• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 39
  • 5
  • 2
  • 2
  • 1
  • 1
  • Tagged with
  • 51
  • 51
  • 51
  • 22
  • 22
  • 13
  • 12
  • 11
  • 7
  • 7
  • 6
  • 6
  • 6
  • 6
  • 6
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Análise de viabilidade técnico-econômica de repotenciação de PCHS com inserção de benefícios ambientais: estudo de caso

Gyori, Dinara Fernandes Silva [UNESP] 08 1900 (has links) (PDF)
Made available in DSpace on 2014-06-11T19:30:10Z (GMT). No. of bitstreams: 0 Previous issue date: 2007-08Bitstream added on 2014-06-13T20:20:26Z : No. of bitstreams: 1 gyori_dfs_me_guara.pdf: 1709694 bytes, checksum: 9bbf8bfbc8fba1f7d05b85cb38d2ca50 (MD5) / Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES) / O crescente aumento da demanda de energia elétrica, aliada ao aumento dos custos de produção de energia e à preocupação com questões ambientais e sociais, conduz o planejamento do setor energético mundial para uma estratégia de utilização mais eficiente das fontes de produção já existentes. Neste trabalho é apresentado um estudo de caso de repotenciação de uma Pequena Central Hidrelétrica (PCH), com o objetivo de demonstrar que este tipo de empreendimento é viável para aumentar a oferta de energia elétrica do sistema, necessária para suprir a demanda futura. Do levantamento do potencial hidráulico do rio que alimenta a usina, verifica-se a possibilidade de elevar a capacidade de geração a fio d’água em aproximadamente 75%. A análise de viabilidade técnica-econômica apresentada não considera somente os custos de equipamentos e preços de mercado da energia elétrica, mas incorpora o benefício ambiental referente à comercialização dos créditos de carbono que podem ser obtidos com a repotenciação da PCH e que promovem a redução do tempo de amortização do investimento. Citam-se ainda diversas contribuições sociais que podem resultar de um projeto de repotenciação, principalmente no caso de usinas desativadas, tornando este tipo de empreendimento mais atrativo, tanto do ponto de vista técnico-econômico quanto sócio-ambiental. / The increase of the electrical energy demand associated with the high cost of the energy production and some concerns regarding social and environmental issues led the energy sector to develop new efficient ways of energy production. This work has analyzed the repowering of a Small Hydroelectric Power Plant (SHPP) of the ‘‘run-off river’’ type, aiming to demonstrate that such activity is feasible and able to increase the energy supply to handle future demands. It was verified, after an analysis of a river hydraulic potential, the possibility of a 75% increase of its own capacity to generate energy. The presented analysis of the technical-economical viability doesn’t only consider the value of the equipments and the current costs of the electrical energy, but it incorporates the environmental benefit regarding the commercialization of the carbon credits which can be obtained by the repowering of a SHPP and that it promote the reduction of the investment paying-off time. Several social contributions that can be resulted of a repowering project are mentioned, mainly in the disabled plants case, making this enterprise more attractive, so much of the standpoint technician-economical as socio-environmental.
2

An object-oriented knowledge-based system for hydroelectric power plant turbine selection

Andrade, Dagmar Luz de January 1992 (has links)
No description available.
3

Upių hidrokinetinės energijos gavybos ir aplinkosaugos priemonių integracija / Integration of hydrokinetic river energy production and environmental instruments

Mažeikytė, Ernesta 21 June 2013 (has links)
Magistrantūros studijų baigiamasis darbas 52 lapai, 30 paveikslų, 4 lentelės, 41 literatūros šaltiniai. PAGRINDINIAI ŽODŽIAI: Hidrokinetinė energija, turbinos, nepatvankinė technologija, hidroelektrinė. Tiriamojo darbo objektas: Nepatvankinių technologijų panaudojimas upių hidrokinetinės energijos gavybai. Tiriamojo darbo tikslas: Įvertinti nepatvankinių energijos gavybos technologijų ir aplinkosaugos priemonių integracinius suderinamumus. Tiriamojo darbo uždaviniai: 1. Apžvelgti hidrokinetinės energijos panaudojimo taikant nepatvankines technologijas patirtį užsienio šalyse. 2. Apžvelgti hidrokinetinės energijos taikant nepatvankines technologijas panaudojimo siekius Lietuvoje. 3. Išanalizuoti nepatvankinių technologijų schemas. 4. Išanalizuoti nepatvankinių technologijų poveikį vandens ekosistemoms. 5. Įvertinti galimas nepatvankinių technologijų poveikio vandens ekosistemoms sumažinimo priemones. Tiriamojo darbo metodika: literatūros apžvalgos skyrius rašomas referatyviai, analizuojant mokslinius šaltinius. Duomenys tyrimui renkami analizuojant lietuvišką ir užsienio literatūrą, patentus, schemas, didžiausią dėmesį atkreipiant į nepatvankines energijos gavybos technologijas ir jų poveikį aplinkai. Tiriamojo darbo rezultatai: 1. Literatūros analizėje apžvelgta hidrokinetinės energijos panaudojimo taikant nepatvankines technologijas patirtis Lietuvoje, bei užsienyje. 2. Išanalizuotos nepatvankinių technologijų schemos, bei nepatvankinių technologijų poveikis... [toliau žr. visą tekstą] / The final master work consisting of 52 sheets, 30 images, 4 tables, 41 sources of literature. Key words: hydrokinetic energy, turbines, non-affluent technology, hydroelectric power plant. The object of this work: use of non – affluent technologies in extracting hydrokinetic energy out of the rivers. Main goal of this work: estimate the compatibility between non – affluent energy extracting technologies and tools of environment control integrity. Tasks of this work: 1. Overview of the hydrokinetic energy use abroad applying non – affluent technologies. 2. Overview of the hydrokinetic energy implementation and goals into Lithuanian market. 3. Analyses of the schemes about non – affluent technologies. 4. Analyze the impact of non-affluent technologies to eco systems. 5. Estimate the possible tools for decreasing impact of the non-affluent technologies to water eco systems. Methodology of this work: Literature overview charter is written abstractly analyzing scholarly sources. Data for the research was collected by analyzing Lithuanian and foreign literature, licenses, schemes considering non-affluent energy extraction technologies and their impact to the environment. The results of the work: 1. In literature analysis overviewed the experience of the hydrokinetic energy use applying non-affluent technologies in Lithuania and abroad. 2. Analyzed the schemes of the non – affluent technologies and their impact to the eco systems. 3. Estimating the tools for decreasing impact of the... [to full text]
4

Análise de viabilidade técnico-econômica de repotenciação de PCHS com inserção de benefícios ambientais : estudo de caso /

Gyori, Dinara Fernandes Silva. January 2007 (has links)
Resumo: O crescente aumento da demanda de energia elétrica, aliada ao aumento dos custos de produção de energia e à preocupação com questões ambientais e sociais, conduz o planejamento do setor energético mundial para uma estratégia de utilização mais eficiente das fontes de produção já existentes. Neste trabalho é apresentado um estudo de caso de repotenciação de uma Pequena Central Hidrelétrica (PCH), com o objetivo de demonstrar que este tipo de empreendimento é viável para aumentar a oferta de energia elétrica do sistema, necessária para suprir a demanda futura. Do levantamento do potencial hidráulico do rio que alimenta a usina, verifica-se a possibilidade de elevar a capacidade de geração a fio d'água em aproximadamente 75%. A análise de viabilidade técnica-econômica apresentada não considera somente os custos de equipamentos e preços de mercado da energia elétrica, mas incorpora o benefício ambiental referente à comercialização dos créditos de carbono que podem ser obtidos com a repotenciação da PCH e que promovem a redução do tempo de amortização do investimento. Citam-se ainda diversas contribuições sociais que podem resultar de um projeto de repotenciação, principalmente no caso de usinas desativadas, tornando este tipo de empreendimento mais atrativo, tanto do ponto de vista técnico-econômico quanto sócio-ambiental. / Abstract: The increase of the electrical energy demand associated with the high cost of the energy production and some concerns regarding social and environmental issues led the energy sector to develop new efficient ways of energy production. This work has analyzed the repowering of a Small Hydroelectric Power Plant (SHPP) of the ''run-off river'' type, aiming to demonstrate that such activity is feasible and able to increase the energy supply to handle future demands. It was verified, after an analysis of a river hydraulic potential, the possibility of a 75% increase of its own capacity to generate energy. The presented analysis of the technical-economical viability doesn't only consider the value of the equipments and the current costs of the electrical energy, but it incorporates the environmental benefit regarding the commercialization of the carbon credits which can be obtained by the repowering of a SHPP and that it promote the reduction of the investment paying-off time. Several social contributions that can be resulted of a repowering project are mentioned, mainly in the disabled plants case, making this enterprise more attractive, so much of the standpoint technician-economical as socio-environmental. / Orientador: Oscar Armando maldonado Astorga / Coorientador: José Luz Silveira / Banca: Durval Luiz Ricciulli / Banca: Albert Cordeiro Geber de Mello / Mestre
5

Vidas despedaçadas impactos socioambientais da construção da usina hidrelétrica de Balbina (AM), Amazônia Central

Rodrigues, Renan Albuquerque 25 March 2013 (has links)
Submitted by Geyciane Santos (geyciane_thamires@hotmail.com) on 2015-06-26T15:06:02Z No. of bitstreams: 1 Tese- Renan Albuquerque Rodrigues.pdf: 17846569 bytes, checksum: f0ee1270ae29383f2371d60c5710a3f3 (MD5) / Approved for entry into archive by Divisão de Documentação/BC Biblioteca Central (ddbc@ufam.edu.br) on 2015-06-30T14:46:54Z (GMT) No. of bitstreams: 1 Tese- Renan Albuquerque Rodrigues.pdf: 17846569 bytes, checksum: f0ee1270ae29383f2371d60c5710a3f3 (MD5) / Approved for entry into archive by Divisão de Documentação/BC Biblioteca Central (ddbc@ufam.edu.br) on 2015-06-30T14:58:17Z (GMT) No. of bitstreams: 1 Tese- Renan Albuquerque Rodrigues.pdf: 17846569 bytes, checksum: f0ee1270ae29383f2371d60c5710a3f3 (MD5) / Made available in DSpace on 2015-06-30T14:58:17Z (GMT). No. of bitstreams: 1 Tese- Renan Albuquerque Rodrigues.pdf: 17846569 bytes, checksum: f0ee1270ae29383f2371d60c5710a3f3 (MD5) Previous issue date: 2013-03-25 / Não Informada / Sustainable development is a global necessity. Regarding the Amazon, there is much to discuss and improve the scope of projects for large hydroelectric plants, built for a generating energy, but because involve forced displacement of populations due to the dams of the rivers, often have large social conflicts created as occurred historically, from projects and military government agencies, in the 1960, 1970 and 1980 in Brazil. One of Amazonian dams that showed great potential for the generation of these conflicts was Balbina. Located in Presidente Figueiredo, in the Central Amazon, the Balbina dam had completed its construction in 1987, flooding an area of 2.400 km2 of forest, reaching about 3.000 families living downstream of the dam. The objective of this study is to analyze social impacts after nearly 25 years of operation of the dam began in 1989. The impacts were analyzed based on: i) participant observation, in which the social context is described, and ii) study and inferential analysis of lifestyles, through analytic ethnography. At around Balbina were interpreted results indicating disaffiliation territorial biases and emotional, fragmentation of belonging, weakening of social relations and demotion of practical actions for the formation of organized groups in the region. How coping and mitigating actions, we chose to highlight: i) suspension and cancellation, immediately, via action by Public Ministry and Procon, of all debts pertaining to electricity bills that have been imputed to those affected by dams, ii ) reorganization of the economy within the living environments to address food insecurity and lack of income, iii) implementation of a model of trade with use aggregate of social currency to those affected by the dam and iv) the orientation of production according to the population diversity upstream and downstream of the dam. / O desenvolvimento sustentável é uma necessidade global. No que tange à Amazônia, há muito o que se debater e melhorar no âmbito dos projetos para grandes centrais hidrelétricas, construídas para a geração energética, mas que, dado implicarem deslocamentos forçados de populações por causa das barragens dos rios, amiúde tem criado amplos conflitos sociais em épocas atuais, tal como ocorreu historicamente, a partir de projetos de organismos e governos militares, nas décadas de 1960, 1970 e 1980 no Brasil. Uma das represas amazônicas que apresentou grande potencial para a geração desses conflitos foi Balbina. Localizada em Presidente Figueiredo, na Amazônia Central, a represa de Balbina teve finalizada sua construção em 1987, alagando uma área de 2.400 km2 de floresta, atingindo cerca de 3 mil famílias que viviam a jusante e montante da usina. O objetivo do presente trabalho foi analisar impactos sociais após duas décadas e meia de operação da hidrelétrica, iniciada em 1989. Os impactos foram analisados a partir de: i) observação participante, em que o contexto social é descrito; e ii) estudo e análise inferencial dos modos de vida, por meio da etnografia analítica. No entorno de Balbina, foram interpretados resultados de vieses de desfiliação territorial e afetiva, fragmentação de pertencimento, enfraquecimento de relações sociais e rebaixamento de ações práticas para a formação de grupos organizados na região. Como ações de enfrentamento e mitigadoras, optou-se por destacar: i) suspensão e cancelamento imediado, via ação judicial, dos passivos financeiros que tenham sido imputadas aos atingidos pela UHE Balbina, ii) reorganização da economia dentro dos ambientes de vivência para enfrentar a insegurança alimentar e a falta de renda, iii) implantação de um modelo de comércio agregador com uso de moeda social para os atingidos pela barragem e iv) a orientação da produção segundo a diversidade populacional a montante e jusante da represa.
6

A implantação da hidreletricidade e o processo de ocupação do território no interior paulista (1890-1930) / The influence of the hydroelectricity in the occupation's process of São Paulo State (1890-1930)

Mortati, Débora Marques de Almeida Nogueira, 1970- 23 August 2018 (has links)
Orientador: André Munhoz de Argollo Ferrão / Tese (doutorado) - Universidade Estadual de Campinas, Faculdade de Engenharia Civil, Arquitetura e Urbanismo / Made available in DSpace on 2018-08-23T15:40:09Z (GMT). No. of bitstreams: 1 Mortati_DeboraMarquesdeAlmeidaNogueira_D.pdf: 28876564 bytes, checksum: 99810be9d7ae2de311a4373f3df37859 (MD5) Previous issue date: 2013 / Resumo: A Tese é que a disponibilidade de energia foi fundamental para a mudança da economia rural do café para a da urbano-industrial no estado de São Paulo, Brasil, e, portanto, as centrais hidrelétricas são parte relevante do patrimônio cultural brasileiro. Como patrimônio industrial, este conjunto de centrais é um caso atípico no mundo, pela sua concentração e intensidade e representatividade da arquitetura industrial da época, devendo ser resgatada e preservada. A intenção do trabalho é demonstrar a arquitetura das primeiras centrais hidrelétricas do estado de São Paulo à luz do urbanismo, do desenvolvimento tecnológico e da engenharia civil, revelando demandas da época e o contexto em que se inseriram. A matriz de energia elétrica do Brasil é composta principalmente pela energia hidrelétrica, devido a sua grande disponibilidade de recursos hídricos. A eletrificação do país aconteceu prioritariamente no estado de São Paulo, alavancando o processo de enriquecimento e industrialização que até hoje caracteriza o estado. O período do trabalho é de 1890 a 1930, em que o estado de São Paulo começa seu processo de industrialização, a economia cafeeira está no auge e é fundada a companhia de energia elétrica que fará a primeira usina hidrelétrica do estado de São Paulo; este panorama vai evoluindo até 1930 quando a economia cafeeira entra em crise, a indústria já está estabelecida e a construção de hidrelétricas, assume outro caráter: o das grandes hidrelétricas, encerrando o ciclo das pequenas centrais hidrelétricas. A chegada da eletricidade e suas usinas foi um dos elementos definidores da paisagem industrial do território de São Paulo. A geração de energia elétrica no estado seguiu os caminhos da ferrovia, desenhando novas fronteiras e configurações de cidades, conforme aumentava a disponibilidade de "melhorias", sendo que muitas delas eram movidas a eletricidade. As nascentes indústrias também iam ocupando o espaço entre a ferrovia e a energia, criando novos bairros e centralidades. O objetivo desse trabalho é analisar a relevância que o patrimônio formado pelas companhias concessionárias e suas 115 primeiras centrais hidrelétricas tiveram na formação da paisagem industrial do território paulista. Analisa-se então, o processo da implantação das primeiras usinas hidrelétricas, bem como a trajetória das companhias e redes criadas no interior do estado de São Paulo no período do estudo / Abstract: The Thesis is that the energy availability was fundamental in the changing of the rural coffee's economy to the urban-industrial's economy in São Paulo State, Brazil, and so, the hydroelectric plants are a relevant part of the Brazilian cultural heritage. As an industrial heritage, this group of plants is an atypical case in the world, by their concentration and intensity and represent the industrial architecture of this period, and must be rescued and preserved. The intention of this work is to reveal the first hydroelectric plants architecture in São Paulo State, Brazil under the gaze of urbanism, technology development and civil engineering, exposing their demands and the context of the period. The electric energy pattern of Brazil is the hydroelectric power, because there is large availability of water resources. The Brazilian electrification was occurred primarily in São Paulo State, incrementing the enrichment process and the industrialization, that today characterizes the state. The work period is from 1890 to 1930, when São Paulo State began its industrialization process, the coffee economy was booming and was founded the first hydroelectric power company in the state. This panorama advanced til 1930, when the coffee economy began in crisis, the industry was already established and the construction of hydroelectric plants after 1930, takes another course: the large dams, closing the small hydroelectric plants' cycle. The arrival of electricity and their plants was one of the elements that made the industrial landscape in the São Paulo territory. The electricity generation followed the railway paths and x was drawing new boundaries and new cities plans according as the "benefits" were growing, and much of them was electrical. The nascent industries were also occupying the space between the railway and the energy, rising new districts and centralities. The intention is formulate considerations about the heritage relevance of these 115 hydroelectric plants and their companies had in the consolidation of the São Paulo State industrial landscape. This way, the work analyzes the implantation actions of the first hydroelectrics powers and the ways of their companies and networks in the Sao Paulo State's hinterland through this period / Doutorado / Recursos Hidricos, Energeticos e Ambientais / Doutora em Engenharia Civil
7

Benefícios associados à operação coordenada do sistema interligado nacional junto com as usinas binacionais de Corpus e Yacyretá = Benefits associated with the coordinated operation of the Brazilian national interconnected system along with the binational hydro plants of Corpus and Yacyretá / Benefits associated with the coordinated operation of the Brazilian national interconnected system along with the binational hydro plants of Corpus and Yacyretá

Barrientos Mujica, Luis Germán 21 August 2018 (has links)
Orientadores: Secundino Soares Filho, Monica de Souza Zambelli / Dissertação (mestrado) - Universidade Estadual de Campinas, Faculdade de Engenharia Elétrica e de Computação / Made available in DSpace on 2018-08-21T13:07:22Z (GMT). No. of bitstreams: 1 BarrientosMujica_LuisGerman_M.pdf: 2072271 bytes, checksum: 0bd4e2be251a8462886f62e46c8e5f32 (MD5) Previous issue date: 2012 / Resumo: O presente trabalho apresenta uma avaliação do impacto da operação das usinas hidrelétricas brasileiras que compõem o Sistema Interligado Nacional (SIN) sobre as usinas hidrelétricas binacionais de Corpus e Yacyretá. Alguns dos benefícios que apresentam a interligação elétrica e a integração energética entre os países integrantes do MERCOSUL podem ser um maior aproveitamento do potencial hidráulico, a redução do custo da eletricidade, o aproveitamento da energia excedente, entre outros. Foram considerados dois estudos de caso com dados oficiais do Programa Mensal da Operação (PMO) do SIN referentes a setembro de 2011, considerando o planejamento da expansão do parque gerador e da transmissão até dezembro de 2015. As soluções foram fornecidas pelo modelo ODIN (Otimização do Despacho Interligado Nacional), uma abordagem baseada em otimização determinística e não linear com vazões previstas e atualizadas a cada intervalo de tempo, no que se denomina Modelo de Controle Preditivo (MCP). Dessa forma é possível uma representação detalhada e individualizada das usinas hidrelétricas do sistema, viabilizando a análise pretendida. A avaliação do desempenho do sistema nos estudos de caso se deu através de simulação sobre 64 cenários históricos, considerando a série histórica de vazões de 1931 a 1998. Existem cenários em que a operação coordenada concentrou benefícios nas usinas brasileiras, e cenários em que a operação coordenada concentrou benefícios nas usinas binacionais. Porém, considerando a geração hidrelétrica média total, foi obtido um aumento de geração de 12,27 MW médios, ou 107.485,2 MWh por ano, o que significa que operando de maneira coordenada haverá um ganho de cerca de R$ 10.748.520,00 por ano, considerando um valor médio de 100 R$/MWh / Abstract: This work presents an assessment of the impact of the operation of the hydro power plants that comprise the Brazilian National Interconnected System (SIN) over the binational hydro power plants of Corpus and Yacyretá. Some of the benefits that arise from the electrical interconnection and the energy integration between the countries members of MERCOSUL may be a better exploitation of the hydraulic potential, a reduction of the cost of electricity, and the utilization of surplus energy, among others. Two case studies using official data from the Monthly Operation Program (PMO) of SIN referred to September 2011 were considered, taking into consideration the generation and transmission expansion plan until December 2015. The solutions were provided by the ODIN model, an operation approach based on deterministic and nonlinear optimization with forecasted inflows, and updated at each time interval, which is known as Model Predictive Control (MPC). By this way, a detailed and individualized representation of the hydro plants of the system is possible, allowing the required analysis. The performance evaluation of the system in the case studies were calculated through the simulation over 64 historical scenarios, taking into consideration the historical inflow records from 1931 to 1998. There were hydrological scenarios where the coordinated operation concentrates benefits in the Brazilian hydro plants, and scenarios where the coordinated operation concentrates benefits on the binational plants. However, considering the total average hydroelectric generation, an increase on generation of 12,27 MW was obtained, or 107.485,2 MWh per year, which means that operating the system on a coordinated way there will be a benefit of approximately R$ 10.748.520,00 per year, considering an average value of energy of 100 R$/MWh / Mestrado / Energia Eletrica / Mestre em Engenharia Elétrica
8

O planejado e o vivido: histórias de vida de moradores do Sertão Goiano / The planed and experiencied: life histories of residentes of Sertão Goiano

Araújo, Kalliandra de Moraes Santos 16 December 2014 (has links)
Esta dissertação é resultado de uma pesquisa com atingidos pela Usina Hidrelétrica Serra do Facão no sudeste de Goiás. Foram coletadas histórias de vida de moradores da zona rural de Goiás em dois momentos distintos. O primeiro em 2009, antes da instalação da barragem do rio São Marcos. O segundo momento das entrevistas foi pós o deslocamento compulsório, em 2012 e 2013, com a usina em funcionamento. Este intervalo entre as entrevista nos permitiu analisar o que foi planejado e o que foi efetivamente vivido por estes moradores do sertão goiano. Este empreendimento desapropriou 420 famílias, moradoras da zona rural em seis municípios: Catalão, Ipameri, Cristalina, Davinópolis, Campo Alegre de Goiás, em Goiás e Paracatu, no triângulo mineiro, Minas Gerais. Tomamos como recorte analítico as famílias remanescentes ou as famílias retornadas a terra, sendo assim, selecionamos seis histórias de vida que nos evidenciaram o que foi este processo de expulsão de suas terras de origem e as formas de reconstruir suas vidas agora não mais margeadas pelo rio. Os colaboradores foram mulheres e homens de distintas idades, todos moradores das beiras do rio São Marcos, localizados na zona rural do município de Campo Alegre de Goiás, que teve a maior área atingida e a maior quantidade de famílias desapropriadas. Por meio da História Oral, registarmos histórias de vida nas quais foram expostos os mecanismos de sobrevivência destes afogados. Transcriadas, as histórias de vida revelaram a complexidade deste cenário e demonstram a face perversa de expulsão do camponês de suas terras. Estes sujeitos tem outros conhecimentos para além do português letrado, que os permitiram reconfigurar a vida já tão dura pela lida na terra e pelos desmandos do estado. Revelou também que é preciso superar práticas autoritárias e de subordinação política na relação entre mediadores da barragem e camponeses, como uma das condições para uma nova retomada em suas vidas. / This dissertation is the result of a research about people affected by Serra do Facão Hydroelectric Dam at south-east Goiás. The histories of people who lived in the rural area were collected at two distinct times. First before the dams construction at São Marcos River in 2009. The second moment of interviews was after the mandatory move, in 2012 and 2013, with the power plant already producing. This time offset allowed us to analyze what had been planned and what the former residents of this area actually experienced. This venture expropriated 420 families living in the rural areas of six cities: Catalão, Ipameri, Cristalina, Davinópolis and Campo Alegre de Goiás in Goiás and Paracatu in Triângulo Mineiro region of Minas Gerais. As analytical approach taken cover the reminiscent families or families which returned to their land, so we selected six life stories what was this process of expulsion from their own land and ways of rebuilding their lives, now, no longer at the border of the river. The interviewed people were women and men of different ages, all residents of São Marcos river borders, in rural areas of the city of Campo Alegre de Goiás, the one with the largest affected area and dispossessed families as well. Through Oral History, we recorded their life stories in which the mechanisms of survival of those drowned were exposed. Transcreated, These guys have other knowledge beyond the literate Portuguese, which allowed them to reconfigure life already so hard for the land labor and government excesses. Also revealed that it is necessary to overcome authoritarian and political subordination in the relationship between mediators of the dam and peasants practices as a condition for a new resume in their lives.
9

Afluências agregadas na programação dinâmica estocástica aplicada ao planejamento da operação energética / Agregated inflows for stochastic dynamic programming applied to energetic operation planning

Scarcelli, Ricardo de Oliveira Camargo 22 August 2016 (has links)
O planejamento da operação energética em sistemas hidrotérmicos de potência com um único reservatório tem como objetivo determinar a participação de usinas hidrelétricas e térmicas de forma a garantir o suprimento de energia demandada ao menor custo operacional possível, dentro de restrições físicas e técnicas do modelo. Alguns fatores tornam a solução deste problema bastante complexa destacando a não linearidade e a não separabilidade temporal aditiva. O objetivo deste trabalho é apresentar uma nova abordagem com tratamento agregado das afluências, descrevendo uma nova caracterização das distribuições de probabilidades e um novo modelo para a programação dinâmica estocástica markoviana. Nesse novo modelo da programação dinâmica estocástica markoviana, agregações plurimensais de vazões são utilizadas como entrada em um modelo de programação dinâmica estocástica markoviana modificado para discretizações temporais plurimensais. A nova abordagem proposta foi simulada em diferentes usinas hidrelétricas brasileiras localizadas em diferentes regiões geográficas e sob diferentes regimes hidrológicos. Os resultados das simulações feitas com a utilização deste novo modelo são apresentados e comparados ao modelo de programação dinâmica estocástica markoviana mensal, atualmente utilizado no setor elétrico brasileiro, com economia de custos relativas superiores a 10% em alguns casos. / The energetic operation planning on hydrothermal power systems with a single reservoir aims to determine the participation of hydroelectric power plants and thermal power plants to guaranty supply of energy demanded with the smallest possible cost, under physical and technical model boundaries. Some points became the solution of this problem complex, highlighting the non linearity and the additive non time separability. The objective of this paper is show the new approach with aggregated inflows, describing a new probability distributions featuring and a new model for the markovian stochastic dynamic programming. On this new model of markovian stochastic dynamic programming, multi monthly inflow aggregations are used as input in a model of markovian stochastic dynamic programming modified for multi months discretizations. The new approach proposed was simulated on differents Brazilian hydroelectric power plants located on different regions and under different hydrologic regime. The results of simulations using this new model are presented and compared to the model of monthly markovian dynamic programming, nowadays used on the Brazilian electrical sector, with relatives economic savings up to 10% in some cases.
10

A compensação ambiental no Brasil: compensação para que e para quem? / The environmental compensation in Brazil: compensation for what and for whom?

Fonseca, Rafael Oliveira 24 May 2017 (has links)
A temática ambiental se constitui em um contexto complexo e dinâmico de inúmeras relações de interdependência e/ou de subordinação, pois está inserida em um constante movimento ocasionado pelas variadas forças e interesses de atores que as circundam, como por exemplo, o Estado, a sociedade civil e o mercado. Nesse sentido, a questão não deve ser compreendida como simples resultante do vínculo entre os homens e a natureza, mas como um componente das relações humanas, como um objeto econômico, político e cultural. No Brasil, a relevância do tema é evidente devido a sua posição de protagonista internacional nas esferas ambiental e socioeconômica. Dessa forma, um instrumento constituinte da política territorial e ambiental nacional, que está diretamente inserido nessa complexa e dinâmica temática e envolvo pelos interesses e poderes de vários atores, é a Compensação Ambiental (CA). Objeto central desta pesquisa, a CA está subordinada ao processo estatal de emissão de licenças ambientais e visa contribuir para o fortalecimento do Sistema Nacional de Unidades de Conservação (SNUC). A hipótese deste trabalho é que a Compensação Ambiental Federal, na forma como está estabelecida e operacionalizada na atualidade, é pouco eficaz em relação ao seu propósito. Assim, o objetivo desta pesquisa é compreender e analisar o papel e/ou a finalidade do Estado (e de suas políticas públicas) na definição da CA, bem como o potencial deste instrumento em influenciar no ordenamento do território, particularmente ante a abordagem ambiental e a sua conjuntura contemporânea, perpassando igualmente pelos outros atores que envolvem este instrumento. Para isso consideramos a escala federal da administração do território, ou seja, a atuação da União, abarcando, dessa maneira, as atividades dos principais órgãos ambientais do país, sejam: do Ministério do Meio Ambiente, do Ibama, do ICMBio etc. Para atingir tal proposição, este trabalho se baseia em pesquisas bibliográficas, levantamento de dados e estatísticas, entrevistas em órgãos públicos e em instituições não-estatais, produção de elementos gráficos, tabulares e cartográficos, e em um estudo de caso, a UHE Santo Antônio do Jari, e seu respectivo trabalho de campo. O conteúdo está segmentado em três etapas: a primeira aborda a tríade dos atores que envolvem a CA, com base em um esquema conceitual de análise; a segunda apresenta um aprofundamento sobre o instrumento em uma perspectiva histórica, legislativa e operacional; e, a terceira transpõe a teoria e tange o território a partir da análise empírica do estudo de caso. Ao final, visando responder o para que e para quem que intitula este trabalho, conclui-se em relação ao para que, que de fato, a CA Federal visa fortalecer o SNUC, essa finalidade está consolidada. Por outro lado, a análise do para quem nos leva a afirmar que no presente o instrumento serve a todos os atores que o envolvem apesar de não atender todas as suas demandas, deixando uma lacuna sobre o seu futuro se nenhuma alteração significativa for realizada em suas diretrizes operacionais. / Environmental issues constitute a complex and dynamic context of numerous relationships of interdependence and/or subordination because they are part of a constant motion due to the different forces and interests of the actors that surround them, such as the State, the civil society and the market. In this sense, these questions should not be understood as a simple result of the relationships between human beings and the nature, but should be seen as part of a component of human relations, as an economic, political and cultural object. In Brazil, the relevance of the questions is evident due to its position as an international protagonist in the environmental and socioeconomic spheres. Environmental Compensation (EC) is an instrument that is part of the national territorial and environmental policy, that is directly inserted in this complex and dynamic thematic and that envelops the interests and powers of several actors. The central object of this research, the EC, is related to the State´s allocations of environmental licenses and aims to contribute to the strengthening of the National System of Conservation Units (SNUC). This study is based in the following hypothesis: Environmental Compensation managed by the federal government is not very effective in relation to its purpose, as currently established and operationalized. Thus, this research aims to understand and analyze the role and/or the purpose of the State (and its public policies) in the definition of EC, as well as the potential of this instrument in influencing the spatial planning, particularly facing the contemporary conjuncture of the environmental issue, also permeating the other actors that are involved in this instrument. For this, we consider the federal scale of territory administration, covering in this way, the activities of the main public environmental institutions in Brazil, such as the Ministry of the Environment, Ibama, ICMBio, etc. In order to reach such a goal, this work is based on bibliographical research, data collection and analyses, interviews with public agencies and non-state institutions, production of graphics, tables and maps, and on a case study, in the Santo Antônio do Jari Hydroelectric Power Plant, and its related field research. The content is segmented into three parts: the first one presents the triad of the actors that are involved in the EC, based on a conceptual schema of analysis; the second one presents a theoretical understanding of the instrument in a historical, legislative and operational perspective; and the third part transposes the theory and covers the territory from the empirical analysis of the case study. In the end, in order to answer \"for what and for whom\", the question in the title of this research, we conclude, with regard to the for what\", that in fact, the Federal EC aims to strengthen the SNUC, this purpose seems consolidated. The analysis of the \"for whom\" leads us to affirm that, in the present, the instrument serves all the actors that involve it, even if it does not meet all your demands. Thus leaves doubts about its future if no significant change in its operational guidelines is made.

Page generated in 0.1012 seconds