• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 480
  • 38
  • 3
  • 3
  • 2
  • 2
  • 2
  • 2
  • 2
  • Tagged with
  • 534
  • 326
  • 112
  • 97
  • 86
  • 78
  • 68
  • 55
  • 55
  • 51
  • 44
  • 38
  • 38
  • 36
  • 36
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
321

A influência da estratégia na folga orçamentaria mediada pela incerteza: um estudo de caso em uma empresa familiar

Zenker, Rolf 07 May 2010 (has links)
Submitted by Paulo Junior (paulo.jr@fgv.br) on 2011-01-26T17:16:40Z No. of bitstreams: 1 Dissertação Rolf Zenker.pdf: 888848 bytes, checksum: 751073eac815822129f9e30a32eac443 (MD5) / Approved for entry into archive by Paulo Junior(paulo.jr@fgv.br) on 2011-01-26T17:17:28Z (GMT) No. of bitstreams: 1 Dissertação Rolf Zenker.pdf: 888848 bytes, checksum: 751073eac815822129f9e30a32eac443 (MD5) / Made available in DSpace on 2011-01-31T10:58:43Z (GMT). No. of bitstreams: 1 Dissertação Rolf Zenker.pdf: 888848 bytes, checksum: 751073eac815822129f9e30a32eac443 (MD5) Previous issue date: 2010-05-07 / Este trabalho tem como objetivo principal analisar as relações entre variáveis que influenciam o processo de estabelecimento dos sistemas de controle gerencial e orçamento, assim como os mecanismos de mensuração e avaliação de desempenho nas organizações, tendo como referencial básico a Teoria da Agência. As variáveis analisadas foram: folga orçamentária, incerteza e estratégia. O problema de pesquisa apresentado visa encontrar evidências acerca dos relacionamentos entre estas variáveis, tendo como pressuposto a função chave desempenhada pelo orçamento nos processos em questão. Entre os principais autores que compõem o referencial da pesquisa, destacamos diversos estudos que buscaram explicar relações entre as variáveis em foco e outras, visando compreender os antecedentes que definem os desenhos dos sistemas de controle e avaliação de desempenho. Assim, a partir da compreensão dos conceitos básicos envolvidos neste estudo – Teoria da Agência, sistemas de controle gerenciais, indicadores de desempenho e orçamento, os quais compõem o referencial teórico da pesquisa, foram propostas hipóteses para se tentar responder ao problema de pesquisa. Estas relacionam-se com a existência de folga orçamentária no orçamento de resultado da empresa em estudo, e com a influência do ambiente de incerteza e da estratégia associada ao negócio, no processo de criação de folga orçamentária. Desta forma, estas hipóteses foram testadas em um estudo de caso em uma corporação familiar, que é composta por três empresas de capital fechado, que atuam na importação, industrialização e comercialização de insumos, partes e peças e produtos. Para realizar os testes estatísticos, foi feito um corte longitudinal nos dados do orçamento de indicadores de desempenho do tipo Accounting Performance Measure (APM), formando uma série histórica de 36 meses. Dentre as principais conclusões do estudo, que permitiram uma análise ampla dos aspectos relacionados aos antecedentes ambientais internos e externos que levam a comportamentos disfuncionais entre os agentes, foi evidenciada a existência da folga orçamentária e a influencia da incerteza em sua criação, porém não se pode afirmar que a estratégia tenha influência neste processo, no caso em questão.
322

Essays in recursive equilibrium and market selection hypothesis

Raad, Rodrigo Jardim 28 February 2011 (has links)
Submitted by Rodrigo Raad (rjraad@gmail.com) on 2011-08-01T19:42:30Z No. of bitstreams: 1 tese-07-28-11.pdf: 1676279 bytes, checksum: 7d90ecb1faf2651b3aefa84a97e7308c (MD5) / Approved for entry into archive by Marcia Bacha (marcia.bacha@fgv.br) on 2011-08-17T11:54:45Z (GMT) No. of bitstreams: 1 tese-07-28-11.pdf: 1676279 bytes, checksum: 7d90ecb1faf2651b3aefa84a97e7308c (MD5) / Made available in DSpace on 2011-08-17T11:55:11Z (GMT). No. of bitstreams: 1 tese-07-28-11.pdf: 1676279 bytes, checksum: 7d90ecb1faf2651b3aefa84a97e7308c (MD5) Previous issue date: 2011-02-28 / Este trabalho consiste em estudar modelos incluindo agentes com informação completa e incompleta sobre o ambiente econômico. Prova-se a existência de equilíbrio em que esses dois agentes coexistem e sob, algumas condições, obtêm-se que esse equilíbrio é recursivo e contínuo, ou seja, pode ser implementado por uma função contínua de transição que relaciona as variáveis de equilíbrio entre dois períodos consecutivos. Mostra-se, sob algumas hipóteses, que em equilíbrios recursivos contínuos, os agentes que cometem erros persistentes nas antecipações dos preços de equilíbrio são eliminados do mercado. Finalmente, exibimos diversos exemplos numéricos, no caso de mercados incompletos e informação completa, em que os agentes com expectativas racionais são eliminados do mercado. Usam-se métodos numéricos alternativos que possibilitam computar um equilíbrio em modelos com agentes heterogêneos.
323

Incertezas e impactos de mudanças climáticas sobre o regime de vazões na Bacia Hidrográfica do Rio Uruguai

Adam, Katiúcia Nascimento January 2016 (has links)
Mudanças climáticas podem afetar a distribuição espacial e temporal das variáveis hidrológicas, tendo como consequências alterações nos regimes de precipitação e vazão dos rios. Aumentos ou reduções no volume de escoamento de uma bacia hidrográfica podem, por exemplo, produzir danos aos ecossistemas, afetar a produção de alimentos, abastecimento de água, navegação e geração de energia. Atualmente buscam-se relações que permitam entender os processos de mudanças climáticas a fim avaliar os impactos e mitigá-los, assim como avaliar as incertezas inerentes ao processo de modelagem hidrológica de tais mudanças. Neste contexto este trabalho apresenta uma metodologia de quantificação e análise de incertezas para estudos de mudanças climáticas, tomando como estudo de caso a bacia hidrográfica do Rio Uruguai (BHRU) com área aproximada de 110,000 Km². Para tanto três fontes de incerteza foram analisadas e comparadas: o modelo hidrológico, técnicas de remoção de viés e modelos climáticos. O modelo hidrológico MGB-IPH foi avaliado quanto ao processo de parametrização, utilizando diferentes períodos de simulação para calibração: (i) Período de calibração 1 – MGB/P1: representando a série completa de observações de 1960-1990 com verificação no período de 1992-1999; (ii) Período de calibração 2 - MGB/P2: calibração em período seco e verificação de período de cheias (iii) Período de calibração 3 – MGB/P3: calibração em período característico de cheias e verificação de período de estiagem. Três diferentes técnicas de remoção de viés foram aplicadas para analisar o grau de incerteza que a escolha de um determinado método de correção pode agregar ao resultado final: (i) RV1 - Técnica de Mapeamento Quantil-Quantil; (ii) RV2 - Técnica de Escalonamento Linear e (iii) RV3 - Técnica Delta change. Os modelos climáticos globais (GMC’s) foram analisados quanto a sua estrutura, comparando projeções de cinco diferentes modelos: MPEH5 (ECHAM5/MPIOM), GFCM21 (GFDL-CM2.1), MRCGCM (MRI-CGCM2.3.2), HADCM3 (UKMO-HadCM3) e NCCCSM (CCSM3). Adicionalmente, também foram analisadas as projeções climáticas de cinco diferentes versões do modelo climático regional (RCM) ETA/CPTEC: CT20, CT40, LOW, MID e HIGH. Inicialmente os resultados das simulações provenientes de cada uma destas fontes foram comparados de maneira isolada e em seguida de maneira combinada. Portanto, a metodologia foi dividida em Etapa (1) e Etapa (2). A Etapa (1) teve por objetivo responder a seguinte pergunta: Qual dentre as fontes de incerteza selecionadas agrega maior variação ao resultado final? Ou seja, qual destas fontes propaga maior incerteza em termos de impactos de mudanças climáticas na BHRU? Os resultados obtidos por cada uma das fontes de incerteza foram comparados em termos de anomalias de vazões médias de longo período (QMLP), máximas e mínimas anuais. Na Etapa (2) foi realizada a análise total de incerteza, ou seja, a análise combinada dos resultados obtidos na Etapa (1). As anomalias de vazões foram apresentadas utilizando as curvas de distribuição acumulada (CDF’s) e a incerteza total expressa pela diferença entre os percentis 5% e 95%. Considerando os resultados obtidos para as vazões médias de longo período (QMLP), as fontes podem ser ordenadas de forma decrescente, em relção ao grau de incerteza que propagam: modelos climáticos globais > modelos climáticos regionais > técnicas de remoção de viés > modelo hidrológico. Para as vazões extremas os RCM’s apresentam as maiores variações de anomalias se comparadas às dos modelos hidrológicos e técnicas de remoção de viés, inclusive para ambos os extremos, máximos e mínimos. Esta variação se dá principalmente, pelos resultados de LOW e MID. Estas informações podem ajudar os gestores e tomadores de decisão no adequado gerenciamento e planejamento dos recursos hídricos sob condições de mudanças climáticas, assim como o entendimento da incerteza associada. / Climate change can affect the spatial and temporal distribution of hydrological variables, with the consequences of changes in precipitation regimes and river flows. Increase or decrease the flow of rivers, for example, can cause damage to ecosystems, affecting food production, water supply, navigation and power generation. Currently seeking to relationships that allow understand climate change processes in order to assess the impacts and mitigate them, and assess the uncertainties inherent in hydrologic modeling process of such climate change. This thesis aimed at the development of a methodology for quantification and analysis of uncertainties for climate change studies in hydrology , taking as a case study the basin of the Uruguay River (BHRU) with a drainage area near 110,000 km². For that three sources of uncertainty were analyzed and compared: the hydrologic model, bias removal techniques and climate models. The hydrological model MGB-IPH was evaluated for parameterization, using different simulation periods for calibration: (i) MGB /P1: full range with calibration period (1960-1990) and validate (1992-1999); (ii) MGB / P2: calibrated in the period of dry and validated in the flood season (iii) MGB/P3: calibrated in the period of floods and validated in the dry season. Three different bias correction methods were applied to analyze the degree of uncertainty that the choice of a particular method of correction can add to the final result: (i) RV1 - Quantil-Quantil Mapping; (ii) RV2 - Linear Scaling, and (iii) RV3 - Delta Change Technique. Global climate models (GMC's) were analyzed for their structure, comparing projections of five different models: MPEH5 (ECHAM5/MPI-OM), GFCM21 (GFDLCM2.1), MRCGCM (MRI-CGCM2.3.2), HADCM3 (UKMO-HadCM3) e NCCCSM (CCSM3). Additionaly, climate projections from five different versions of the regional climate model (RCM) ETA / CPTEC were also analyzed: CT20, CT40, LOW, MID e HIGH. Initially the simulation results from each of the sources of uncertainty were compared individually (single propagation) and then in a combined way (multi propagation). Therefore, the methodology was divided in Step (1) and Step (2). Step (1) aimed to answer: Which of the selected sources of uncertainty adds more variation to the final result? Which of these sources propagates greater uncertainty in terms of impacts of climate change on BHRU? The results for each of the sources of uncertainty were compared in terms of long-term mean flow (QMLP), maximum and minimum annual flow. In Step (2) total uncertainty analysis was performed, therefore the combined analysis of the results obtained in Step (1). The anomalies in discharge were presented using the cumulative distribution function (CDF's) and the total uncertainty expressed by the difference between the percentiles 5% and 95%. Throughout the application of the proposed methodology it was concluded that: (i) for the extremes (maximum and minimum) annual discharges the largest source of uncertainty are the projections of the RCM's, followed by the the bias removal technique and finally the hydrological model; (ii) for the QMLP the largest source of uncertainty are followed global climate models, then the regional climate models. This information can help managers and decision makers in the proper management and planning of water resources under climate change conditions, as well as the understanding of the associated uncertainty.
324

(Im)precisão numérica

Sangioratto, Laercio January 2015 (has links)
Orientador: Prof. Dr. André Ricardo Oliveira da Fonseca. / Dissertação (mestrado) - Universidade Federal do ABC, Programa de Pós-Graduação em Mestrado Profissional em Matemática em Rede Nacional, 2015. / Toda medida possui intrinsecamente uma incerteza em sua interpretação, e neste trabalho mostramos a importância das aproximações, considerando o erro de uma medida como principal fator analisado, fazendo com que o aluno compare o que mais aproxima de sua realidade, estimulando-o ao raciocínio lógico, tornando-o mais seguro na forma de representar um número, motivando-o na utilização dos conceitos e situações abordadas, não o deixando levar por uma pseudo-interpretação, em que este trabalho tem por finalidade, adequar o papel do professor, enfatizando a sua abordagem de forma gradual, desde os primeiros anos do ensino fundamental. / Every measure intrinsically has an uncertainty in its interpretation, and in this work we show the importance of approaches, considering the error of a measure as the main factor analyzed, causing the student compare what else approaching your reality, stimulating it to logical thinking , making it the safest in the way of representing a number, motivating him in the use of concepts and situations addressed, not carried away by a pseudo-interpretation in this work aims, adapting the role of the teacher, emphasizing the its approach gradually, from the first years of elementary school.
325

[en] UNCERTAINTY MEASURES AND THEIR IMPACTS ON FORECASTING THE BRAZILIAN OUTPUT GAP / [pt] MEDIDAS DE INCERTEZA E SEUS IMPACTOS NA PREVISÃO DO HIATO DO PRODUTO BRASILEIRO

ILAN SAMPAIO PARNES 26 December 2018 (has links)
[pt] A incerteza é um fator relevante na modelagem de variáveis macroeconômi-cas, especialmente em países emergentes. Neste estudo, tentamos entender se me-didas de incerteza oriundas do mercado brasileiro podem melhorar as projeções de PIB do país. Traçando uma curva IS da forma mais simples possível: relacionando o hiato do produto a suas primeiras defasagens e aos juros reais ex-ante, podemos adicionar medidas de incerteza e atestar se estas melhoram as projeções de hiato realizadas para o período imediatamente subsequente. Como medidas de incerte-za, utilizamos a dispersão de expectativas do boletim Focus para PIB e inflação; a volatilidade implícita dos contratos futuros de câmbio; o VIX; a volatilidade observada nas empresas mais relevantes do índice Bovespa e o Índice de Incerteza Econômica (IIE-Br). Conseguimos demonstrar com um exercício de backtest que a previsão de hiatos do PIB se torna melhor com a inclusão de variáveis de incerteza na curva IS. / [en] Uncertainty is a relevant matter when modelling economic variables, especially in emerging countries. Here, we try to understand if measures of uncertainty observed in the Brazilian market allow us to improve GDP forecasting. By defining an IS curve as simply as possible: relating current output gap with its lags and the economy s ex-ante real interest rate, it is possible to introduce an uncertainty measure and examine if the forecasting exercise improves in the next period. As proxies for uncertainty, we shall use dispersion of financial markets expectations for future inflation and future output growth; FX future contracts implied volatility; VIX Index; observed volatility in Brazil s most relevant companies stock prices, and; the Economy Uncertainty Index (IIE-Br). We were able to demonstrate through a backtest exercise that the insertion of uncertainty measures in the IS curve improves the output gap forecasting.
326

Soluções analíticas para transporte de hidrocarbonetos do petróleo em água subterrânea : avaliação determinística e probabilística do risco à saúde humana

Melo, Tirzah Moreira de January 2010 (has links)
O presente trabalho apresenta um estudo de caso de contaminação de solo e água subterrânea por derivados do petróleo em uma refinaria da região Sudeste do país, para o qual foram aplicados todos os níveis ou tiers da metodologia RBCA de avaliação de risco à saúde humana. Diferentes vias de exposição foram consideradas ao longo de toda a metodologia, a qual foi dividida em determinística, compreendendo os dois primeiros níveis, e estocástica, no caso do terceiro nível. Sobre a abordagem determinística, o modelo de Domenico (1987) para transporte de contaminantes em água subterrânea foi substituído por um conjunto de soluções analíticas que considera diferentes geometrias de fonte de contaminação para casos instantâneos e contínuos de liberação de contaminantes, permitindo que a metodologia RBCA também possa ser empregada mesmo quando o modelo de Domenico (1987) não se aplica. A comparação deste conjunto de soluções com outro utilizado apenas para comparar e confirmar a validade dos modelos escolhidos demonstrou grande estabilidade nas soluções, enquanto os modelos de comparação apresentaram instabilidade nas soluções para altos valores da variável tempo. Tal fato comprovou a viabilidade do emprego do conjunto de soluções analíticas proposto para avaliação de risco à saúde humana. No contexto da abordagem estocástica da estimativa do risco, o método de Monte Carlo foi empregado para propagação das incertezas sobre uma das soluções analíticas citadas anteriormente, da qual, por sua vez, foram extraídos os resultados para a simulação estocástica do risco para a via de contato dermal com água superficial contaminada por Benzeno. Os resultados da simulação estocástica demonstraram uma correlação muito grande do risco com a variável C (concentração do contaminante), a qual, por sua vez, foi modelada pela simulação estocástica da condutividade hidráulica. Logo, pode-se concluir que a condutividade hidráulica afeta a estimativa do risco, para o qual observou-se uma diferença de seis ordens de magnitude entre o valor mínimo e o máximo simulados e duas ordens de magnitude para o valor real do risco. / This dissertation presents a case study on soil and ground water contamination by components derived from petroleum in a refinery located in the Southeast region of Brazil. All of the RBCA health risk assessment methodology tiers were applied in this study. Different exposure pathways were considered throughout the methodology. Firstly, the deterministic approach which encompasses the first two tiers and secondly, the stochastic approach which addressed the third tier. Regarding the deterministic approach, the Domenico (1987) ground water contaminant transport model was replaced by a new set of analytical solutions that consider different geometries of contamination sources used in cases of instantaneous and continuous release of contaminants. This replacement allowed for the utilization of the RBCA methodology whenever the Domenico (1987) analytical model does not apply. A comparison between this set of analytical solutions with another set used to validate and testify the chosen set only, showed great solution stability response; whereas, the models of comparison have demonstrated instability for high values of the time variable. Such a fact proved the validity of the use of the proposed set of analytical solutions inserted in a health risk assessment context. In the context of the stochastic approach of risk estimation, the Monte Carlo method was employed to propagate uncertainties over one of the analytical solutions mentioned above, from which results were obtained to simulate dermal contact with contaminated surface water while swimming exposure pathway. The results of the stochastic simulation demonstrated a high correlation between the risk and the variable C (contaminant concentration), which was modeled by the hydraulic conductivity stochastic simulation. Hence, it may be concluded that the hydraulic conductivity affects the risk estimation, for which a difference of six orders of magnitude between the minimum and maximum simulated values and two orders of magnitude for the real risk value was observed.
327

[en] INSECTICIDE-TREATED BED NETS SUPPLY CHAIN OPTIMIZATION UNDER UNCERTAINTY FOR MALARIA PREVENTION AND CONTROL / [pt] OTIMIZAÇÃO SOB INCERTEZA DA CADEIA DE SUPRIMENTOS DE MOSQUITEIROS UTILIZADOS NA PREVENÇÃO E CONTROLE DA MALÁRIA

ROBERTO GOMES DE MATTOS 22 March 2018 (has links)
[pt] Em 2015 quase metade da população mundial vivia em área de risco de transmissão de malária. Neste mesmo ano, estimam-se 214 milhões de casos e 438 mil fatalidades. A principal forma de prevenção e redução da transmissão da malária é através do controle dos vetores, em particular, destaca-se o uso de mosquiteiros impregnados com inseticidas de longa duração (MILD). Neste contexto, os programas de distribuição de MILDS enfrentam desafios relacionados a obtenção de fundos e à gestão da cadeia de suprimentos como, por exemplo, incertezas associadas as atividades logísticas, as variáveis de oferta e demanda, e a volatilidade de preços. À luz destes fatos, esta dissertação propõe um modelo de otimização robusta, fundamentado em extensões dos arcabouços teóricos de Bertsimas e Sim (2004) e Fernandes et al. (2016), capaz de minimizar os custos de um programa de distribuição de mosquiteiros ou, dada uma restrição orçamentária, maximizar a distribuição para áreas prioritárias. Ademais, foi realizada uma revisão da literatura acadêmica acerca de modelos de otimização robusta aplicados no contexto da logística humanitária, onde alguns aspectos ainda pouco explorados foram ressaltados e considerados no modelo proposto. Um estudo de caso real é feito sobre um projeto feito do Fundo das Nações Unidas para crianças na Costa do Marfim. Os resultados apontam que conforme esperado, à medida que o nível de robustez considerado no modelo cresce, os custos totais também aumentam. Em contrapartida, o modelo robusto fornece soluções com maior flexibilidade na cadeia de suprimentos para a eventual necessidade de se ajustar os planos de compras e distribuição. Por fim, as soluções robustas foram avaliadas através de simulações de Monte Carlo, indicando que, conforme desejado, a probabilidade de viabilidade dos planos aumentam junto com nível de conservadorismo da solução. / [en] In 2015, almost half of the world population lived in areas at risk of malaria transmission. There were around 214 million malaria cases and 438,000 associated deaths. One of the major paths to prevent and reduce malaria transmission is through vector control, especially with the use of insecticide-treated nets (ITN). In this context, ITN distribution campaigns face several challenges, such as uncertainties related to funding, transportation, market and price volatility, which might be effectively tackled through long-term agreements and proper planning. However, that might not be an option for all humanitarian organizations and governments. Besides, considering uncertainties during budgetary planning is particular relevant. In this sense, a robust optimization model, based on Bertsimas and Sim (2004) and Fernandes et al. (2016) frameworks, is proposed to minimize the involved costs or, given a budget constraint, maximize the coverage of priority areas. A literature review on robust optimization applied to humanitarian logistics is conducted, in which aspects with less academic research attention are revealed and considered in the model, such as the simultaneous account of the aforementioned uncertainties and demand prioritization. A United Nations Children s Fund campaign in Ivory Coast is studied, and reveals that, as expected, as the robustness level increases so does the total costs. In return, the robust model generally provides a solution with improved supply chain flexibility, that might minimize efforts, in case it is necessary to adjust procurement and transportation plans when uncertainty is revealed. In addition, robust solutions were assessed through Monte Carlo simulations against several realizations of uncertain parameters values, pointing that, as desired, solution feasibility increases alongside the specified level of conservatism.
328

Uma metodologia para redu??o de incertezas em sistema de medi??o de vaz?o de ?leo e g?s

Ara?jo, Jo?o de Deus Freire de 20 March 2009 (has links)
Made available in DSpace on 2014-12-17T14:55:41Z (GMT). No. of bitstreams: 1 AraujoJDF_DISSERT.pdf: 2882504 bytes, checksum: 96c2fbb3f2a5321e6d6c3d365cb77eff (MD5) Previous issue date: 2009-03-20 / The objective of this research is to discuss about the need for implementation of new alternatives for the implementation on the metrological control: on the findings of initial and subsequent measurements, the control procedures of measurement uncertainty applied in assessing the loss or remains found in handling operations of bulk liquids, when used turbine meters used in measuring the tax on the business of Petrobras, due to the current environment of legal metrology and scientific, both domestic and international. We aim, with these alternatives: standardizing the minimization of random and systematic errors, the estimate of the remaining errors, as well as the management control of metrological calibration procedures, control of measurement uncertainty, and contribute to the change in the form of performance of legal metrology and scientific disseminating new information to change management of metrological control, objectively focused on aspects of supervision in implementing these activities in the control of the uncertainties of measurement used in our processes in the fiscal measurement system Petrobras. Results are presented, information and comments on the influence of measurement uncertainty in the current results of the fiscal and transfer of custody. This will emphasize the need, among other things, improvement and expansion of metrological control monitored by setting a better meet demand, calibration equipment and measuring instruments for Petrobras. Finally, we intend to establish the need for improving the method of evaluation of the data meter applied to the current management control of measurement uncertainty by proposing a methodology for addressing the problem, as well as highlighting the expected results. / O objetivo deste trabalho de pesquisa ? abordar a necessidade de implementa??o de novas alternativas para a execu??o da gest?o no controle metrol?gico: quanto ?s verifica??es das medi??es iniciais e posteriores; nos procedimentos de controle da incerteza de medi??o; aplicada na avalia??o das perdas ou sobras constatadas nas opera??es de movimenta??o de gran?is l?quidos; quando utilizamos medidores tipo turbina na medi??o fiscal utilizada nos neg?cios da Petrobras, em virtude ao atual cen?rio da metrologia legal e cient?fica; no contexto nacional e internacional. Almeja-se, com estas alternativas: padronizarmos a minimiza??o dos erros aleat?rios e sistem?ticos; a estimativa dos erros remanescentes; assim como, a gest?o no controle metrol?gico dos procedimentos de calibra??o; controle das incertezas de medi??es; e contribuirmos para a mudan?a na forma de atua??o da metrologia legal e cient?fica, divulgando novas informa??es para a gest?o de mudan?as do controle metrol?gico, voltadas objetivamente para os aspectos de supervis?o na execu??o destas atividades no controle das incertezas de medi??o utilizadas em nossos processos de medi??o fiscal no sistema Petrobras. S?o apresentados resultados, informa??es e coment?rios sobre a influ?ncia da incerteza de medi??o nos resultados atuais das medi??es fiscais e transfer?ncias de cust?dia. Isto enfatizar? a necessidade, dentre outras coisas, de melhoria e na amplia??o do controle metrol?gico monitorado, definindo um melhor atendimento ? demanda de calibra??es dos equipamentos e instrumentos de medi??es da Petrobras. Finalmente, pretende-se concluir pela necessidade do aprimoramento do m?todo de avalia??o dos dados do medidor aplicado na gest?o atual do controle de incertezas de medi??es, propondo metodologia para a abordagem do problema, assim como, destacando os resultados esperados.
329

Incertezas e impactos de mudanças climáticas sobre o regime de vazões na Bacia Hidrográfica do Rio Uruguai

Adam, Katiúcia Nascimento January 2016 (has links)
Mudanças climáticas podem afetar a distribuição espacial e temporal das variáveis hidrológicas, tendo como consequências alterações nos regimes de precipitação e vazão dos rios. Aumentos ou reduções no volume de escoamento de uma bacia hidrográfica podem, por exemplo, produzir danos aos ecossistemas, afetar a produção de alimentos, abastecimento de água, navegação e geração de energia. Atualmente buscam-se relações que permitam entender os processos de mudanças climáticas a fim avaliar os impactos e mitigá-los, assim como avaliar as incertezas inerentes ao processo de modelagem hidrológica de tais mudanças. Neste contexto este trabalho apresenta uma metodologia de quantificação e análise de incertezas para estudos de mudanças climáticas, tomando como estudo de caso a bacia hidrográfica do Rio Uruguai (BHRU) com área aproximada de 110,000 Km². Para tanto três fontes de incerteza foram analisadas e comparadas: o modelo hidrológico, técnicas de remoção de viés e modelos climáticos. O modelo hidrológico MGB-IPH foi avaliado quanto ao processo de parametrização, utilizando diferentes períodos de simulação para calibração: (i) Período de calibração 1 – MGB/P1: representando a série completa de observações de 1960-1990 com verificação no período de 1992-1999; (ii) Período de calibração 2 - MGB/P2: calibração em período seco e verificação de período de cheias (iii) Período de calibração 3 – MGB/P3: calibração em período característico de cheias e verificação de período de estiagem. Três diferentes técnicas de remoção de viés foram aplicadas para analisar o grau de incerteza que a escolha de um determinado método de correção pode agregar ao resultado final: (i) RV1 - Técnica de Mapeamento Quantil-Quantil; (ii) RV2 - Técnica de Escalonamento Linear e (iii) RV3 - Técnica Delta change. Os modelos climáticos globais (GMC’s) foram analisados quanto a sua estrutura, comparando projeções de cinco diferentes modelos: MPEH5 (ECHAM5/MPIOM), GFCM21 (GFDL-CM2.1), MRCGCM (MRI-CGCM2.3.2), HADCM3 (UKMO-HadCM3) e NCCCSM (CCSM3). Adicionalmente, também foram analisadas as projeções climáticas de cinco diferentes versões do modelo climático regional (RCM) ETA/CPTEC: CT20, CT40, LOW, MID e HIGH. Inicialmente os resultados das simulações provenientes de cada uma destas fontes foram comparados de maneira isolada e em seguida de maneira combinada. Portanto, a metodologia foi dividida em Etapa (1) e Etapa (2). A Etapa (1) teve por objetivo responder a seguinte pergunta: Qual dentre as fontes de incerteza selecionadas agrega maior variação ao resultado final? Ou seja, qual destas fontes propaga maior incerteza em termos de impactos de mudanças climáticas na BHRU? Os resultados obtidos por cada uma das fontes de incerteza foram comparados em termos de anomalias de vazões médias de longo período (QMLP), máximas e mínimas anuais. Na Etapa (2) foi realizada a análise total de incerteza, ou seja, a análise combinada dos resultados obtidos na Etapa (1). As anomalias de vazões foram apresentadas utilizando as curvas de distribuição acumulada (CDF’s) e a incerteza total expressa pela diferença entre os percentis 5% e 95%. Considerando os resultados obtidos para as vazões médias de longo período (QMLP), as fontes podem ser ordenadas de forma decrescente, em relção ao grau de incerteza que propagam: modelos climáticos globais > modelos climáticos regionais > técnicas de remoção de viés > modelo hidrológico. Para as vazões extremas os RCM’s apresentam as maiores variações de anomalias se comparadas às dos modelos hidrológicos e técnicas de remoção de viés, inclusive para ambos os extremos, máximos e mínimos. Esta variação se dá principalmente, pelos resultados de LOW e MID. Estas informações podem ajudar os gestores e tomadores de decisão no adequado gerenciamento e planejamento dos recursos hídricos sob condições de mudanças climáticas, assim como o entendimento da incerteza associada. / Climate change can affect the spatial and temporal distribution of hydrological variables, with the consequences of changes in precipitation regimes and river flows. Increase or decrease the flow of rivers, for example, can cause damage to ecosystems, affecting food production, water supply, navigation and power generation. Currently seeking to relationships that allow understand climate change processes in order to assess the impacts and mitigate them, and assess the uncertainties inherent in hydrologic modeling process of such climate change. This thesis aimed at the development of a methodology for quantification and analysis of uncertainties for climate change studies in hydrology , taking as a case study the basin of the Uruguay River (BHRU) with a drainage area near 110,000 km². For that three sources of uncertainty were analyzed and compared: the hydrologic model, bias removal techniques and climate models. The hydrological model MGB-IPH was evaluated for parameterization, using different simulation periods for calibration: (i) MGB /P1: full range with calibration period (1960-1990) and validate (1992-1999); (ii) MGB / P2: calibrated in the period of dry and validated in the flood season (iii) MGB/P3: calibrated in the period of floods and validated in the dry season. Three different bias correction methods were applied to analyze the degree of uncertainty that the choice of a particular method of correction can add to the final result: (i) RV1 - Quantil-Quantil Mapping; (ii) RV2 - Linear Scaling, and (iii) RV3 - Delta Change Technique. Global climate models (GMC's) were analyzed for their structure, comparing projections of five different models: MPEH5 (ECHAM5/MPI-OM), GFCM21 (GFDLCM2.1), MRCGCM (MRI-CGCM2.3.2), HADCM3 (UKMO-HadCM3) e NCCCSM (CCSM3). Additionaly, climate projections from five different versions of the regional climate model (RCM) ETA / CPTEC were also analyzed: CT20, CT40, LOW, MID e HIGH. Initially the simulation results from each of the sources of uncertainty were compared individually (single propagation) and then in a combined way (multi propagation). Therefore, the methodology was divided in Step (1) and Step (2). Step (1) aimed to answer: Which of the selected sources of uncertainty adds more variation to the final result? Which of these sources propagates greater uncertainty in terms of impacts of climate change on BHRU? The results for each of the sources of uncertainty were compared in terms of long-term mean flow (QMLP), maximum and minimum annual flow. In Step (2) total uncertainty analysis was performed, therefore the combined analysis of the results obtained in Step (1). The anomalies in discharge were presented using the cumulative distribution function (CDF's) and the total uncertainty expressed by the difference between the percentiles 5% and 95%. Throughout the application of the proposed methodology it was concluded that: (i) for the extremes (maximum and minimum) annual discharges the largest source of uncertainty are the projections of the RCM's, followed by the the bias removal technique and finally the hydrological model; (ii) for the QMLP the largest source of uncertainty are followed global climate models, then the regional climate models. This information can help managers and decision makers in the proper management and planning of water resources under climate change conditions, as well as the understanding of the associated uncertainty.
330

Gestão de incertezas em projetos complexos: quadro conceitual e estudos de caso. / Sem título em inglês

Esther Zhi Hong Zheng 15 August 2016 (has links)
As metodologias tradicionais de gerenciamento de projetos são caracterizadas como sendo rígidas e adequadas apenas para ambientes de pouca incerteza. No entanto, atualmente cada vez mais projetos são desenvolvidos em ambientes de alta complexidade e maiores incertezas, o que requer formas diferentes de gerenciamento do projeto, menos rígidas e mais flexíveis. Assim, o objetivo deste trabalho é propor um quadro conceitual para o gerenciamento de incertezas em projetos complexos. A abordagem metodológica mescla revisão sistemática da literatura e estudos de caso. O quadro conceitual desenvolvido, baseado na teoria da contingência, sugere que as abordagens de gestão de projetos sob incertezas são, em parte, determinadas pelas características das incertezas existentes. As respostas às incertezas podem ser orientadas à causa ou ao efeito da incerteza, e essas são escolhidas de acordo com a habilidade de influência sobre a causa, que aumenta para incertezas internas e diminui para incertezas externas. Já a flexibilidade da abordagem de gestão de projetos é impactada pelo grau da incerteza. Foram realizados seis estudos de caso, e um caso piloto, em projetos complexos, que mostraram que existe relação entre a origem da incerteza e a habilidade de influência, e entre a habilidade de influência e a orientação das ações. Eles mostraram também como a flexibilidade é importante para o gerenciamento das incertezas do projeto, associando métodos de antecipação, de instrucionismo, como o gerenciamento de riscos e a resiliência, principalmente a capacidade da alta direção assumir a existência de incertezas. Os estudos de caso evidenciaram que quanto maior o nível de incerteza do projeto, maior é a flexibilidade necessária. A dissertação apresenta ainda as limitações do estudo e as sugestões para trabalhos futuros. / Traditional project management methodologies are considered rigid and suitable only for environments of little uncertainty. However nowadays increasing number of projects is being developed in high complexity and uncertainty environment, requiring different approaches for project management: less rigid and more flexible. Thus, the purpose of this paper is to present a framework for managing projects under uncertainties, through a systematic literature review. The developed framework, based on the contingency theory, suggests that approaches for project management under uncertainty are, in part, determined by the characteristics of the existing uncertainties. The responses for uncertainty can be driven by the cause or consequence of the uncertainties and those are chosen according to the ability to influence the cause, which is higher for internal uncertainties and lower for external uncertainties. The flexibility of the project management approach, in its turn, is impacted by the uncertainty degree. Six case studies and a pilot case study were conducted in projects with complexity. The cases showed that there is a relation between the source of the uncertainty and the ability to influence, and between the ability to influence and the orientation of the responses. They also pointed out the importance of flexibility to manage uncertainties, combining prediction methods, the instructionism, such as using risk management, and resilience, especially the ability of the management to admit the existence of uncertainties. The cases also indicated that the highest is the project uncertainty, the highest is the need for flexibility. The paper also presents the limitation of the research, and suggestions for further works.

Page generated in 0.0741 seconds