Spelling suggestions: "subject:"hydroelectric plant"" "subject:"hydroelectric slant""
1 |
Repurposing a Hydroelectric PlantPritcher, Melissa 01 January 2008 (has links)
This thesis project explores repurposing a hydroelectric plant along Richmond Virginia's Canal Walk. The building has been redesigned to create a community-oriented space programmed as an indoor park, event venue space, and cafe. Throughout this thesis, it became important to create private niches within a public space while creating a flexible public venue that accommodates a variety of activities. Through a variety of spaces that offer users options, a flexible public venue is creating, yielding a community-oriented environment that reconnects local with the site.
|
2 |
INCIDÊNCIA DE MALÁRIA NO MUNICÍPIO DE ARIPUANÃ E SUAS RELAÇÕES COM A OCORRÊNCIA DE VETORES NAS ÁREAS DA USINA HIDRELÉTRICA DARDANELOS. / INCIDENCE OF MALARIA IN THE MUNICIPALITY OF ARIPUANÃ AND ITS RELATIONS WITH THE OCCURRENCE OF VECTORS IN THE AREAS OF POWER PLANT DARDANELOS.Ferreira, Fabiana Angélica Santos Rodrigues 25 November 2013 (has links)
Made available in DSpace on 2016-08-10T10:54:18Z (GMT). No. of bitstreams: 1
FABIANA ANGELICA SANTOS RODRIGUES FERREIRA.pdf: 11901316 bytes, checksum: 6d7d6074465de974860aa8fde54abd66 (MD5)
Previous issue date: 2013-11-25 / Os empreendimentos hidrelétricos podem causar impactos ambientais os quais
trazem como consequência a alteração da dinâmica populacional de vários insetos,
dentre eles mosquitos do gênero Anopheles, amplamente conhecidos por serem
vetores de malária. O estudo teve por objetivo realizar um diagnóstico sobre o
comportamento da incidência de malária no município de Aripuanã, Mato Grosso,
onde está localizada a Usina Hidrelétrica Dardanelos, e verificar a relação entre os
casos de notificação compulsória frente aos dados primários obtidos nas etapas de
campo. As coletas dos Anopheles ocorreram trimestralmente, ao longo do ano de
2012, através de metodologias como as Armadilhas Luminosas do Tipo CDC e Tubo
de Sucção com Isca Humana. Além das coletas de dados primários, foram
consultados casos de notificação compulsória de malária na Secretaria Municipal de
Saúde de Aripuanã, Mato Grosso, Setor de Vigilância em Epidemiologia. As análises
dos resultados foram feitas por meio de testes estatísticos, a saber: Teste T de
Student, Qui-Quadrado e Análise de Variância (ANOVA). O Teste T foi utilizado para
comparar a diferença no número de casos de malária antes e depois da construção
da usina como também para comparar a abundância de anofelinos coletados nas
diferentes técnicas empregadas. O Qui-Quadrado foi empregado para verificar se
houve diferença entre a abundância de indivíduos coletados nas diferentes estações
climáticas. Já a ANOVA foi utilizada para saber se houve alteração nas coletas dos
anofelinos nos ambientes apresentados nas áreas de influência da UHE Dardanelos.
Para todas as análises foi adotado um nível de significância de 0,05. Os resultados
mostraram que Aripuanã possui casos de malária que foram reduzidos nos anos
referentes à construção da usina. O ano de 2012 apresentou 113 casos, sendo o
mês de janeiro referente às chuvas, com maior representatividade. No referido mês
não foi catalogado nenhum anofelino nas áreas da usina, uma vez que as chuvas
dificultaram o trabalho da amostragem das armadilhas. Todos os resultados
abordados mostraram que não houve diferença significativa para os testes
realizados. Portanto, foi possível verificar que ocorre transmissão de malária em
Aripuanã e que na região da usina possui o vetor Anopheles darlingi que está
relacionado a transmissão da enfermidade.
|
3 |
AVALIAÇÃO DA VEGETAÇÃO RIBEIRINHA EM RESPOSTA À REDUÇÃO DA VAZÃO À JUSANTE DA UHE PASSO SÃO JOÃO / EVALUATION OF RIPARIAN VEGETATION IN RESPONSE TO THE REDUCTION OF THE DOWNSTREAM FLOW OF THE HEP PASSO SÃO JOÃOBalestrin, Diego 31 July 2014 (has links)
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior / In front of the current and growing demand for natural resources, especially of the water resources, it seeks to find a way to minimize the impacts caused by the anthropic interference in areas of riparian vegetation. These environments have an important functionality to the ecosystems belonging and surrounding due to the fact of this vegetation possesses intrinsic characteristics and adapted to the hydro and ecological environment. The rivers barring for water use as an energy source (study subject of this work) cause various impacts to the environment, one of the major is the alteration of the natural regime of pulses and often, the reducing the downstream flow of the works. The flow reduction in certain stretches of the waterway, besides requiring an in-depth study about the impacts caused by the reduction of the downstream water level of the utilization section, it becomes essential to the vegetation analysis, soil and local geology. These related factors to the morphophysiological characteristics of the different species found in these locations will determine if the current ecosystem, observed in natural altimetric quotes previously found in the area of riparian vegetation, will be able to adapt to the lower quotes checked after implementation of the barring, in other words, in the stretch of reduced flow (SRF). For determination and differentiation of the vegetation it was necessary the study and development of a methodology of analysis by quotes. This analysis was performed using the points method that consisted of a classification and identification by functional character of the existing plants in three sampling units (SU's) located in the SRF of the hydroelectric unit Passo São João town of Roque Gonzales-RS. Furthermore, were performed the gathering of soil samples in the different quotes of the three SU's for physical and chemical analysis. Thus, it was possible to determine that the soil variable (physical and chemical characteristics), has no significant variation by quotes gap and therefore, are not considered necessary for studies of adaptive variations of the vegetation established there. However, in front of this fact and of the generated results, one can strengthen the hypothesis that the hydrological variable is directly responsible for the adaptive variation of the vegetal species in these areas. / Diante da atual e crescente demanda por recursos naturais, em especial dos recursos hídricos, busca-se uma forma de minimizar os impactos causados pela interferência antrópica em áreas de vegetação ribeirinha. Estes ambientes possuem uma importante funcionalidade aos ecossistemas pertencentes e circundantes devido ao fato desta vegetação possuir características intrínsecas e adaptadas ao meio hidro ecológico. O barramento de rios para utilização da água como fonte energética (objeto de estudo deste trabalho) causa vários impactos ao meio ambiente, um dos principais é a alteração do regime natural de pulsos e, muitas vezes, a redução da vazão a jusante das obras. A redução da vazão em determinados trechos do curso d´agua, além de necessitar um estudo aprofundado a respeito dos impactos causados pela redução do nível de água a jusante da seção de aproveitamento, torna-se indispensável a análise da vegetação, solo e geologia local. Estes fatores relacionados com as características morfofisiológicas das diferentes espécies encontradas nestes locais determinarão se o ecossistema atual, observado nas cotas altimétricas naturais anteriormente encontradas na área de vegetação ribeirinha, terá condições de se adaptar às cotas inferiores verificadas após a implantação do barramento, ou seja, no trecho de vazão reduzida (TVR). Para determinação e diferenciação da vegetação foi necessário o estudo e desenvolvimento de uma metodologia de análise por cotas. Esta análise foi realizada pelo método de pontos que consistiu em uma classificação e identificação por caracteres funcionais das plantas existentes em três unidades amostrais (UA‟s) locadas no TVR da UHE Passo São João, município de Roque Gonzales-RS. Além disso, foram realizadas coletas de amostras de solo nas diferentes cotas das três UA‟s para análise física e química. Desta forma, foi possível determinar que a variável solo (características físicas e químicas), não possuem variação significativa por intervalo de cotas e, portanto, não são consideradas necessárias para estudos de variações adaptativas da vegetação ali estabelecida. Contudo, diante deste fato e dos resultados gerados, pode-se fortalecer a hipótese de que a variável hidrológica é, de forma direta, responsável pela variação adaptativa das espécies vegetais destas áreas.
|
4 |
ANÁLISE DA EFETIVAÇÃO DAS MEDIDAS PROGNOSTICADAS NO EIA/RIMA DA USINA HIDRELÉTRICA DONA FRANCISCA, RIO GRANDE DO SUL / ANALYSIS OF PROGNOSTICATED MEASURES EFFECTUATION EIA/RIMA FROM DONA FRANCISCA HYDROELECTRIC PLANT, RIO GRANDE DO SULNoal, Tatiana Nardon 06 July 2012 (has links)
The society lives in dynamic pursuit of improved quality of life. The need for the supply of electricity, in increasing amounts, boosts the pressure over the environment. Thus, procedures as the environmental licensing, the environmental impact study have their importance and necessity recognized, especially in ensuring entrepreneurial actions that respect the principles of sustainability. This study aimed to identify problems in the effectiveness of mitigation measures of Dona Francisca Hydroelectric plant collaborating to methodological improvement of the planning process and environmental licensing in hydroelectric projects, aiming to better legislation compliance. This work is characterized as a case study, consisting of extensive research, drawing on multiple sources of evidence. The case choice for Dona Francisca Hydroelectric Plant was taken due to the development being located near the city of Santa Maria, with greater accessibility, facilitating the planning and execution of research activities. Data collection was performed in 4 phases; the first phase was characterized as exploratory, through literature review, followed by diagnosis and problem identification through obtained data, and on-site visit in the surroundings of Dona Francisca HPP and Conservation Unit. In the third phase, we performed a planning study setting, where ideas were structured according to the proposed goals, and finally in the fourth phase an assessment of the briefings was done. Based on the Basic Environmental Project were analyzed 5 programs relating to the physical environment, 7 programs related to the biotic environment and 4 programs for the socioeconomic and cultural conditions of the population. After the analysis it was concluded that even with some adjustments, all environmental programs produced were implanted. The identified deficiencies were in meeting deadlines, deficiencies in technical projects, superficial presentation and data exploration, besides the bureaucracy generated during the process. The importance of increased support from the government is revealed, faced with environmental projects, either in improving operationalizator institutions and supervisory bodies of environmental issues or investing in environmental studies, with the goal of forming an independent database, as well as in creating less bureaucratic procedures in order to facilitate the work of everyone involved in the licensing process. It is recommended the standardization and creation of document templates and procedures as a viable alternative to improve the licensing processes, and the use of multicriteria methodologies for carrying out the Environmental Impact Assessment. / A sociedade vive em dinâmica busca pela melhoria na qualidade de vida. A necessidade do abastecimento de energia elétrica, em quantidades cada vez maiores, impulsiona a pressão sobre o meio ambiente. Assim, procedimentos como o licenciamento ambiental, o estudo de impacto ambiental tem sua importância e necessidade reconhecida, especialmente na garantia de ações empreendedoras que respeitem os princípios de sustentabilidade. O presente estudo teve como objetivo identificar os problemas na efetivação das medidas mitigadoras da Usina Hidrelétrica Dona Francisca colaborando para o aperfeiçoamento metodológico do processo de planejamento e licenciamento ambiental em projetos hidrelétricos, visando o melhor cumprimento às legislações pertinentes. Este trabalho caracteriza-se como um estudo de caso, consistindo em uma pesquisa abrangente, valendo-se de múltiplas fontes de evidência. A escolha do Caso da Usina Hidrelétrica Dona Francisca deu-se em função do empreendimento localizar-se próximo ao Município de Santa Maria, apresentando maior acessibilidade, facilitando o planejamento e execução das atividades de pesquisa. A coleta de dados foi executada em 4 fases, a primeira foi caracterizada como fase exploratória, através da revisão bibliográfica, seguida pelo diagnóstico, e identificação do problema através de dados obtidos, além de visita in loco no entorno da UHE Dona Francisca e na Unidade de Conservação. Na terceira fase, foi realizada a configuração do planejamento do estudo, onde foram estruturadas as idéias de acordo com os objetivos propostos e, por fim na quarta fase foi realizada uma avaliação das informações apuradas. Com base no Projeto Básico Ambiental, foram analisados 5 programas referentes ao meio físico, 7 programas referentes ao meio biótico e 4 programas referentes as condições socioeconômicas e culturais da população. Após a análise concluiu-se que mesmo com algumas adaptações, todos os programas ambientais elaborados foram implantados. As deficiências identificadas foram quanto ao cumprimento de prazos, deficiências em projetos técnicos, apresentação e exploração superficial de dados, além da burocracia gerada no decorrer do processo. Revela-se a importância de um maior apoio por parte do governo, frente a projetos ambientais, seja na melhoria das instituições operacionalizadoras e fiscalizadoras das questões ambientais ou no investimento em estudos ambientais, com objetivo de formar um banco de dados independente, assim como na criação de procedimentos menos burocráticos com vistas a facilitar a atuação de todos envolvidos nos processos de licenciamento. Recomenda-se a uniformização e criação de modelos de documentos e procedimentos como uma alternativa viável para melhoria nos processos de licenciamento, bem como a utilização de metodologias multicritério para a realização da Avaliação de Impactos Ambientais.
|
5 |
O Projeto Educacional da Itaipu Binacional (1974-1985) : uma educação para cada vila e para cada fração da classe trabalhadora / The educational project of the Binacional Itaipu : an education for each village and each fraction of the working classSbardelotto, Denise Kloeckner, 1983- 26 August 2018 (has links)
Orientador: Sérgio Eduardo Montes Castanho / Tese (doutorado) - Universidade Estadual de Campinas, Faculdade de Educação / Made available in DSpace on 2018-08-26T16:36:53Z (GMT). No. of bitstreams: 1
Sbardelotto_DeniseKloeckner_D.pdf: 10961869 bytes, checksum: 12b6e42597dfba467d2601e7ecf3a127 (MD5)
Previous issue date: 2014 / Resumo: A presente tese analisa o Projeto Educacional da Itaipu Binacional, viabilizado nas três Vilas Habitacionais e no Canteiro de Obras da margem esquerda brasileira da Usina Hidrelétrica Binacional de Itaipu, entre 1974 e 1985. Fez parte deste projeto toda a estrutura ideológica implementada pela entidade, através da União de Construtoras - UNICON, responsável pelas obras civis de Itaipu. São analisadas as iniciativas de educação formal, efetivadas através do ensino regular do Anglo-Americano, técnico-profissionalizante do SENAI e Centro de Treinamento e Desenvolvimento da UNICON no Canteiro de Obras, e de alfabetização funcional e supletiva pela Escola do Canteiro; e não-formal, através das atividades culturais e desportivas realizadas pelos Centros Comunitários das Vilas Habitacionais e Canteiro de Obras. Resultante de conflitos diplomáticos entre Brasil, Paraguai e Argentina, a Usina Hidrelétrica de Itaipu foi construída em Foz do Iguaçu, região Oeste do Paraná, concretizando um dos grandes projetos dos governos militares no Brasil. O aumento da capacidade energética significava a infraestrutura necessária ao crescimento do parque industrial brasileiro, com o fortalecimento de indústrias nacionais dependentes de tecnologia externa e instalação de multinacionais e associadas. Porém, a construção da hidrelétrica gerou inúmeros impactos econômicos, ambientais, sociais e educacionais para Foz do Iguaçu e região Oeste do Paraná, devido ao alagamento de grandes áreas rurais e urbanas e inchaço populacional da cidade sede. Sob pressupostos do materialismo histórico-dialético, utilizei fontes bibliográficas, documentais e orais. O recorte histórico definido tem por justificativa a data de início e término da construção civil da Usina Hidrelétrica de Itaipu (1974-1985). A pesquisa me permitiu constatar que a educação formal e não-formal ofertada para os trabalhadores e seus dependentes na região do Projeto Itaipu foi diferenciada de acordo com a fração da classe trabalhadora a que eram destinadas, aprofundando a estratificação de classe que já era visível pelas diferenças qualitativas entre as Vilas Habitacionais A, B e C e alojamentos do Canteiro de Obras. Foram utilizadas estratégias para destinar educação de qualidade e voltada à "formação" generalista aos dependentes de trabalhadores dos altos níveis funcionais/fração de classe, enquanto aos trabalhadores e seus dependentes dos baixos níveis funcionais/fração de classe era oferta educação qualitativamente inferior, limitada ao "cuidado" e técnica-profissionalizante. Através da educação formal e não-formal o Projeto Educacional de Itaipu consolidou uma estrutura ideológica eficiente em disseminar valores éticos e morais de racionalidade, produtividade, disciplina, cooperação, respeito à hierarquia, civismo e meritocracia, adequados à manutenção da ordem nas Vilas Habitacionais e Canteiro de Obras e à formação da força de trabalho para as necessidades da obra, prioridade absoluta dos governos militares do Brasil e Paraguai / Abstract: This thesis analyzes the Educational Project of Itaipu , conducted in the three Villages Housing and Construction Works of the Brazilian left bank of the Itaipu Binational hydroelectric plant between 1974 and 1985. He was part of this project all the ideological structure implemented by the entity through the Builders Union - UNICON , responsible for the civil works of Itaipu. Formal education initiatives are analyzed , carried through the regular teaching of Anglo -American, technical and professional SENAI and Training and Development Center of UNICON Jobsite , and functional literacy and supplementary by the School of Construction ; and non- formal, through cultural and sporting activities carried out by Community Centers of VillagesHousing and Construction Site . Resulting diplomatic conflicts between Brazil , Paraguay and Argentina , Itaipu Hydroelectric Power Plant was built in Foz do Iguaçu , western Paraná , fulfilling one of the great projects of the military governments in Brazil. The power capacity meant the infrastructure necessary for growth of Brazilian industry , with the strengthening of national industries dependent on foreign technology and installation of multinational and associates. However, dam construction has generated numerous economic, environmental , social and educational impacts to Foz do Iguaçu and western Paraná , due to flooding of large rural and urban population and swelling of the host city . Under assumptions of historical and dialectical materialism , I used bibliographical, documentary and oral sources . The historical approach is justification set the start date and completion of construction of the Itaipu Hydroelectric Power Plant ( 1974-1985 ) . The research allowed me to see that the formal and non- formal education offered to employees and their dependents in the Itaipu project area was differentiated according to the fraction of the working class to which they were intended , deepening class stratification that was already visible by qualitative differences between the Villages Housing a, B and C and Construction Site lodges . Strategies were used to assign quality education and focused on " training " generalist to dependents of employees of high functional levels / class fraction , while the workers and their dependents of low functional levels / class fraction was offering qualitatively inferior education, limited to "care" and technical - vocational . Through formal and non - formal educational project of the Itaipu consolidated an effective ideological framework in spreading ethical and moral values of rationality , productivity , discipline, cooperation , respect for hierarchy , civility and meritocracy , necessary to maintain the order in the Housing and Villages Construction Works and training of the workforce to the needs of the work , absolute priority of the military governments of Brazil and Paraguay / Doutorado / Filosofia e História da Educação / Doutora em Educação
|
6 |
Análise da abordagem geomorfológica em Estudos de Impactos Ambientais (EIAs) de projetos hidrelétricos apresentados ao Instituto Brasileiro do Meio Ambiente e dos Recursos Naturais Renováveis (IBAMA), no período de 1993 a 2014 / Analysis of the geomorphological approach in Environmental Impact Statements (EISs) of hydroelectric projects presented to the Brazilian Institute of Environment and Renewable Natural Resources (IBAMA) in the period 1993-2014Aguiar, Karina Barbosa de 07 October 2015 (has links)
No Brasil, os EIAS/RIMAS são o principal instrumento para a análise de viabilidade ambiental dos empreendimentos potencialmente causadores de significativo impacto ambiental, sendo também peça indispensável ao processo licenciamento ambiental. Esta pesquisa tem como objetivo central a abordagem geomorfológica adotada em EIAs de usina hidrelétricas no período entre 1993 a 2014. Foram analisados 13 registros de EIAs elaborados para usinas hidrelétricas cujo licenciamento ocorre em nível federal, analisando informações como escala de abordagem, escola teórica, procedimento metodológico, etc. Todos estes dados foram analisados quali e quantitativamente, sendo que os resultados apresentados permitem verificar o aprimoramento técnico contínuo na abordagem geomorfológica nestes estudos ambientais. Os resultados da pesquisa também proporcionaram a elaboração de recomendações visando à elaboração de futuros estudos de impactos ambientais. / In Brazil, the Environmental Impact Statements (EISs) are the main instrument for environmental feasibility analysis of enterprises, which can cause significant environmental impact, and is also indispensable part of environmental licensing process. This research is based on the geomorphological approach adopted in EIAs (Estudos de Impacto Ambiental, or Environmental Impact Studies, in free translation) applied for hydroelectric power plants, in the period of 1993-2014. We have analyzed 13 EIAs designed to hydroelectric power plant which licensing occurs at the federal level, analyzing information such as scale approach , theoretical school, content, assignment of technical staff , etc. All these data were analyzed qualitatively and quantitatively, and the results allow verify the continuous technical improvement in the geomorphological approach of these environmental studies. The results have also provided the elaboration of recommendations for the development of future environmental impacts studies.
|
7 |
Análise da abordagem geomorfológica em Estudos de Impactos Ambientais (EIAs) de projetos hidrelétricos apresentados ao Instituto Brasileiro do Meio Ambiente e dos Recursos Naturais Renováveis (IBAMA), no período de 1993 a 2014 / Analysis of the geomorphological approach in Environmental Impact Statements (EISs) of hydroelectric projects presented to the Brazilian Institute of Environment and Renewable Natural Resources (IBAMA) in the period 1993-2014Karina Barbosa de Aguiar 07 October 2015 (has links)
No Brasil, os EIAS/RIMAS são o principal instrumento para a análise de viabilidade ambiental dos empreendimentos potencialmente causadores de significativo impacto ambiental, sendo também peça indispensável ao processo licenciamento ambiental. Esta pesquisa tem como objetivo central a abordagem geomorfológica adotada em EIAs de usina hidrelétricas no período entre 1993 a 2014. Foram analisados 13 registros de EIAs elaborados para usinas hidrelétricas cujo licenciamento ocorre em nível federal, analisando informações como escala de abordagem, escola teórica, procedimento metodológico, etc. Todos estes dados foram analisados quali e quantitativamente, sendo que os resultados apresentados permitem verificar o aprimoramento técnico contínuo na abordagem geomorfológica nestes estudos ambientais. Os resultados da pesquisa também proporcionaram a elaboração de recomendações visando à elaboração de futuros estudos de impactos ambientais. / In Brazil, the Environmental Impact Statements (EISs) are the main instrument for environmental feasibility analysis of enterprises, which can cause significant environmental impact, and is also indispensable part of environmental licensing process. This research is based on the geomorphological approach adopted in EIAs (Estudos de Impacto Ambiental, or Environmental Impact Studies, in free translation) applied for hydroelectric power plants, in the period of 1993-2014. We have analyzed 13 EIAs designed to hydroelectric power plant which licensing occurs at the federal level, analyzing information such as scale approach , theoretical school, content, assignment of technical staff , etc. All these data were analyzed qualitatively and quantitatively, and the results allow verify the continuous technical improvement in the geomorphological approach of these environmental studies. The results have also provided the elaboration of recommendations for the development of future environmental impacts studies.
|
8 |
Análise da estabilidade de pequenas centrias hidrelétricas em operação isolada / Stability analysis of small hydroelectric plant in isolated operationKarnikowski, Douglas de Castro 21 March 2016 (has links)
Fundação de Amparo a Pesquisa no Estado do Rio Grande do Sul / Islanding occurs when a part of the electrical system is supplied solely by a unit or group of distributed generators isolated from the main electrical network. When the center of Distributed Generation (DG) operates connected to the electrical system, the stability depends especially on the inertia of the large power generation plants. However, when DG operates in isolation, the stability depends on the response from controllers, the dynamics of the turbine and generator to maintain the system in normal operation. Due to the low inertia of the isolated system, the network is more susceptible to sags or swells and violations in the frequency levels. Thus, this work aims to analyze the stability of systems with DG operating in isolation, making sure that it can keep the stress levels and appropriate frequency. Dynamic simulation system are performed in Matlab Simulink® environment using the SimPowerSystems library, where the case study is carried out with a DG type Small Hydroelectric Plant (SHP), analyzing the stability of microgrid upon disconnection with the system main and stand-alone operation (load shedding, load connection, short circuit, among other contingencies). It is also observed the behavior of the microgrid in cases of restoration of power supply through the start of DG operating in isolation. / O ilhamento ocorre quando uma parte do sistema elétrico é suprida unicamente por uma unidade ou grupo de geradores distribuídos isolados da rede elétrica principal. Quando a central de Geração Distribuída (GD) opera conectada ao sistema elétrico, a estabilidade depende especialmente da inércia das grandes centrais de produção de energia. No entanto, quando a GD opera em modo isolado, a estabilidade depende da resposta dos controladores, da dinâmica da turbina e do gerador para manter a rede elétrica em operação adequada. Devido à baixa inércia do sistema isolado, a rede fica mais susceptível a afundamentos e/ou elevações de tensão e violações nos níveis de frequência. Desta forma, este trabalho tem o objetivo de analisar a estabilidade de sistemas com GD operando no modo isolado, verificando se a mesma pode manter os níveis de tensão e frequência adequados. As simulações dinâmicas são realizadas em ambiente Matlab® Simulink®, utilizando a biblioteca SimPowerSystems, onde o estudo de caso é realizado com uma GD do tipo Pequena Central Hidrelétrica (PCH), analisando a estabilidade da microrrede no momento da desconexão do sistema principal e em operação isolada (rejeição de carga, conexão de cargas, curto-circuito, entre outras contingências). Também é verificado o comportamento da microrrede em casos de recomposição do fornecimento de energia através da partida da GD em operação isolada.
|
9 |
Altamira indígena em Belo Monte: experiências Xipaya e Kuruaya em transformação / Indigenous altamira under Belo Monte: Xipaya and Kuruaya experiences in transformationArnault, Renan Patrick Pinas 10 December 2015 (has links)
A dissertação propõe um recorte etnográfico para pensar a situação dos indígenas moradores da cidade de Altamira-PA face à construção da hidrelétrica de Belo Monte. Acompanhando de perto algumas experiências dos habitantes Xipaya e Kuruaya da cidade (grupos do tronco linguístico Tupi), a etnografia lança mão de três contribuições diferentes da antropologia para pensar memória, parentesco e política entre os interlocutores. Partindo do espaço geográfico e simbólico dos tradicionais bairros Xipaya e Kuruaya de Altamira (Muquiço/São Sebastião e Jardim Independente/Missão), os dados estatísticos e relatos reconstituem as migrações e transformações experienciadas, falam de características da espacialização e vivência na cidade e na extensão do médio rio Xingu. Diferentes práticas e discursos nativos são produto de relações de parentesco e corresidência entre indígenas e não indígenas da região, que expressam estilos de bem viver e, por sua vez, também estruturam propostas e atuações do movimento indígena citadino. Tendo em vista o cenário crítico imposto pela construção de Belo Monte com suas transformações inerentes, a etnografia buscou restituir agências Xipaya e Kuruaya que tencionam uma vida melhor. / This essay proposes an ethnographic approach as a means to think about the situation of the indigenous people residing in Altamira-PA under the construction of the hydroelectric plant of Belo Monte. By closely witnessing a certain number of happenings of the Xipaya and Kuruaya townspeople (groups of the Tupian language family), this ethnography provides three different anthropological contributions to think about memory, kinship and politics between the counterparts. Starting with the fields, both geographic and symbolic of the traditional Xipaya and Kuruaya boroughs of Altamira (Muquiço/São Sebastião e Jardim Independente/Missão), statistical data and narrative registers retrace migrations and experienced transformations, thus speaking about the recreation of the space and about the perception of life, both in the city and throughout the extensions of the Medium Xingu River. Diverse techniques and native discourses are a product of kinship relations and cohabitation between indigenous and non-indigenous inhabitants, who express styles of well-living and, in turn, also structure bidding and fields of action for the urbanite indigenous movement. Keeping in sights the critical scenario imposed by the construction of the Belo Monte plant, as well as its underlying transformations, the ethnography seeked to reinstate Xipaya and Kuruaya agencies that intend to a better life.
|
10 |
Neodesenvolvimentismo e conflitos socioambientais: o caso de Belo MonteGilbert, Caroline Marie Abrahão Salomão 28 March 2016 (has links)
Submitted by Marlene Aparecida de Souza Cardozo (mcardozo@pucsp.br) on 2016-11-17T11:10:56Z
No. of bitstreams: 1
Caroline Marie Abrahão Salomão Gilbert.pdf: 1249967 bytes, checksum: 584a09efa0e40969c9821343d8c53a88 (MD5) / Made available in DSpace on 2016-11-17T11:10:57Z (GMT). No. of bitstreams: 1
Caroline Marie Abrahão Salomão Gilbert.pdf: 1249967 bytes, checksum: 584a09efa0e40969c9821343d8c53a88 (MD5)
Previous issue date: 2016-03-28 / Coordenação de Aperfeiçoamento de Pessoal de Nível Superior / Our object of study is the conflict around the construction of Belo Monte Dam in Xingu River in the state of Pará. Planed to be the third biggest hydroeletricpower plant in the world in one of the most important Amazonian socioecological system, is a product of the governmental Plans to Accelerate Growth (PAC) witch at his turn integrates the Initiative for the Integration of Regional Latin-America Infrastructure. Our objective is to evaluate the development of the actual dam project compared to that other one from the 80’s, when it was first presented to the Brazilian society. The reason why we consider important to study the case is that it´s a huge project witch demands an investment of R$ 30 billion (financed in 80% by public, or, tax money) generating great social environment impacts. One of our hypothesis is that the project, elaborated in a military development agenda, is now inserted in a new context, but still a development one, but a neodevelopment context. Our second hypothesis is that, due to the period it was elaborated (military dictature) and the strong criticisms it received back in 1989, and still does in the present time, there would be some traces like lack of democracy in the way the government and his agencies conducted back then and are conducting now the environmental licensing of the dam. In a context where Brazilian sensibility to environmental problems is increased. The methodology of the study consisted in the research oh bibliographic studies, besides the classes followed in the Post-Graduation Department of Geography of the Pontíficia Universidade Católica de São Paulo / Nosso objeto de estudo consiste no conflito em torno da construção do Aproveitamento Hidrelétrico (AHE) de Belo Monte, no Rio Xingu (PA). Planejada para ser a terceira maior hidrelétrica do mundo, em uma das regiões socioecológicas mais importantes da Amazônia, integra a agenda dos Plano de Aceleração do Crescimento (PAC), programa governamental que, por sua vez, integra agenda mais ampla da Iniciativa para Integração da Infraestrutura Regional Sul-americana (IIRSA). O objetivo, é avaliar os desdobramentos do atual projeto da usina, em relação àquele do final da década de 1980, quando da primeira tentativa de sua construção. A justificativa se estabelece na medida em que se trata de um projeto que implica um investimento de R$ 30 bilhões (financiados em 80% pelo dinheiro público), gerando muitos impactos socioambientais. Uma de nossas hipóteses é que o projeto, elaborado dentro de uma agenda desenvolvimentista militar, apresentaria diferenças em relação ao contexto de desenvolvimentismo em que se insere a presente, um assim chamado neodesenvolvimentismo. Nossa segunda hipótese é de que, dado o período de elaboração do projeto (ditadura militar) e as fortes críticas que recebeu quando apresentado em 1989, e a presente, haveria resquícios de falta de democracia na forma como os órgãos públicos conduziram, e conduzem a presente, o processo de licenciamento da usina, num contexto de crescente sensibilidade da sociedade brasileira para a questão ambiental. A metodologia consistiu no levantamento de fontes bibliográficas, além dos conteúdos estudados nas disciplinas assistidas no curso de Pós-Graduação do Departamento de Geografia da Pontifícia Universidade Católica de São Paulo (PUC – SP)
|
Page generated in 0.0442 seconds