• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 56
  • 48
  • 7
  • 5
  • 5
  • 5
  • 5
  • 5
  • 5
  • 4
  • 4
  • 4
  • 4
  • 4
  • 2
  • Tagged with
  • 135
  • 135
  • 135
  • 51
  • 49
  • 20
  • 17
  • 17
  • 14
  • 13
  • 12
  • 10
  • 10
  • 10
  • 10
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
121

Análise hidrológica utilizando redes neurais para previsão de séries de vazões / Hydrologic analysis using Artificial Neural Networks for time series forecasting streamflow

Sergio Luis Yoneda 20 March 2014 (has links)
O estudo de inventário tem por objetivo estimar o potencial hidroelétrico de rios ou bacias, analisando várias alternativas propostas de partição de quedas, sendo que cada alternativa contém um conjunto de aproveitamentos hidroelétricos. Essas alternativas são então estudadas individualmente para definição da alternativa ótima, ou seja, a que tem melhor custo beneficio e ao mesmo tempo cause menos danos ambientais. Para essa análise necessitamos calcular a potência de cada aproveitamento específico, assim como a energia gerada, para isso então precisamos conhecer a vazão do rio em estudo, no local desses aproveitamentos. Como a vazão dos rios varia com o tempo, pois depende de variáveis como clima, geologia dos solos, desmatamento, entre outras, se recomenda usar nos cálculos séries longas de vazões médias com no mínimo 30 anos de dados, o problema é que em muitos casos não temos essas séries ou temos séries menores e incompletas, nesse caso então necessitamos estimar os valores ausentes e ruidosos utilizando os dados de estações fluviométricas próximas, para depois transportá-las para o aproveitamento em estudo, para isso utilizamos de técnicas estatísticas de correlação. A ideia nesse trabalho é de utilizarmos redes neurais artificiais ao invés das técnicas convencionais e comparar os resultados obtidos. / The inventory study aims to estimate the hydropower potential of rivers or basins, analyzing several alternative proposals for partition of falls, each of which contains a set of alternative hydroelectric developments. These alternatives are then individually analyzed to define the optimal alternative, namely that which has the best cost benefit while causing less environmental damage. For this analysis we need to calculate the power of each specific use, as well as the energy generated for that then we need to know the flow of the river under study, the location of these usages. As the river flow varies with time because it depends on variables such as climate, geology, soils, deforestation, among others, we recommend using the long series of calculations mean flow at least 30 years of data, the problem is that in many cases we do not have these series or have smaller and incomplete series, in this case then we need to estimate the missing values and noisy data using next gauged stations, and then transport them to use in the study, for this we use statistical correlation techniques. The idea is that we use work instead of the conventional Artificial Neural Network techniques and compare the results.
122

Aprimoramento de um instrumento de gestão para operação de reservatórios hidrelétricos com usos múltiplos sob condições de mudanças climáticas : estudo de caso UHE de Furnas / Improvement of a management instrument for operation of hydropower reservoirs with multiple uses under conditions of climate changes : case study Furnas hydropower plant

Ribeiro Junior, Leopoldo Uberto, 1978- 23 August 2018 (has links)
Orientador: Antonio Carlos Zuffo / Tese (doutorado) - Universidade Estadual de Campinas, Faculdade de Engenharia Civil, Arquitetura e Urbanismo / Made available in DSpace on 2018-08-23T22:45:35Z (GMT). No. of bitstreams: 1 RibeiroJunior_LeopoldoUberto_D.pdf: 7603056 bytes, checksum: 74ce20bf0fd942a64b1199863b05ffc9 (MD5) Previous issue date: 2013 / Resumo: As pesquisas referentes às mudanças do clima são de extrema relevância para a sociedade; contudo, vêm resultando em divergências no meio científico e o tema necessita de mais estudos. Caso as projeções do Painel Intergovernamental sobre Mudanças Climáticas (IPCC), que apontam para mudanças futuras do ambiente sejam verificadas, as consequências para as atividades humanas devem se manifestar de diversas formas. No Brasil, a hidroeletricidade é a principal fonte da matriz energética, e com a perspectiva de alterações do clima, os conflitos pelo uso da água nos reservatórios podem se acentuar. Dessa forma, analisa-se o possível impacto das mudanças climáticas sobre a Usina Hidrelétrica de Furnas e propõe-se uma abordagem metodológica para mitigação dos conflitos. Como o estudo do comportamento hídrico é fundamental para a eficiência do sistema de gestão, foi realizada análise de tendência temporal das variáveis precipitação e vazão, com base nos registros históricos por meio de sete testes não paramétricos. Diversos critérios restringiram a análise a 15% do total de postos pluviométricos na bacia, o que representa a deficiência do sistema de coleta, tratamento e gerenciamento dos dados, sendo que em 40% das estações avaliadas, as alterações foram significativas; contudo, as distribuições do número de dias chuvosos se mantiveram inalteradas. Em relação aos dados fluviométricos, foram identificadas tendências de aumento não significativas. Para estimativa da disponibilidade hídrica futura, foi utilizado o modelo hidrológico chuva-vazão MGB, que obteve bom ajuste e calibração em relação aos dados observados. A fim de alimentar o MGB, foram utilizados dados do modelo atmosférico global HadCM3; no entanto, o modelo possui limitações devido à alta resolução e custo computacional. Para contornar essa limitação, foi utilizada a técnica do "downscaling" para melhor representação dos processos físicos locais, por meio do modelo regional Eta desenvolvido pelo INPE. Foram projetados cenários por meio de seis variáveis climatológicas de quatro membros, sendo o cenário "medium" o mais restritivo, dentro dos parâmetros do cenário A1B do IPCC, que foram bem ajustados para prever condições futuras, no período 2011 - 2099. Caso os cenários do Eta se verifiquem e a produção de energia de Furnas se mantenha próximo dos registros históricos, o reservatório pode esvaziar-se intensamente devido a uma estiagem prolongada. Assim, buscou-se o aprimoramento de uma metodologia para que as os aproveitamentos hidrelétricos venham atender tanto a produção de energia como a necessidade da comunidade ribeirinha e de jusante. Com base nos dados históricos da operação, prosseguiu-se para fixação da duração e frequência de transgressão de referência, com base na cota 762 m, sendo determinado como condição ideal para um período de cinco anos que o reservatório deva ficar apenas dois ciclos distribuídos em 15 meses abaixo deste nível, que pode ser alcançado com adoção de uma regra operativa por meio do armazenamento de um percentual da vazão afluente planejada para o mês subsequente, sempre que as condições de frequência e duração não sejam atingidas. Como resultado, verifica-se a possibilidade de uso integrado mais eficiente, embora o efeito sobre o Sistema Interligado Nacional não tenha sido analisado / Abstract: The research related to climate change are very important to society; however, has resulted in differences in the scientific community and the topic requires further studies. If the projections of the Intergovernmental Panel on Climate Change - IPCC that point for future changes in the environment, the consequences for human activities should manifest itself in many way. In Brazil, hydroelectric power is the greatest of the energy matrix, and with the possibility of climate change conflicts related to the water use in the reservoirs can be accentuated. In This way, were analyzes the potential impact of climate change on Furnas Hydroelectric Power and proposes a methodology to mitigation the conflicts. As the hydrology study is critical to the efficiency of the water management system, analysis trends of precipitation and flow variables, based on historical records using seven non-parametric tests. Some criteria analysis restricted to 15% of all pluviometer in the Furnas basin, which represents the deficiency in the collection, treatment and data management system, and in 40% of the stations evaluated the changes were significant, however the distributions of the number of rainy days remained without changed. In relation to runoff data, trends were identified no significant increase. To estimate future water availability, was used a hydrological rainl-flow model - MGB, which got good adjustment and calibration to the observed data. In order to use the MGB, were used data from HadCM3 global atmospheric model; however, the model has limitations due to the high resolution and computational cost. To work around this limitation, it was used the technique of "downscaling" for better representation of local physical processes, through the regional model Eta developed by INPE. Scenarios were projected through six climatological variables of four members, the "medium" scenario show the most restrictive, within the parameters of the IPCC A1B scenario, which were well adjusted to predict future conditions in the period 2011 - 2099. If the Eta scenarios occur, and the energy production of Furnas remains similar to historical records, the reservoir may empty intensely due to a prolonged drought. Thus, to improve the hydroelectric plants system will be proposed a methodology to consider energy production, such as the need of the riverside community and downstream public. Based on historical data of the operation, was fixed the duration and frequency of transgression of reference, based on 762 m level, being determined as optimal ideal condition for a period of five years that the reservoir should stay only two cycles distributed in 15 months under this level, which the adoption of an operation rule by storing a percentage of the influent flow planned for the following month, whenever the conditions of frequency and duration are not affected. As a result, there is the possibility of integrated use more efficient, although the effect on National Interconnected System has not been analyzed / Doutorado / Recursos Hidricos, Energeticos e Ambientais / Doutor em Engenharia Civil
123

Relações de poder na hidreletricidade = a instalação da UHE Foz do Chapecó na bacia do rio Uruguai / Power relations in hydroelectricity : the installation HEP Foz do Chapecó in the Uruguay river basin

Rocha, Humberto José da, 1976- 05 February 2012 (has links)
Orientador: Emília Pietrafesa de Godoi / Tese (doutorado) - Universidade Estadual de Campinas, Instituto de Filosofia e Ciências Humanas / Made available in DSpace on 2018-08-20T08:57:21Z (GMT). No. of bitstreams: 1 Rocha_HumbertoJoseda_D.pdf: 6518138 bytes, checksum: 73f7ff5f435d88d4e661b1f8a57b3f9f (MD5) Previous issue date: 2012 / Resumo: A energia elétrica está na base do estilo de vida da sociedade atual assumindo papel estratégico nos projetos de desenvolvimento econômico. No Brasil a hidreletricidade é a forma consagrada para a geração de energia elétrica, respondendo por mais de 70% da capacidade de operação. A importância da energia hidrelétrica contrasta com impactos ambientais e sociais que mesmo relativizados em relação a outras fontes de energia como a nuclear ou termelétrica, comprovadamente afetam a vida das comunidades locais e do meio ambiente no sentido amplo. A instalação de cada nova Usina Hidrelétrica de Energia (UHE) acontece através de relações de poder entre agentes sociais com diferentes interesses de acordo com o caso específico, mas, de maneira geral, segundo um processo social amplo que no Brasil ultrapassa um século. Da multiplicidade de agentes e situações, partimos da tese de que a assimetria dessas relações de poder em favor dos empreendedores tende a apontar para a inevitabilidade da instalação dessas obras alheiamente ao posicionamento da população local. O estudo analisa o processo de instalação da UHE Foz do Chapecó, situada no rio Uruguai, entre os municípios de Alpestre (RS) e Águas de Chapecó (SC), este abrigando o canteiro de obras localizado na comunidade de Saltinho do Uruguai, locus empírico da pesquisa que desenvolvemos entre os anos de 2006 e 2011. Considerando o caso segundo um processo social amplo, discutimos a instalação da hidrelétrica sob a luz do conflito entre dois projetos políticos antagônicos, o neoliberal, conduzido pelo empreendedor, e o democrático-participativo, representado principalmente pelo Movimento dos Atingidos por Barragens (MAB). Nesta perspectiva, analisamos uma rede social relacionando diferentes agentes compreendendo desde instituições transnacionais até ribeirinhos que poucas vezes em suas vidas se afastaram da barranca do rio. Esta rede compreende um campo social transpassado por aspectos políticos, jurídicos, econômicos e ambientais, a partir do que se estabelecem os conflitos e alianças entre os múltiplos agentes sociais com interesses variados, onde cada agente utiliza estratégias tendo em vista um ambiente democrático marcado pela tensão entre legalidade e legitimidade, onde o resultado significa a instalação - ou não - de uma hidrelétrica / Abstract: Electrical energy is the basis of the lifestyle of today's society assuming a strategic role in economic development projects. Hydroelectricity in Brazil is the established way to generate electricity, accounting for more than 70% of operating capacity. The importance of hydropower contrasts with environmental and social impacts that even relativized in relation to other energy sources such as nuclear power plant or demonstrably affect the lives of local communities and the environment in the broad sense. The installation of each new Hydroelectric Power (HEP) happens through the power relations between social actors with different interests according to the specific case, but, in general, according to a broad social process that goes beyond a century in Brazil. The multiplicity of actors and situations, we start with the thesis that the asymmetry of these relations of power in favor of entrepreneurs tends to point to the inevitability of the installation of these works unrelated the positioning of the local population. The study analyzes the process of installing the HEP Foz do Chapecó, located on the Uruguay river between the towns of Alpestre (RS) and Águas de Chapecó (SC), this housing the construction site located in the community Saltinho do Uruguai, empirical locus the research that developed between the years 2006 and 2011. Considering the case in a broad social process, we discuss the installation of the dam in light of the conflict between two antagonistic political projects, the neoliberal, led by the entrepreneur, and democratic participation, represented mainly by the Movement of People Affected by Dams (MAB). In this perspective, we analyze a social network connecting different agents including from transnational institutions to riparian few times in their lives away from the riverbank. This network comprises a pierced by the social political, legal, economic and environmental, from settling the conflicts and alliances between multiple social agents with varied interests, where each agent uses strategies aimed at a democratic environment characterized by tension between legality and legitimacy, where the result means the installation - or not - of a hydroelectric / Doutorado / Ciencias Sociais / Doutor em Ciências Sociais
124

[en] REFORMATTING MODEL FOR HYDROELECTRIC CONTRACTS IN ORDER TO MITIGATE HYDROLOGICAL RISKS FOR HYDRO POWER GENERATORS / [pt] MODELO DE REFORMATAÇÃO DE CONTRATOS DE ENERGIA HÍDRICA PARA MITIGAÇÃO DO RISCO HIDROLÓGICO DE HIDRELÉTRICAS

CAMILLA MAGALHAES DE ALMEIDA 27 July 2017 (has links)
[pt] Entre 2013 e 2015, os níveis dos reservatórios das hidrelétricas brasileiras foram reduzidos pelas secas que atingiram o país. Como consequência, o Operador Nacional do Sistema restringiu a geração hídrica na composição da oferta de energia, aumentando a participação de energia térmica no suprimento da demanda. A restrição da geração hídrica, no entanto, impossibilitou os geradores hidrelétricos de cumprirem seus contratos de venda com a geração própria, forçando-os a comprar energia no mercado de curto prazo e acumular prejuízos. A crise hídrica evidenciou a exposição dos geradores hidrelétricos aos riscos hidrológicos, consequência da modalidade contratual praticada na comercialização de energia hídrica, na qual os geradores assumem todo o risco relacionado à geração. O presente estudo apresenta uma alternativa a este modelo de contratação, de forma que a parte da geração mais exposta aos riscos hidrológicos seja vendida na modalidade que repassa os riscos ao comprador. Para que não haja alteração nos custos totais esperados do comprador com a troca de modelos, o gerador deve pagar um prêmio, refletido na diferença de preços entre as duas modalidades de venda. Os resultados mostraram ganhos em termos de equivalente de certeza e redução considerável do CVaR para o gerador em todos os cenários analisados, porém, o prêmio demonstrou significativa sensibilidade em relação a diversos fatores do modelo. / [en] Between 2013 and 2015, the water levels at storage reservoirs of the Brazilian hydroelectric power plants were reduced by the droughts that impacted the country. As a consequence, the National System Operator restricted hydro power generation in its offer composition, increasing the thermal energy generation to meet the demand. However, this restriction on hydro power energy prevented suppliers from fulfilling their contracts through their own energy production, which forced them to purchase short-term-trade energy and accumulate loss. This water crisis highlighted how exposed hydro power generators are to hydrological risks, a consequence of the contractual modality practiced in this market, in which suppliers take on all of the risk associated with generating power. This study presents an alternative to this contractual model, one in which part of the hydroelectric energy is sold in a modality of contract where risks are borne by the buyer. In exchange, the hydro generator is expected to pay a premium, reflected on the price difference between the two contractual modalities and calculated in a way that would not alter the expected total costs for the buyer. The results showed gains in terms of certainty equivalent and a considerable decrease of CVaR for the hydro generator in all analyzed scenarios. The premium, however, showed significant sensitivity in regards to many factors of the model.
125

Empire’s Stores: The Architecture of Conveyance and Corporate Imperialism in America, 1890–1930

Sturtevant, Elliott January 2024 (has links)
This dissertation examines how American businesses’ focus on transportation and trade came to be key agents of US imperialism at the turn of the twentieth century. Extending our understanding of the architecture and urbanism of US industry and commerce, “Empire’s Stores” turns to the design, construction, and maintenance of transnational and transimperial supply chains and the physical infrastructure that made them possible—what I call the architecture of conveyance. Divided into four chapters, the project examines the built environment created by a set of firms and related industries selected geographically: to the West, the “Big Five” sugar factors and their predecessors operating in the Hawaiian Islands; to the North, the Niagara Falls Power Company and related hydroelectric concerns located along the Niagara Frontier; to the South, the United Fruit Company’s operations, including both tourism and trade, anchored in the Port of New Orleans; and, to the East, the storage, handling, and shipment of freight at the Bush Terminal Company in Brooklyn, New York. Through these case studies I show how American corporations produced and profited from imperial formations and, in doing so, reshaped territorial, geographic, and economic borders.
126

Habitat use by fishes of the New River, West Virginia

Lobb, M. Delbert January 1986 (has links)
Density estimates of the species and life stages in different habitat types were made from electrofishing collections and underwater fish counts. During midday, fish densities in edge pool and riffle habitats were comparable, but densities in edge pool habitat were significantly higher than densities in middle pool and run habitats. Snag and edge riffie habitats supported the highest densities of fish. Habitat use and activity shifts between daytime and nighttime were found for many species. Fish species and lifestage composition and densities differed among the habitat types, and five habitat-use guilds (edge-pool, middle-pool, edge-channel, riffie, and generalists) were described. Larger centrarchids preferred deep habitats with slow velocities (deep edge and middle pool, and snags), while young centrarchids preferred shallower habitat. However, all sizes of smallmouth bass were nearly ubiquitous in the habitats of the study area. The cyprinids and percis preferred shallow areas, but preferences for velocity differed among the species and lifestages. Spawning and habitat preferences of the endemic bigmouth chub, Nocomis platyrhynchus, were described. Bigmouth chubs used areas with plenty of small to large gravel (3-64 mm diameter), shallow depths, and moderate velocities for constructing spawning mounds. Bigmouth chubs were seen only using riffie and adjacent run habitat during late summer. Within these areas, depth, velocity, substrate, and cover were used in accordance with their availability, except for an avoidance of the shallowest available depths. Bigmouth chubs occupied positions near the substrate, where velocities were slower than the mean water column velocity. / M.S.
127

A organização de movimentos sociais de expropriados nas trajetórias sociotécnicas de implantação de hidrelétricas no Brasil (1974-2016) / The organization of social movements of evicted people from the sociotechnical trajectories of hydroeletric dams in Brazil. (1974-2016)

Matiello, Catiane 14 October 2016 (has links)
CAPES: Fundação Araucária / A tese tem como objetivo principal analisar como as populações atingidas pela implantação de hidrelétricas no Brasil têm se articulado e organizado nas trajetórias sociotécnicas que conduzem à concretização desses projetos. Para tanto, se estudarão as trajetórias de implantação de três casos, que conformam o período de 1974 a 2016: Itaipu, construída no rio Paraná, na fronteira entre Brasil e Paraguai; Baixo Iguaçu, no rio Iguaçu, no estado do Paraná; e o complexo de Garabi e Panambi, projetado para o rio Uruguai, em trecho de fronteira entre Brasil e Argentina. A análise dos casos selecionados ocorreu a partir de ferramentas teórico-conceituais do campo de estudos em Ciência, Tecnologia e Sociedade (CTS) – em especial da Sociologia da Tecnologia. A metodologia de trabalho é qualitativa e contou com pesquisa bibliográfica e documental, além de documentação produzida através de observações em pesquisa de campo e entrevistas orientadas pela metodologia da história oral de vida. Parte-se, portanto, de uma abordagem sociotécnica para a observação das dinâmicas de interação entre movimentos sociais, instituições políticas, empresas estatais e privadas e tecnologias. Por meio de uma análise descritiva e também voltada a compreender causalidades e explorar relações explicativas, buscou-se a identificação de padrões de interação entre as trajetórias sociotécnicas que constituem os casos analisados. Observou-se que na implantação da usina de Itaipu, caso que apresenta a primeira experiência de resistência organizada a esse tipo de projeto, os agricultores se organizaram a partir de espaços de troca de informação; incluíram solidariamente em suas reivindicações as demandas de todos os tipos de ocupações de terra, combatendo a estratégia patrimonialista e desagregadora da empresa e; colocaram suas demandas em pauta a partir de práticas como ocupações e acampamentos. Nos processos constituídos nas primeiras fases das trajetórias de Baixo Iguaçu, Garabi e Panambi, os movimentos de resistência conquistaram a suspensão dos projetos articulando experiências anteriores de organização política; o estabelecimento de alianças com setores da comunidade regional; a realização de práticas de resistência antes da fase de projeto básico; o desenvolvimento de práticas de resistência que impediam os trabalhos dos técnicos; e a pressão sobre o ator responsável pelos projetos, à época, a Eletrosul. Nas fases recentes das trajetórias, as conquistas se relacionam a práticas de resistência anteriores à fase de projeto básico, bem como à articulação dos componentes ambientais dos projetos. Concluiu-se, portanto, que ao longo das trajetórias houve o fortalecimento dos movimentos sociais, com acúmulo e transmissão de experiências, mas que dadas às características de estruturação do processo de implantação de hidrelétricas atuais, que não reservam momentos de participação para a sociedade nem garantias institucionais aos atingidos, a experiência de luta precisa ser retomada e atualizada a cada processo de implantação de hidrelétrica. / The main objective of this thesis is to analyze how populations affected by implantation of hydroelectrics in Brazil have articulated and organized throughout the socio-technical trajectories which led to the implementation of such projects. To that end, the implantation trajectories of three cases will be studied, which correspond to the period from 1974 to 2016: Itaipu, built into the Paraná river, on the Brazil – Paraguay borders; Baixo Iguaçu, on the Iguaçu river at Paraná state; and the Garabi and Panambi complex, projected for the Uruguai river, on a section of the border between Brazil and Argentina. The analysis of the selected cases occurred by using theoretical-conceptual tools from the field studies of Science, Technology and Society (STS) - particularly of Sociology of Technology. The methodology is qualitative and used bibliographical and documental research, as well as documents produced by observation on field research and interviews oriented by oral history methodology. Therefore, it results from a socio-technical approach to the observation of interaction dynamics between social movements, political institutions, state and private companies and technologies. The identification of patterns of interaction in socio-technical trajectories which constitute the analyzed cases are searched through a descriptive and also targeted analysis focused on understanding causalities and exploring explanatory relations. It was observed that on the implantation of Itaipu, a case which represents the first experience of organized resistance to this kind of project, farmers organized themselves through information exchange spaces; in solidarity, they included in their claims the demands of all kind of land occupation movements, fighting the patrimonial and disaggregating strategy of the company; they put their demands on the agenda by using practices such as occupations and encampments. In the processes constituted in the early stages of Baixo Iguaçu, Garabi and Panambi trajectories, the resistance movements conquered the suspension of projects by articulating previous experiences of political organization; the establishment of alliances with regional community; the conduction of resistance practices before the basic design phase; the development of resistance practices which prevented the technicians work; and the pressure over the actor responsible for the projects, Eletrosul at the time. On the recent trajectories phases, achievements are related to resistance practices previous to the basic project phase, as well as articulation on environmental components of projects. It was concluded, therefore, that the strengthening of social movements happened along the trajectories, with experience accumulation and transmission, but given the structuring characteristics of the current hydroelectric deployment process, which do not reserve moments to the participation of the society, nor provides institutional guarantees to those affected, the struggle experience must be resumed at each hydroelectric deployment process.
128

A organização de movimentos sociais de expropriados nas trajetórias sociotécnicas de implantação de hidrelétricas no Brasil (1974-2016) / The organization of social movements of evicted people from the sociotechnical trajectories of hydroeletric dams in Brazil. (1974-2016)

Matiello, Catiane 14 October 2016 (has links)
CAPES: Fundação Araucária / A tese tem como objetivo principal analisar como as populações atingidas pela implantação de hidrelétricas no Brasil têm se articulado e organizado nas trajetórias sociotécnicas que conduzem à concretização desses projetos. Para tanto, se estudarão as trajetórias de implantação de três casos, que conformam o período de 1974 a 2016: Itaipu, construída no rio Paraná, na fronteira entre Brasil e Paraguai; Baixo Iguaçu, no rio Iguaçu, no estado do Paraná; e o complexo de Garabi e Panambi, projetado para o rio Uruguai, em trecho de fronteira entre Brasil e Argentina. A análise dos casos selecionados ocorreu a partir de ferramentas teórico-conceituais do campo de estudos em Ciência, Tecnologia e Sociedade (CTS) – em especial da Sociologia da Tecnologia. A metodologia de trabalho é qualitativa e contou com pesquisa bibliográfica e documental, além de documentação produzida através de observações em pesquisa de campo e entrevistas orientadas pela metodologia da história oral de vida. Parte-se, portanto, de uma abordagem sociotécnica para a observação das dinâmicas de interação entre movimentos sociais, instituições políticas, empresas estatais e privadas e tecnologias. Por meio de uma análise descritiva e também voltada a compreender causalidades e explorar relações explicativas, buscou-se a identificação de padrões de interação entre as trajetórias sociotécnicas que constituem os casos analisados. Observou-se que na implantação da usina de Itaipu, caso que apresenta a primeira experiência de resistência organizada a esse tipo de projeto, os agricultores se organizaram a partir de espaços de troca de informação; incluíram solidariamente em suas reivindicações as demandas de todos os tipos de ocupações de terra, combatendo a estratégia patrimonialista e desagregadora da empresa e; colocaram suas demandas em pauta a partir de práticas como ocupações e acampamentos. Nos processos constituídos nas primeiras fases das trajetórias de Baixo Iguaçu, Garabi e Panambi, os movimentos de resistência conquistaram a suspensão dos projetos articulando experiências anteriores de organização política; o estabelecimento de alianças com setores da comunidade regional; a realização de práticas de resistência antes da fase de projeto básico; o desenvolvimento de práticas de resistência que impediam os trabalhos dos técnicos; e a pressão sobre o ator responsável pelos projetos, à época, a Eletrosul. Nas fases recentes das trajetórias, as conquistas se relacionam a práticas de resistência anteriores à fase de projeto básico, bem como à articulação dos componentes ambientais dos projetos. Concluiu-se, portanto, que ao longo das trajetórias houve o fortalecimento dos movimentos sociais, com acúmulo e transmissão de experiências, mas que dadas às características de estruturação do processo de implantação de hidrelétricas atuais, que não reservam momentos de participação para a sociedade nem garantias institucionais aos atingidos, a experiência de luta precisa ser retomada e atualizada a cada processo de implantação de hidrelétrica. / The main objective of this thesis is to analyze how populations affected by implantation of hydroelectrics in Brazil have articulated and organized throughout the socio-technical trajectories which led to the implementation of such projects. To that end, the implantation trajectories of three cases will be studied, which correspond to the period from 1974 to 2016: Itaipu, built into the Paraná river, on the Brazil – Paraguay borders; Baixo Iguaçu, on the Iguaçu river at Paraná state; and the Garabi and Panambi complex, projected for the Uruguai river, on a section of the border between Brazil and Argentina. The analysis of the selected cases occurred by using theoretical-conceptual tools from the field studies of Science, Technology and Society (STS) - particularly of Sociology of Technology. The methodology is qualitative and used bibliographical and documental research, as well as documents produced by observation on field research and interviews oriented by oral history methodology. Therefore, it results from a socio-technical approach to the observation of interaction dynamics between social movements, political institutions, state and private companies and technologies. The identification of patterns of interaction in socio-technical trajectories which constitute the analyzed cases are searched through a descriptive and also targeted analysis focused on understanding causalities and exploring explanatory relations. It was observed that on the implantation of Itaipu, a case which represents the first experience of organized resistance to this kind of project, farmers organized themselves through information exchange spaces; in solidarity, they included in their claims the demands of all kind of land occupation movements, fighting the patrimonial and disaggregating strategy of the company; they put their demands on the agenda by using practices such as occupations and encampments. In the processes constituted in the early stages of Baixo Iguaçu, Garabi and Panambi trajectories, the resistance movements conquered the suspension of projects by articulating previous experiences of political organization; the establishment of alliances with regional community; the conduction of resistance practices before the basic design phase; the development of resistance practices which prevented the technicians work; and the pressure over the actor responsible for the projects, Eletrosul at the time. On the recent trajectories phases, achievements are related to resistance practices previous to the basic project phase, as well as articulation on environmental components of projects. It was concluded, therefore, that the strengthening of social movements happened along the trajectories, with experience accumulation and transmission, but given the structuring characteristics of the current hydroelectric deployment process, which do not reserve moments to the participation of the society, nor provides institutional guarantees to those affected, the struggle experience must be resumed at each hydroelectric deployment process.
129

Integrated Modeling of Electric Power System Operations and Electricity Market Risks with Applications

Sun, Haibin 14 November 2006 (has links)
Through integrated modeling of power system operations and market risks, this thesis addresses a variety of important issues on market signals modeling, generation capacity scheduling, and electricity forward trading. The first part of the thesis addresses a central problem of transmission investment which is to model market signals for transmission adequacy. The proposed system simulation framework, combined with the stochastic price model, provides a powerful tool for capturing the characteristics of market prices dynamics and evaluating transmission investment. We advocate the use of an AC power flow formulations instead since it allocates transmission losses correctly and reveals the economic incentives of voltage requirements. By incorporating reliability constraints in the market dispatch, the resulting market prices yield incentives for market participants to invest in additional transmission capacity. The second part of the thesis presents a co-optimization modeling framework that incorporates market participation and market price uncertainties into the capacity allocation decision-making problem through a stochastic programming formulation. Optimal scenario-dependent generation scheduling strategies are obtained. The third part of the thesis is devoted to analyzing the risk premium present in the electricity day-ahead forward price over the real-time spot price. This study establishes a quantitative model for incorporating transmission congestion into the analysis of electricity day-ahead forward risk premium. Evidences from empirical studies confirm the significant statistical relationship between the day-ahead forward risk premium and the shadow price premiums on transmission flowgates.
130

Critérios para análise de limites e potencialidades da sustentabilidade de fontes de energia: um estudo da cadeia produtiva das pequenas centrais hidrelétricas no Brasil

Nowakowski, Geórgia Alana Andréas 11 March 2015 (has links)
Esta pesquisa apresenta como tema de estudo as Pequenas Centrais Hidrelétricas (PCHs). O seu objetivo geral é identificar os principais limites e potencialidades da sustentabilidade da cadeia produtiva de PCHs no Brasil, ao contexto das dimensões ambiental, social, econômica e institucional. O referencial teórico contempla conceitos e questões referentes: a cadeia produtiva; a Teoria do Ator-rede; as fontes de energia renováveis, mais especificamente a hidroeletricidade; e aos fatores determinantes da competitividade. Para a identificação dos gargalos e potencialidades, foi realizado um mapeamento da estrutura da cadeia de produção das PCHs, assim como a descrição do panorama atual das PCHs no país. Em seguida, foram estudadas, de forma mais aprofundada, cinco etapas que compõem a cadeia: recurso natural; geração; transmissão; distribuição; e comercialização. Na sequência, foram utilizados cinco critérios (importância, probabilidade, temporalidade, efeito e abrangência) para classificar os fatores identificados em cada etapa. Por fim, através da multiplicação dos índices numéricos atribuídos aos critérios, foi obtido o Índice de Significância (IS. No que tange à metodologia da pesquisa, ela pode ser classificada como aplicada e exploratória. Os dados empregados são secundários e foi utilizada a técnica de análise qualitativa. Como resultado, foram identificados 20 limites e 17 potencialidades relacionadas com a cadeia produtiva das PCHs no Brasil, sendo que destes 37 itens, 8 foram enquadrados como muito significativos, segundo os critérios estabelecidos para o IS. No que se refere ao resultado principal da pesquisa, verifica-se que, apesar de existirem potencialidades significativas para o desenvolvimento das PCHs na matriz energética nacional (o potencial hidrelétrico das bacias hidrográficas, a sua capacidade de atuar como vetor de desenvolvimento regional, a consolidação dos fabricantes de turbinas e geradores, e o livre acesso), alguns gargalos existentes na sua cadeia de produção devem ser trabalhados, tais como a interferência na migração e reprodução da ictiofauna continental, a desigualdade na distribuição de energia elétrica, e os aspectos legais e técnicos relacionados com o meio ambiente e a comercialização de energia. / This research study has as a theme: Small Hydro Power Plants (SHP). Its overall objective is to identify the main limits and potential sustainabilities of the productive chain of power plants in Brazil to the context of environmental, social, economic and institutional dimensions. The theoretical framework includes concepts that concern: the production chain, the Actor-Network Theory, renewable energy sources (specifically hydroelectricity) and the determinants of competitiveness. For the identification of limits and potential, mapping of the production of SHP chain structure was carried out; as well as the description of the current landscape of the SHP in the country. They were then studied in more depth. The five steps that make up the chain being: natural resource, generation, transmission, distribution and commercialization. Next, five criteria were used: importance, likelihood, timeliness, effect and scope; in order to classify the factors identified in each step. Finally, by multiplying the numerical index assigned to the criteria; the significance index (SI) was obtained, which was used to frame the final significance of the aspects by: less significant, significant and very significant. Regarding research methodology; it can be classified as: exploratory and applied. The data used was secondary and was used as qualitative analysis. As a result, we identified 20 potential limits and 17 related to the production chain of power plants in Brazil, and of these 37 items, 8 were classified as very significant, according to the criteria established for the IS. With regard to the main search result, it appears that, although there are significant potential for the development of SHP in the national energy matrix (hydropower potential of river basins, their ability to act as regional development vector, consolidation of turbines and generators manufacturers, and free access), some hurdles in the production chain must be worked out, such as interference in the migration and reproduction of continental fish fauna, inequality in the distribution of electricity, and the legal and technical aspects related to the environment and the commercialization of energy.

Page generated in 0.1764 seconds