• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 140
  • 25
  • 19
  • 10
  • 9
  • 2
  • 2
  • 2
  • 1
  • 1
  • Tagged with
  • 215
  • 215
  • 138
  • 134
  • 131
  • 123
  • 114
  • 109
  • 107
  • 105
  • 105
  • 95
  • 94
  • 94
  • 93
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
61

Logistické centrum odpadů - příprava a organizace výstavby / Logistic center of waste - Preparation and organization of construction

Polách, Miroslav January 2013 (has links)
This thesis deals with the preparation and organization of construction of Logistic center of waste for processing biologically decomposable waste in Vsetín. It is focused mostly on technological procedure of realization of main building object, based on the budget, the progress chart, the technological instructions and the inspecting and test plan. The thesis also contains a description of other objels with time and financial planning. It is designed and described the construction site equipment, the composition of machinery for construction and the design of the supply of material resources.
62

Příprava realizace bytové výškové budovy v Bratislavě / Preparation for the implementation of a high-rise apartment building in Bratislava

Krajčovič, Matúš January 2022 (has links)
The subject of this diploma thesis is processing of a construction technological project for the preparation of the realization of a high-rise residential building in Bratislava. The thesis is based on construction technology solution. The content of thesis is a technical report, coordination situation with broader transport relations, time and financial plan, study of realization of technological stages, solution of construction organization including drawing of construction site, design of main construction machines and mechanisms, technological regulation for upsite monolithic construction, control and testing plan, item budget, detail of relief elements of the ceiling structure, drawing of the formwork of the ceiling structural floor, specific research in the field of tower cranes.
63

Energocentrum - vybrané části STP / Energy centre - selected parts of building technology project

Suchánek, Jiří January 2012 (has links)
Master thesis Energy centre - selected parts of building technology project is solving problems connected with technological issues from the construction work supplier point of view. This thesis concerns such a parts as financial, timing and preparations are. Material used as a base was a master thesis of the student from Civil engineering department.
64

Podzemní garáže v Bratislavě - stavebně technologický projekt / Underground Parking in Bratislava - Building Contruction Project

Raučinová, Veronika Unknown Date (has links)
The topic of the diploma thesis is the elaboration of a construction-technological project for the Underground Parking for the Pradiareň BCT in Bratislava. The work contains a technical report for a construction technology project, a study of the implementation of the main technological stages of the building, solving broader transport relations with the design of the building supply, object time and financial plan, time plan, construction site project, design of main machines, technological regulation for monolithic construction , the balance of workers and main machines, control and test plans for the operation of the monolithic structure and the health and safety plan. As another assignment, I process the item budget of selected technological processes, schematic solution of pilots, selected LEED certification points, noise study, access road technology, scheme of connection of object SO 0.2 to object BCT1 and formwork drawings.
65

Stavebně technologický projekt přípravy a realizace 1. etapy Ponava City / Construction Project for Implementation of Ponava City - 1st phase

Gunár, Juraj Unknown Date (has links)
The diploma thesis deals with construction project of the prepraration and realisation of the 1st stage of Ponava City residential district in Brno, Královo Pole. A construction technological project, a construction plan from a financial and time point of view, a design of construction site equipment, a design of construction machinery and a health and safety plan were prepared for a multifunctional building. Furthermore, the content includes more detailed technological regulations of reinforced concrete structures and related inspection and test plans.
66

Stavebně technologický projekt přípravy a realizace polyfunkčního domu / Construction Project for Implementation of Multifunctional Building

Mičjaňová, Lívia Unknown Date (has links)
The subject of the diploma thesis is the elaboration of the technological project of the multifunctional building DASS in Martin. It is a two-storey building that will serve for the needs of DASS company. The diploma thesis assesses the building as a whole and focuses on selected technological processes. The work consists of the technical report, study of the implementation of the main technological stages of the main building, technological regulations for monolithic reinforced concrete horizontal structures and for vegetation flat roof, design of main construction machines and mechanisms, design and assessment of lifting mechanism and control-test plans for structures from technological regulations. Furthermore, a time and financial plan is developed. Than staff balance and a schedule of selected technological processes of the main building is processed. At the same time a construction site project, a health and safety plan, a noise study and LEED 2009 CORE & SHELL are prepared for the construction of a multifunctional building. The work is further supplemented by a specialization focused on the analysis of the contribution of green roofs on energy efficiency of buildings.
67

An Exploratory Study of Drones Used for Safety Purposes on Outdoor Construction Sites / En Explorativ Studie på Användandet av Drönare för Säkerhetsskäl på Byggarbetsplatser

Makadsi, Ivar, Makdisi-Somi, Maikel January 2019 (has links)
Syftet med denna studie är att undersöka faktorer som påverkar adoptionen av drönare för säkerhetsskäl på byggarbetsplatser, och att fastställa hur dessa faktorer påverkar adopteringen. Detta bidrar till att teknologiskt modernisera byggbranschen samt fylla en lucka i befintlig litteratur om adoptionen av drönare för säkerhetsskäl. För att undersöka detta genomfördes elva semistrukturerade intervjuer med personer som representerade åtta olika företag av varierande storlek, alla aktiva i byggindustrin. Resultaten indikerar att de primära faktorer som påverkar adopteringen är 1) Kännedom, 2) Organisation, 3) Arbetarna, 4) Genomförbarhet och 5) Extern miljö. Alla dessa faktorer kan påverka adoptionen såväl positivt som negativt. Hur dessa faktorer påverkar adoptionen av drönare har också modellerats i det framtagna ramverket Drone Adoption Model (DAM). Adoptionsprocessen inleds med att Intresset sprids inom företaget. När intresset är etablerat görs en Genomförbarhetsbedömning. Beroende på resultatet från genomförbarhetsbedömning pilottestas tekniken, vilket sedan lägger grunden för Diffusionen. De olika faktorerna påverkar adoptionen i olika faser. Kännedom påverkar primärt adoptionen i Intressefasen. Faktorerna genomförbarhet och organisation påverkar adoptionen primärt i genomförbarhetsbedömningen. Slutligen påverkar faktorerna Arbetarna och Extern miljö genom hela processen. / The aim of this study is to explore, understand and elucidate the factors that influence the adoption of drones for safety purposes on outdoor construction sites, as well as to determine how these factors influence adoption. This contributes to the role of modern technologies in the construction industry as well as fill a gap in existing literature of drone adoption for safety purposes. In order to investigate this, eleven semi-structured interviews were conducted with people representing eight different companies of varying size, all active in the construction industry. The results indicate that the major factors influencing adoption are: 1) Awareness, 2) Organization, 3) Workers, 4) Feasibility and 5) External environment. All these factors could influence the adoption both positively and negatively. How the factors influence the adoption has been modelled in the proposed framework Drone Adoption Model (DAM). The adoption process starts with Interest being spread throughout the firm. Once an interest is established, a Feasibility assessment is conducted. Depending on the result from the feasibility assessment, the technology is Pilot tested, which then lays the foundation for the Diffusion. The different factors influence adoption in different phases. Awareness primarily influence adoption in the Interest phase, whereas the factors Feasibility and Organization influence adoption mainly in the Feasibility assessment. Lastly, the two factors external environment and workers influence the adoption throughout the whole process.
68

Construction power - systematic energy initiatives at the construction site / Byggström - systematiskt energiarbete på byggarbetsplatsen

Bölin, Johan, Sundbom, Jacob January 2014 (has links)
Recent studies have suggested that an increasingly large proportion of a building's energy cost consists of energy consumption during the building process, before the building becomes operational. A large part of this "early energy" consists of indirect energy that has been used to manufacture building materials and components and to transport material to the construction site. Furthermore, there is the more direct energy used in construction projects such as construction electricity, district heating, LPG and diesel fuel used on-site. These costs are in a more direct and comprehensible way linked to the construction site and can be influenced by the developer and / or contractor. Therefore, this report focuses primarily on the direct energy involved during a building’s constructions phase. The problems that exist today are several. For example, both clients and contractors have very poor means of monitoring energy consumption on construction sites thus making it difficult to optimize the costs. There are no reliable statistics regarding energy usage, which makes it difficult to analyze problems and to suggest improvements. One of the reasons is that the cost of construction energy, or at least the monetary value of the potential savings, is considered to be negligible in the context of a major construction project and the subject has therefore rather low priority. Furthermore, the clients rely heavily on the contractor’s expertise and have big faith in the contractor’s ability to optimize energy usage. On the other hand, contractors assume that the customers are fully informed and aware of their own needs and that the contractor should only offer what the customer asks for, as cheaply as possible. However, it would be possible for both parties to make substantial savings by adopting a more efficient energy management. In order to achieve this, construction energy issues have to be considered early in the planning process and throughout the entire project. The best results are achieved when the developer and contractor share a common vision and there is open exchange of knowledge and experience. To facilitate this dialogue and to create a tool to address the issue early in the project, this exam-work has led to a prototype for a template that is intended to be used as a letter of intent between the parties, by which they can jointly or individually clarify and specify their energy goals within a specific project / Nya utredningar tyder på att en allt större andel av en byggnads energiåtgång återfinns i de tidiga skedena, innan huset ännu tagits i drift, det vill säga under produktionsfasen. En stor del av denna "tidiga energi" består av indirekt energi som har använts i framställningen av byggmaterial och byggnadskomponenter samt till transporter för att få materialet på plats. Därtill finns den mer direkta energin, i form av byggström, fjärrvärme, gasol och diesel som används på byggena. Dessa kostnader är på ett mer direkt och lättöverskådligt sätt knutna till byggarbetsplatsen och bakomliggande processer är något som beställare och entreprenör har inflytande över och kan förbättra. Följaktligen kommer denna rapport främst behandla den direkta energin som används under en byggnads uppförandefas. Problemen som finns idag är flera. Delvis har många aktörer, både på beställar- och utförarsidan, bristfälligt statistiskt underlag angående byggenergin. Detta resulterar i en undermålig eller obefintlig uppföljning och identifiering av förbättringsmöjligheter gällande energianvändningen. En bidragande anledning till problemet är att kostnaden för byggenergi, eller åtminstone det monetära värdet av en potentiell besparing, av många anses som en försumbar del av ett stort byggprojekt och frågan blir därför nedprioriterad. Vidare verkar det inom beställarleden finnas en viss överdriven tilltro till entreprenörernas expertis och vilja att utveckla branschen i energihänseende medan det omvända förhållandet delvis råder bland entreprenörerna, där man utgår från att kunderna är aktiva beställare som vet vad de vill ha. Entreprenörerna föreslår sällan alternativa lösningar utan försöker snarare uppfylla kundernas kravspecifikationer till ett så billigt pris som möjligt. Det skulle dock kunna vara möjligt för bägge parter att spara både pengar och koldioxid genom en effektivare energihantering. Dessa åtgärder kräver att byggenergifrågan finns med tidigt i projekten och i planeringsprocessen. Allra bäst resultat uppnås när beställare och entreprenör har en gemensam målbild och ett öppet utbyte av kunskaper och erfarenheter. För att underlätta denna dialog har vi tagit fram ett förslag till en mall som är tänkt att fungera som en intentionsförklaring mellan parterna varigenom man gemensamt eller individuellt kan tydliggöra och konkretisera energimålen i byggprojekten. Vi har även tagit fram förslag till formuleringar gällande energieffektivitet som kan inkluderas vid upphandlingar.
69

Byggarbetsplatsens arbetsmiljöarbete : Effekterna av en arbetsmiljöinsats på en byggarbetsplats / The effects of an extra effort for the work environment at a construction site

Ljungberg, Adam January 2021 (has links)
Bygg- och anläggningsbranschen har kompetensbrist, låga vinstmarginaler och är en av de mest olycksdrabbade branscher i Sverige. Byggarbetsplatser har ständiga förändringar och olika förutsättningar för att kunna leverera en bra slutprodukt och samtidigt upprätthålla en god arbetsmiljö. Bra arbetsmiljö och hälsofrämjande insatser leder till ökad attraktivitet på arbetsplatser, arbetsglädje, engagemang, effektivitet, produktivitet och lönsamhet. Genom ett systematiskt arbetsmiljöarbete (SAM) kan bättre arbetsmiljöer uppnås. Syftet med denna studie är att studera effekterna av en arbetsmiljöinsats på en byggarbetsplats genom förbättrad insikt och förståelse för hur de arbetstagarna ser på arbetsplatsens arbetsmiljö och SAM.Studien innehåller en fallstudie under en intervention i form av arbetsmiljöinsats. Mätning av antal inrapporterade riskobservationer samt en kvantitativ datainsamling har utförts genom en enkätundersökning där arbetsplatsens arbetstagare deltog både innan och efter arbetsmiljöinsatsen. Efter arbetsmiljöinsatsen visade resultaten att arbetstagarnas intresse minskade, kunskap upplevdes som större och delaktighet i frågor om arbetsmiljö och SAM minskade. Arbetstagarnas upplevelse av arbetsgivarens intresse för arbetsmiljö minskade medan den ökade för SAM. Arbetsplatsen fick in fler riskobservationer på kortare tidsperiod efter arbetsmiljöinsatsen jämfört med innan. Studien har bidragit med vetskap om att arbetsmiljöinsatser behöver pågå under längre tid och vara med omfattande för att förutsättningarna för byggarbetsplatsers arbetsmiljö ska bli bättre på de arbetsplatser där arbetstagarna upplever att arbetsmiljön redan är bra. / The construction industry has skills shortages, low profit margins and is one of the most unfortunate industries in Sweden. Construction sites have constant changes and different conditions to be able to deliver a good end product while should maintain a good working environment. Good work environment and health promotion efforts leads to more attractive workplaces, job satisfaction, commitment, efficiency, productivity and profitability. Systematic Work Environment Management (SWEM) can achieve better working environments. The purpose of this study is to study the effects of a work environment initiative on a construction site through improved insight and understanding of the workers perspective for the workplace's work environment and SWEM.The study includes a case study during an intervention in the form of work environment initiative. Measurement of the number of reported risk observations and a quantitative data collection has been carried out through a survey in which workers at the workplace participated both before and after the work environment initiative. After the work environment intervention, the results showed that the interest of workers decreased, knowledge was perceived as greater and participation in issues related to the work environment and SAM decreased. The employee's experience of the employer's interest in the work environment decreased while it increased for SWEM. The workplace received more reported risk observations during a shorter period after the intervention compared to before. The study has contributed with the knowledge that work environment initiative needs to last for a longer period and be more extensive to improve the conditions for the work environment at construction sites workplaces that workers feel that the work environment is already good.
70

Feasibility study for electrification of Logistics centre at Stockholm Royal Seaport

Sachdewani, Rohit Kumar January 2021 (has links)
In the eastern part of Stockholm, a major urban development project is taking place. It is called Stockholm Royal Seaport and up to the year 2030 approximately 12000 new homes, 35000 workplaces and 600000 square meters of commercial areas will be added to the area. The project has been given a very ambitious environmental action program. As a part of that, the City of Stockholm has established a logistics centre in the area. The logistics centre is supposed to coordinate all transports of building material and handle the waste during the construction phase. One objective with the logistics centre is to reduce the number of transports and thereby reduction in the use of energy. The thesis-work mainly focused on developing an optimisation program for electricity supply to the logistics centre, in order to find the optimal way of managing charging and the use of electrical energy, when the logistics centre has procured a new batterypowered truck. The main objective is to minimize the purchase of power bought from the grid, for the loads at the logistics centre at Stockholm Royal Seaport. This thesis not only focused on this site in particular, but the work also resulted in creating a benchmark model that could be used for studying the electrification process for other construction sites in general. The logistics centre contains stationary battery storage, electrified distribution trucks, a PV generation system, and other electrical loads at the site. This thesis aimed at considering all the limitations and constraints for all the resources at the site and then finding an optimal method of utilising these resources in order to minimize the overall energy consumption. In this thesis, the optimal sizing of the battery for an electrified distribution truck is also performed considering the overall functional requirements of the distribution truck. Various charging strategies have been identified and simulated to understand the routines of charging the truck and their direct impact on the grid due to the purchase of energy during various hours of the day. The work resulted in optimised use of assets at the site during different hours of the day. The simulation work identified the best strategy and the use of resources at the site thus saving some amount of energy consumption at the site. This directly resulted in saving overall operational costs of the logistics centre. / I den östra delen av Stockholm pågår ett stort stadsutvecklingsprojekt. Det kallas Norra Djurgårdsstaden och fram till år 2030 kommer cirka 12000 nya bostäder, 35000 arbetsplatser och 600000 kvadratmeter kommersiella områden att läggas till området. Projektet har fått ett mycket ambitiöst miljöprogram och som en del av det har Stockholm stad inrättat ett logistikcenter i området. Logistikcentret ska samordna alla transporter av byggmaterial och hantera avfallet under byggfasen. Ett mål med logistikcentret är att minska antalet transporter och därmed minska energianvändningen. Examensarbetet fokuserade främst på att utveckla ett optimeringsprogram för elförsörjningen till bygglogistikcentret för att hitta det optimala sättet att hantera laddning och användning av elektrisk energi när logistikcentret investerar i en ny batteridriven lastbil. Huvudmålet är att minimera importen av elkraft som köps från nätet för att försörjar lasterna vid Norra Djurgårdsstadens Bygglogistikcenter. Målet är att göra en vägledande modell som kan användas för att studera elektrifieringsprocessen för byggarbetsplatser i allmänhet. Detta logistikcenter innehåller stationär batterilagring, elektrifierade distributionsbilar, ett PV -genereringssystem och andra elektriska laster på platsen. Syftet med denna avhandling var att överväga begränsningarna och resurserna på platsen och sedan hitta en optimal metod för att använda dessa resurser för att minimera den totala energiförbrukningen. I detta examensarbetet utförs också den optimala dimensioneringen av batteriet för en elektrifierad distributionsbil med beaktande av de övergripande funktionella kraven för distributionsbilen. Olika laddningsstrategier har identifierats och simulerats för att förstå rutinerna för laddning av lastbilen och dess direkta påverkan på nätet på grund av inköp av energi under olika timmar på dygnet. Arbetet resulterade i optimerad användning av tillgångar på platsen under olika timmar på dygnet. Simuleringsarbetet identifierade den bästa strategin och användningen av resurser på platsen, vilket sparar en viss energiförbrukning på platsen. Detta resulterade direkt i att spara logistikcentralens totala driftskostnader.

Page generated in 0.1619 seconds