• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 228
  • 89
  • 13
  • 10
  • 9
  • 6
  • 5
  • 5
  • 5
  • 5
  • 5
  • 4
  • 4
  • 4
  • 4
  • Tagged with
  • 396
  • 257
  • 164
  • 111
  • 98
  • 76
  • 67
  • 50
  • 48
  • 44
  • 44
  • 37
  • 36
  • 35
  • 33
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
121

Análise de viabilidade técnico-econômica de repotenciação de PCHS com inserção de benefícios ambientais : estudo de caso /

Gyori, Dinara Fernandes Silva. January 2007 (has links)
Resumo: O crescente aumento da demanda de energia elétrica, aliada ao aumento dos custos de produção de energia e à preocupação com questões ambientais e sociais, conduz o planejamento do setor energético mundial para uma estratégia de utilização mais eficiente das fontes de produção já existentes. Neste trabalho é apresentado um estudo de caso de repotenciação de uma Pequena Central Hidrelétrica (PCH), com o objetivo de demonstrar que este tipo de empreendimento é viável para aumentar a oferta de energia elétrica do sistema, necessária para suprir a demanda futura. Do levantamento do potencial hidráulico do rio que alimenta a usina, verifica-se a possibilidade de elevar a capacidade de geração a fio d'água em aproximadamente 75%. A análise de viabilidade técnica-econômica apresentada não considera somente os custos de equipamentos e preços de mercado da energia elétrica, mas incorpora o benefício ambiental referente à comercialização dos créditos de carbono que podem ser obtidos com a repotenciação da PCH e que promovem a redução do tempo de amortização do investimento. Citam-se ainda diversas contribuições sociais que podem resultar de um projeto de repotenciação, principalmente no caso de usinas desativadas, tornando este tipo de empreendimento mais atrativo, tanto do ponto de vista técnico-econômico quanto sócio-ambiental. / Abstract: The increase of the electrical energy demand associated with the high cost of the energy production and some concerns regarding social and environmental issues led the energy sector to develop new efficient ways of energy production. This work has analyzed the repowering of a Small Hydroelectric Power Plant (SHPP) of the ''run-off river'' type, aiming to demonstrate that such activity is feasible and able to increase the energy supply to handle future demands. It was verified, after an analysis of a river hydraulic potential, the possibility of a 75% increase of its own capacity to generate energy. The presented analysis of the technical-economical viability doesn't only consider the value of the equipments and the current costs of the electrical energy, but it incorporates the environmental benefit regarding the commercialization of the carbon credits which can be obtained by the repowering of a SHPP and that it promote the reduction of the investment paying-off time. Several social contributions that can be resulted of a repowering project are mentioned, mainly in the disabled plants case, making this enterprise more attractive, so much of the standpoint technician-economical as socio-environmental. / Orientador: Oscar Armando maldonado Astorga / Coorientador: José Luz Silveira / Banca: Durval Luiz Ricciulli / Banca: Albert Cordeiro Geber de Mello / Mestre
122

'Clean Energy' At What Cost?

Conrad, Rachel E 01 April 2013 (has links)
Ecuador was ‘refounded’ at the turn of the 21st century, with the articulation of progressive and inclusive ideals in a new Constitution. Social movements and leftist intellectuals in Ecuador have expressed that president Rafael Correa has failed to uphold the 2008 Constitution’s goals and values. President Correa and his Alianza PAIS government have utilized the rhetoric of the revolutionary ideals articulated in the Constitution, but in practice, they have continued to implement the status quo Western development model, and a large part of their development strategy involves ‘neo-extractive’ activities. Hydroelectric energy production is contributing to the ‘neo-extractive’ development model in Ecuador, and its implementation has often violated Constitutional rights. This thesis is an analysis of natural resource extraction in Ecuador and its social repercussions, with a focus on hydroelectric energy production. It is shown that the hydroelectric industry in Ecuador is not as “clean,” sustainable, or non-extractive as it is purported to be, through a case study of the San José del Tambo hydroelectric project and the exploration of an international support for hydroelectric extractivism, the United Nations Clean Development Mechanism, and its misleading framing of extractive projects as “sustainable development.” Social movements in Ecuador are acting to reverse the perversion of their originally revolutionary ideals, and to implement a post-extractive model informed by those revolutionary ideals.
123

Mapeamento de potencial hidrelétrico do Estado de Roraima para a construção de pequenas centrais hidrelétricas – PCHS : alternativa energética para o desenvolvimento sustentável

Evangelista, Frederico Júnior Pereira January 2012 (has links)
No contexto social a produção de energia elétrica tem sido um dos grandes desafios da atualidade. Assim tem-se buscado formas de garantir a sustentabilidade das matrizes energéticas associadas à produção de bens e serviços. Neste sentido, a presente pesquisa se configura como uma proposta de investigação que busca demonstrar a atual situação da estrutura energética disponível no Estado de Roraima, seu custo econômico e social, e os benefícios relacionados com a implantação de um programa de incentivo para as Pequenas Centrais Hidrelétricas (PCHs), fornecendo suporte ao desenvolvimento sustentável. Para o desenvolvimento deste estudo, foi utilizado o método de pesquisa tipo descritiva, que frente aos objetivos e finalidades da investigação, também se procedeu à combinação de pesquisa bibliográfica e documental. Assim foi analisada a capacidade da matriz energética de Roraima localizada no sistema isolado, que tem na interligação com a Venezuela, através do Linhão de Guri, seu principal fornecedor. Adicionado a uma distribuição no interior do Estado predominantemente a óleo diesel. A pesquisa verificou que a estrutura energética disponível, não fornece o suporte necessário e confiável para um processo de desenvolvimento sustentável. Portanto, o cenário atual exige das instituições públicas e privadas a busca por alternativas para equacionar as questões da deficiência da matriz energética do Estado de Roraima. Adicionalmente discutem-se algumas estratégias para um planejamento energético de implantação de um programa de incentivo para as Pequenas Centrais Hidrelétricas (PCHs). / In the social context the electric power production has been one of the great challenges of the present time. It has been looking for like this forms of guaranteeing the sustainability of the energy head offices associated to the production of goods and services. In this sense, to present researches configures itself as an investigation proposal that looks for to demonstrate the current situation of the available energy structure in the State of Roraima, its economical and social cost, and the benefits related with the implantation of an incentive program for the Small Central Hydroelectric (PCHs), supplying support to the maintainable development. For the development of this study, the descriptive method of research type was used, to obtain the objectives and purposes of the investigation, it was also proceeded to the combination of bibliographical and documental research. So, the capacity of the energy head office of Roraima located in a isolated system was analyzed that it has an interconnection with Venezuela, through ‘ Linhão de Guri’, its main supplier, added it a distribution inside the State predominantly to diesel oil. The research verified that the available energy structure, doesn't supply the necessary and reliable support for a process of maintainable development. Therefore, the current scenery demands the search from the public and private institutions for alternatives to set out the subjects of the deficiency of the energy head office of the State of Roraima. Additionally some strategies are discussed for an energy planning of implantation of an incentive program for the Small Central Hydroelectric (PCHs).
124

Análise dos potenciais de desenvolvimento sustentável gerados pela instalação de hidrelétrica no rio Cotingo as comunidades indígenas da área Raposa Serra do Sol em Roraima

Silva, Luis Cláudio de Jesus January 2009 (has links)
Desde o início da década de 70 que se discute a exploração dos recursos hídricos da bacia do rio Cotingo, hoje, localizado no interior da Terra Indígena Raposa Serra do Sol, no Estado de Roraima. Perseguir a disposição de energia limpa e sustentável, como alavanca propulsora do desenvolvimento regional, foi o argumento a justificar ações e projetos governamentais ao longo destes quase 40 anos. Infelizmente, nem sempre respeitando os instrumentos normatizadores, o meio ambiente e as comunidades diretamente afetadas. O assunto voltou a ser destaque após a aprovação pelo Senado Federal do Decreto Lei 434/06, autorizando a exploração dos recursos hídricos e potenciais energéticos do rio Cotingo com a condição de prévia consulta as comunidades indígenas afetadas. Conhecer os recursos disponíveis é o primeiro ato na intenção de produção ou desenvolvimento. A identificação dos recursos naturais disponíveis na região do rio Cotingo, bem como, os potenciais de desenvolvimento sustentável pós instalação de Hidrelétrica na região são elementos de informação essenciais a sensibilização das comunidades envolvidas e nortearam o posicionamento consciente e responsável para tomada de decisão quando da discussão do tema. / Since the beginning of the 70’s the exploration of the hydric resources of the basin of the Cotingo river is discussed, today, located in the Amerindian’s Land called Raposa Serra do Sol, in the State of Roraima. To pursue the disposal of clean and sustainable energy, as propeller of the regional development it was the argument to justify the government actions and projects throughout these almost 40 years. Unfortunately, hardly ever respecting the instrument rules, the environment and the communities directly affected. The subject came back to be discussed after the approbation by the Federal Senate of the Decree Law 434/06, authorizing the exploration of the hydric resources and potential energy of the Cotingo river with the previous condition of consulting the amerindians communities affected. To know the available resources is the first act in the production intention or development. The identification of the available natural resources in the region of the Cotingo river, as well as, the potencial of sustainable development after installation of Hydroelectric in the region are essential elements for information the and sensibilization of the involved communities and will guide the conscientious and responsible positioning to make a decision about the discussion of the subject.
125

O silêncio dos afogados : o ethos jornalístico na complexidade ambiental e a formação e sentidos do acontecimento Garabi

Echenique Dominguez, Carlos André January 2015 (has links)
Esta tese discute o silenciamento de vozes em uma dada contextualização do ethos jornalístico na produção de noticiário em jornais de Posadas e Porto Alegre, e investiga a cobertura realizada pelos veículos em relação ao projeto de construção de duas hidrelétricas na fronteira entre os dois países, Brasil e Argentina, no rio Uruguai, denominadas complexo de Garabi- Panambi. Três grandes eixos sustentam esse trabalho: o conhecimento sobre o meio-ambiente, o ethos jornalístico e a cena social do acontecimento Garabi. O saber ambiental foi tratado desde a sua origem na teoria marxista que descreve a separação do homem da natureza pelo trabalho, a falha metabólica presente até hoje no cerne da questão da crise ambiental do século XXI. O ethos jornalístico e seus valores e essência foram recuperados historicamente, perfazendo um trajeto que se inicia na modernidade, onde o Jornalismo ganhou a forma atual, e chegando aos dias de hoje, quando a atividade enfrenta o desafio de conseguir dar conta da complexidade e das falhas decorrentes do processo discursivo de uso da linguagem jornalística. Para compreender o contexto social em que transcorre o acontecimento Garabi- Panambi, foi feita uma investigação jornalística com o método de apuração para produção de reportagem. Esta reportagem-ensaio trouxe a voz dos ribeirinhos, suas histórias e culturas, estabelecendo a polifonia de vozes. Foram analisados os discursos do noticiário de quatro jornais: Zero Hora, Correio do Povo, Primera Edición e El Territorio. O resultado dessa análise aponta a ausência da voz dos ribeirinhos que seriam atingidos pelo projeto. Conclui-se que o Jornalismo dá uma grande contribuição para a discussão da complexidade ambiental se estiver centrado em um ethos que considere efetivamente a possibilidade de liberdade no acaso e na contingência dos discursos e dos saberes que estão contidos na expressão do pensamento, na formação de imagens, no devir dos sentidos, no sentir das emoções. A força das imagens naturais e dos saberes não científicos comporia este ethos. Um ethos que aceite e estimule a necessidade de interação com o ambiente e os seres vivos. Com a reflexão desta contextualização sobre o território e seus habitantes, e com as teorias do Jornalismo, Ambientalismo, Análise do Discurso e Imaginário, recortamos conceitos para fazer um retrato do universo simbólico que envolve jornalistas e ribeirinhos. Postula-se que a imersão no natural e em suas imagens é determinante para a formação de saberes jornalísticos que produzam sentidos múltiplos e complexos, acolhendo outros conhecimentos da sociedade em que o jornalista está inserido e onde ele exerce seu ofício. / The main objectives of this thesis is to discuss the issue of discursive silencing in a given context of the journalistic ethos in newspapers of Posadas and Porto Alegre, investigating the coverage carried by the vehicles in relation to the projects for the construction of the two hydro power plants on the border between the two countries, Brazil and Argentina, on the River Uruguay – the complex Garabi-Panambi. The absence of the voice of the riverside population that will be affected by the project is the main result of the analysis of the speeches of the four newspapers: Zero Hora, Correio do Povo, Primera Edición and El Territorio. To build the social context, we worked with three main theoretical fields of knowledge. Environmental knowledge was studied since its Marxist origin – the separation of man from nature through work; this metabolic failure is still today the heart of the matter of the environmental crisis of the 21st century. The journalistic ethos and its values and essence were recovered historically, making a path that begins in the modern years, when journalism gained its present form, and coming up to the present day, when the activity faces the challenge of succeeding in being able to account for the complexity and failures resulting from the discursive process of language use. To understand the environment in which takes place the Garabi-Panambi event, we employed a journalistic investigation and calculated the production of news. This story-essay brought the voice of the riparian, their histories and cultures, establishing the polyphony of voices. We pointed out that journalism would be a great contribution to the complexity of the environmental discussion were it centered on an ethos that effectively considered the possibility of freedom in what is left to chance and in the contingency of discourses and knowledges that are contained in the expression of thought, in imaging, in the becoming of senses, in feeling. The strengths of natural images and of the non-scientific knowledge compose this ethos. An ethos that supports and stimulates the need for interaction with the environment and living beings. With the reflection of this context on the territory and its inhabitants, and with the theories of Journalism, Environmentalism, Discourse Analysis and of the Imaginary, we gathered concepts to make a picture of the symbolic universe that surrounds journalists and the riverside population. We affirm that immersion in the natural and its images is crucial for the formation of a journalistic knowledge that forms multiple and complex senses, welcoming other knowledge societies where the journalist is inserted and where he exercises his craft.
126

[en] ANALYSIS OF DIFFERENT ALLOCATION METHODOLOGIES OF COSTS AND BENEFITS APPLIED TO THE OPERATION AND PLANNING OF HYDROELECTRIC SYSTEMS / [pt] ANÁLISE DE DIFERENTES ALTERNATIVAS DE ALOCAÇÃO DE CUSTOS E BENEFÍCIOS APLICADOS À OPERAÇÃO E AO PLANEJAMENTO DE SISTEMAS HIDRELÉTRICOS

SILVIO BINATO 28 August 2007 (has links)
[pt] Esta tese apresenta uma análise de formas alternativas de rateio de custos e benefícios em um pool de empresas de geração de energia elétrica, verificando seus impactos na operação em pool, sob o ponto de vista da remuneração dos investimentos e no dimensionamento ótimo de novos equipamentos. São apresentados estudos de caso envolvendo um sistema formado por seis usinas hidrelétricas pertencentes à companhia Furnas Centrais Elétricas S/A. o modelo de operação do sistema hidrelétrico considera as restrições hidráulicas e cenários para volumes afluentes às usinas. / [en] This thesis analyzes alternative methodologies for allocating coasting costs and benefits among participants of na energy generation pool. The impact of these alternative allocations with respect to revenues and dimensioning of new equipaments is assessed. Case studies, considering a system with six plants of Furnas Centrais elétricas S/A company, are presented. The system operation model takes into account hydro constrains and inflow scenarios.
127

Modelagem do aporte de sedimentos aplicada à bacia hidrográfica contribuinte da PCH Costa Rica (MS) e proposta de mitigação do assoreamento / Modeling of sediment delivery applied to the watershed of SHP Costa Rica (MS) and a siltation mitigation proposal

Zanella, Bruno Pavanelli [UNESP] 28 January 2016 (has links)
Submitted by BRUNO PAVANELLI ZANELLA null (brunopzanella@gmail.com) on 2016-02-26T19:05:23Z No. of bitstreams: 1 TESE BRUNO PAVANELLI ZANELLA.pdf: 21746898 bytes, checksum: dfe54ee2f810b98550af3d99f8c3d4a7 (MD5) / Approved for entry into archive by Ana Paula Grisoto (grisotoana@reitoria.unesp.br) on 2016-02-29T13:55:20Z (GMT) No. of bitstreams: 1 zanella_bp_dr_guara.pdf: 21746898 bytes, checksum: dfe54ee2f810b98550af3d99f8c3d4a7 (MD5) / Made available in DSpace on 2016-02-29T13:55:20Z (GMT). No. of bitstreams: 1 zanella_bp_dr_guara.pdf: 21746898 bytes, checksum: dfe54ee2f810b98550af3d99f8c3d4a7 (MD5) Previous issue date: 2016-01-28 / Fundação para o Desenvolvimento da UNESP (FUNDUNESP) / A avaliação do potencial de produção de sedimentos de uma bacia hidrográfica contribuinte de uma hidrelétrica é de extrema importância para a análise da viabilidade de implantação de uma planta geradora, sobretudo quando se trata de uma Pequena Central Hidrelétrica (PCH), pois o assoreamento pode comprometer a longevidade do empreendimento. Este estudo teve como objetivo aplicar e avaliar modelos de predição de aporte de sedimentos na bacia hidrográfica contribuinte da PCH Costa Rica, no Estado de Mato Grosso do Sul, gerados pelos softwares SWAT e InVEST. A bacia contribuinte desta PCH, com aproximadamente 1.200km², é integrante da bacia do Alto Rio Sucuriú, e apresenta escassez de dados de séries históricas de hidrologia e sedimentologia. A modelagem pelo software SWAT e InVEST permitiu verificar que a produção de sedimentos ocorre em altas taxas na bacia contribuinte desta PCH. A perda total de solo nesta bacia obtida pelo InVEST foi de 19,23 Mg ha-1 ano-1 (2.392.353,10 Mg ano-1), superior em 2,2 vezes o valor gerado pelo software SWAT, de 8,54 Mg ha-1 ano-1 (1.062.402,15 Mg ano-1). O total de sedimentos que efetivamente chega ao canal de adução da PCH Costa Rica estimada pelo InVEST foi de 100.674,20 Mg ano-1 de sedimentos, enquanto o SWAT apresentou um total 10,43 vezes superior (1.049.521,72 Mg ano-1). A diferença obtida entre os dois modelos pode ser atribuída às peculiaridades de cada software, sendo utilizada no InVEST, a relação máxima do aporte de sedimento definida em 80% que não é aplicada no SWAT representa a capacidade máxima de retenção possível em cada célula. A modelagem da perda de solo em bacias hidrográficas realizada pelos softwares SWAT e InVEST mostrou-se promissora, com elevada correlação entre si e com o Método de Einsten Modificado. Estes sedimentos são carreados e se acumulam nos cursos d’água, gerando problemas operacionais para esta PCH, que necessita de dragagem constante para permitir o funcionamento do empreendimento, gerando custos que não foram previstos na concepção do projeto. Diante deste cenário foi proposta a recomposição vegetal das áreas degradadas por processos erosivos intensos, com a utilização de biotecnologia, em sistema de plantio direto de espécies nativas do Cerrado em consórcio com leguminosas inoculadas com rizóbio. A simulação do InVEST para o cenário futuro com recomposição vegetal de 13,78 km2 das APPs hídricas desta bacia gerou uma redução na produção de sedimentos de 6.464,99 Mg ano-1, demonstrando que a adoção de práticas conservacionistas pelos produtores da bacia contribuinte da PCH Costa Rica pode amenizar os processos erosivos, aumentar a capacidade produtiva dos solos e diminuir os custos desta hidrelétrica com o desassoreamento do canal de adução. / The evaluation of sediment production potential in a hydroelectric watershed is extremely important for the deployment of assessing the feasibility of a generating plant, especially in the case of a Small Hydroelectric Plant (SHP) because the sediment deposition may compromise the longevity of the project. This study aimed to implement and evaluate sediment delivery prediction models in the watershed of SHP Costa Rica in the state of Mato Grosso do Sul, generated by SWAT and InVEST software. The basin of this SHP, with approximately 1.200km², is an upper portion of the Sucuriú river basin and presenting scarcity of data time series of hydrology and sedimentology. Modeling by SWAT and InVEST software has shown that the production of sediments occurs at high rates in the basin of this SHP. The total soil losses in watersheds of this SHP obtained by InVEST was 19,23 Mg ha-1 ano-1 (2392353,10 Mg ano-1), higher than the value obtained by SWAT software with 8,54 Mg ha-1 ano-1 (1062402,15 Mg ano-1). The sediment that reaches the adduction channel of SHP Costa Rica estimated by InVEST is 100,674.20 Mg year-1 of sediments, while the SWAT has a total 10.43 times higher (1.049.521,72 Mg ano-1). The difference obtained between the two models can be attributed to the peculiarities of each software being used in InVEST, the maximum ratio of sediment contribution set at 80% which is not applied in SWAT is the maximum capacity possible retention in each cell. The modeling of soil loss in river basins performed by SWAT and InVEST software proved promising, with high correlation with each other and the method of Modified Einstein. These sediments are carried and accumulate in streams, creating operational problems for SHP Costa Rica, which requires dredging to allow operation, and generates costs that were not anticipated in the initial project. In this scenario was proposed a plant recovery of degraded areas with the use of biotechnology in no-tillage system of native Cerrado species intercropped with legumes inoculated with Rhizobium. The simulation of InVEST for future scenario with plant recovery of 13.78 km2 of hydric permanent preservation areas in the SHP Costa Rica basin generated a reduction of 6464.99 Mg year-1 in the total loss of sediment in small watersheds. The adoption of conservation practices by farmers of the SHP Costa Rica basin can mitigate the erosive processes, increase the productive capacity of soils and reduce the costs of this hydropower plant with dredging in the adduction channel. / FUNDUNESP: 1886/2011
128

As Centrais Hidrelétricas de Canoas I e II no Médio Vale Paranapanema: história e impactos sócios-econômicos

Vieira, Sergio Domingos [UNESP] 27 February 2007 (has links) (PDF)
Made available in DSpace on 2014-06-11T19:26:39Z (GMT). No. of bitstreams: 0 Previous issue date: 2007-02-27Bitstream added on 2014-06-13T18:54:53Z : No. of bitstreams: 1 vieira_sd_me_assis.pdf: 965591 bytes, checksum: 7bf80ba6749e07ff391804f692c4554b (MD5) / A construção do Complexo Energético Canoas no Médio Paranapanema no início dos anos 1990 gerou uma expectativa de desenvolvimento acentuado nesta região do Estado de São Paulo, considerada uma das mais pobres, ficando atrás somente do Vale do Ribeira. Todavia, a região experimentou um breve período de prosperidade com o início das obras e os investimentos estatais em obras compensatórias que beneficiaram as comunidades dos municípios impactados. A crise que atingiu a economia brasileira nos meados dos anos 90 inviabilizou a continuidade das obras do Complexo Canoas através do modelo estatal, por intermédio da CESP e as mesmas foram paralisadas no inicio de 1995. Este trabalho procura mostrar a frustração de desenvolvimento a partir da construção das usinas hidrelétricas Canoas I e Canoas II que não se concretizou e a adoção de um novo modelo de gerenciamento de Estado que até então era responsável pela construção das principais obras de infra-estrutura. A partir de então, adota-se um novo modelo de gerenciamento do setor energético. No Estado de São Paulo, adota-se a parceria Estado e Iniciativa Privada para viabilizar a expansão do setor elétrico a partir de 1995. Esta parceria permitiu a conclusão das obras do Complexo Canoas no Médio Paranapanema e da usina Porto Primavera no Pontal do Paranapanema. Mais adiante, já sob a ótica de um modelo econômico neoliberal, o governo do Estado de São Paulo privatiza todo o setor energético, principalmente na área de geração de energia. Este novo modelo, principalmente na área energética, mostrou-se equivocado. Sem investimentos, o País teve que conviver no final dos anos 90 com uma crise sem precedentes no setor, que culminou com o apagão e o racionamento de energia elétrica. / The construction of the Energy Complex Canoas in Medium Paranapanema in the beginning of nineties generated a stressed expectation of development in this São Paulo state s region, considered one of the poorest, only superadded by Vale do Ribeira. However, the region experimented a short period of prosperity with the beginning of the building and the governments investments in compensatory works that benefited the communities of impacted cities. The crisis that reached the Brazilian economy in the middle of nineties made impracticable the continuity of the work in Canoas complex by the government model, through CESP and it was stopped in the beginning of 1995. This work intends to show a development frustration from the construction of the hydroelectric energy stations Canoas 1 and Canoas 2 which weren t concretized and the adoption of a new state management model that until then was responsible for the construction of the main infrastructure works. From then on, a new management model is adopted in energetic sector. In São Paulo state, a partnership between state and private initiative is adopted to make possible the electric sector expansion from 1995. This partnership allowed the Canoas complex work conclusion in the medium Paranapanema and Porto Primavera energy station in Pontal do Paranapanema. Straight ahead, under a neoliberal economic model view, the government of São Paulo state privatizes the whole energetic sector, mainly in the energy generation area. This new model, mainly in the energetic area, was shown in a wrong way. With no investments the country had to live with a non-precedent crisis in the end of nineties, what culminated in a blackout, apagão, and electric energy shortage.
129

Maciços rochosos em projetos hidrelétricos: proposta de classificação geomecânica

Mesquita, João Batista de [UNESP] 17 November 2008 (has links) (PDF)
Made available in DSpace on 2014-06-11T19:32:18Z (GMT). No. of bitstreams: 0 Previous issue date: 2008-11-17Bitstream added on 2014-06-13T18:43:33Z : No. of bitstreams: 1 mesquita_jb_dr_rcla.pdf: 5875287 bytes, checksum: db2a8395dcb44ca32fbf3d80e933e123 (MD5) / Desenvolveu–se proposta de classificação geomecânica de maciços rochosos para uso em projetos e obras de hidrelétricas a céu aberto, tendo como base estrutural o sistema Rock Mass Ration (RMR), proposto por Bieniawski (1989), para aplicação nas fases de: viabilidade e projeto básico, e projeto executivo (obras civis), direcionado, sobretudo para as atividades de preparo, tratamento e liberação das fundações. Os parâmetros classificatórios, simples e consagrados no meio técnico, são obtidos por meio de procedimentos metodológicos e pesquisa comumente empregados, tendo como estudo de casos os Aproveitamentos Hidrelétricos Jirau e Serra do Facão, localizados no rio Madeira, município de Porto Velho- RO e rio São Marcos em Catalão-Go, Brasil. O sistema básico foi testado e avaliado nos dois projetos hidrelétricos citados e ainda foram demonstradas incoerências do sistema RMR, na obtenção e aplicação dos pesos relativos dos parâmetros fraturamento e Rock Quality Designation (RQD), tendo sido solucionadas na presente tese. Introduziu-se de forma inédita como parâmetro de ajuste com pesos positivos, os tratamentos de fundação aplicados, que deverá ser objeto de calibração em projetos e obra em curso, que poderá servir para avaliar o coeficiente de segurança de determinada estrutura, por meio do ganho que é submetido o maciço rochoso tratado dos índices e parâmetros geotécnicos Os parâmetros e pesos da classificação da fase de projeto são revistos e ou determinados para a classificação fase de obras, durante o preparo e liberação da fundação, e nessa oportunidade pode-se reavaliar as especificações técnicas e aplicabilidade do projeto executivo, nessa área específica. Demonstrou-se a metodologia de obtenção de parâmetros geomecânicos, testou-se e avaliouse nos casos citados a Proposta Classificação Geomecânica e, finalmente... / There has been developed geomechanic classification of rock mass for outdoors use in projects and works of hydroelectrics, having as structural basis the Rock Mass Ration (RMR) System, proposed by Bieniawski (1989), for application in the phases of viabilitiy and basic project, and executive project (civil works) mainly directed for the activities of preparation, treatment and liberation of the foundations. The classificatory parameters, simple and consecrated in technical environment, are obtained from methodological procedures and researches, having as cases of study Jirau and Serra do Facão Hydroelectric Uses located in the Madeira River, in the region of the city of Porto Velho-RO and in São Marcos River, in Catalão-GO, Brazil. The basic system was tested and appraised in the two mentioned hydroelectric projects and incoherences of the system were still demonstrated RMR, in the obtaining and application of the relative weights of the parameters Fracturement and Rock Quality Designation (RQD), having been solved in the present thesis. It was introduced in an unpublished way as adjustment parameter with positive weights, the applied foundation treatments, that should be calibration object in projects and work in course, that it can be to evaluate safety's certain structure coefficient, through the earnings that is submitted the rocky solid agreement of the indexes and parameters geotecnics. The parameters and weights of the classification of the project phase are reviewed and or certain for the classification phase of works, during the preparation and liberation of the foundation, and in that opportunity it can be revalued the technical specifications and aplicabilidade of the executive project, in that specific area. The methodology of obtaining of parameters geomechanics was demonstrated, it was tested and it was evaluated in the mentioned cases the developed geomechanic... (Complete abstract click electronic access below)
130

Da barranca do rio para a periferia dos centros urbanos: a trajetória do Movimento dos Atingidos por Barragens face às políticas do setor elétrico no Brasil

Foschiera, Atamis Antonio [UNESP] 26 February 2010 (has links) (PDF)
Made available in DSpace on 2014-06-11T19:33:35Z (GMT). No. of bitstreams: 0 Previous issue date: 2010-02-26Bitstream added on 2014-06-13T20:25:17Z : No. of bitstreams: 1 foschiera_aa_dr_prud.pdf: 4855753 bytes, checksum: dc15a8aacce8f84e35a82991cdba8ebd (MD5) / Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES) / Este estudo tem o objetivo de apresentar a origem, formação e trajetória dos atingidos por barragens, organizados entorno do Movimento de Atingidos por Barragens (MAB), frente às políticas do setor elétrico, no Brasil. A trajetória do MAB apresenta semelhanças com outros movimentos sociais que se formaram no final da década de 1970 e início dos anos de 1980. Teve sua gênese ligada a ações pontuais da Igreja (Católica e Luterana) e à oposição sindical, vinculando-se, posteriormente, com a Central Única dos Trabalhadores (CUT) e o Partido dos Trabalhadores (PT), o que contribuiu para a formação de um movimento de âmbito nacional. Enquanto especificidade, o MAB lutava por indenizações justas e mudança das políticas do setor elétrico, que tinha objetivos desenvolvimentistas, propondo formas alternativas de obtenção de energia (eólica, pequenas centrais elétricas (PCHs), de biomassa etc.). No conjunto dos movimentos sociais, o MAB buscava a abertura democrática e se inseria no projeto popular que buscava tomar o poder do Estado, pela via eleitoral, como forma de fazer a transformação social no país. Com a reestruturação do setor elétrico, na década de 1990, marcado pela privatização de empresas do setor, a iniciativa privada busca dominar as fontes de geração de energia e assume o conflito junto aos atingidos por barragens, que até então se dava com o Estado. Esta nova forma de conflito fez com que o MAB redefinisse seu papel, extrapolando sua ação para além das áreas de abrangência das usinas hidrelétricas, passando a atuar junto aos trabalhadores de centros urbanos, tendo como referência o conceito de atingido pelo preço da energia... / This study aims to present the origin, formation and history of those affected by dams, organized around the Movement of Dam Affected People (Movimento de Atingidos por Barragens - MAB), ahead to the policies of the electricity industry in Brazil. The trajectory of the MAB has similarities with other social movements that were created in the late 1970‟s and early years of 1980. It had its genesis linked to specific actions of the Church (Catholic and Lutheran) and union opposition, and linking subsequently to the Unic Workers Central (Central Única dos Trabalhadores - CUT) and the Workers Party (PT), which contributed to the formation of a nationwide movement. While specificity, MAB fought for fair compensation and change of policies in the electricity sector, which had development objectives by offering alternative ways of energy production (wind, small hydro power (PCHs), biomass etc.). In all social movements, the MAB was seeking a democratic opening and fell within the popular project that sought to take State power, through elections, as means to social transformation in the country. With the restructuring of the electricity sector, marked by the privatization of companies in the sector, private initiative seeks to dominate the sources of power generation and assumes the conflict with those affected by dams, which until then was dealt by State. This new way of conflict has made the MAB redefine its role, surpassing its action beyond the coverage areas of hydroelectric, starting to work with the workers in urban centers, with reference to the concept of hit by energy prices. The expansion of the capital‟s domain over the economy has made the MAB move closer to other social movements, rural (by Via Campesina) or urban (by Consulta Popular) and started to do joint activities with them... (Complete abstract click electronic access below)

Page generated in 0.0725 seconds