• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 16
  • 6
  • Tagged with
  • 22
  • 22
  • 22
  • 21
  • 11
  • 5
  • 5
  • 5
  • 5
  • 5
  • 4
  • 4
  • 4
  • 4
  • 4
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
21

Utmaningar & möjligheter med barnkonsekvensanalys : Implementering av barnkonsekvensanalys i trafikplanering / Challenges & possibilities with child impact assessment : Implementation of child impact assessment in transport planning

Sörell, Frida January 2022 (has links)
Inkluderandet av barn i planeringsprocesser är en aktiv diskussion i samhället då barn som grupp ofta blir åsidosatta i sitt deltagande. Barn utgör ungefär 25 procent av befolkningen men de utgör 100 procent av vår framtid, vilket innebär att de bör ges möjlighet att påverka det samhälle de växer upp i. År 2020 blev barnkonventionen en svensk lag som främjar barns rättigheter och skyddar barnets bästa. För att uppnå barnets bästa och inkludera barn i planeringsprocesser finns metoden barnkonsekvensanalys. Denna metod analyserar planeringsprojekts konsekvenser, bedömer hur barn påverkas av planeringssituationer samt presenterar lösningar för att uppnå den mest gynnsamma miljön för barn. Denna uppsats syftar till att undersöka möjligheter och utmaningar med barnkonsekvensanalys i planeringsprocesser genom att implementera metoden i Trafikverkets planering för en ny vägplan (väg 684). Undersökningen genomförs baserat på metoderna barnkonsekvensanalys och aktionsforskning för att både möjliggöra en implementering och en reflektion av processen. Tillvägagångssättet för metoderna består av workshops, gåtur och intervju varpå dess resultat analyseras och reflekteras över. Resultatet diskuteras utifrån teorier om barns rättigheter, både i den fysiska miljön samt i planeringsprocesser. Uppsatsens slutsats är att det finns ett flertal utvecklingsmöjligheter för barnkonsekvensanalys som bör beaktas för att metoden ska uppnå sin fulla potential. Detta inkluderar exempelvis att öka förståelsen för barnens perspektiv och ge barnkonsekvensanalys ökat utrymme inom planeringsprocesser. Implementeringen av barnkonsekvensanalysen i Trafikverkets planering ger slutsatsen att förslagen för vägplanen gynnar barnets bästa. Det finns dock utmaningar med metoden som måste hanteras för att barnens delaktighet ska förbättras, exempelvis gällande utformningen av kunskapsinhämtning. / The inclusion of children in planning processes is an active discussion in society as children as a group often become disregarded in their participation. Children constitute about 25 percent of the population, but they constitute 100 percent of our future, which means that they should be given the opportunity to influence the society in which they grow up. In the year 2020, the Convention on the Rights of the Child became a Swedish law that promotes children’s rights and protects what is best for the children. To fulfill the children’s best interests and include children in planning processes, there is a method called child impact assessment. This method analyzes the consequences of planning projects, assesses how children are affected by planning situations, and presents solutions to achieve the most advantageous environment for children. This thesis aims to investigate opportunities and challenges with child impact assessment in planning processes by implementing the method in the Swedish Transport Administration’s planning for a new transportation plan (road 684). The thesis is conducted based on the methods of child impact assessment and action research to enable both an implementation and a reflection of the process. The implementation of the methods consists of workshops, child-led tour, and interview, after which the results are analyzed and reflected on. The results are discussed based on theories about children’s rights, both in the physical environment and in planning processes. The thesis’ conclusion is that there are several development opportunities for child impact assessment that should be considered for the method to reach its full potential. This includes, for example, improved understanding of children’s perspectives and giving child impact assessment more space in planning processes. The implementation of the child impact assessment in the Swedish Transport Administration’s planning gives the conclusion that the proposals for the transportation plan benefit children’s best interests. However, there are challenges with the method that must be addressed in order for the children’s participation to be improved, for example regarding the design of knowledge acquisition.
22

Förseningstimmar på mötesseparerade 2+1-vägar : Hur förseningskostnaden påverkas av ombyggnad till 2+2-väg i relation till investeringskostnaden / Delay hours on 2+1-separeted roads : How the cost of delay hours are affected by reconstructing to 2+2-roads in relation to the investment cost

Hamadi, Farah, Wallin, Viktor January 2019 (has links)
Från slutet av 1990-talet har en stor mängd av de icke-separerade 13 meter breda vägarna byggts om till mötesseparerade vägar, där trafiken i varje riktning separeras med en mittremsa. Mötesseparerade vägar har varit ett mycket lyckat projekt för trafiksäkerheten och bidragit med en stor minskning av svårt skadade och döda i trafiken. Det finns många mötesseparerade vägar i Sverige. Vid olyckor på 2+1-vägar blir det svårt för trafiken att vända på vägen vilket leder till stopp och gör det även svårt för Blåljusmyndigheten samt bärgningsbilar att ta sig fram. Dessa olyckor leder till förseningstimmar och i sin tur till samhällskostnader. Det här examensarbetet är skrivet för Trafikverket för att granska 2+1-vägar i Trafikverkets Region Öst. Rapporten tar fram och jämför minskning av förseningskostnader efter en ombyggnad från 2+1- till 2+2-väg, rapporten tar även fram och jämför förseningskostnaden med investeringskostnaden för ombyggnationen. Resultatet för den här studien har framförts genom litteraturstudier, analys av data från Trafikledningen, webbverktyg och genom användning av Microsoft Excel för kalkylering av förseningstimmar och -kostnader för utvalda vägar och sträckor. Resultatet från rapporten visar om det är värt att undersöka en 2+1-väg för ombyggnation från 2+1- till 2+2-väg ur förseningskostnadsperspektiv. Detta redovisas genom en generell jämförelse per mil 2+1-väg baserad på väg 50, 55 och 56 i Trafikverkets Region Öst. Rapporten innehåller även en analys över de fem mest drabbade olycksplatserna på E18:s 2+1 sträckor. Analysen av dessa visade att alla fem sträckor låg mellan Köping och Västerås i Västmanland. / From the late 1990s, a large part of the non-separated 13-meter-wide roads have been reconstructed into meeting separated roads, where traffic in each direction is separated by a middle strip. Meeting separated roads have been a very successful project for road safety and have contributed to a large reduction in severely injured and casualties in traffic. There are many meeting separated roads in Sweden. In the case of accidents on 2+1-roads, it becomes difficult for the traffic to turn around on the road, which leads to a stop and makes it difficult for the emergency services and tow trucks to reach the scene of the accident. These accidents lead to delay hours and, in turn, to community costs. This thesis is written for the Swedish Transport Administration to review 2+1 roads in the Swedish Transport Administration’s Region East. The report produces and compares the reduction of delay costs after rebuilding a road from 2+1- to 2+2-standard, the report also presents and compares the delay cost with the investment cost for the reconstruction. This study is based on literature studies, analysis of data from the “Traffic Management”, internet-based programs and through the use of Microsoft Excel for calculating delay hours and -costs for selected roads and routes. The result of the report shows whether it is worth investigating in a reconstruction from 2+1- to 2+2-road from delay cost perspective. This is presented through a general comparison per Scandinavian mile of 2+1-road based on roads 50, 55 and 56 in the Swedish Transport Administration’s Region East. The report also contains an analysis of the five most affected accident sites on the E18's 2+1-routes. The analysis of these accident sites showed that all five were between Köping and Västerås in Västmanland county.

Page generated in 0.1373 seconds