• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 805
  • 124
  • 35
  • 30
  • 20
  • 18
  • 11
  • 4
  • 4
  • 4
  • 3
  • 3
  • 3
  • 3
  • 2
  • Tagged with
  • 1125
  • 371
  • 215
  • 192
  • 172
  • 160
  • 159
  • 154
  • 132
  • 132
  • 127
  • 109
  • 105
  • 105
  • 104
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
51

The emotional effects of disruption

Adcock, Christina Annie Lee 15 November 2004 (has links)
Disruption is something that we must negotiate as part of our everyday lives. The context of disruption can vary in nature from being positive to being negative in nature. However, the emotional effects of the disruption have not been investigated in the social psychological literature. This study utilizes structuralized ritualization affect theory of social exchange, attribution theory, and the theory of relational cohesion in order to investigate the effects of disruption on the overall positive emotion of the actors involved and their feelings of cohesiveness with regard to their group.
52

Improvement of a maintenance strategy in a fast moving consumable goods environment

Van Biljon, Barrie January 2013 (has links)
M. Tech. Industrial Engineering. / Aims to improve the maintenance strategy in order to improve Return on Capital Investment (ROCI) in a Fast Moving Consumable Goods (FMCG) environment.
53

Turning Water Into Wine: The Celebration of Water Through the Aesthetic of the Sustainable Landscape

Minto, Kelly 10 July 2012 (has links)
This thesis examines the relationship between water and the winemaking industry through an integrated architectural approach to the landscape. The emphasis is on the refinement of water use for vineyard irrigation and wine processing, and the promotion of the value of water by celebrating a productive landscape. The proposition is explored through the design of a winery and its associated grapes to produce the wines.
54

Plan för implementering av strukturerat underhållsarbete på Valmet ABs gjuteri i Karlstad

Åstrand, Leon January 2014 (has links)
Rapporten handlar om att sätta upp en plan för implementering av ett mer strukturerat underhållsarbete på Valmet ABs gjuteri i Karlstad. Arbetet görs i kursen examensarbete för högskoleingenjörsexamen i maskinteknik på Karlstads universitet under våren 2014. Valmet har nyligen köpt upp gjuteriet på Lamberget i Karlstad. Där är det ett mycket eftersatt underhåll och finns i nuläget inte någon bra struktur på hur de arbetar med underhåll. Underhållsverksamheten är i behov av att systematiseras och integreras i Valmets övriga underhållsorganisation. Syftet med arbetet är således att utarbeta en plan för att strukturera underhållet på Valmets gjuteri i Karlstad. Arbetet är indelat i tre faser. - Nulägesanalys genom dels intervjuer av underhållspersonal samt kartläggning av utrustning - Skapa en målbild över hur man vill arbeta med underhåll, genom studiebesök hos andra liknande verksamheter, diskussioner med ledningen samt litteraturstudier. - Upprättande av plan för hur man ska ta sig dit. Vilka aktiviteter som skall utföras samt i vilken ordning, där bland annat lämpliga mätetal ska tas fram. Arbetet är baserat på metodiken TPM (total productive maintenance), det handlar dock inte om ett fullständigt införande av TPM utan begränsat till valda delar. Utifrån intervjuer med underhållspersonalen på gjuteriet samt observationsstudier och en kartläggning av maskinparken har en nulägesanalys gjorts. Denna nulägesanalys har visat de problem och utmaningar som finns på underhållsavdelningen på gjuteriet. En målbild över hur man vill arbeta med underhåll på gjuteriet har ritats upp utifrån de studiebesök samt intervjuer med personal i ledningen. Det mest vitala som framkommit i denna fas är hur viktigt ledningens engagemang är för att kunna genomföra ett förändringsarbete, samt hur viktigt det är med en bra kommunikation både mellan de olika avdelningarna, men också inom gruppen. Med hjälp av de två ovanstående faserna samt den teori som bearbetats under projektet har en plan upprättats för ett mer strukturerat underhållsarbete. Planen innefattar 12 punkter som behandlar de aktiviteter som bör implementeras, samt i den turordning de bör implementeras, för att få en bättre struktur på underhållsarbetet på Valmets gjuteri. De två enskilt viktigaste delarna i planen är enligt mig dels att anställa en person som ansvarar för den dagliga driften av underhållet. Samt att implementera underhållssystemet AM-underhåll, så att man kan få en bättre struktur på underhållsarbetet i form av arbetsordrar, mätetal och historik. / The report is about setting up an Implementation plan for a structured maintenance work on Valmet ABs foundry in Karlstad. This work is the final part for the Degree of Bachelor of Science in mechanical engineering and takes place at Karlstad University in the spring of 2014. Valmet has recently bought the foundry at Lamberget in Karlstad. The maintenance work is much neglected and in the current state there is no good structure. The maintenance work is in need of systemization and integration into Valmets other maintenance organization. The purpose of the project is to develop a plan Implementation plan for a structured maintenance work on Valmet ABs foundry in Karlstad. The project is divided into three phases. - Situational analysis through both interviews of maintenance personnel and identifying the current equipment - Create a vision of how they want to work with maintenance through benchmarking against other similar businesses, and literature studies - Establishment of a plan for how to get there. What activities to be performed and in what order The work is based on the methodology TPM (total productive maintenance). However it is not about an implementation of TPM, but limited to certain parts. From interviews with the maintenance staff at the foundry, observational studies and an identification study of the machinery, a situational analysis has been made. This situation analysis has shown the problems and challenges that exist in the maintenance department at the foundry. A vision of how they want to work with maintenance on the foundry has been drawn, based on study visits and interviews with management staff. It is most vital that emerged in this phase is the importance of management commitment to implement a process of change. A good communication both between the different departments and within the group is also vital. Using the two phases above, together with the theory processed during the project, a plan has been established for a more structured maintenance. The plan includes 12 stages that addresses the activities that should be implemented, and in what order, in order to get a better structure on maintenance work at the foundry at Valmet. The two single most important elements of the plan are, in my mind, to hire a person who is responsible for the daily operations of the maintenance work. As well as to implement the maintenance system AM-underhåll, so you can get a better structure to the maintenance work in the form of work orders, metrics and history.
55

Moving towards food sovereignty: creating a connected, fair and sustainable food system in Winnipeg through productive urban landscapes

Quesada, Evelyn 21 January 2014 (has links)
The intention behind this work was to re-imagine the possibilities for productive landscapes within our city. The purpose of this practicum is to design opportunities for people to become more self-sufficient, self-sustaining and less-dependant on the current food system through productive urban landscapes. This practicum proposes that we design a strong network of city wide productive landscapes in order to provide people with the space to grow, trade, buy or sell good quality food at a fair and just price. Through a set of strategies derived from research, observation and experience, we can design a new way of looking at landscapes within our city in order to create a connected, resilient, fair and sustainable food system within Winnipeg.
56

Relationships between Changes in Coping Strategies and Community Integration Status at 6 and 12 Months after Traumatic Brain Injury

Li, Erxun 20 November 2012 (has links)
The purpose of this prospective cohort study was to determine the relationships between changes in coping strategies and community integration at 6 and 12 months post traumatic brain injury (TBI). Seventy-one participants were adult significant others (SOs) (family members/friends) of people with TBI. SOs, proxies for TBI patients, completed coping and community integration questionnaire to describe TBI patients’pre-injury status immediately post-injury as baseline information. Followed-up interviewed were completed at 6 and 12 months. Results showed that increased emotional preoccupation coping from baseline to 6 months were significantly associated with decreased productive activities and decreased social integration at 6 months and 12 months and modestly associated with decreased home integration at 12 months. Multivariable regressions showed that changes in emotional preoccupation coping from baseline to 6 months contributed significantly to social integration and productive activities above and beyond demographic factors and injury severity. Implications for cognitive rehabilitation are discussed.
57

Relationships between Changes in Coping Strategies and Community Integration Status at 6 and 12 Months after Traumatic Brain Injury

Li, Erxun 20 November 2012 (has links)
The purpose of this prospective cohort study was to determine the relationships between changes in coping strategies and community integration at 6 and 12 months post traumatic brain injury (TBI). Seventy-one participants were adult significant others (SOs) (family members/friends) of people with TBI. SOs, proxies for TBI patients, completed coping and community integration questionnaire to describe TBI patients’pre-injury status immediately post-injury as baseline information. Followed-up interviewed were completed at 6 and 12 months. Results showed that increased emotional preoccupation coping from baseline to 6 months were significantly associated with decreased productive activities and decreased social integration at 6 months and 12 months and modestly associated with decreased home integration at 12 months. Multivariable regressions showed that changes in emotional preoccupation coping from baseline to 6 months contributed significantly to social integration and productive activities above and beyond demographic factors and injury severity. Implications for cognitive rehabilitation are discussed.
58

Older workers :

Hartmann, Linley. Unknown Date (has links)
Thesis (MBus) -- University of South Australia, 1992
59

Desenho e análise da cadeia produtiva dos vinhos da serra gaúcha

Souza, Sinval Oliveira January 2001 (has links)
O estudo teve por objetivo analisar de forma crítica a cadeia produtiva dos vinhos finos do Estado do Rio Grande Sul, bem como desenhar, descrever e identificar seus principais pontos fortes e fracos e as inter-relações entre os elos da referida cadeia. Para o atingimento dos objetivos propostos o presente trabalho foi realizado em duas etapas. Inicialmente foi realizado um estudo exploratório com proprietários e executivos de empresas do setor. Esta etapa subsidiou a pesquisa descritiva a qual procurou descrever a cadeia produtiva de vinhos finos gaúchos. As principais constatações foram a carência de integração entre os elos da cadeia produtiva comprometendo a competitividade da mesma, bem como, os elos que se constituem em pontos fracos. Com base nessas evidencias foram sugeridas melhorias. / The aim of this study is to critically analyse the productive chain of fine wines in the State of Rio Grande do Sul, as well as design, describe and identify his main strengths and weaknesses and the interrelationship between them. In order to achieve this aim, the dissertation has beem divided in two stages. First, an exploratory study took place, with owners and executives ofthe sector. This stage subsidised the descriptive research which sought to describe the productive chain ofthe "gaúcho" fine wines. The principal results point at the lack of integration between the productive links, which in tum, has negative results for its competitivity. Based on this avidence a number of improvements have been suggested.
60

Qual o "Q" da qualidade? o programa de qualidade total do Banco do Brasil

Ramos, Iuri Roberto Sacramento January 2007 (has links)
Submitted by Suelen Reis (suziy.ellen@gmail.com) on 2013-04-11T18:02:08Z No. of bitstreams: 1 Iuri Ramosseg.pdf: 1696256 bytes, checksum: 5e1897a9a5a0f7d1d9166f902475e0a4 (MD5) / Approved for entry into archive by Rodrigo Meirelles(rodrigomei@ufba.br) on 2013-05-26T11:03:08Z (GMT) No. of bitstreams: 1 Iuri Ramosseg.pdf: 1696256 bytes, checksum: 5e1897a9a5a0f7d1d9166f902475e0a4 (MD5) / Made available in DSpace on 2013-05-26T11:03:08Z (GMT). No. of bitstreams: 1 Iuri Ramosseg.pdf: 1696256 bytes, checksum: 5e1897a9a5a0f7d1d9166f902475e0a4 (MD5) Previous issue date: 2007 / O presente trabalho se inicia com a caracterização do período mais recente de desenvolvimento do sistema sócio-metabólico do capital, partindo dos conceitos de “acumulação flexível”, de David Harvey e de “mundialização do capital” de François Chesnais, para entender a implementação do “modelo japonês”/“Toyotismo”, em um dos seus instrumentos mais usuais: o Programa de Qualidade Total. O lócus da pesquisa é o Banco do Brasil, a maior instituição financeira da América Latina. Tomando como marco referencial para o início da investigação o ano de 1986, quando o Banco perde a conta-movimento e se vê obrigado a buscar no mercado fontes próprias de captação de recursos, são analisadas as diversas iniciativas que a empresa adota, as quais ela chamou de “Programa de Ajustes” e que tinham como objetivo declarado “adaptar a instituição a essa nova realidade”. No bojo da análise das transformações que foram desencadeadas, argumenta-se que o Programa de Qualidade Total do Banco do Brasil – PQTBB, assume um papel significativo na medida em que é por meio dele que a empresa busca demonstrar a inexorabilidade das mudanças que vão sendo implementadas, ao mesmo tempo em que se tenta alcançar a adesão e o convencimento dos funcionários da instituição acerca da necessidade de adotar e conviver com os novos referenciais de gestão e organização do trabalho e da produção, mesmo que esses venham a exigir um aumento da produtividade e uma ampliação do controle da empresa por sobre as atividades desenvolvidas. / Salvador

Page generated in 0.051 seconds