Business consulting de Tejas y Chocotejas Sra. Buendía S.A.C.Cavero Garibay, José Luis, Ore Salazar, Nelson Camilo, Parvina Fernández, Elmer Simeón, Prada Villagaray, Juan Alexander 20 July 2021 (has links)
Tejas y Chocotejas Buendía S.A.C., es una empresa fundada en el departamento de
Ica, por la señora Blanca Medina de Buendía, en 1966. La empresa inició sus operaciones
cerca al santuario del Señor de Luren. Al transcurrir el tiempo y con el crecimiento
geográfico y demográfico se aperturaron otras tiendas en Ica, Chincha, Pisco, Nazca y Lima.
Esta empresa iqueña se dedica a la producción y comercialización de tejas y chocotejas, cuya
propuesta de valor es ofrecer productos 100% natural y artesanal, sin uso de preservantes.
El objetivo de la consultoría es identificar un problema que no le permite a la empresa
incrementar sus ventas y expandir su mercado. En ese sentido, a partir del análisis cualitativo
y cuantitativo con herramientas de mejora de procesos, se identificó que, el problema
principal es la: Deficiente gestión estratégica y marketing que limita el crecimiento de las
ventas y expansión de la red de tiendas, en torno al no logro de la meta anual de 95% de sus
ventas presupuestadas. No obstante, se realizaron reuniones de trabajo en modalidad virtual
con la gerencia general, gerencia de producción y la gerencia de comercialización,
identificándose que, el problema principal está relacionado a tres (3) causas primarias: (1)
Falta de plan estratégico y plan de marketing, (2) Falta de inspección continua en el flujo de
producción, y la (3) Falta de máquinas de mayor capacidad de producción. En este contexto,
se revisó literatura y buenas prácticas del entorno para hacer frente al problema que, permitió
proponer cuatro (4) alternativas de mejora que, concluyó en la propuesta de los siguientes
entregables: (1) Plan estratégico y Plan de Marketing, (2) Tablero de Mando Integral, (3)
Manual de Procesos y Procedimientos, y (4) Software de Gestión integral de costos.
Finalmente, se realizó la evaluación económica y financiera del proyecto,
demostrándose la viabilidad del proyecto en los dos (2) escenarios: Optimista y Pesimista. En
el escenario optimista, el VAN fue de S/. 64, 686.93, y la TIR de 90.86%, y el PAYBACK menor a un año. Por su parte, en el escenario pesimista, el VAN fue de S/. 29,244.73, la TIR
de 32.78%, y el PAYBACK es menor a un año. / Tejas y Chocotejas Buendía S.A.C. is a company founded in 1966 by Mrs. Blanca
Medina de Buendía, in the department of Ica. The company began its operations near the
sanctuary of the Lord of Luren. As time passed and with the geographical and demographic
growth, other stores were opened in Ica, Chincha, Pisco, Nazca and Lima. This Ica company
is dedicated to the production and commercialization of tiles and chocotejas, whose value
proposition is to offer 100% natural and handmade products, without the use of preservatives.
The objective of the consultancy is to identify a problem that does not allow the
company to increase its sales and expand its market. In this sense, from the qualitative and
quantitative analysis with process improvement tools, it was identified that the main problem
is: Poor estrategia and marketing management that limits the growth of sales and expansion
of the store network, around not achieving the annual goal of 95% of its budgeted sales.
However, working meetings were held in virtual mode with the general management,
production management and marketing management, identifying that the main problem is
related to three (3) primary causes: (1) Lack of strategic and marketing plan, (2) Lack of
continuous inspection in the production flow, and (3) Lack of machines with higher
production capacity. In this context, literature and good practices of the environment were
reviewed to face the problem that allowed to propose four (4) alternatives for improvement
that, concluded in the proposal of the following deliverables: (1) Strategic Plan and
Marketing Plan, (2) Comprehensive Dashboard, (3) Processes and Procedures Manual, and
(4) Comprehensive Cost Management Software. Finally, the economic and financial
evaluation of the project was carried out, demonstrating the viability of the project in the two
(2) scenarios: Optimistic and Pessimistic. In the optimistic scenario, the NPV was
S/.64, 686.93, the IRR of 38.59% and the PAYBACK less than one year. On the other hand, in the pessimistic scenario, the NPV was S/.29,244.73, the IRR was 32.78% and the
PAYBACK was less than one year.
|
142 |
Business consulting de la empresa Transportes 77 S.A.Roca Vera, Eva Karina, Huertas Pomalaya, Donnie Luis Miguel, Soto Valencia, Clifor Anibal 29 November 2023 (has links)
Transportes 77 S.A. es una empresa de transportes de carga pesada del grupo Ab-Inbev,
único responsable de la distribución de los productos de Backus y Johnston en el Perú. Así,
Transportes 77 mantiene una participación de mercado del 98,6% del mercado de transporte
de bebidas de cerveza envasadas. Transportes 77 forma parte de un sector económico
bastante complejo debido a ciertos factores que impactan directamente en los resultados,
como, por ejemplo: deficiente infraestructura vial, volatilidad del precio de los combustibles
y otros costos asociados, competencia informal, manifestaciones sociales y sindicalización.
Todos estos factores presionan a la baja los márgenes de utilidad en el sector.
En este contexto, esta investigación identificó como problema clave en la empresa la falta de
diversidad en las líneas de negocio, y luego de evaluar diversas alternativas, se propone una
nueva línea de negocio, disruptiva, altamente beneficiosa y de implementación factible en el
corto plazo, la cual utilizaría los activos existentes de Transportes 77, como son sus
camiones, para ofrecer servicios de paneles publicitarios en sus semirremolques,
aprovechando la ventaja competitiva que tiene la compañía que es recorrer todo el Perú.
Para la puesta en marcha del proyecto se estima que se requiere una inversión de S/ 409 mil,
los mismos que están distribuidos en: S/ 158 mil en activos y S/ 251 mil en capital de trabajo.
Esta inversión será financiada con una estructura de 100% de capital propio.
El VAN económico resultante es de S/ 7,2 millones descontado con un costo promedio
ponderado del capital (WACC, por sus siglas en inglés) del 17.15% y la TIR económica es de
173.7%, por lo cual el proyecto es ampliamente rentable, mantiene un bajo nivel de riesgo y
la inversión se recupera en el segundo año de operación. / Transportes 77 S.A. is a heavy load transport company of the Ab-Inbev group, solely
responsible for the distribution of Backus and Johnston products in Peru. Transportes 77
maintains a market share of 98.6% of the packaged beer beverage transport market.
Transportes 77 is part of a fairly complex economic sector due to certain factors that directly
impact results, such as: deficient road infrastructure, fuel price volatility and other associated
costs, informal competition, social demonstrations, and unionization. All these factors put
downward pressure on profit margins in the sector.
In this context, this research identified the lack of diversity in the business lines as a key
problem. After evaluating various alternatives, this thesis proposes a new disruptive business
line that uses the existing assets of Transportes 77, such as its trucks, to offer advertising
panel services in its semi-trailers, taking advantage of the competitive advantage that the
company has, which is to travel throughout Peru.
For the implementation of the project, it is estimated that an investment of S/ 409 thousand is
required, which are distributed in: S/ 158 thousand in assets and S/ 251 thousand in working
capital. This investment will be financed with a structure of 100% own capital.
The resulting economic NPV is S/ 7.2 million discounted with a WACC of 17.15% and the
economic IRR is 173.7%, for which the project is widely profitable, maintains a low level of risk
and the investment is recovered in the future. second year of operation.
|
143 |
Business consulting para Nexa ResourcesAzabache Tufenio, Bárbara Luz, Peláez Ruiz, Juan Iván, Osorio Mayta, José Luis 28 February 2024 (has links)
La consultoría de negocios se realizó en la empresa Nexa Resources ubicada en la
ciudad de Lima, departamento de Lima. La cual produce zinc y cobre; cuenta con una
capacidad de producción de 120 000 toneladas anuales de mineral. Esta consultoría se enfoca
en conocer al detalle los procesos operativos del negocio, con el fin de encontrar
oportunidades de mejora en los mismos. Para este fin, se realizaron reuniones con los
representantes del negocio, especialmente con los usuarios de producción y mantenimiento
para recabar sus principales puntos de dolor. Con la finalidad de conocer los factores externos
que afectan al negocio, se procedió a realizar los análisis de Porter y Peste, a continuación, se
hizo un análisis interno de negocio con la técnica AMOFHIT, para finalmente derivar en el
FODA del negocio. Luego de estos análisis, se procedió a determinar el problema principal
del negocio, el cual es la pérdida de ventas debido a que uno de los productos se encuentra
fuera de especificación de calidad.
Con el problema identificado vía el diagrama de Ishikawa se identificaron las causas
del problema para luego plantear ideas de solución para atender el problema. Se planteó
mejorar la tecnología la línea de producción para tener visibilidad en línea de las variables
que afectan a la calidad del producto y así evitar reprocesos por rangos fuera de
especificación, debido a que son estos reprocesos los que generan pérdida de valor comercial
del producto y por lo tanto perdida de ventas. Para solucionar este problema se planteó la
implementación de una solución de IoT (Internet de las Cosas) con un tiempo de
implementación de siete meses y una inversión de 384 mil dólares. La inversión se recupera
en un período de 11 meses además de obtener un Valor Presente Neto superior a 1.3 millones
de dólares americanos, con un retorno de la inversión (ROI) de 412% lo cual hace viable la
implementación. / The business consulting was carried out in the company Nexa Resources located in
the city of Lima, department of Lima. Which produces zinc and copper; in addition to having
a production capacity of 120,000 tons of mineral per year. This consultancy focuses on
knowing in detail the operational processes of the business, in order to find opportunities for
improvement in them. For this purpose, meetings were held with business representatives,
especially with production and maintenance users to gather their main pain points. In order to
know the external factors that affect the business, the Porter and Peste analyzes were carried
out, followed by an internal business analysis with the AMOFHIT technique to finally derive
the SWOT of the business. After these analyzes we proceeded to determine the main problem
of the business, which is the loss of sales due to one products being out of quality
specification.
With this problem identified via the Ishikawa diagram, the causes of the problem were
identified and then ideas for solutions were proposed to address the problem. It was proposed
to improve the technology of the production line to have online visibility of the variables that
affect the quality of the product and thus avoid reprocessing due to out-of-specification
ranges, because it is these reprocesses that generate loss of commercial value of the product
and therefore loss of sales. For this purpose, the implementation of an IoT (Internet of
Things) solution was proposed, with an implementation time of 7 months and an investment
of 384 thousand dollars. The investment is recovered in a period of 11 months in addition to
obtaining a Net Present Value greater than 1.3 million US dollars, with a return on
investment (ROI) of 412% which makes the implementation viable.
|
144 |
Business consulting para la implementación de las metas de sostenibilidad 4.7 Y 8.7 en el proceso de homologación de proveedores de la empresa CáliddaEnriquez Meza, Jorge Guillermo, Garro Medina, Jorge Daniel, Puerta Guevara, Rholy, Vega Lujan, Santos Cleber 31 August 2022 (has links)
Cálidda - Gas Natural de Lima y Callao S.A. es una empresa peruana que tiene la concesión
del Estado por un plazo de 33 años prorrogables para diseñar, construir y operar el sistema de
distribución de gas natural en el departamento de Lima y la Provincia Constitucional del
Callao. El objetivo de esta Tesis es identificar una propuesta de solución para implementar
los criterios de las metas 4.7 y 8.7 en el proceso de homologación de proveedores de Cálidda.
Para determinar la propuesta de solución, se utilizó la metodología planteada en la tesis
doctoral de Fernández (2016). Posteriormente, se realizó el análisis cualitativo para
determinar los criterios de evaluación relevantes y poder priorizarlos. Asimismo, se realizó el
análisis cuantitativo para identificar las calificaciones de los proveedores, y así determinar si
eran homologados o no.
De acuerdo con los hallazgos, se determinó implementar el programa de homologación con
los criterios de evaluación para el cumplimiento de las metas 4.7 y 8.7. Así mismo, se
propone un plan de desarrollo basado en itinerarios para mejorar las capacidades en
sostenibilidad y en derechos fundamentales.
Posteriormente, se diseñó un plan de implementación para ejecutar las actividades por medio
de las cuales se masificará el uso del proceso de homologación de proveedores en las metas
4.7 y 8.7. Se diseñó un Gantt con 15 semanas de duración, y un presupuesto de 2500 soles y
392 horas hombre trabajadas. Finalmente, se identificó que la propuesta de solución tendrá un
impacto en 2,044 personas, lo que genera un incremento del SROI en 5 %, que es equivalente
a $ 2,058 por cada dólar invertido en sostenibilidad, debido a que se logrará incrementar los
beneficiarios sin incrementar el presupuesto de forma relevante. / Cálidda - Gas Natural de Lima y Callao S.A. is a Peruvian company that has a concession
from the State for a period of 33 years that can be extended to design, build and operate the
natural gas distribution system in the department of Lima and the Constitutional Province of
Callao. The objective of this consultancy is to identify a solution proposal to implement the
criteria of goals 4.7 and 8.7 in the certification process of Cálidda's suppliers. To determine
the proposed solution, the qualitative analysis was carried out to determine the relevant
evaluation criteria and to prioritize them. Likewise, a quantitative analysis was carried out to
identify the qualifications of the suppliers and thus determine whether they were approved or
not.
According to the findings, it was determined to implement the homologation program with
the evaluation criteria for the fulfillment of goals 4.7 and goal 8.7. A development plan is
also proposed based on itineraries to improve capacities in sustainability and fundamental
rights.
Subsequently, an implementation plan was designed to execute the activities through which
the use of the supplier approval process in goals 4.7 and goals 8.7 will become widespread, a
Gantt was designed with 15 weeks duration and a budget of 2,500 soles and 392 man hours
worked. Finally, it was identified that the solution proposal will have an impact on 2,044
people, generating an increase in the SROI of 5%, which is equivalent to $2,058 for every
dollar invested in sustainability, since it will be possible to increase the number of
beneficiaries without significantly increasing the budget.
|
145 |
Business consulting para C&R Integral Service S.A.C.Bruno Sernaque, Carlos Alberto, Flores Medina, Jhosue William, Madrid Clavijo, Stefany Del Pilar, Melgarejo Avila, Jefferson Franklin, Tapia Marca, Josseline Prisila 14 June 2023 (has links)
C&R es una empresa que brinda servicios de ingeniería en telecomunicaciones con
más de 16 años de experiencia en el mercado peruano, su mayor porcentaje de ventas está
vinculado al sector minero, los proyectos que ejecuta están ubicados en su mayoría en el sur
del país, en los departamentos de Moquegua y Tacna; en el año 2021 logró un hito en ventas
duplicando el nivel obtenido el año anterior y en el año 2022 ingresó al norte del país
abriendo una sede en Trujillo.
Aplicando la priorización y mediante entrevistas a la alta dirección se pudo identificar
qué el problema principal de C&R es la ausencia de toma de decisiones con base en
indicadores de gestión que se relacionen con la estrategia, luego de un análisis se
establecieron alternativas de solución para mitigar el impacto negativo del problema
principal. La propuesta final se centra en el Modelo de Infraestructura de Gestión que agrupa
la estrategia y objetivos de C&R en un modelo global de indicadores multinivel para
implementarlos en todas las áreas y asegurar la sostenibilidad del proceso.
Se concluye la consultoría con una reunión con la Gerencia para explicar la
importancia de la implementación de un Modelo de Infraestructura de Gestión que abarcó
cuatro alternativas que fueron priorizadas durante el análisis que se realizó en conjunto con la
gerencia de C&R, el cual tiene como monto de inversión un total de S/54 000, y se le brinda
dos escenarios: a) un escenario conservador el cual tendría un ahorro proyectado por un valor
actual neto (VAN) de S/405,001 y b) un escenario optimista el cual tendría un ahorro
proyectado por un valor actual neto (VAN) de S/1,206,806; en ambos casos con una tasa de
descuento del 9%. La tasa interna de retorno (TIR) superó en ambos escenarios el WACC con
173% y 501% respectivamente. / C&R is a company that provides telecommunications engineering services with more
than 16 years of experience in the Peruvian market, its highest percentage of sales is linked to
the mining sector, the projects it executes are located mostly in the south of the country, in
the departments of Moquegua and Tacna; in 2021 it achieved a milestone in sales, doubling
the level obtained the previous year and in 2022 it entered the north of the country by
opening an-office in Trujillo.
Applying prioritization and through interviews with senior management, it was
possible to identify that the main problem of C&R is the absence of decision-making based
on management indicators that are related to the strategy, after an analysis, alternative
solutions were established to mitigate the negative impact of the main problem. The final
proposal focuses on the Management Infrastructure Model that groups the C&R strategy and
objectives into a global model of multilevel indicators to implement them in all areas and
ensure the sustainability of the process.
The consultancy is concluded with a meeting with the Management to explain the
importance of the implementation of a Management Infrastructure Model that included four
alternatives that were prioritized during the analysis that was carried out in conjunction with
the C&R management, which has as an amount of investment a total of S/54,000, and two
scenarios are provided: a) a conservative scenario which would have projected savings for a
net present value (NPV) of S/405,001 and b) an optimistic scenario which would have
savings projected for a net present value (VAN) of S/1,206,806; in both cases with a discount
rate of 9%. The internal rate of return (IRR) exceeded the WACC in both scenarios with
173% and 501% respectively.
|
146 |
Business consulting para la empresa Azzorti en PerúAvalos Marengo, Jackeline Yessenia, Ponce Uriol, Enerik Milagritos, Vera Castañeda, Beatriz Rocío, Villanueva Mercado, Jennifer Marisol 10 September 2022 (has links)
Si bien tener un clima laboral satisfactorio es un factor que ha venido ganando relevancia en
el ámbito empresarial dado los diferentes aspectos de mejora que genera (e.g., productividad,
motivación, compromiso, entre otros), solo en algunas empresas se decide implementar
programas que permitan tener o mejorar este activo tan clave. Revisando la literatura
académica, se comprobó que existe cierta renuencia por parte de la alta dirección de las
empresas en invertir recursos económicos en algunos programas de recursos humanos, puesto
que no existiría evidencia suficiente que indique que los beneficios sean mayores al capital
desembolsado; no obstante, se comprobó que sí existen casos de éxito aplicando estos
programas. La presente consultoría de negocios busca identificar el problema central que
afronta una empresa de venta directa en el Perú llamada Azzorti, la cual tiene importante
presencia en cinco países de Latinoamérica. Para ello, se identificaron seis causas principales,
definiendo e implementando una alternativa de solución para cada una de ellas. Como
resultado, se determinó que el problema central es el clima laboral insatisfactorio que se
percibe en las áreas operativas de la Gerencia de Logística, situación diferente a lo que ocurre
en las administrativas y de ventas. En ese sentido, se espera que la definición,
implementación y ejecución de las seis propuestas de solución permitan mejorar el clima
laboral significativamente en Azzorti, siendo estas los desarrollos de: (a) un programa de
transformación que forme líderes orientados a las personas, (b) canales de comunicación
interna, (c) un programa de retroalimentación efectiva, (d) dos programas de incentivos
(productividad y salud), (e) un programa de aprendizaje y desarrollo y (f) un programa de
reconocimiento. Finalmente, teniendo un clima laboral satisfactorio, como consecuencia, los
resultados operacionales del negocio deberían mejorar. / Although maintaining a satisfactory work climate is a factor that has been gaining relevance
in the business environment because the different aspects of improvement that it generates
(e.g., productivity, motivation, commitment, among others), only in some companies it is
decided to implement programs that allow have or improve this key asset. At academic
literature, it was found that there is a certain reluctance on companies to invest economic
resources in some human resources programs, since there would not be sufficient evidence to
indicate that the benefits are greater than the investment; however, it was found that there are
cases of success applying these programs. This business consultancy seeks to identify the
central problem faced by a direct sales company in Peru called Azzorti, which has a known
presence in five Latin American countries. For this, six main causes were identified, defining,
and implementing an alternative solution for each of them. As a result, it was determined that
the central problem is the unsatisfactory work climate that is perceived at the operational
areas of the Logistics Management, a situation different from what happens at the
administrative and sales areas. In this sense, it is expected that the definition, implementation,
and execution of the six solution proposals will improve the work climate significantly in
Azzorti. The proposals are the developments of: (a) a transformation program that trains
people-oriented leaders, (b) an internal communication channel, (c) an effective feedback
program, (d) two incentive programs (productivity and health), (e) a learning and
development program, and (f) a recognition program. Finally, having a satisfactory work
climate, therefore, the operational results of the business should improve.
|
147 |
Business consulting – Ibe Contratistas Generales S.A.C.Cruzado Cajan, Hector Giancarlo 02 May 2022 (has links)
Ibe Contratistas Generales S.A.C. es una organización de capital peruano que se
ha enfocado en el sector inmobiliario y construcción, y cuenta con más de 13 años de
amplia experiencia en el rubro por todos los servicios que ofrece. El objetivo de la
presente consultoría fue de identificar el problema clave que no le está permitiendo a
Ibe Contratistas Generales alcanzar los márgenes de rentabilidad esperados, y cumplir
con lo estipulado en los contratos ganados correspondientes a las licitaciones
participadas. Por ello, se han analizado las principales causas que generan el problema
identificado, en base al estudio interno realizado y a las entrevistas y reuniones con el
equipo estratégico de Ibe Contratistas Generales S.A.C. Por otro lado, se encontró que
la causa raíz del problema está relacionada al crecimiento del presupuesto designado al
levantamiento de observaciones en obra, esto como producto de una insuficiente
revisión e interpretación de expedientes y planos, así como también, al insuficiente
personal para el seguimiento y control de calidad y la falta de comunicación entre las
áreas.
En la presente consultoría se proponen iniciativas para reforzar la gestión de la
construcción, a través de la implementación del software Fieldwire, y con ello la
posibilidad de visualizar en tiempo real de todas las observaciones producidas, el
seguimiento y control de las tareas asignadas para el levantamiento de observaciones. El
costo total de la implementación del software es de S/ 102,658.08 y se espera lograr
ahorros hasta en 18% correspondientes al presupuesto de Calidad, es decir, S/59,760,70.
Con respecto al ahorro en observaciones no planificadas, se espera ahorrar hasta en un
S/ 671,562.24, es decir, 3% de reducción en un escenario optimista. Lo anteriormente
mencionado conllevará a que la empresa alcance sus objetivos de rentabilidad y logre la
sostenibilidad deseada en el tiempo. / Ibe General Contractors S.A.C. is a Peruvian capital organization that has
focused on the real estate and construction sector, and has more than 13 years of
extensive experience in the field for all the services it offers. The objective of this
consultancy was to identify the key problem that is not allowing Ibe Contratistas
Generales to reach the expected profit margins, and to comply with the provisions of the
contracts won corresponding to the participated tenders. For this reason, the main causes
that generate the identified problem have been analyzed, based on the internal study
carried out and the interviews and meetings with the strategic team of Ibe Contratistas
Generales S.A.C. On the other hand, it was found that the root cause of the problem is
related to the growth of the budget allocated to the collection of observations on site,
this as a result of insufficient review and interpretation of files and plans, as well as
insufficient personnel for follow-up. and quality control and the lack of communication
between the areas.
In this consultancy, initiatives are proposed to reinforce construction
management, through the implementation of Fieldwire software, and with it the
possibility of visualizing in real time all the observations produced, the monitoring and
control of the tasks assigned for the Rising observations. The total cost of software
implementation is S/ 102,658.08 and it is expected to achieve savings of up to 18%
corresponding to the quality budget, that is, S/ 59,760.70. With regard to savings in
unplanned observations, it is expected to save up to S/ 671,562.24, that is, a 3%
reduction in an optimistic scenario. The aforementioned will lead to the company
reaching its profitability objectives and achieving the desired sustainability over time.
|
148 |
Consultoría para el mejoramiento de la gestión de impactos del sistema de humectación en la presa de relaves La Enlozada Sociedad Minera Cerro VerdeAnchaise Chávez, Elizabeth Verónica, Arce Noriega, Giuseppe Giobata Paolo, Medina Cruzado, Edgar César, Rentería Gutiérrez, Rafael Esteban 05 May 2023 (has links)
El presente trabajo de consultoría busca brindarle a Sociedad Minera Cerro Verde una
alternativa de solución que fundamente una mejora en la actual gestión de la humectación del
talud de la presa de relaves La Enlozada, a través de la cual, se optimice la utilización del
agua y se mantengan atendidas las necesidades de los principales interesados; respetando las
exigencias propias de los altos estándares con los que se ejecuta la construcción de la presa
La Enlozada. Reforzando de manera integral la gestión en la operación del depósito de
relaves.
Luego de la interacción con los interesados, compenetración con la operación y
levantamiento de información sobre las necesidades e ideas de solución, de manera conjunta
con un equipo de SMCV conformado específicamente para desarrollar la idea inicial, se pasó
a una etapa de adaptación y creación de un prototipo mínimamente viable; el cual, se
contrastó tomando en cuenta los puntos de referencia internos, nacionales e internacionales.
Es así como, se plantea un sistema de humectación que consta de un equipo todo terreno
sobre orugas.
Los datos presentados, en este trabajo de consultoría, otorgarán a Sociedad Minera
Cerro Verde un análisis completo de las ventajas que le brinda el sistema de humectación
planteado para la humectación de la presa de relaves La Enlozada y, en consecuencia, los
impactos positivos en su Sistema de Gestión Integrado del depósito de relaves,
fundamentalmente en su balance aguas para la operación; cuidando de respetar, en todo el
proceso, sus principios de producción segura y cultura de alto rendimiento. Se considera, por
tanto, que servirá como herramienta para la toma de decisión en busca de la mejora continua. / This consultancy seeks to provide Sociedad Minera Cerro Verde with an alternative
solution that supports an improvement in the current management of the wetting of the slope
of the La Enlozada tailings dam, through which the use of water is optimized and the needs of
the main stakeholders are maintained; respecting the requirements of the high standards with
which the construction of the La Enlozada dam is executed. Comprehensively reinforcing
management in the operation of the tailings deposit.
After the interaction with the interested parties, insight into the operation and
gathering of information on the needs and solution ideas, jointly with a SMCV team
specifically formed to develop the initial idea, we moved on to a stage of adaptation and
creation of a minimally viable prototype; which was contrasted taking into account internal,
national and international reference points. This is how, a humidification system consisting of
an all-terrain equipment on caterpillars is proposed.
The data presented, in this consultancy, will provide Sociedad Minera Cerro Verde
with a complete analysis of the advantages offered by the wetting system proposed for the
wetting of the La Enlozada tailings dam and, consequently, the positive impacts on its
Integrated Management System of the tailings deposit, mainly in its water balance for the
operation; taking care to respect, throughout the process, its principles of safe production and
high performance culture. Therefore, it is considered that it will serve as a tool for decision making in search of continuous improvement
|
149 |
Business consulting a la empresa Unión de Cervecerías Peruanas Backus y Johnston S.A.A.Espinoza Robles, Cinthia Steffani, Galarza Meza, Marco Paulo, Huamán Ramírez, María Elena 27 April 2023 (has links)
Backus es una empresa que se dedica a la elaboración y venta de bebidas alcohólicas
y no alcohólicas, es una empresa cervecera peruana que pertenece al grupo AB InBev, siendo
esta última una de las corporaciones cerveceras más grandes a nivel mundial. Backus es una
de las principales empresas del Perú, que aporta en gran medida al sector industrial y
empresarial.
Este trabajo propone el desarrollo de una ampliación de capacidad de malteo local para la
principal compañía cervecera del Perú mediante el análisis de un proyecto de implementación
de una nueva línea de producción de malta nacional. El abastecimiento de malta actualmente
utilizado por la compañía en estudio tiene un alto porcentaje de importación, lo que
incrementa los costos de producción de la cerveza ya que la malta es uno de los principales
insumos, asimismo genera un riesgo de abastecimiento de materia prima ya que está expuesto
a sobrecostos y contingencias propias de la logística internacional. La ampliación propuesta
impactará significativamente los resultados estratégicos de la compañía. / Backus is a company engaged in the production and sale of alcoholic and non alcoholic beverages, is a Peruvian brewing company that belongs to the AB InBev group, the
latter being one of the largest brewing corporations worldwide. Backus is one of the main
companies in Peru, which contributes greatly to the industrial and business sector.
This paper proposes the development of a local malting capacity expansion for Peru's leading
brewing company by analyzing a project to implement a new domestic malt production line.
The malt supply currently used by the company under study has a high percentage of imports,
which increases beer production costs since malt is one of the main inputs, and also generates
a raw material supply risk since it is exposed to cost overruns and contingencies inherent to
international logistics. The proposed expansion will significantly impact the company's
strategic results.
|
150 |
Business consulting report para una empresa del sector construcciónÁlvarez Chirinos, Andrea Eloísa, Larraín Aspilcueta, Jean Paul, Salas Mestas, Pierre Tany, Yucra Limahuay, Jenny Marlene 24 April 2023 (has links)
Wasi SA es una empresa que provee soluciones de ingeniería en encofrados y
andamios. El objetivo central de la consultoría fue identificar una propuesta de mejora para
que la empresa optimice su servicio a sus clientes, con el consiguiente impacto positivo en su
nivel de rentabilidad y en su competitividad en el rubro. Para tal efecto, se procedió a
identificar los problemas relevantes mediante reuniones de trabajo con colaboradores de la
empresa y la realización de encuestas. En base a dicha información se determinó los
principales problemas para, posteriormente, analizar las causas raíz de los mismos. Finalizado
dicho análisis se plantearon opciones de solución para asegurar la mejora continua en la
empresa en su servicio a sus clientes. En cuanto a la metodología, se utilizó el análisis
AMOFHIT y la Matriz de Complejidad versus Beneficio. La principal conclusión fue que el
principal problema de la empresa en cuanto a su servicio a sus clientes es la falta de
velocidad y capacidad de respuesta a los requerimientos de los clientes. Al respecto, las
principales causas raíz identificadas son: a) la falta de un sistema ágil que permita programar
o reprogramar los pedidos de los clientes en tiempo real, y b) el nivel de rotación y/o
ausentismo del personal contratista encargado de los despachos, factor que también impacta
negativamente en el nivel de capacitación de dicho personal.
En este escenario y considerando que la empresa busca mantener su posición de
liderazgo en el rubro, se propone implementar un sistema automatizado para la programación
y/o reprogramación de órdenes de compra. Se espera que dicho sistema facilite una
interacción más fluida y efectiva con el cliente garantizando puntualidad y precisión en la
entrega de los pedidos. Adicionalmente, se espera que dicho sistema facilite la optimización
del uso de recursos humanos destinados a las labores vinculadas a los despachos de pedidos.
Finalmente, la factibilidad de la propuesta se analizó bajo tres escenarios (base, pesimista y
optimista) y en todos ellos se obtuvo VAN y TIR positivos. / Wasi SA. is a company that provides engineering solutions in formwork and
scaffolding. The main objective of this Business Consulting was to identify an improvement
project so that the company optimizes its customer service, thus having a positive impact on
its level of profitability and its competitiveness on the market. To that end, the relevant
problems were identified through meetings with company collaborators and surveys. Based
on this information, the main problems were determined to subsequently analyze their root
causes. After this analysis, solution options were proposed to ensure continuous improvement
in the customer service of the company. Regarding the methodology, the AMOFHIT analysis
and the Complexity versus Benefit Matrix were used. In conclusion, the main problem of the
company in terms of its customer service is the lack of speed and responsiveness to
customers’ requirements. In this regard, the main root causes identified are: a) the lack of an
agile system that allows scheduling or rescheduling customer orders in real time, and b) the
level of turnover and/or absenteeism of the contractor personnel in charge of dispatches, this
is a factor that also impacts negatively on the level of training of those personnel.
In this scenario and considering that the company seeks to maintain its leading
position, it is proposed to implement an automated system for the programming and/or
rescheduling of purchase orders. This system is expected to facilitate a more fluid and
effective interaction with the customer, guaranteeing punctuality and precision in the delivery
of orders. Additionally, it is expected that this system will facilitate the optimization of the
use of human resources assigned to dispatch-related tasks. Finally, the feasibility of the
proposal was analyzed under three scenarios (baseline, pessimistic and optimistic) and
positive NPV and IRR were obtained in all of them.
|