Spelling suggestions: "subject:"[een] PERFORMANCE INDICATORS"" "subject:"[enn] PERFORMANCE INDICATORS""
221 |
Circular and Profitable Apparel Product Design : Critical success factors for circular and profitable apparel product design and key performance indicators to follow up- a multiple case studyHammarström, Klara, Domeij, Simon January 2024 (has links)
The research explores how Swedish apparel companies are integrating Circular Economy (CE) principles into the product design phase and identifies Critical Success Factors (CSFs) and Key Performance Indicators (KPIs) for circular and profitable apparel products. It uses a multiple case study approach, interviewing employees from five companies involved in the Vinnova project. Key findings include the importance of design for durability, balancing recycled content with quality, and the need for measurable CE principles. The study highlights the need for KPIs to track circular design performance and suggests managers prepare for upcoming EU ESPR legislation. Limitations include its focus on Swedish companies and the short research timeframe. Future research should further explore the impact of ESPR and develop more KPIs for CE in the apparel industry.
|
222 |
Development of systemic methods to improve management techniques based on Balanced Scorecard in Manufacturing Environment / Desarrollo de métodos sistémicos para la mejora de las técnicas de gestión basadas en el cuadro integral de mando en entornos de fabricaciónSánchez Márquez, Rafael 07 January 2020 (has links)
Tesis por compendio / [ES] El "Balanced Scorecard" (BSC) como "Performance Management System" (PMS) se ha difundido por todo el mundo desde que Kaplan y Norton (1992) establecieron sus fundamentos teóricos. Kaplan (2009) afirmó que el uso del BSC y, especialmente, la conversión de estrategias en acciones era más un arte que una ciencia. La falta de evidencia de la existencia de relaciones de causa-efecto entre Key Performance Indicatiors (KPIs) de diferentes perspectivas y de métodos sólidos y científicos para su uso, eran algunas de las causas de sus problemas. Kaplan emplazó a la comunidad científica a confirmar los fundamentos del BSC y a desarrollar métodos científicos.
Varios trabajos han intentado mejorar el uso del BSC. Algunos utilizan herramientas heurísticas, que tratan con variables cualitativas. Otros, métodos estadísticos y datos reales de KPI, pero aplicados a un período específico, que es una visión estática y que requiere muestras a largo plazo y recursos muy especializados cada vez que los ejecutivos necesitan evaluar el impacto de las estrategias. Esta tesis también aborda el retraso entre variables de "entrada" y de "salida", además de la falta de trabajos centrados en el entorno de fabricación, que constituye su objetivo principal.
El primer objetivo de este trabajo es desarrollar una metodología para evaluar y seleccionar los principales KPI de salida, que explican el desempeño de toda la compañía. Usa las relaciones entre variables de diferentes dimensiones descritas por Kaplan. Este método también considera el retraso entre las variables. El resultado es un conjunto de KPI principales de salida, que resume todo el BSC, lo que reduce drásticamente su complejidad.
El segundo objetivo es desarrollar una metodología gráfica que utilice ese conjunto de KPI principales de salida para evaluar la efectividad de las estrategias. Actualmente, los gráficos son comunes entre los profesionales, pero solo Breyfogle (2003) ha intentado distinguir entre un cambio real significativo y un cambio debido a la incertidumbre de usar muestras. Este trabajo desarrolla aún más el método de Breyfogle para abordar sus limitaciones.
El tercer objetivo es desarrollar un método que, una vez demostrada gráficamente la efectividad de las estrategias, cuantifique su impacto en el conjunto de KPI principales de salida.
10
El cuarto y último método desarrollado se centra en el diagnóstico del sistema de gestión de la calidad para revelar cómo funciona en términos de las relaciones entre los KPI internos (dentro de la empresa) y externos (relacionados con el cliente) para mejorar la satisfacción del cliente.
La aplicación de los cuatro métodos en la secuencia correcta constituye una metodología completa que se puede aplicar en cualquier empresa de fabricación para mejorar el uso del cuadro de mando integral como herramienta científica. Sin embargo, los profesionales pueden optar por aplicar solo uno de los cuatro métodos o una combinación de ellos, ya que la aplicación de cada uno de ellos es independiente y tiene sus propios objetivos y resultados. / [CA] El "Balanced Scorecard" (BSC) com "Performance Management System" (PMS) s'ha difós per tot el món des que Kaplan i Norton (1992) van establir els seus fonaments teòrics. Kaplan (2009) va afirmar que l'ús del BSC i, especialment, la conversió d'estratègies en accions era més un art que una ciència. La manca d'evidència de l'existència de relacions de causa-efecte entre Key Performance Indicatiors (KPIs) de diferents perspectives i de mètodes sòlids i científics pel seu ús, eren algunes de les causes dels seus problemes. Kaplan va emplaçar a la comunitat científica a confirmar els fonaments del BSC i a desenvolupar mètodes científics.
Diversos treballs han intentat millorar l'ús del BSC. Alguns utilitzen eines heurístiques, que tracten amb variables qualitatives. D'altres, mètodes estadístics i dades reals de KPI, però aplicats a un període específic, que és una visió estàtica i que requereix mostres a llarg termini i recursos molt especialitzats cada vegada que els executius necessiten avaluar l'impacte de les estratègies. Aquesta tesi també aborda el retard entre variables d ' "entrada" i de "eixida", a més de la manca de treballs centrats en l'entorn de fabricació, que és el seu objectiu principal.
El primer objectiu d'aquest treball és desenvolupar una metodologia per avaluar i seleccionar els principals KPI d'eixida, que expliquen l'acompliment de tota la companyia. Es fa servir les relacions entre variables de diferents dimensions descrites per Kaplan. Aquest mètode també considera el retard entre les variables. El resultat és un conjunt de KPI principals d'eixida, que resumeix tot el BSC, i que redueix dràsticament la seua complexitat.
El segon objectiu és desenvolupar una metodologia gràfica que utilitze aquest conjunt de KPI principals d'eixida per avaluar l'efectivitat de les estratègies. Actualment, els gràfics són comuns entre els professionals, però només Breyfogle (2003) ha intentat distingir entre un canvi real significatiu i un a causa de la incertesa d'utilitzar mostres. Aquest treball desenvolupa encara més el mètode de Breyfogle per abordar les seues limitacions.
El tercer objectiu és desenvolupar un mètode que, una vegada demostrada gràficament l'efectivitat de les estratègies, quantifique el seu impacte en el conjunt de KPI principals d'exida.
El quart i l'últim mètode es centra en el diagnòstic del sistema de gestió de la qualitat per a revelar com funcionen les relacions entre els KPI interns (dins de l'empresa) i externs (relacionats amb el client) per millorar la satisfacció del client.
L'aplicació dels quatre mètodes en la seqüència correcta constitueix una metodologia completa que es pot aplicar en qualsevol empresa de fabricació per millorar l'ús del quadre de comandament integral com a eina científica. No obstant això, els professionals poden optar per aplicar només un dels quatre mètodes o una combinació d'ells, ja que l'aplicació de cada un d'ells és independent i té els seus propis objectius i resultats. / [EN] The Balanced Scorecard (BSC) as a Performance Management Method (PMS) has been spread worldwide since Kaplan and Norton (1992) established its theoretical foundations. Kaplan (2009) claimed that the use of the BSC and especially turning strategies into actions was more an art than a science. The lack of evidence of the existence of such cause and effect relationships between Key Performance Indicators (KPIs) from different perspectives and the lack of robust methods to use it as a scientific tool were some of the causes of its problems. Kaplan placed the scientific community to confirm the foundations of the BSC theory and to develop methods for its use as a scientific tool.
Several works have attempted to enhance the use of the balanced scorecard. Some methods use heuristic tools, which deal with qualitative variables. Some others use statistical methods and actual KPIs data, but applied to a specific period, which is a static vision and needing long-term samples and expertise resources to apply advanced analytic methods each time executives need to assess the impact of strategies. This thesis also tackles the lag between "input" and "output" variables. Moreover, there is a lack of works focused on the manufacturing environment, which is its main objective.
The first objective of this work is to develop a methodology to assess and select the main output KPIs, which explains the performance of the whole company. It is taking the advantage of the relationships between variables from different dimensions described by Kaplan. This method also considers the potential lag between variables. The result is a set of main output KPIs, which summarizes the whole BSC, thus dramatically reducing its complexity.
The second objective is to develop a graphical methodology that uses that set of main output KPIs to assess the effectiveness of strategies. Currently, KPIs charts are common among practitioners, but only Breyfogle (2003) has attempted to distinguish between a significant actual change in the metrics and a change due to the uncertainty of using samples. This work further develops Breyfogle's method to tackle its limitations.
The third objective is to develop a method that, once the effectiveness of those strategies and actions have been proved graphically, quantifies their impact on the set of main output KPIs.
The ultimate goal was to develop a method that, using data analytics, will focus on the diagnosis of the quality management system to reveal how it works in terms of the relationships between internal (within the company) and external (costumer-related) KPIs to improve customer satisfaction.
The application of the four methods in the right sequence makes up a comprehensive methodology that can be applied in any manufacturing company to enhance the use of the balanced scorecard as a scientific tool. However, professionals may choose to apply only one of the four methods or a combination of them, since the application of each of them is independent and has its own objectives and results. / Sánchez Márquez, R. (2019). Development of systemic methods to improve management techniques based on Balanced Scorecard in Manufacturing Environment [Tesis doctoral]. Universitat Politècnica de València. https://doi.org/10.4995/Thesis/10251/134022 / Compendio
|
223 |
Developing integrated performance measurement systems for improving the efficiency of mixed model flow linesLabovas, Dimitris January 2010 (has links)
No description available.
|
224 |
Risk management as a strategy for promoting sound financial management at Sedibeng District Municipality / Natanya MeyerMeyer, Natanya January 2013 (has links)
Since the introduction of the Municipal Finance Management Act (MFMA) in 2003 and the Public Sector Risk Management Framework in 2010, Municipalities had to start focusing on proper risk management as part of their management activities. Within the government sector, risk management needs to be implemented in order to prevent financial losses and to improve service delivery. If shortcomings regarding risk management exist within a
municipality, it could have a negative effect on sound financial management and the outcome of annual audits. This study was conducted to test the hypothesis, namely if shortcomings regarding risk management exist within a municipality. Should this be the case, it could possible affect sound financial management and the outcome of annual audits. This was to a large extent proven within this case study and it is likely that other municipalities will have similar problems. Information was obtained from two groups of officials of the Sedibeng District Municipality by means of one-on-one interviews and hand delivered questionnaires. Group 1 consisted of 14 officials not in management positions and group 2 of 11 officials in senior management positions. The questionnaire comprised five sections of questions that aimed at determining the extent of knowledge and attitude of the respondent towards monitoring, assessment, identification and response to risk management within their specific departments. Analysis of the results indicated clearly that the overall risk management knowledge differed substantially from group 1 to group 2. The knowledge, monitoring, assessment, identification and response to risk management
activities were minimal or unclear to respondents not in management positions. Respondents in senior management positions were more aware of risk management responsibilities. However they admitted that it was not always done as required and in many cases only due to compliance. The results are strengthened by the statement released by the Auditor General in his 2011 audit report on Sedibeng District Municipality stating “the implementation of appropriate risk management activities to ensure risk assessment, were not conducted and the risk strategy to address the risks was not developed and monitored.” Various recommendations are proposed within this article that could improve the overall management and sustainability of risk management within municipalities. / M Development and Management (Public Management and Governance), North-West University, Vaal Triangle Campus, 2014
|
225 |
Avaliação de indicadores de desempenho da área de engenharia clínica: uma proposta para um hospital público universitário / Evaluation of clinical engineering performance indicators: a proposal for a university public hospitalSantos, Rafael Maia dos 09 November 2017 (has links)
O desenvolvimento tecnológico em todas as áreas está cada vez mais acelerado no mundo atual, sobretudo quando se diz respeito a equipamentos médico-hospitalares. A gestão de equipamentos médicos é um desafio a ser enfrentado pelas instituições de saúde, principalmente no setor público onde os recursos disponíveis não são suficientes. A engenharia clínica (EC) surgiu para gerenciar toda essa estrutura tecnológica visando principalmente qualidade, redução de custos, eficiência dos equipamentos e segurança para usuários e pacientes. Para uma gestão de qualidade, há necessidade de monitoramento do departamento de Engenharia Clínica por meio de indicadores de desempenho. Objetivo: Propor um conjunto de indicadores de desempenho para o Departamento de EC de um hospital público universitário. Metodologia: Foi realizada pesquisa bibliográfica dos indicadores da área de engenharia clínica mais citados e elaborado um questionário aplicado a gestores de hospitais de alta complexidade, docentes e especialistas. Os indicadores foram segregados nas perspectivas do Balanced Scorecard, uma ferramenta que propõe a escolha de indicadores balanceados entre as perspectivas processos internos, financeira, aprendizado/crescimento e cliente, e a avaliação de cada indicador foi realizada perante os atributos para um bom indicador descritos na literatura, sendo eles: pertinência, credibilidade do resultado, esforço de apuração, simplicidade de interpretação e de algoritmo de cálculo. Após a avaliação dos indicadores pelos entrevistados, foi idealizada a proposta de painel de bordo para o Departamento de EC. Resultados: A escolha dos indicadores para compor o painel de bordo para o hospital público universitário se deu pela análise das respostas dos entrevistados quanto ao grau de concordância e também pelas características da instituição. Foram propostos 14 indicadores para compor esse painel de bordo: percentual de conclusão do programa de manutenção preventiva, tempo médio de atendimento, tempo médio de paralisação de máquina, número de reparos repetidos, percentual do total de ordens de serviço concluídas, número de ordens de serviço por área, percentual de reparos realizados externamente, percentual de reparos realizados por erro do usuário, custo de manutenção versus custo de aquisição, custo total de manutenção, satisfação do funcionário, treinamento da equipe técnica, satisfação do cliente e treinamento de usuários. Conclusões: Em uma instituição de pública de grande porte e nível terciário, a escolha dos indicadores para compor um painel de bordo para a gestão do Departamento de EC, bem como a apuração dos resultados, deve ser ponderada, tendo em vista que, instituições governamentais sofrem impactos diretos quanto à disponibilidade de verba e entraves burocráticos que, muitas vezes, geram impasses difíceis de serem solucionados. Dados sobre a escolha de quais e quantos indicadores de EC devem ser utilizados não foram encontrados na literatura de forma concisa, portanto fica a critério das instituições. A sugestão é que a escolha dos indicadores deva ser estruturada pelo tipo de organização, se baixa, média ou de alta complexidade, pelo tamanho da estrutura física, pelo tamanho e complexidade do parque tecnológico, e pelos objetivos aos quais as organizações se propõem. Para o gerenciamento estratégico utilizando a ferramenta de indicadores de desempenho é importante que exista um trabalho de conscientização dos funcionários quanto ao seu Resumo papel nos resultados dos indicadores e na busca das metas estabelecidas pela organização, pois somente esse conjunto vai permitir uma gestão de sucesso. / Technological development in all areas is increasingly accelerating in today\'s world, especially when it comes to medical-hospital equipment. The management of medical equipment is a challenge to be faced by health institutions, especially in the public sector where the available resources are not enough. Clinical engineering emerged to manage all this technological structure aiming mainly at quality, cost reduction, equipment efficiency and safety for users and patients. For quality management, there is a need for monitoring the Clinical Engineering department through performance indicators. Objective: To propose a set of performance indicators for the clinical engineering department of a university public hospital. Methodology: In order to propose the set of indicators, a bibliographical research was carried out on the indicators of the clinical engineering area most frequently cited, and a questionnaire was developed for managers of high complexity hospitals, teachers and specialists. The indicators were segregated within the perspectives of the Balanced Scorecard, a tool in which it proposes the choice of balanced indicators between the perspectives internal processes, financial, learning / growth and client, and, the evaluation of each indicator was performed before those assigned to a good indicator described in the literature, being, pertinence, credibility of the result, calculation effort, simplicity of interpretation and simplicity of calculation algorithm. After evaluating the indicators by the interviewees, the board panel proposal for the EC department was idealized. Results: The choice of the indicators to compose the onboard dashboard for the public university hospital, was based on the analysis of the respondents\' answers regarding the degree of agreement and also the characteristics of the institution. In total, 14 indicators were proposed to compose the on-board dashboard, being: Percentage of completion of the preventive maintenance program, average service time, average machine downtime, number of repeated repairs, percentage of total completed service orders , number of work orders per area, percentage of repairs performed externally, percentage of repairs performed by user error, maintenance cost versus cost of acquisition, total cost of maintenance, employee satisfaction, technical team training, customer satisfaction and training. Conclusions: In a large tertiary public institution, the choice of the indicators to compose a dashboard for the management of the EC department as well as the calculation of the results should be pondered, considering that government institutions suffer impacts on the availability of funds and bureaucratic obstacles that often generate impasses that are difficult to solve. The choice of which EC indicators should be used, has not been found in the literature in a concise manner, therefore left to the discretion of the institutions. The suggestion is that the choice of indicators should be structured by type of organization, low, medium or high complexity, the size of the physical structure, the size and complexity of the technological park, and the objectives for which the organizations propose. For strategic management using the performance indicators tool, it is important that there is a job of raising awareness among employees about their role in the results of the indicators, and on the reach of the goals established by the organization, only this characteristic will allow a successful management.
|
226 |
Arquitetura de sistemas para otimização da cadeia de suprimentos hospitalar (ASOCSH). / Architectual System for the Optimization of the Hospital Supply Chain - ASOHSC.Bego, Marco Antonio 12 May 2016 (has links)
Esta dissertação de mestrado apresenta o desenvolvimento e a aplicação da Metodologia MOCSH - Metodologia para Otimização da Cadeia de Suprimentos Hospitalar. Esta metodologia é dividida em três etapas de implantação, e o seu objetivo principal é orientar o projeto da Arquitetura de Sistemas para Otimização da Cadeia de Suprimentos Hospitalar - ASOCSH, que permite a otimização dos processos de gestão da cadeia de suprimentos. Os resultados da aplicação da metodologia MOCSH e da implementação da arquitetura ASOCSH, são também mostrados e analisados nesta dissertação. Os estudos detalhados das cadeias de suprimentos e das cadeias de suprimentos hospitalar, também são expostos neste trabalho. / This Master\'s dissertation presents the development and application of the methodology MOHSC - Methodology to optimize the hospital supply chain. This methodology is divided in three stages of implementation and its main objective is to guide the design of the architecture system for the optimization of hospital supply chain - ASOHSC, which allows optimization of the management processes of the supply chain. The results of applying the MOHSC methodology and the implementation of the ASOHSC architecture are also shown and analyzed in this dissertation. Detailed studies of supply chains and hospital supply chains, are also presented in this dissertation.
|
227 |
Sistemas de gestão ambiental na indústria química: desempenho, avaliação e benefícios / Environmental management systems in the chemical industry: performance, assessment and benefitsAguiar, Alexandre de Oliveira e 30 August 2004 (has links)
Objetivo. Este trabalho tem como objetivo geral avaliar benefícios da implantação de sistemas de gestão ambiental ISO 14001 e Atuação Responsável®, em amostras de empresas do setor químico no Brasil, até o ano de 2002. A pesquisa buscou avaliar tanto resultados de sustentabilidade com base em indicadores, quanto práticas gerenciais das empresas, em especial práticas relacionadas a gerenciamento de produtos, conscientização de funcionários, exigências a fornecedores, entre outras. Métodos. Dados secundários fornecidos pela ABIQUIM e dados obtidos de fontes bibliográficas foram usados para análise estatística do desempenho ambiental de empresas signatárias do Atuação Responsável no ano de 2002, utilizando testes não-paramétricos. O principal indicador utilizado foi a eco-eficiência econômica. Dados primários foram obtidos por meio de entrevistas com representantes de indústrias químicas no estado de São Paulo, e por consulta por meio de correio eletrônico. Foram utilizados métodos quantitativos para análise de dados qualitativos para estudo das respostas às questões das entrevistas. Resultados. Quando comparado o desempenho ambiental de empresas com e sem ISO 14001, dentre aquelas que subscrevem o Atuação Responsável®, a geração de resíduos perigosos resultou cerca de 55 por cento menor no grupo com ISO 14001, e o consumo de gás natural cerca de 50 vezes menor nesse mesmo grupo. Quando comparado o desempenho ambiental de empresas que subscrevem o programa Atuação Responsável®, classificadas por grupos de produtos, foram identificadas poucas diferenças estatisticamente significantes. Não foi possível incluir na comparação a eco-eficiência de empresas não signatárias do programa Atuação Responsável®, com ou sem ISO 14001, por insuficiência de dados, bem como dados estatísticos para 1999. As entrevistas mostraram que entre os principais benefícios obtidos pela implantação dos sistemas de gestão, quando as práticas são comparadas empresas com e sem sistemas de gestão, estão a maior freqüência e variedade de atividades de conscientização ambiental para funcionários, e maiores exigências feitas a certos tipos de fornecedores, entre outras. Conclusões. Em poucos casos foi possível identificar diferenças de desempenho ambiental. As informações para estudos comparativos de eco-eficiência são pouco disponíveis, e o uso de indicadores de eco-eficiência ainda é restrito na maioria das indústrias químicas, mesmo em empresas com sistema de gestão ambiental consolidado. Os compromissos das empresas de comunicação com partes interessadas nem sempre são mantidos. Poucas diferenças de resultados de eco-eficiência puderam ser comprovadas, para implementação de ISO 14001 nas empresas que são signatárias do Atuação Responsável® / Objective. This work has as general objective toe evaluate the benefits from the implementation of ISO 14001 Environmental Management Systems and from Responsible Care in Brazilian chemical industry sector samples, till the year 2002. The research aimed at evaluating both indicator-based sustainability results and somo of their management practices, related to product stewardship, workers awareness, requirements for suppliers, and others. Methods. Secondary data provided by ABIQUIM and data from bibligraphic fonts have been used to perform the statistical analysis of Responsible Care® subscribers environmental performance, in year 2002. The main used indicator has been economic eco-efficiency. Primary data have been got by means of interviews with chemical industries representatives, in the state of são Paulo, and by means of e-mail. Quantitative methods for the analysis of qualitative data have been used to study the answers to the interviews\' questions. Results. When comparing ISO 14001 certified and non-certified companies, among those that subscribe Responsible Care®, hazardous waste generation was about 55 per cent lower in the ISO 14001 group, and the natural gas consumption about 50 times lower in this same group. Statistically significant differences have been identified in the performance related to waste management generation, around 55 per cent lower in the group of ISO 14001 certified industries, and in the natural gas consumption, 50 times lower in the same group. When comparing the Responsible Care® subscribers environmental performance, classified by product group, only a few indicators resulted statistically different. It was not possible to include non-Responsible Care® subscribers in the comparison, and also those related to the statistical information for the year 1999, because data was not enough. The interviews showed that, when the practices by the companies that operate environmental management systems are compared with companies without these systems, among the main benefits it has been found an improved amount and variety of awareness activities for employees, and more requirements for certain suppliers. Conclusions. The information for comparative studies of eco-efficiency is still not much available, and the use of eco-efficiency indicators is weak in the most chemical industries, even in those that have consolidated environmental management systems. The compromises the companies have related to the communication with stakeholders are not always maintained. Only a few differences in eco-efficiency results have been confirmed, from the implementation of ISO 14001 in Responsible Care® subscribers companies
|
228 |
Critérios e condições dos planos de participação nos lucros ou nos resultados e sua inserção no controle de gestão: estudo de casos em indústrias do interior paulista / Profit and gain sharing plans criteria and conditions and their insertion on managerial control: cases studies in industries located in São Paulo stateMoreira, Vanessa Berlato 05 November 2007 (has links)
O objetivo geral deste trabalho foi de examinar os critérios e condições do plano de participação nos lucros e nos resultados (PPLR) adotado nas indústrias visando ao seu conhecimento para posterior investigação da sua inserção no controle gerencial. A realização deste trabalho deu-se por meio do estudo de casos em quatro indústrias. Para alcançar o objetivo geral foi necessário identificar nas empresas: aspectos que caracterizam os planos de recompensa objetivando o conhecimento dos critérios e condições definidos para o funcionamento do plano, com o intuito subliminar de estudar-se a percepção que as partes (superiores e subordinados) têm do plano. Dentre os casos estudados, dois apresentaram o PPLR inserido no controle de gestão, os demais apresentaram uma inserção parcial. Foram identificados também os fatores relevantes à continuidade da empresa, verificando se há relação entre indicadores do plano de recompensa e esses fatores. De forma geral, o estudo dos casos sugeriu que as empresas estudadas confiam na capacidade motivacional de uma gratificação financeira adicional, além do salário e 13º salário, pois a praticam. Entretanto, a formulação de um plano de recompensa financeira baseada no desempenho parece não ter sido uma prática totalmente espontânea nas empresas. Sua implantação decorre parcialmente de pressões sociais e da regulamentação do PPLR, que se constituíram em aspectos catalisadores. Observou-se, ainda, ao analisar como o plano adotado nas empresas estudadas poderia estar inserido no controle de gestão, que as empresas têm consciência de que os indicadores de desempenho do plano devem estar associados a informações relevantes para a empresa. No entanto, percebeu-se que a forma como as empresas fazem tal associação é problemática, refletindo em planos parcialmente inseridos no controle de gestão das empresas. A percepção dos empregados também foi verificada ao analisar-se a inserção do PPLR no controle de gestão das empresas. Em algumas delas foram identificados grupos de pessoas indiferentes ao plano, que percebiam que seus esforços não eram nele avaliados, sequer reconhecidos. Tais observações minimizam o potencial de congruência de objetivos do PPLR e, portanto, enfraquece sua inserção no controle de gestão. A ausência de identificação dos empregados com o plano pode ser resultado da dificuldade no estabelecimento de indicadores para cada uma das áreas. As justificativas da inserção parcial do PPLR no controle de gestão das empresas apontadas encontram-se atreladas aos casos estudados não sendo possível sua generalização. / The main goal of this research was to analyze the Brazilian industries profit and gain sharing plan, called PPLR, criteria and conditions, considering that are many motivations for its adoption. This knowledge acquisition will be used further to investigate the PPLR insertion on managerial control. This research was carried out through case studies in four industries located in Sao Paulo state. For the purpose of the research general objective, it was necessary identify in the companies: aspects that could characterize the reward plan objecting the knowledge of the criteria and condition for the functioning of the plan, with the intention subliminal of studying the perception that the parts (superiors and subordinated) have of the plan and the company critical success factors, verifying if there is relation between indicators of the reward plan and this factors. Two cases presented a managerial control inserted PPLR, and the other two presented a partial managerial control inserted PPLR. The industries critical success factors were also identified to confirm the relationship between the PPLR`s indicators and them. In general, the study of the cases suggested that the studied companies trust in the motivational capacity of a additional financial gratuity, besides the salary and Christmas bonus, because they practice it. But the formulation of a financial reward plan based in the performance seems not be a spontaneous practice related of the companies. Its implementation is probably a consequence of the social and legal pressure, which could be an aspect catalyser in their adoption. Besides this, when analyzing how the plan adopted by the studied companies could be inserted in the management control, it was possible observe that the companies have conscience that the performance indicators of the plan should be associated to the critical success factors for the company, therefore, it was possible notice that the way in which the companies do this association is problematic, reflecting in plans inserted partially in the managerial control systems of the company. The employees PPLR\'s perception was also analyzed to grasp the PPLR managerial control insertion. Analyzing the PPLR perception was detected the existence of group of people, in the studied companies, that are indifferent to the plan because these groups perceive that their efforts were not valued by the plan adopted in the companies. Such perceptions minimize the goal congruence potential of the plan adopted, and minimize its insertion on the managerial control. The lack of employees PPLR appreciation may be a consequence of the difficult in establishing indicators for all of their areas. The reasons for the PPLR partial aid to the control that outcome from this study are associated with the companies studied and can not be generalized.
|
229 |
Análise dos indicadores de desempenho fabril no setor de usinagem pesada em indústria de produção sob encomendaGuadagnim, João Luís 17 October 2008 (has links)
A indústria brasileira produtora de bens de capital para o setor sucroalcooleiro, teve no início do século XXI grandes taxas de crescimento devido ao aumento do consumo do álcool combustível. Na onda deste crescimento, aumentou também o interesse das empresas em ingressar neste mercado. Para obter êxito, qualquer empresa deve conhecer muito bem os seus recursos de fabricação e gerenciá-los da melhor forma. Uma boa maneira de se conhecer o sistema produtivo de uma empresa é utilizando os indicadores de desempenho fabril. De posse destes indicadores é possível avaliar a eficiência, o índice de ciclo e os tempos de fila do setor. Assim, o objetivo deste trabalho é avaliar os indicadores de desempenho do setor mostrando o impacto que os tempos improdutivos podem causar no resultado final do exercício, usando como objeto de pesquisa o castelo de moenda, principal peça do conjunto do terno de moenda. Para o conhecimento dos indicadores foram acompanhadas 12 peças entre os meses de fevereiro e maio de 2008 e os resultados anotados. Com base nos resultados das 12 amostras a eficiência do setor ficou em 102%, o índice de ciclo em 19,8% e o tempo médio de fila entre as operações foi de 6,4 dias. Por meio da avaliação dos dados, conclui-se que o maior problema do setor é o gargalo formado antes das operações nas mandriladoras, estes gargalos influenciam diretamente no resultado do setor. O conhecimento destes valores pode orientar a empresa na busca por melhores resultados e direcionar esforços de maneira correta. / The brazilian industry that produces capital possessions for the sugar and alcohol sector, had, in the beginning of the XXI century, a very high growth due to increasing of the fuel alcohol consumption. With this growth, there also was an increasing in the interests of the companies about entering this market. To be successful, any company should know very well its fabrication resources and manage them as well as possible. A good way to know the production system of a company is to use the indicators for the factory performance. Though these indicators is possible to evaluate the efficiency the cycle indexes and the row times of the sector. Another way to manage the production is through the analysis of the DRE (is the chart that contains the results of the exercise) that is totally connected with the performance indicators. Therefore, the purpose of this work is to evaluate the efficiency of the production, the index of the products cycles and the times of the rows at the sector showing the impact that the non productable times can cause in the final results of the exercise. For the evaluation of the indicators twelve housings were analyzed (main part of the milling tandem) between the months of February and May of 2008 and based in the results of the twelve pieces, the efficiency was 102%, value considered high for the sector, the cycle index was 19,8%, and the mean row times between the operations was 6,4 days. The study of the times and movements at the housings showed that during all the transformation process, the main obstade for the production flow was the milling machine. The evaluation of the efficiency and IC of the sector pointed out that the problem generated by the critical point of the production can damage too much the demonstrative of the results of the exercises (DRE) of the sector.
|
230 |
Framework para desenvolver um sistema de medição de desempenho para PLM (Product Lifecycle Management) com indicadores de sustentabilidade / Framework to develop a performance measurement system for the Product Lifecycle Management with performance sustainabilityNappi, Vanessa 08 May 2014 (has links)
De modo geral, há pouca informação disponível aos gestores para orientá-los tanto sobre o desenvolvimento de um Sistema de Medição de Desempenho (SMD) quanto à adequabilidade do SMD atual. Já Product Lifecycle Management (PLM) é uma abordagem para a gestão integrada das informações e dos processos de negócio para todas as fases da vida de um produto. A fim de compreender todas as fases da vida de um produto e, de forma consistente, considerar a abordagem PLM, as empresas estão tentando incorporar indicadores de desempenho de sustentabilidade em seus SMDs. O presente trabalho possui por objetivo propor um framework para o desenvolvimento de um SMD para a abordagem PLM com ênfase na sua aplicação prática, compreendendo as seguintes características: um procedimento com a descrição dos seus passos; um conjunto de ferramentas como formulários para apoiar o procedimento; uma lista de indicadores de desempenho de prática seleção dos indicadores na aplicação do framework, relacionados com PLM e sustentabilidade. Esta pesquisa adota a metodologia de pesquisa em design, como a abordagem mais ampla, na qual a proposta do framework é sintetizada da literatura e posteriormente aplicada e aperfeiçoada à medida que se conduzia uma pesquisa-ação. As principais contribuições consistem em possibilitar o diagnóstico do SMD atual da empresa assim como o seu nível de maturidade e selecionar indicadores com base em uma lista previamente sistematiza, para facilitar essa escolha. Finalmente, mostra-se que é possível incorporar indicadores de desempenho de sustentabilidade nos SMDs atuais da empresa para abordagem PLM, desde que existam stakeholders interessados em estabelecer objetivos estratégicos para a sustentabilidade. / Usually there is little information available to managers to guide them on either the development of a Performance Measurement System (PMS) or the uptade of the current PMS. Product Lifecycle Management (PLM) is an integrated approach to information management and business processes for all stages of life of a product. Further, in order to fully address all phases of a products life and consistently support consider the PLM; companies are trying to incorporate sustainability performance indicators into their PMS. Thus, this work aims at proposing a framework to develop a PMS for the PLM approach with an emphasis on practical application, comprising the following characteristics: a procedure containing steps and a set of tools such as forms to support them; a list of performance indicators PLM and sustainability to enable the selection of indicators. This research adopts the design research methodology, as the broader approach, in which the proposed framework is synthesized from literature and then applied and improved during an action research. The highlights of the framework are the diagnosis of the current SMD company as well as their level of maturity of the PMS and the selection of performance indicators through a list. Finally, this work indicates that is possible to incorporate sustainability performance indicators into the PMS for the PLM approach as long as there stakeholder interested in establishing strategic objectives for sustainability.
|
Page generated in 0.0539 seconds