• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 47
  • 1
  • Tagged with
  • 48
  • 48
  • 36
  • 36
  • 36
  • 36
  • 36
  • 34
  • 34
  • 17
  • 16
  • 14
  • 13
  • 11
  • 10
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
41

Los gastos por indemnizaciones y su impacto en los estados financieros y en el impuesto a la renta en las empresas constructoras en el distrito de Miraflores, Lima 2019 / The costs of compensation and their impact on the Financial Statements and income tax in the construction companies, in the district of Miraflores, Lima 2019

Herrero Scotto, Enrique Alexander, Rubiños Crespo, Nadia Mirieli 20 October 2020 (has links)
El presente trabajo de investigación tiene el objetivo de evaluar cuales serían los impactos de la deducibilidad, o no, de los gastos por indemnización y su influencia en los estados financieros, y el Impuesto a la Renta en las empresas constructoras del distrito de Miraflores, Lima 2019. Para el desarrollo de la presente investigación se ha tenido en consideración el principio de causalidad, los estados financieros y el Impuesto a la Renta. También, se ha realizado una investigación sobre las principales características del sector construcción, así como el de los gastos por indemnización y las jurisprudencias correspondientes. Este trabajo de investigación se divide en 5 capítulos, los cuales son: Capítulo 1: Marco Teórico, donde se enseña información básica referente al tema principal. Siguiendo en el Capítulo 2: Plan de Investigación, se presenta el problema en sí, así como la determinación de los objetivos e hipótesis generales y específicas. Continuado con el Capítulo 3: Metodología de investigación, en donde definiremos y explicaremos el tipo de investigación que vamos a emplear, así también se definirá el tamaño de muestra para los análisis cualitativos y cuantitativos. Siguiendo con el Capítulo 4: Desarrollo de la investigación, se realizará la explicación de las herramientas previamente descritas. También se hará un caso práctico para evaluar la incidencia de la deducibilidad, o no, de los gastos por indemnización y su implicancia en los estados financieros e Impuesto a la Renta. Por último, en el Capítulo 5: Análisis de los resultados, se tomará como análisis las herramientas y el caso práctico, dando como últimos elementos, conclusiones y recomendaciones finales en relación a todo lo estudiado. Por tal motivo, hemos elegido que en el presente trabajo utilicemos al sector construcción, ya que estos trabajan con cláusulas indemnizatorias con contratos de servicio regularmente, más que otros sectores. Así como el riesgo en un trabajador es mayor que en la mayoría de rubros de empresas. / This research paper has the objective of assessing what the impacts of the deductibility or not of compensation expenses and their influence on the financial statements and income tax on the construction companies of the Miraflores district, Lima 2019. The principle of causation, financial statements and income tax have been taken into account for the conduct of this investigation. An investigation has also been carried out on the main characteristics of the construction sector, as well as that of compensation costs and the corresponding case-law. This research work is divided into 5 chapters, which are: Chapter 1: Theoretical Framework, which teaches basic information regarding the main topic. Then, in Chapter 2: Research Plan, the problem itself presents, as well as the determination of general and specific objectives and hypotheses. Continued with Chapter 3: Research Methodology, where we will define and explain the type of research we are going to use, so will the sample size for qualitative and quantitative analyses. Following Chapter 4: Development of Research, the explanation of the tools described above will be made. A case study will also be made to assess the impact of the deductibility, or not, of compensation expenses and their implications for financial statements and income tax. Finally, in Chapter 5: Analysis of the results, the tools and the case study will be taken as analysis, giving as the last elements, conclusions and final recommendations in relation to everything studied. For this reason, we have chosen to use the construction sector in this work, as they work with contracts with compensation clauses, regularly, rather than other sectors. Just as the risk in a worker is greater than in most business items. / Tesis
42

Aplicación de la curva de liberación versión simplificada para evitar el síndrome del 90%, caso de estudio: adecuación de infraestructura de la escuela superior de tecnología – Senati del distrito de Villa el Salvador (VES)

Espinoza Jara, José Luis, Caciano Jares, Francisco Javier, Busso Escobar, Fernando Cristian 22 December 2021 (has links)
El presente trabajo de investigación dota de un análisis aplicativo que se fundamenta en el Sistema de Gestión de Calidad (SGC) orientado al desarrollo y ejecución de los proyectos de construcción en el mercado de Lima Metropolitana. La Curva de Liberación versión simplificada como complemento de la “Curva S” se desarrolló con el fin de sincerar la situación real de avance y estimación de la terminación de los entregables de un proyecto. En efecto, las empresas constructoras deben mejorar y desarrollar productos de calidad que satisfacen las expectativas del cliente, y con ello, ganar posicionamiento e imagen, el cumplimiento del total de requerimientos del cliente se denomina calidad. Probablemente, la primera inquietud relacionada a la calidad en la industria de la construcción es la recepción del proyecto concluido por parte del cliente. Ello tiene implicancia en el cumplimiento del alcance del Proyecto de manera real y de los requisitos acordados con el cliente. Sin embargo, al momento de tratar los plazos de recepción de la obra en la construcción también es de completo interés tomar en cuenta el costo que esta representa y aspectos como la calidad de la obra. Dado que uno de los propósitos de amplia importancia es maximizar la rentabilidad del proyecto, los costos que se relacionan con la gestión de calidad deben ser considerados. A medida de la imperiosa necesidad de incrementar la capacidad de atención en la Institución Educativa, el nuevo Centro Tecnológico de SENATI, acordó poner en marcha la obra “Adecuación de Infraestructura de la Escuela Superior de Tecnología – SENATI de Villa El Salvador (VES)”. El trabajo de investigación desarrolló la curva de liberación versión simplificada para evitar el Síndrome del 90%, determinando su impacto en el proyecto de estudio. El objetivo general propuso una metodología que permita una mejora en la dirección de la construcción del proyecto. Se determinó como costo directo de adecuación en obra la suma de S/. 248,990.85 soles y un plazo de ejecución de 75 días calendarios, obteniéndose mediante el análisis de las cinco (05) valorizaciones, el retraso injustificado y partiendo de allí se desarrolló la matriz de restricciones con la finalidad de plantear las acciones correctivas. En efecto, se demuestra en la investigación que el nivel de confiabilidad del desarrollo de los pasos de la obra impacta de manera positiva en su culminación. Por lo tanto, se debe tomar en cuenta la gestión de los costos de calidad, por ello, los costos de los recursos para el aseguramiento y control de la calidad del proyecto (costos controlables) deben ser gestionados, asimismo, los costos que se relacionan al cumplimiento de ellos (costos no controlables). Si hay una mala gestión, se compromete parte de la utilidad del proyecto. Frente a ello es indispensable aplicar herramientas relacionadas con el control de avance real de la obra frente al cronograma planteado, para ello se aplicó la curva de liberación versión simplificada para evitar el Síndrome del 90%. Finalmente, el estudio sirve como un marco referencial para los directores de proyectos; como guía en sus actuales y futuras obras, adaptándolo a su realidad. / This research work provides an application analysis that is based on the Quality Management System (QMS) oriented to the development and execution of construction projects in the Lima Metropolitan market. The Release Curve simplified version as a complement to the “Curve S” was developed in order to ascertain the real situation of progress and estimate of the completion of the deliverables of a project. Indeed, construction companies must improve and develop quality products that meet customer expectations, and thereby gain positioning and image, meeting the total customer requirements is called quality. Probably the first concern related to quality in the construction industry is the reception of the completed project by the client. This has implications in the fulfillment of the scope of the Project in a real way and of the requirements agreed with the client. However, when dealing with the deadlines for receiving the work in construction, it is also of complete interest to take into account the cost it represents and aspects such as the quality of the work. Since one of the most important purposes is to maximize the profitability of the project, the costs that relate to quality management must be considered. As the urgent need to increase the capacity of attention in the Educational Institution, the new Technological Center of SENATI, agreed to launch the work “Adaptation of Infrastructure of the Higher School of Technology - SENATI of Villa El Salvador (VES)”. The research work developed the simplified version release curve to avoid the 90% Syndrome, determining its impact on the study project. The general objective proposed a methodology that allows an improvement in the direction of the construction of the project. The sum of S/. 248,990.85 soles and an execution period of 75 calendar days, obtained by analyzing the five (05) valuations, the unjustified delay and starting from there the restriction matrix was developed in order to propose corrective actions. Indeed, it is demonstrated in the investigation that the level of reliability of the development of the steps of the work has a positive impact on its completion. Therefore, the management of quality costs must be taken into account, therefore, the costs of resources for the assurance and quality control of the project (controllable costs) must be managed, as well as the costs that are related compliance with them (uncontrollable costs). If there is mismanagement, part of the utility of the project is compromised. In view of this, it is essential to apply tools related to the control of the real progress of the work against the proposed schedule, for this, the simplified version release curve was applied to avoid the 90% Syndrome. Finally, the study serves as a frame of reference for project managers; as a guide in his current and future works, adapting it to his reality. / Trabajo de investigación
43

Propuesta de utilización de unidades de albañilería ecosostenibles y económicas de tipo modular con componente plástico PET para la construcción de viviendas en Arequipa / Proposal for the use of eco-sustainable and economic masonry units of modular type with PET plastic component for the construction of green houses in Arequipa

Huerta Paulino, Briggithe Rodhy, Palacios Quico, Diana Katherine 07 October 2020 (has links)
La industria de la construcción es un sector altamente contaminante debido tanto a los procesos que en él se realizan como a los residuos o desechos que se generan. Asimismo, este es considerado tradicionalista por la aplicación de procedimientos y metodologías que no cambian a través del tiempo y que generalmente son las que generan mayor cantidad de contaminantes. Esto, a su vez, no ha permitido los costos de elaboración sean más óptimos o que las estructuras sean más resistentes a los esfuerzos a los que son sometidas. Por ello, en este trabajo de investigación se ha propuesto la utilización de plástico PET para la elaboración de 1 unidad de albañilería apilable. Primeramente, se ejecutaron las dosificaciones 1:1 y 1:2 (Cemento y Arena) con diferentes porcentajes de plástico PET en unidades con características físicas similares a los ladrillos comúnmente utilizados en Arequipa. Estas fueron analizadas experimentalmente en un laboratorio en la ciudad de Arequipa mediante los ensayos de resistencia a la compresión, variación dimensional, alabeo y absorción. Posteriormente, con la dosificación más óptima y la unidad de albañilería modular seleccionada se hicieron las mismas pruebas para su análisis y se realizó un murete de aproximadamente 1m de lado. Finalmente, se realizó el análisis sobre el impacto ambiental que genera reutilizar el plástico desechable PET en la elaboración de bloques de concreto y se desarrollaron comparaciones en propiedades mecánicas y físicas, peso y costo, mostrando que la unidad de albañilería modular propuesta es, en muchos casos, más óptima. / The construction industry is a highly polluting sector due to both the processes that are carried out in it and the waste or waste that is generated. Likewise, this is considered traditionalist because of the application of quite a few procedures and methodologies that do not change over time and that generally generate the most pollutants. This, in turn, has not allowed manufacturing costs to decrease or manufacturing times to be more optimal or for structures to be more resistant to the stresses they are subjected to. For that reason, in this research work the use of PET plastic has been proposed for the preparation of 1 stackable masonry unit. Firstly, 1:1 and 1:2 dosages (Cement and Sand) were executed with different percentages of PET plastic in bricks with physical characteristics similar to the units commonly used in Arequipa. These were analyzed experimentally in a laboratory in Arequipa through the tests of resistance to compression, dimensional variation, warping and water absorption. Subsequently, with the most optimal dosage and the selected modular masonry unit, the same tests were made for analysis and, also, a wall of approximately 1x1m square. Finally, the analysis of the environmental impact generated by reusing the PET disposable plastic in concrete blocks and the properties granted by it was performed and comparisons were developed in mechanical and physical properties, weight and cost, showing that the proposed modular masonry unit is, in many cases, more optimal. / Tesis
44

Mejora de la gestión del mantenimiento de las grúas tipo puente en el taller de construcciones navales del astillero SIMA Callao / Improvement of the maintenance management of the bridge-type cranes in the shipbuilding workshop of the SIMA Callao shipyard

Burgos Hermoza, Juan Manuel, Pflücker Vallejos , Renzo Luis 27 April 2021 (has links)
Actualmente, las operaciones del Taller de Construcciones Navales del SIMA Callao cuenta con 9 grúas tipo puente, 1 pórtico y 1 semi-pórtico, las cuales durante los años 2016 al 2019 incrementaron en un 110.21% el presupuesto destinado a su mantenimiento, el cual llegó a S/ 272,218.54. Este incremento está relacionado con el aumento de paradas de mantenimiento no programado y la disminución de la disponibilidad de las grúas en un 5%. Esta situación conllevó a realizar el proyecto para buscar una mejora en la gestión del mantenimiento de grúas, entre ellas en específico las de tipo puente, tipo pórtico y tipo semi-pórtico aplicando la herramienta de Mantenimiento Centrado en la Confiabilidad (RCM). Esta metodología tiene como fortaleza el uso de la herramienta de análisis de gravedad de los fallos (criticidad), más conocida como AMFE, el cual permitió identificar que los equipos eléctricos de polipasto y traslación fueron los sistemas que presentaron mayor frecuencia de fallas debido su bajo aislamiento, falta de limpieza y la excesiva humedad en el ambiente. Esta información facilitó la presentación de una propuesta optimizada con un nuevo plan de mantenimiento basado en el RCM, la cual generó un impacto positivo en el aumento del tiempo promedio entre fallas (MTBF) de 312 a 819 días, la mejora de la disponibilidad de las grúas tipo puente de un 84% a un 93% y la reducción del 80% del costo de mantenimiento correctivo respecto al año 2019, llevando a un ahorro económico de S/ 301,362.4. / Currently, the Naval Construction Department of SIMA Callao has 09 bridge-type cranes, 01 gantry and 01 semi-gantry. Between 2016 to 2019, it was reflected an increase of 110.21% of the budget in the maintenance of this equipment, risen to the amount of S /. 272,218.54. Likewise, there was evidence of an increase in unscheduled maintenance stops and a decrease in crane availability by 5%. This situation led to the implementation of this project, which aims to improve the maintenance management of bridge, gantry and semi-gantry cranes. For this reason, the Reliability Centered Maintenance (RCM) tool was applied, highlighting its importance in the application of the failure severity analysis methodology (criticality), well known as AMFE. This methodology allowed to identify that electric systems of hoist as well as movement systems were those with the highest frequency of failures, due to the low insulation they presented, as a result of the lack of cleaning and the excessive humidity in the environment. This valuable information made it possible to present an optimized proposal, developing a new maintenance plan based on the RCM. This improvement proposal permitted to demonstrate an increase in the mean time between failures (MTBF) from 312 to 819 days, improving the availability of bridge cranes from 84% to 93% and a reduction of 80% in the cost of corrective maintenance, which led to economic savings of S/ 301,362.4, in comparison to 2019. / Trabajo de Suficiencia Profesional
45

Evaluación de la Asistencia Técnica y su impacto tributario en las empresas inmobiliarias en el distrito de Surquillo, año 2019 / Evaluation of Technical Assistance and its tax impact on real estate companies in the district of Surquillo, year 2019

Barreto Ullón, Violeta Karina, Cornejo Silva, Darwin Davian 27 August 2021 (has links)
El presente trabajo de investigación tiene como objetivo principal determinar como la evaluación de la asistencia técnica impacta tributariamente en las empresas inmobiliarias del distrito de Surquillo, año 2019.Por otro lado, se ha considerado conveniente el sector inmobiliario porque engloba diferentes etapas en las cuales se aplica dicho servicio, la adquisición de información de dicho sector abarca características principales, situación actual del sector, datos estadísticos del servicio de asistencia técnica. El trabajo de investigación se encuentra dividido en 5 capítulos: Capítulo I: Marco Teórico, se exponen definiciones que corresponden al tema principal de la investigación, en el Capítulo II: Plan de Investigación, se expone el problema, los objetivos e hipótesis generales y específicas, en Capítulo III: Metodología de Investigación, se detalla el tipo, nivel, método y diseño de la investigación y el tamaño de la muestra para un posterior análisis aplicando técnicas e instrumentos de recolección de datos tantos como cuantitativos y cualitativos, el Capítulo IV: Desarrollo de la Investigación, se aplican los instrumentos de investigación a la muestra determinada en la investigación y además se plantea un caso práctico para evaluar la asistencia técnica y su influencia en el impuesto a la renta. Finalmente, en el Capítulo V: Análisis de los Resultados, se observa los resultados obtenidos brindando las respectivas conclusiones y recomendaciones en relación con todo lo investigado. / The main objective of this research work is to determine how the evaluation of technical assistance has a fiscal impact on real estate companies in the district of Surquillo, year 2019. On the other hand, the real estate sector has been considered appropriate because it encompasses different stages in which this service is applied, the acquisition of information on this sector includes main characteristics, current situation of the sector, statistical data of the technical assistance service. The research work is divided into 5 chapters: Chapter I: Theoretical Framework, it presents definitions that correspond to the main topic of the research, in Chapter II: Research Plan, the problem, objectives and general and specific hypotheses are presented, in Chapter III: Research Methodology, it details the type, level, method and design of the research and the size of the sample for a later analysis applying techniques and instruments for data collection, both quantitative and qualitative, Chapter IV: Development of the Research, the research instruments are applied to the sample determined in the research and a practical case is also presented to evaluate technical assistance and its influence on income tax. Finally, in Chapter V: Analysis of the Results, the results obtained are observed, providing the respective conclusions and recommendations in relation to everything investigated. / Tesis
46

Modelo prolab: Ecobaldosas, baldosas de concreto eco amigables con utilización de plásticos y vidrios reciclados en la ciudad de Lima

Cerna Velasquez, Juan Manuel, León Morales, Cristina Ivonne, Mamani Serrano, Felicitas Mercedes, Vidal Vasquez, Jorge Christian 04 May 2023 (has links)
El presente documento detalla el proceso mediante el cual se identificó un problema social relevante y se diseñó una solución a través del uso de metodologías ágiles, dando como resultado un modelo de negocio sostenible generando beneficios a todos los stakeholders. La solución planteada recibe el nombre de Eco Baldosa, un revestimiento de piso de alta gama accesible a niveles socioeconómicos C & D de Lima Metropolitana, asimismo se busca reducir la contaminación ambiental al usar PET y Vidrio molido en su fabricación creando un ecosistema de bienestar social integral. La solución propuesta fue sometida a validación con potenciales usuarios. Primeramente, con el factor de deseabilidad obteniendo como resultado de un 87% de los entrevistados estarían dispuestos en comprar las Eco baldosas; a pesar de que este tenga un costo mayor de 30% en comparativa con las mayólicas, pero compensado por el tiempo de vida mucho mayor al revestimiento que usualmente usa este sector económico. Adicionalmente, se validó el diseño de nuestro prototipo obteniendo un 80% de aprobación, considerando además la resistencia y durabilidad como factores decisivos de compra. Finalmente, se validó la viabilidad financiera y sometidos los resultados a través de un análisis de Montecarlo con 500 simulaciones del VAN financiero, obteniendo como resultado un porcentaje muy bajo de pérdida de alrededor del 2%. Finalmente, se concluye que la solución de las Eco baldosas es un modelo de negocio sostenible y escalable, que corresponde directamente con la ODS#12 con un índice de relevancia social del 50%, generando un VAN financiero de S/ 1,920,455 y un TIR del 77% con una inversión total de S/ 1 190 046 y VAN Social de S/ 4 890 443. / This document details the process by which a relevant social problem was identified and a solution was designed through the use of agile methodologies, resulting in a sustainable business model generating benefits for all stakeholders. The proposed solution is called Eco Tile, a high-end floor covering accessible to C & D socioeconomic levels of Metropolitan Lima, it also seeks to reduce environmental pollution by using PET and ground glass in its manufacture, creating an ecosystem of social welfare. Integral. The proposed solution was subjected to validation with potential users. Firstly, with the desirability factor obtained as a result of 87% of the interviewees they would be willing to buy the Eco tiles; despite the fact that this has a higher cost of 30% compared to majolica, but compensated by the much longer life of the coating that this economic sector usually uses. Additionally, the design of our prototype was validated, obtaining 80% approval, also considering resistance and durability as decisive purchase factors. Finally, the financial viability was validated and the results submitted through a Monte Carlo analysis with 500 simulations of the financial NPV, obtaining as a result a very low percentage of loss of around 2%. Finally, it is concluded that the Eco tile solution is a sustainable and scalable business model, which corresponds directly to ODS#12 with a social relevance index of 50%, generating a financial NPV of S/1,920,455 and a IRR of 77% with a total investment of S/ 1 190 046 and Social VAN of S/ 4 890 443.
47

Propuesta de aplicación de elementos prefabricados de concreto armado para mejorar la productividad en la construcción de edificios multifamiliares en Lima / Proposal for the application of precast reinforced concrete elements to improve productivity in the construction of multifamily buildings in Lima

Perez Santamaria, Sandra Pamela, Soplin Diapiz, Luz Clarita 18 February 2022 (has links)
La industria de la construcción de viviendas en Lima, tiene como principal característica la aplicación de métodos de construcción tradicionales, basados en construcción in situ. Los procesos constructivos implican una serie de actividades de gran complejidad que muchas veces alteran la producción y dificultan el eficiente empleo de los recursos. Por ejemplo, la alta demanda de mano de obra genera un entorno de incertidumbre en los procesos de producción, por una mayor probabilidad a errores que generan pérdidas. En los últimos años se han hecho importantes esfuerzos para optimizar los recursos y mejorar la eficiencia y el desempeño de la construcción convencional a través de metodologías y herramientas como Lean Construction, BIM, Last Planner entre otros; sin embargo, alcanzados sus máximos posibles, no logran incrementar la productividad ni disminuir los efectos adversos de la construcción tradicional en términos reales a través del tiempo. Por ende, este estudio propone la aplicación de los sistemas constructivos prefabricados altamente industrializados en la construcción del casco estructural de viviendas multifamiliares con el objetivo de elevar la productividad a los estándares internacionales. Del estudio se encontró una reducción del 5% en el costo por metro cuadro de construcción y una reducción en el plazo y el costo de la mano de obra del 26% y 61% respectivamente. Se puede concluir que el método de construcción por prefabricados permite incrementar la productividad dado un eficiente empleo de los recursos como la mano de obra, materiales y el tiempo de construcción. / The main characteristic of the housing construction industry in Lima is the application of traditional construction methods, based on on-site construction. Construction processes involve a series of highly complex activities that often alter production and hinder the efficient use of resources. For example, the high demand for labor generates an environment of uncertainty in the production processes, due to a greater probability of errors that generate losses. In recent years, significant efforts have been made to optimize resources and improve the efficiency and performance of conventional construction through methodologies and tools such as Lean Construction, BIM, Last Planner, among others; however, having reached their maximum possible levels, they fail to increase productivity or reduce the adverse effects of traditional construction in real terms over time. Therefore, this study proposes the application of highly industrialized prefabricated construction systems in the construction of the structural hull of multi-family homes with the aim of raising productivity to international standards. The study found a 5% reduction in the cost per square meter of construction and a reduction in the term and cost of labor of 26% and 61%, respectively. It can be concluded that the prefabricated construction method allows increasing productivity due to an efficient use of resources such as labor, materials and construction time. / Tesis
48

Propuesta de uso de la herramienta dynamo para optimizar el tiempo en el proceso de valorización de subcontratistas de acabados en edificios multifamiliares menores de 10 pisos de NSE A y B ejecutado por una Pyme constructora en Lima Metropolitana / Proposal for the use of Dynamo software to optimize time in subcontractor’s schedule of values of finishes process in less than 10-story multi-family buildings of Socioeconomic Status A & B executed by a small and medium-sized construction enterprise in Metropolitan Lima

Chavez Guerrero, Rodrigo Americo, Vilchez Chung, Sebastian Rodrigo 25 June 2021 (has links)
Lima es el principal escenario de desarrollo de proyectos de vivienda, por ello es una importante fuente de oportunidades para las empresas constructoras. Un significativo porcentaje de estas lo conforman pequeñas y medianas empresas, que buscan estrategias para competir en el mercado. Por ejemplo, la canalización de sus actividades a través de la subcontratación. En este escenario, suelen presentarse dificultades en el proceso de valorización de los subcontratistas de las partidas de acabados, dado que son tareas que requieren de mayor tiempo y detalle para validar. Estos problemas son resueltos de manera sintomática porque no se trabaja con herramientas que permitan anticiparlos ni entenderlos en su totalidad. El objetivo de la presente investigación es desarrollar una propuesta de solución frente a los problemas identificados, a través de la implementación de una herramienta de programación visual (Dynamo) dentro de un entorno de trabajo BIM, que permita optimizar el tiempo en el proceso de valorización de subcontratistas de acabados en edificios multifamiliares menores de 10 pisos de NSE A y B ejecutado por una PYME constructora en Lima Metropolitana. Se realizaron entrevistas a profesionales encargados de realizar las valorizaciones para identificar las principales deficiencias que se presentan en este proceso y de esta forma, plantear la propuesta de solución. Finalmente, se realizó la validación de la propuesta de solución a través del juicio de expertos, como resultado de las opiniones emitidas por estos y su nivel de interés percibido se concluyó que la propuesta sería de gran aporte en una posible implementación. / Lima has been the main scenario for the development of building projects, which makes it an important source of opportunities for construction enterprises. A significant percentage of these are made up of small and medium-sized enterprises (SMEs), which constantly seek strategies to compete in the construction industry. One of these is assigning their activities through subcontracting. In this common practice, difficulties often arise in subcontractor’s schedule of values of finishes process, since they are tasks that demand more time and detail to track the progress, even more critical situation in projects with a reduced site-based staff. These problems are solved symptomatically because they do not work with tools for anticipate or understand them entirely. The objective of this research is to develop a proposed solution to the problems identified, through the implementation of a visual programming tool (Dynamo) within a BIM environment, for optimize time in subcontractor’s schedule of values of finishes process in less than 10-story multi-family buildings of Socioeconomic Status A & B executed by a construction SME in Metropolitan Lima. In order to identify the main deficiencies that appears in traditional process, interviews were conducted with in-charge professionals of subcontractor’s schedule of values of finishes. Then, collected information was analyzed to propose a solution for the problem. Finally, the proposed solution was validated through expert judgment, which through the opinions expressed by the professionals and their perceived level of interest, it was concluded that the proposal would be of great contribution in a possible implementation. / Tesis

Page generated in 0.0735 seconds