• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 8
  • 2
  • 2
  • 1
  • 1
  • Tagged with
  • 17
  • 17
  • 10
  • 7
  • 6
  • 6
  • 6
  • 4
  • 4
  • 4
  • 4
  • 4
  • 4
  • 3
  • 3
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
11

Energetický posudek kogenerace a plynové kotelny / Energy Assessment of Cogeneration and a Gas Boiler room

Kandl, Petr January 2016 (has links)
The thesis contains a gas boiler room energy assessment in Lišov. In the mentioned boiler room, there are instaled gas condensing boilers and cogeneration units Theoretical part of the thesis lists a summary of generally used cogeneration equipment and ordinarily used gases. Calculation part includes four variants of the boiler room reconstruction. Energy assessment compares the chosen variant from the calculation part with the original condition of the boiler room.
12

Проблемы технического перевооружения систем теплоснабжения с целью повышения их энергетической эффективности : магистерская диссертация / Problems of reconstruction of heat supply systems in order to improve their energy efficiency

Гордиенко, Н. С., Gordienko, N. S. January 2018 (has links)
В выпускной квалификационной работе описываются основные пути реконструкции систем теплоснабжения, позволяющие добиться значительного повышения их энергоэффективности, а именно переход котельной на альтернативное топливо с целью повышения энергоэффективности, снижения экономических и экологических потерь. Целью работы является поиск и формулирование основных проблем реконструкции систем теплоснабжения, развитие технологического процесса перевода котельной на альтернативное топливо, проведение энергетического и экономического обоснования предлагаемой замены. Были изучены отечественные и зарубежные публикации по проблемам реконструкции систем теплоснабжения для повышения их энергоэффективности. Приведено обоснование необходимости перевода котельной на альтернативное и экологически чистое топливо, на основе оценки основного и вспомогательного оборудования котельной, а также экологического благополучия территории, прилегающей к котельной. Разработан технологический процесс перевода котельной на альтернативное и экологически безопасное топливо, выявлена и доказана необходимость модернизации оборудования для использования альтернативного топлива. Были определены существующие методы модернизации котла, работающего на угле для альтернативного и экологически чистого топлива. Выполнено экономическое обоснование предлагаемой замены. / This final qualifying work describes the main ways of reconstruction of heat supply systems, allowing achieving a significant increase in the energy efficiency of these systems, namely the transfer of the boiler to alternative fuel in order to improve energy efficiency, reduce economic and environmental losses. The purpose of the work is to consider and formulate the main problems of reconstruction of heat supply systems, development of the technological process of transferring the boiler house to alternative fuel, implementation of energy and economic justification of the proposed replacement. Domestic and foreign publications on the problems of reconstruction of heat supply systems in order to improve their energy efficiency were studied. The substantiation and relevance of the transfer of the boiler house to alternative and environmentally friendly fuel was discussed, for which the assessment of the main and auxiliary equipment of the boiler house, as well as the ecological well-being of the territory adjacent to the boiler house. The technological process of transfer of a boiler room to alternative and environmentally friendly fuel was developed, need of modernization of the equipment for use of pellet fuel is revealed and proved. The existing methods of modernization of the boiler unit operating on coal for alternative and environmentally friendly fuel were identified. Economic justification of the proposed replacement was done.
13

Оценка рисков внедрения автоматизированной системы управления теплоснабжением г. Перми (на примере Пермского филиала ПАО "Т ПЛЮС") : магистерская диссертация / Risk assessment of the implementation of an automated heat supply management system in Perm (on the example of the Perm branch of PJSC "T PLUS")

Колясников, А. Н., Kolyasnikov, A. N. January 2021 (has links)
Проблема оценки рисков при реализации сложных энергетических проектов чрезвычайно актуальна, поскольку подобные проекты представляют собой сложные планы, масштаб которых может охватывать не только отдельные предприятия, но и города, а также целые регионы. В настоящее время в российской энергетике постепенно создаются условия для внедрения риск-ориентированного управления энергоактивами за счет совершенствования нормативно-правового и нормативно-технического регулирования. Однако подобный переход еще находится на начальном этапе и вопросы оценки рисков в проектах продолжают оставаться в ведении энергокомпаний. Целью работы является комплексная оценка рисков внедрения энергоэффективных проектов в теплоснабжающих компаниях. Научная новизна состоит в систематизации специфических рисков, сопровождающих реализацию проекта внедрения автоматизированной системы управления теплоснабжением в г. Пермь. Практическая значимость - результаты, полученные в работе, могут быть использованы при управлении рисками в аналогичных проектах ПАО «Т Плюс». / The problem of risk assessment in the implementation of complex energy projects is extremely relevant, since such projects are complex plans, the scale of which can cover not only individual enterprises, but also cities, as well as entire regions. Currently, conditions are gradually being created in the Russian energy sector for the introduction of risk-based management of energy assets by improving regulatory and technical regulation. However, such a transition is still at the initial stage and the issues of risk assessment in projects continue to be the responsibility of energy companies. The purpose of this work is a comprehensive assessment of the risks of implementing energy-efficient projects in heat supply companies. The scientific novelty consists in the systematization of specific risks accompanying the implementation of the project of the automated heat supply management system in Perm. Practical significance - the results obtained in this work can be used in risk management in similar projects of PJSC “T Plus”.
14

Multikriterielle Bewertung von Technologien zur Bereitstellung von Strom und Wärme / Multi-criteria assessment of technologies for electricity and heat supply

Oberschmidt, Julia 26 August 2010 (has links)
No description available.
15

Geothermie / Geothermal Energy. Initial stages for the utilisation of renewable energy sources in the GDR

Eichkorn, Florian 26 January 2016 (has links) (PDF)
Ende der 1970er Jahre sah sich die SED in der DDR gezwungen angesichts hoher Auslandsverschuldung und gestiegener Importpreise für fossile Energieträger stärker in heimische Energiequellen und rationellere Energieanwendung zu investieren. In diesem Kontext und um Anschluss an die internationale Entwicklung zu halten wurde Ende der 1970er und in den 1980er Jahren die Nutzung oberflächennaher und tiefer Geothermie gefördert. Im Rahmen dieser Arbeit wird neben einer chronologischen Darstellung der Geothermieförderung in der DDR eine Einordnung in deren Energiepolitik, der Wärmeversorgung und der Förderung anderer erneuerbarer Energien geleistet. Aufgrund des geringen historischen Forschungsstandes zur Geothermie und der Wärmeversorgung in der DDR allgemein wurde dieser Arbeit ein explorativer Ansatz zugrunde gelegt. Als Quellenbasis dienten unter anderem Artikel aus wissenschaftlichen Zeitschriften der DDR und verschiedene Archivbestände. Ende der 1970er Jahre bis 1983 versuchte die SED den Einsatz von Wärmepumpen für die Wärmeversorgung zu fördern. Obwohl zahlreiche Pilotprojekte wie die Wärmepumpenheizzentrale Dresden fertiggestellt wurden stießen die politischen Planvorgaben auf materielle Engpässe und wenig Nachfrage in der Wärmeversorgung. Nach der abrupten Reduzierung der Zielvorgaben für die Wärmepumpenförderung wurde ab 1984 mit besonderem politischem Interesse die Tiefengeothermie gefördert und hierfür der Spezialbetrieb VEB Geothermie Neubrandenburg gegründet. Von den geplanten Anlagen zur Versorgung von Wohngebieten mit insgesamt 110 MW thermischer Leistung konnten bis zum Ende der DDR tiefengeothermische Heizzentralen in Waren, Neubrandenburg und Prenzlau fertiggestellt werden, was 22% der geplanten Leistung entsprach. Somit scheiterte auch das Großprojekt einer geothermischen Wärmeversorgung von Schwerin. Grund waren unter anderem übersteigerte Planvorgaben, der materielle Mangel in der Wirtschaft der DDR und nicht ausreichende Erfahrungen mit der jungen Technologie. / At the end of the 1970s the socialist party of the GDR was forced by high debts in foreign currency and risen import prices for fossil fuels to invest in indigenous energy sources and more rational energy applications. In this context and to take pace with the international development the SED began at the end of the 1970s and during the 1980s to support the use of geothermal heating. This thesis consists of a chronological representation of the geothermal energy support in the GDR and contextualizes East German energy policy, heat supply and use of other renewable energy sources. Historical sources consist to the main extent on archive material and scientific papers from the GDR. Until 1983 the SED tried to promote the application of heat pumps for heat supply. Even though several pilot projects like the heat pump station in Dresden were successfully erected, the political plan targets collided with material short supply and low demand in the heating business. After the sudden reduction of the political targets concerning heat pumps, special political interest was given to geothermal energy in higher depths since 1984. Therefore a special company the VEB Geothermie Neubrandenburg was founded. From the planned stations for heat supply of residential areas with a total power of 110 MW only 22% were actually finished until the end of the GDR in 1990. Those stations were located in Waren, Neubrandenburg and Prenzlau in the northern part of East Germany. Consequently failed the major project of a geothermal heat supply of the city of Schwerin. Reasons were excessive plan targets, the material short supply in the East German economy and a lack of experiences in the young technology.
16

Geothermie: Ansätze zur Nutzung regenerativer Energiequellen in der DDR

Eichkorn, Florian 15 September 2015 (has links)
Ende der 1970er Jahre sah sich die SED in der DDR gezwungen angesichts hoher Auslandsverschuldung und gestiegener Importpreise für fossile Energieträger stärker in heimische Energiequellen und rationellere Energieanwendung zu investieren. In diesem Kontext und um Anschluss an die internationale Entwicklung zu halten wurde Ende der 1970er und in den 1980er Jahren die Nutzung oberflächennaher und tiefer Geothermie gefördert. Im Rahmen dieser Arbeit wird neben einer chronologischen Darstellung der Geothermieförderung in der DDR eine Einordnung in deren Energiepolitik, der Wärmeversorgung und der Förderung anderer erneuerbarer Energien geleistet. Aufgrund des geringen historischen Forschungsstandes zur Geothermie und der Wärmeversorgung in der DDR allgemein wurde dieser Arbeit ein explorativer Ansatz zugrunde gelegt. Als Quellenbasis dienten unter anderem Artikel aus wissenschaftlichen Zeitschriften der DDR und verschiedene Archivbestände. Ende der 1970er Jahre bis 1983 versuchte die SED den Einsatz von Wärmepumpen für die Wärmeversorgung zu fördern. Obwohl zahlreiche Pilotprojekte wie die Wärmepumpenheizzentrale Dresden fertiggestellt wurden stießen die politischen Planvorgaben auf materielle Engpässe und wenig Nachfrage in der Wärmeversorgung. Nach der abrupten Reduzierung der Zielvorgaben für die Wärmepumpenförderung wurde ab 1984 mit besonderem politischem Interesse die Tiefengeothermie gefördert und hierfür der Spezialbetrieb VEB Geothermie Neubrandenburg gegründet. Von den geplanten Anlagen zur Versorgung von Wohngebieten mit insgesamt 110 MW thermischer Leistung konnten bis zum Ende der DDR tiefengeothermische Heizzentralen in Waren, Neubrandenburg und Prenzlau fertiggestellt werden, was 22% der geplanten Leistung entsprach. Somit scheiterte auch das Großprojekt einer geothermischen Wärmeversorgung von Schwerin. Grund waren unter anderem übersteigerte Planvorgaben, der materielle Mangel in der Wirtschaft der DDR und nicht ausreichende Erfahrungen mit der jungen Technologie.:1. Einleitung 3 2. Energiepolitik in der DDR 7 2.1 Energiepolitik der SED 7 2.2 Regenerative Energiequellen in der Energiepolitik 9 3. Erdwärme in der Energiewirtschaft der DDR 13 3.1 Akteure der Energiewirtschaft 13 3.2 Wärmeversorgung 15 3.3 Nutzung regenerativer Energiequellen 18 4. Oberflächennahe und tiefe Geothermie 22 4.2 Wärmepumpen zur Nutzung von Umweltwärme 22 4.2.1 Wärmepumpen für die rationelle Energieanwendung 22 4.2.2 Fallbeispiel Wärmepumpen-Heizzentrale Dresden 28 4.2.3 Vorzeitiges Ende der Wärmepumpenförderung 33 4.3 Tiefengeothermie im Norden der DDR 35 4.3.1 Hohe Erwartungen an die Tiefengeothermie 35 4.3.2 Grenzen der Leistungsfähigkeit des VEB Geothermie 41 5. Zusammenfassung 48 Literatur 51 Archivalische Quellen 54 Abbildungs- und Tabellenverzeichnis 56 Abkürzungsverzeichnis 57 Physikalisch-technischer Anhang 58 / At the end of the 1970s the socialist party of the GDR was forced by high debts in foreign currency and risen import prices for fossil fuels to invest in indigenous energy sources and more rational energy applications. In this context and to take pace with the international development the SED began at the end of the 1970s and during the 1980s to support the use of geothermal heating. This thesis consists of a chronological representation of the geothermal energy support in the GDR and contextualizes East German energy policy, heat supply and use of other renewable energy sources. Historical sources consist to the main extent on archive material and scientific papers from the GDR. Until 1983 the SED tried to promote the application of heat pumps for heat supply. Even though several pilot projects like the heat pump station in Dresden were successfully erected, the political plan targets collided with material short supply and low demand in the heating business. After the sudden reduction of the political targets concerning heat pumps, special political interest was given to geothermal energy in higher depths since 1984. Therefore a special company the VEB Geothermie Neubrandenburg was founded. From the planned stations for heat supply of residential areas with a total power of 110 MW only 22% were actually finished until the end of the GDR in 1990. Those stations were located in Waren, Neubrandenburg and Prenzlau in the northern part of East Germany. Consequently failed the major project of a geothermal heat supply of the city of Schwerin. Reasons were excessive plan targets, the material short supply in the East German economy and a lack of experiences in the young technology.:1. Einleitung 3 2. Energiepolitik in der DDR 7 2.1 Energiepolitik der SED 7 2.2 Regenerative Energiequellen in der Energiepolitik 9 3. Erdwärme in der Energiewirtschaft der DDR 13 3.1 Akteure der Energiewirtschaft 13 3.2 Wärmeversorgung 15 3.3 Nutzung regenerativer Energiequellen 18 4. Oberflächennahe und tiefe Geothermie 22 4.2 Wärmepumpen zur Nutzung von Umweltwärme 22 4.2.1 Wärmepumpen für die rationelle Energieanwendung 22 4.2.2 Fallbeispiel Wärmepumpen-Heizzentrale Dresden 28 4.2.3 Vorzeitiges Ende der Wärmepumpenförderung 33 4.3 Tiefengeothermie im Norden der DDR 35 4.3.1 Hohe Erwartungen an die Tiefengeothermie 35 4.3.2 Grenzen der Leistungsfähigkeit des VEB Geothermie 41 5. Zusammenfassung 48 Literatur 51 Archivalische Quellen 54 Abbildungs- und Tabellenverzeichnis 56 Abkürzungsverzeichnis 57 Physikalisch-technischer Anhang 58
17

Generic design and investigation of solar cooling systems

Saulich, Sven January 2013 (has links)
This thesis presents work on a holistic approach for improving the overall design of solar cooling systems driven by solar thermal collectors. Newly developed methods for thermodynamic optimization of hydraulics and control were used to redesign an existing pilot plant. Measurements taken from the newly developed system show an 81% increase of the Solar Cooling Efficiency (SCEth) factor compared to the original pilot system. In addition to the improvements in system design, new efficiency factors for benchmarking solar cooling systems are presented. The Solar Supply Efficiency (SSEth) factor provides a means of quantifying the quality of solar thermal charging systems relative to the usable heat to drive the sorption process. The product of the SSEth with the already established COPth of the chiller, leads to the SCEth factor which, for the first time, provides a clear and concise benchmarking method for the overall design of solar cooling systems. Furthermore, the definition of a coefficient of performance, including irreversibilities from energy conversion (COPcon), enables a direct comparison of compression and sorption chiller technology. This new performance metric is applicable to all low-temperature heat-supply machines for direct comparison of different types or technologies. The achieved findings of this work led to an optimized generic design for solar cooling systems, which was successfully transferred to the market.

Page generated in 0.0575 seconds