendo uma nova caracterização das distribuições de probabilidades e um novo modelo para a programação dinâmica estocástica markoviana. Nesse novo modelo da programação dinâmica estocástica markoviana, agregações plurimensais de vazões são utilizadas como entrada em um modelo de programação dinâmica estocástica markoviana modificado para discretizações temporais plurimensais. A nova abordagem proposta foi simulada em diferentes usinas hidrelétricas brasileiras localizadas em diferentes regiões geográficas e sob diferentes regimes hidrológicos. Os resultados das simulações feitas com a utilização deste novo modelo são apresentados e comparados ao modelo de programação dinâmica estocástica markoviana mensal, atualmente utilizado no setor elétrico brasileiro, com economia de custos relativas superiores a 10% em alguns casos. / The energetic operation planning on hydrothermal power systems with a single reservoir aims to determine the participation of hydroelectric power plants and thermal power plants to guaranty supply of energy demanded with the smallest possible cost, under physical and technical model boundaries. Some points became the solution of this problem complex, highlighting the non linearity and the additive non time separability. The objective of this paper is show the new approach with aggregated inflows, describing a new probability distributions featuring and a new model for the markovian stochastic dynamic programming. On this new model of markovian stochastic dynamic programming, multi monthly inflow aggregations are used as input in a model of markovian stochastic dynamic programming modified for multi months discretizations. The new approach proposed was simulated on differents Brazilian hydroelectric power plants located on different regions and under different hydrologic regime. The results of simulations using this new model are presented and compared to the model of monthly markovian dynamic programming, nowadays used on the Brazilian electrical sector, with relatives economic savings up to 10% in some cases.
195

Corrosão microbiologicamente influenciada em superfícies metálicas expostas à água de processo industrial de usinas hidrelétricas. / Biocorrosion on metal surfaces in hydroelectric power plant.

Silva, Leandro Jorge da 25 November 2015 (has links)
Materiais metálicos expostos a ambientes aquáticos estão susceptíveis ao desenvolvimento de Corrosão Microbiologicamente Influenciada (CMI). Nas indústrias a CMI é um assunto de extrema importância devido aos prejuízos gerados nos reparos ou trocas de equipamentos e nas interrupções dos sistemas de produção associadas às falhas técnicas. No presente trabalho estão apresentados resultados de um estudo de CMI em superfícies metálicas expostas à água de processo em uma unidade geradora de energia hidrelétrica, que sofre com um acelerado processo corrosivo, principalmente nos trocadores de calor e nas turbinas. A partir de biofilmes de corrosão amostrados nas turbinas e trocadores de calor foram isolados grupos bacterianos redutores de sulfato e oxidantes e redutores de ferro que foram relacionadas como indutoras/ agravantes do processo corrosivo. / Metallic materials exposed to aquatic environments are susceptible to development of Microbiologically Influenced Corrosion (MIC). In industries MIC is a matter of great importance due to damages generated in repairs or equipment changes and production systems disruptions associated with technical failures. In this work are presented results of a MIC study on metal surfaces exposed to process water in a generating unit of hydropower, which suffers from an accelerated corrosion process, especially in the heat exchangers and the turbines. From corrosion biofilms sampled in turbines and heat exchangers were isolated bacterial groups sulfate reducing and oxidizing and reducing iron. These bacteria have been widely reported in the literature as inducing / aggravating the corrosion process.
196

A compensação ambiental no Brasil: compensação para que e para quem? / The environmental compensation in Brazil: compensation for what and for whom?

Fonseca, Rafael Oliveira 24 May 2017 (has links)
A temática ambiental se constitui em um contexto complexo e dinâmico de inúmeras relações de interdependência e/ou de subordinação, pois está inserida em um constante movimento ocasionado pelas variadas forças e interesses de atores que as circundam, como por exemplo, o Estado, a sociedade civil e o mercado. Nesse sentido, a questão não deve ser compreendida como simples resultante do vínculo entre os homens e a natureza, mas como um componente das relações humanas, como um objeto econômico, político e cultural. No Brasil, a relevância do tema é evidente devido a sua posição de protagonista internacional nas esferas ambiental e socioeconômica. Dessa forma, um instrumento constituinte da política territorial e ambiental nacional, que está diretamente inserido nessa complexa e dinâmica temática e envolvo pelos interesses e poderes de vários atores, é a Compensação Ambiental (CA). Objeto central desta pesquisa, a CA está subordinada ao processo estatal de emissão de licenças ambientais e visa contribuir para o fortalecimento do Sistema Nacional de Unidades de Conservação (SNUC). A hipótese deste trabalho é que a Compensação Ambiental Federal, na forma como está estabelecida e operacionalizada na atualidade, é pouco eficaz em relação ao seu propósito. Assim, o objetivo desta pesquisa é compreender e analisar o papel e/ou a finalidade do Estado (e de suas políticas públicas) na definição da CA, bem como o potencial deste instrumento em influenciar no ordenamento do território, particularmente ante a abordagem ambiental e a sua conjuntura contemporânea, perpassando igualmente pelos outros atores que envolvem este instrumento. Para isso consideramos a escala federal da administração do território, ou seja, a atuação da União, abarcando, dessa maneira, as atividades dos principais órgãos ambientais do país, sejam: do Ministério do Meio Ambiente, do Ibama, do ICMBio etc. Para atingir tal proposição, este trabalho se baseia em pesquisas bibliográficas, levantamento de dados e estatísticas, entrevistas em órgãos públicos e em instituições não-estatais, produção de elementos gráficos, tabulares e cartográficos, e em um estudo de caso, a UHE Santo Antônio do Jari, e seu respectivo trabalho de campo. O conteúdo está segmentado em três etapas: a primeira aborda a tríade dos atores que envolvem a CA, com base em um esquema conceitual de análise; a segunda apresenta um aprofundamento sobre o instrumento em uma perspectiva histórica, legislativa e operacional; e, a terceira transpõe a teoria e tange o território a partir da análise empírica do estudo de caso. Ao final, visando responder o para que e para quem que intitula este trabalho, conclui-se em relação ao para que, que de fato, a CA Federal visa fortalecer o SNUC, essa finalidade está consolidada. Por outro lado, a análise do para quem nos leva a afirmar que no presente o instrumento serve a todos os atores que o envolvem apesar de não atender todas as suas demandas, deixando uma lacuna sobre o seu futuro se nenhuma alteração significativa for realizada em suas diretrizes operacionais. / Environmental issues constitute a complex and dynamic context of numerous relationships of interdependence and/or subordination because they are part of a constant motion due to the different forces and interests of the actors that surround them, such as the State, the civil society and the market. In this sense, these questions should not be understood as a simple result of the relationships between human beings and the nature, but should be seen as part of a component of human relations, as an economic, political and cultural object. In Brazil, the relevance of the questions is evident due to its position as an international protagonist in the environmental and socioeconomic spheres. Environmental Compensation (EC) is an instrument that is part of the national territorial and environmental policy, that is directly inserted in this complex and dynamic thematic and that envelops the interests and powers of several actors. The central object of this research, the EC, is related to the State´s allocations of environmental licenses and aims to contribute to the strengthening of the National System of Conservation Units (SNUC). This study is based in the following hypothesis: Environmental Compensation managed by the federal government is not very effective in relation to its purpose, as currently established and operationalized. Thus, this research aims to understand and analyze the role and/or the purpose of the State (and its public policies) in the definition of EC, as well as the potential of this instrument in influencing the spatial planning, particularly facing the contemporary conjuncture of the environmental issue, also permeating the other actors that are involved in this instrument. For this, we consider the federal scale of territory administration, covering in this way, the activities of the main public environmental institutions in Brazil, such as the Ministry of the Environment, Ibama, ICMBio, etc. In order to reach such a goal, this work is based on bibliographical research, data collection and analyses, interviews with public agencies and non-state institutions, production of graphics, tables and maps, and on a case study, in the Santo Antônio do Jari Hydroelectric Power Plant, and its related field research. The content is segmented into three parts: the first one presents the triad of the actors that are involved in the EC, based on a conceptual schema of analysis; the second one presents a theoretical understanding of the instrument in a historical, legislative and operational perspective; and the third part transposes the theory and covers the territory from the empirical analysis of the case study. In the end, in order to answer \"for what and for whom\", the question in the title of this research, we conclude, with regard to the for what\", that in fact, the Federal EC aims to strengthen the SNUC, this purpose seems consolidated. The analysis of the \"for whom\" leads us to affirm that, in the present, the instrument serves all the actors that involve it, even if it does not meet all your demands. Thus leaves doubts about its future if no significant change in its operational guidelines is made.
197

Impactos no sistema de proteção da rede de distribuição com a ligação de pequenas centrais hidrelétricas. / Impacts of small hydroeletric power plants on the distribution protection systems.

Koehler, Marcos 21 September 2006 (has links)
Geração Distribuída é uma expressão utilizada para designar a geração elétrica proveniente de locais próximos ou juntos de consumidores, não interferindo a potência, tecnologia ou fonte de energia empregada. Estudos indicam que, até o ano de 2010, 20% do total de geração (em termos mundiais) serão provenientes desta forma de obtenção, uma vez que se torna fático sua vantagem sobre a geração central, por oferecer economia em matéria de investimentos relacionados à transmissão, redução de perdas e melhoria acerca da estabilidade do serviço de energia elétrica. Exemplos de geração distribuída são observados em pequenas centrais hidrelétricas, eólicas, térmicas, fotovoltaicas e geradoras de emergência, por terem pequeno porte e serem integradas ao sistema elétrico. Voltandose por hora ao potencial hidráulico passível de exploração no país, associado por sua vez às pequenas centrais hidrelétricas, tem-se cerca de 4% da potência instalável total (parcela extremamente significativa). De acordo com o Plano 2.015 da ELETROBRÁS, centrais que atingem até 30 MW de potência instalada representam um potencial de 9.456 MW. Informações de Geração da ANEEL indicam que há cerca de 254 PCH em operação no país, totalizando 1327 MW (1,4% do total), 40 empreendimentos em construção (500 MW) e 211 projetos outorgados (construção não iniciada) que, se implantados, adicionarão ao sistema elétrico 3426 MW. O panorama da reordenação da matriz energética nacional não tem apresentado abundância no que diz respeito ao investimento público, direcionado a grandes empreendimentos. Desta forma, as quedas d´água de pequeno e médio porte representam uma evidente opção de geração. As Pequenas Centrais Hidrelétricas (PCH) surgem então como uma alternativa viável, como já especificado anteriormente. Oferece vantagens primeiramente pelo custo acessível, pelo menor prazo de implementação e maturação do investimento, pelas facilidades oferecidas pela legislação, pela disposição das concessionárias de energia elétrica de comprarem o excedente de energia gerada por autoprodutores e finalmente por disponibilizarem o acesso às suas linhas de distribuição e transmissão à longa distância. A partir do incentivo proveniente do Governo Federal para a construção de PCH e descontos nas tarifas de uso dos sistemas de transmissão e distribuição, propiciou-se a ligação de novos pontos de geração de energia no sistema de Distribuição. Com a finalidade de reduzir os custos de transportes de energia, visa-se a localização dos novos pontos de geração próxima aos pontos de consumo potencial. Sendo assim, na medida em que a rede garante a regulação de freqüência e a absorção permanente da potência total, os grupos serão equipados com geradores que não requerem controle com comando sofisticado. Há, todavia, a possibilidade da construção de interligações que devem ser estudadas mesmo quando se tratando de rede de pequeno porte. Sua vantagem está no fato de permitir a utilização de geradores assíncronos, os quais são menos onerosos e mais robustos. Os efeitos da geração nos sistemas de distribuição irão depender do tamanho, do tipo e do local onde será instalada a geração. Atualmente não se tem dado a devida importância aos impactos na proteção da rede de distribuição da concessionária - fato lamentável já que se poderia evitar a degradação da qualidade de energia, confiabilidade e operação - uma vez que se dá prioridade aos benefícios como a energia de backup, a redução dos afundamentos de tensão, a energia de ponta, dentre outras. A partir do momento em que estas PCH são instaladas nas redes de Distribuição, transforma-se um sistema anteriormente radial em um sistema em anel, com mais de uma fonte de contribuição de corrente de curtocircuito. Sendo assim, têm-se como diretrizes deste trabalho abordar temas relacionados aos problemas com falta de coordenação e sensibilidade dos equipamentos de proteção, bloqueio de religamento, necessidade de proteção de sobre-corrente com função direcional, coordenação com consumidores e ramais (gerando problemas de segurança com pessoas e equipamentos) e continuidade de energia. Portanto, é de suma importância a realização sistemática de estudos de proteção de redes com geração de PCH em paralelo, uma vez que é determinante para a segurança e melhoria dos índices de continuidade de serviço. Finalmente, são descritos e analisados detalhadamente, os impactos no sistema de proteção nas redes de distribuição com a ligação de Pequenas Centrais Hidrelétricas, sendo propostas soluções para a redução deste impacto. / Distributed Generation is an expression used to designate the electric generation source in places near or contiguous to consumers, regardless of the power, technology or energy source used. Studies show that, by the year 2010, 20% of the total amount of generation (worldwide) will be acquired this way. The advantages of distributed generation, over central generation, are obvious and include: lower investment needed for transmission, reduction of losses and better performance regarding stability in the electric energy service. Examples of distributed generation include: small hydro electrics, wind turbines, thermals, photovoltaics and emergency generators. These examples are small in size and are interconnected to the electric system. Hydraulic power, which is available through exploration in the country, could comprise about 4% of the total power to be generated (which is a verysignificant portion) in small hydro electrics. According to ELETROBRÁS´ Plan 2,015, a power station that reaches up to 30 MW of installed power represents a potential of 9,456 MW. ANEEL´ information about Generation shows that there are about 254 PCH in operation in the country, which total 1,327 MW (1.4% of the total), 40 enterprises under construction (500 MW) and 211 approved projects (construction has not yet begun) that, when finished, will add 3,426 MW to the electric system. Substantial public investments have not been directed toward the larger enterprises since the re-arrangement of the national energy center. Thus, small and medium sized waterfalls represent a very interesting generation option. The small hydro electrics (PCH) appear as a possible choice, as mentioned before. They offer advantages, such as affordable cost, a short implementation time required, return of investment, support through legislation, the willingness of the electric power utilities to buy the exceeded energy generated by selfproducers and, finally, the possibility of access to its distribution and transmission lines through long distances. The connection of new points of energy generation in the Distribution system was made possible with the support from the Federal Government, through encouragement for PCH constructions and tax discounts for use of the transmission and distribution systems. We plan on locating the new points of generation next to the points of potential consumers with the objective of decreasing energy transportation costs. Thus, as the network guarantees the regulation of frequency and the permanent absorption of the total power, groups are equipped with generators that do not require a sophisticated command control. There is, however, the possibility of building interconnections, which must be studied even when related to the small potency network. The advantage lies in the facts that asynchronous generators can be used - which are cheaper and stronger. The effects of generation on distribution systems will depend on size, type and location where the generation will be installed. The protection of the utilities distribution network should be assigned a higher priority. Instead, we prioritize the benefits of energy production, such as the backup energy, voltage sags, top-notch energy, among others. This is unfortunate, since the protection of the utilities distribution network will avoid the degradation of the energy quality, of reliability and of operations. From the moment that these PCH are installed on the Distribution networks, a radial system is turned into a ring system with more than one source of short-circuit current contribution. Thus, the guidelines for this work are the approach to topics related to problems with the lack of coordination and sensibility of protection equipment, re-connection blockage, necessity of protection of overcurrent with directional function, coordination with consumers and extension lines (causing security problems with people and equipment) and energy continuity. It is of great importance to perform systematic studies on the protection of networks with the simultaneous generation of PCH since they are essential for the security and improvement of the current levels of continuity of service. Finally, the impacts on the distribution system protection of networks with connections to Small Hydroelectric Centrals are described and analyzed in detail, followed by proposals of solutions for the reduction of such impacts.
198

Modelo institucional do setor elétrico brasileiro: análise da capacidade de atração de capital privado para investimentos em geração de energia hidrelétrica. / Brazilian electric sector\'s institutional model: analysis towards the capacity to attract private capital to investments on hydroelectric power generation.

Aguiar Filho, Fernando Luiz 24 May 2007 (has links)
Em março de 2004, o governo brasileiro aprovou as leis 10.847 e 10.848, que alteram as bases da regulação do Setor Elétrico Brasileiro. As leis instituíram novas regras para a outorga de concessões para aproveitamentos hidrelétricos e para comercialização de energia entre agentes de geração, distribuidores e comercializadores de energia elétrica. Diante da contínua demanda por investimentos na expansão da capacidade de geração, este trabalho foi desenvolvido com o objetivo de inferir sobre a capacidade do modelo institucional vigente de atrair capital privado para investimentos em geração de energia hidrelétrica. A inferência é realizada a partir da análise dos resultados dos leilões de energia nova realizados em 2005 e 2006 e da simulação do investimento em um protótipo de empreendimento de geração de energia hidrelétrica. De forma geral, as mudanças regulatórias favorecem o fluxo de investimentos para empreendimentos de geração hidrelétrica. Contudo, mais do que a um modelo institucional sólido, a derivação de investimentos para este segmento estará condicionada à ação do Estado sobre o equilíbrio entre consumo, oferta e preços de energia, enquanto principal artífice da política energética nacional. / In March 2004, the Brazilian Government passed the laws 10.847 and 10.848, which changed the regulatory guidelines of electric market. The laws established new rules for granting hydroelectric exploitation rights and for energy purchasing, among distributors, new generators and free consumers. In front of the new regulatory basis and the Brazilian demand for installed capacity increase, this research aims to infer the capacity of regulatory basis to attract private recourses for investments on hydroelectric power projects. The inference will be developed based on the results of auctions of electricity from new power plants, occurred in 2005 and 2006, and on the simulation of the investment on a prototype of a hydroelectric project in Brazil. The final remarks show that the new electric model favor the investment flow to hydroelectric power plants. However, more than to a solid institutional model, the investments on this segment will be conditioned to the Government action on the equilibrium between energy consuming, offering and prices, as the main agent of the national energy politics.
199

Migrações ascendentes de peixes neotropicais e hidrelétricas: proteção a jusante de turbinas e vertedouros e sistemas de transposição. / Upstream migrations of neotropical fishes and hidroelectric dams: protection downstream from turbines and from spillways and fish passages.

Junho, Ricardo Ahouagi Carneiro 22 October 2008 (has links)
Este trabalho se propõe a examinar aspectos de engenharia, particularmente da engenharia hidráulica, referentes aos impactos dos aproveitamentos hidrelétricos sobre deslocamentos migratórios ascendentes de peixes, buscando identificar medidas para a redução da eventual mortalidade de peixes, em tubos de sucção de turbinas e em regiões de restituição do escoamento de vertedouros, e descrever os sistemas de transposição de peixes usuais, com destaque para escadas de peixes tipo ranhura vertical. A revisão bibliográfica se inicia abordando migrações de peixes e o impacto causado pela implantação de usinas hidrelétricas, vindo, em seguida, aspectos hidráulicos relativos a barreiras para o impedimento da entrada de peixes em tomadas dágua e sua possível aplicação para tubos de sucção de turbinas. São relatados estudos de casos relativos à implantação de canais de restituição em vertedouros, para evitar a mortalidade de peixes, eventualmente aprisionados em poços e depressões na região de restituição do escoamento vertido, quando esta não possui água permanentemente, após o fechamento das comportas. A revisão da literatura prossegue tratando de sistemas usuais de transposição de peixes para montante, de acordo com a experiência internacional e, também, com a experiência nacional recente. Em seguida, são apresentados estudos em modelo reduzido realizados para a avaliação e caracterização de escoamentos em tanques de algumas escadas de peixes tipo ranhura vertical, tanto com seção transversal retangular, que constituem solução clássica, quanto com seção transversal trapezoidal, com caráter inédito na literatura, que possui, comparativamente, menores custos de implantação, descrevendo-se as instalações experimentais utilizadas, os ensaios realizados e os resultados obtidos, com a discussão de aspectos hidráulicos e de ictiofauna. Conclui-se que as soluções mais promissoras para reduzir a mortalidade de peixes são grades metálicas e barreiras comportamentais sonoras e elétricas, na saída de tubos de sucção, bem como a implantação de canais de restituição do escoamento de vertedouros. Conclui-se, também, que escadas de peixe tipo ranhura vertical com seção transversal trapezoidal fornecem condições de escoamento adequadas, compatíveis com os supostos requisitos natatórios das diferentes espécies de peixes em suas migrações ascendentes, além de exigirem menores investimentos de implantação, quando comparadas com escadas com seção transversal retangular. Recomenda-se que sejam feitos estudos e monitoramentos de ictiofauna específicos para subsidiar projetos de engenharia nessa área. / This work aims to examine engineering, mainly hydraulic engineering, aspects related to the effects of hydroelectric dams on upstream fish migration, identifying possible measures for the reduction of fish mortality, inside turbines draft tubes and in the region downstream from spillways, and describing the most common upstream fish passages, mainly vertical slot fishways. The literature review starts with fish migrations and the effects of dams and reservoir on fishes, followed by hydraulic aspects of barriers to prevent fish entrance in water intakes and their possible application to turbine draft tubes. Case studies are reported concerning the construction of spillway exit channels to avoid the possible mortality of fish entrapped in depressions and pools in the old riverbed, when it`s not permanently flooded, after the closure of the spillway gates. The literature review proceeds with the most common upstream fish passages, according to the international experience and to the recent Brazilian`s experience. Next, the hydraulic model studies developed for evaluation and characterization of flow inside pools of vertical slot fishways are described, for the classical rectangular cross section, as well as for trapezoidal ones, not presented in the literature so far, which have comparatively lower costs, detailing the experimental arrangements, the experiments and experimental results, with discussions on hydraulic and ichthyofauna aspects. Its concluded that the most promising solutions to reduce fish mortality are fish screens and sound and electric behavioural barriers, at the exit of draf tubes, and the construction of spillway exit channels. Its also concluded that vertical slot fishways with trapezoidal cross sections provide good flow conditions, meeting the supposed swimming requirements of different fish species on their upstream migrations, with lower capital costs than classical fishways, with rectangular cross sections. Its recommended that specific ichthyofauna studies and monitoring be developed to subsidize engineering design in this field.
200

Aplicação do teste de "Impairment" em ativo imobilizado: estudo de impacto econômico decorrente da aplicação em uma "CGH" - Central Geradora Hidrelétrica

Canivezi , Evandro Rossi 15 December 2016 (has links)
Submitted by Filipe dos Santos (fsantos@pucsp.br) on 2017-01-10T11:33:44Z No. of bitstreams: 1 Evandro Rossi Canivezi.pdf: 3144731 bytes, checksum: 57b161426a9189d67735d8539d80cceb (MD5) / Made available in DSpace on 2017-01-10T11:33:44Z (GMT). No. of bitstreams: 1 Evandro Rossi Canivezi.pdf: 3144731 bytes, checksum: 57b161426a9189d67735d8539d80cceb (MD5) Previous issue date: 2017-12-15 / The present work refers to the application of the "Impairment test" in a CGH - Hydroelectric Generating Center and aims to understand the condition of this asset, demonstrating the benefit that will be generated by this. The specific objectives of this research include adjusting this fixed asset to its real future economic return capacity, ascertaining that this asset is not recorded in the accounting for a value higher than that recoverable and analyzing whether the book value was recovered or if it is recovered Overvalued, subject to the recognition of losses. The research methodologies used in this work were qualitative and quantitative analysis, besides a case study. The study focuses on two research methodologies regarding the procedures, being carried out research and survey of the information pertinent to the universe to be researched. For the application of the "Impairment test", the amounts presented in the balance sheet and other information provided by the management area of the entity were considered. In the topic "analyzes and discussions", it is possible to observe the impacts, the form of elaboration and disclosure by the organizations and the comments related to this methodology / O presente trabalho refere-se à aplicação do “Impairment Test” em uma CGH - Central Geradora Hidrelétrica e visa compreender a condição deste ativo, demonstrando o benefício que será gerado por este. Os objetivos específicos desta pesquisa compreendem adequar este determinado ativo imobilizado a sua real capacidade de retorno econômico futuro, averiguar que este ativo não esteja registrado contabilmente por um valor superior àquele passível de ser recuperado e analisar se o valor contábil foi recuperado ou se o mesmo se encontra superavaliado, sujeitando-se o ativo ao reconhecimento de perdas. As metodologias de pesquisa utilizadas neste trabalho foram análise qualitativa e quantitativa, além de estudo de caso. Enquadram-se no estudo, duas metodologias de pesquisa quanto aos procedimentos, sendo realizadas pesquisa e levantamento das informações pertinentes ao universo a ser pesquisado. Para aplicação do “Impairment Test”, foram considerados os valores apresentados no Balanço Patrimonial e demais informações fornecidas pela área de gestão da entidade. No tópico “análises e discussões”, é possível observar os impactos, a forma de elaboração e disclosure por parte das organizações e comentários relacionados a essa metodologia

Page generated in 0.07 seconds