Spelling suggestions: "subject:"forminformation delivery"" "subject:"forminformation elivery""
1 |
Parents' and Teachers' Acceptability of Treatments for Attention-Deficit/Hyperactivity Disorder: The Effects of Presentation and Information DeliveryGage, Jason Donald 01 May 2002 (has links)
Attention-deficit/hyperactivity disorder (ADHD) is one of the most frequently diagnosed problems affecting school-age children. This disorder can cause significant problems for children who consequently need treatment. Consumers of interventions for ADHD have efficacious treatments to choose from, but such treatment may not be implemented appropriately and effectiveness may decrease. Viewing treatments as 111 acceptable can affect treatment integrity and in turn increase effectiveness. Therefore, it is important that professionals understand how to increase the acceptability of treatments when first presenting treatment options to consumers. The primary purpose of this study was to determine if presenting parents and teachers with additional information about treatment options (behavioral therapy, medications, combination of both), beyond that of only providing treatment descriptions, would increase their treatment acceptability. Results showed that providing a rationale for treatment increased parents' acceptability for treatments involving medications, but not for behavioral treatments. This effect for how treatments were presented was not found among teachers. The results also suggest that parents and teachers differ in how acceptable they viewed some of these treatments. While parents rated the behavioral intervention as more acceptable than teachers, teachers rated the combination intervention as more acceptable than did parents. The results also indicate that consumers, especially parents, viewed the acceptability of these three treatment options differently, but that these effects interact with the amount and kind of information that the practitioners present to them. Specifically among parents, those who only received a description of the interventions rated the behavioral intervention as more acceptable than the combination intervention. However, there was no longer a significant difference in acceptability ratings of these two treatment options when rationales were provided along with treatment descriptions.
|
2 |
Untersuchungen zur nicht-visuellen Informationsausgabe raumbezogener Informationen auf mobilen EndgerätenHerrmann, Juliane 20 November 2012 (has links) (PDF)
Mobile Endgeräte beeinflussen unseren Alltag und sind allgegenwärtig. Besonders die Vielfalt der Nutzungsmöglichkeiten entwickeln sich stetig weiter. Die meisten Funktionen dieser Geräte basieren auf der visuellen Informationsein- und Ausgabe. Hingegen sind die nicht-visuellen Aktionsmöglichkeiten weniger verbreitet.
In der Bachelorarbeit werden darum die Parameter und die Symboldarstellung der nicht-visuellen Informationsausgabe untersucht. Des Weiteren wird eine Auswahl verschiedener Forschungsprojekte, externer Geräte und anwendungsbereiter Software vorgestellt, die sich größtenteils mit der Navigation besonders im Bezug auf Smartphones beschäftigt.
Aus den gewonnenen Erkenntnissen ist die konzeptionelle Idee einer Navigationsanwendung für Smartphones entstanden. Im Bezug dazu ist eine denkbare Teststrecke im Elbsandsteingebirge für mögliche Experimente und Versuche vorgeschlagen worden, welche vielfältige Bereiche der Navigationsmöglichkeiten abdeckt. / Mobile devices are upiquitous these days and influence our everyday life dramatically, especially as the variety and use of applications is ever-evolving. However, most of the functions of these devices are based on input and output of visual information data. Non-visual features are not yet particularly common. This is why the different parameters and depictions of symbols of the non-visual data output type have been analysed in this paper. Moreover, there are some research projects, additional equipment and applications presented in here which are primarily concerned with the navigational functionality deployed by Smart phones.
The study and research undertaken for this paper has lead to the creation of a concept for an application program which relates to navigational functionality based on smart phones. A test track in the Sächsische Schweiz National Parl, "Elbsandsteingebirge", has already been developed for the purpose of conducting further experiments in this area.
|
3 |
Miljömedveten produktvalsprocess med hjälp av BIM / Eco-friendly material selection with BIMMagnryd, Anton, Kádár, Petra January 2017 (has links)
Syfte: Det föreligger svårigheter att undvika byggprodukter som innehåller farliga ämnen då användningen av dessa varor i vissa projekt är oundviklig spelar dokumentering en nyckelroll. Detta då spårbarhet förutsätter ett gott dokumenteringsunderlag. Genom att vidare kontrollera produkter som byggs in säkerställs det att nödvändig information finns tillgänglig för beslutsfattning och problemlösning. Detta för att möjliggöra hantering av eventuella lagstiftningsförändringar under ombyggnationer eller vid ändring av kemiska ämnens klassificering. Produktval har som ord blivit en vanligare förekomst i byggbranschen efter att Produktvalsprincipen presenterades i Miljöbalkens 2 kapitel 6 §. Produktvalsprincipen uppmanar till att produktval i så stor utsträckning som möjligt ska undvika produkter med fara för människa och miljö om de kan ersättas med mindre farliga. Syftet med arbetet är att kartlägga hur en förvaltarbyggherre inom den offentliga sektorn arbetar med produktval och undersöka vilka problem som kan uppstå kopplat till arbetet samt undersöka hur BIM kan effektivisera processen. Metod: För att upprätta arbetets teoretiska ramverk har en litteraturstudie genomförts. I arbetets fallstudie har empirin som insamlats bestått av dokumentanalys samt intervjuer med projektaktörer. Resultat: Arbetet har kartlagt förvaltarbyggherrens produktvalsprocess samt vidare hur denne ställer krav kopplat till det utförda arbetet, entreprenören genomför sedermera produktval utifrån krav samt rekommendationer i miljöprogram, administrativa föreskrifter samt rambeskrivningar och dokumenterar dessa i projektets loggbok. Problem studien funnit är att produkter ej i full utsträckning registreras utifrån satta krav. Författarna har vidare lokaliserat att i takt med att BIM-utvecklingen fortskrider kommer detta med tid möjliggöra för beställare att tillsammans med färdigställt projekt erhålla en specifik BIM-modell berikad med aktuell produktinformation (en Asset- Information-Model). Då projekterad information och inköpsinformation lagras i en BIM-modell kan en effektivare informationshantering säkerställas med hjälp av leveransspecifikationer vid överföringen av information mellan system. BIM- teknologin möjliggör vidare en effektivare uppföljning av ställda krav samt på sikt en effektivisering av processen som den genomförs idag. Konsekvenser: Rapporten ligger till grund för att tydliggöra upprättning av krav och problem relaterat till produktval under projektering och byggskede. För att produktvalsprocessen ska förlöpa på ett kvalitetsmässigt sätt bör satta krav efterföljas samt ansvariga för registrering genomgå utbildning. Rapporten föreslår att beställare genom ekonomiska incitament kopplar inköpsutbetalningar mot färdig produktdokumentering. En BIM-modell kan när mognadsgrad uppnås med fördel användas som dokumenteringsunderlag. Begränsningar: Rapportens resultat begränsas då undersökningen utförs från tidig design till och med första efterbesiktning samt att endast ett projekt har granskats. / Purpose: There are difficulties in avoiding construction products containing hazardous substances considering that the use of these products are inevitable in some projects. Documentation regarding product selection plays a key role as traceability requires thorough documentation. By adding further control of built-in-products it is ensured that necessary information is available for decision making and problem solving. This will allow the managing of possible legislative changes, during reconstruction or when chemical substances get their classification status changed. Product selection has become a more common occurrence in the construction industry since the release of Miljöbalkens second chapter 6 §, The Product selection principle (Produktvalsprincipen). This legislation has called for product selection to avoid hazardous products where they can be replaced with products less dangerous. The propose with this bachelor thesis is to map how a property developer/facility manager in the public sector transacts the work regarding product selection, map the problems related to the procedure and find a solution to the problem with the help of Building Information Modelling (BIM). Method: To create the theoretical framework of the report a literature study has been conducted. The empirical collection has been made in the form of a case study with empirical collection through interviews and document analysis. Findings: The thesis has mapped how the property developer/facility manager conducts product selection and how the property developer/facility manager sets the requirements connected to product selection. The entrepreneur documents the selected products with an outlook in set requirements in a log book. Problems the study has found are that all utilized products are not documented. The authors have further found that as BIM technology progresses it will eventually enable clients to procure specific BIM models enriched with specific product information. When information is stored in the BIM model it is possible to ensure more efficient information management with the help of information delivery specifications when transferring information in between systems. BIM technology also enables a more efficient follow up of requirements and in the long term a less labour intensive product selection process. Implications: The thesis bases the clarification of requirements and problems that the product selection consists of during the construction planning and construction stage. For the product selection to proceed with quality in mind, set requirements should be followed and the ones responsible for documenting products should undergo adequate training. The thesis proposes clients to connect economic incentives to purchase payments when product documentation is complete. A BIM-model can when maturity level is achieved compile of- and be utilized as product documentation. Limitations: The thesis result is limited in the sense that the investigations that has been conducted has examined the construction phase from early design to final inspection and has studied one project alone.
|
4 |
Untersuchungen zur nicht-visuellen Informationsausgabe raumbezogener Informationen auf mobilen EndgerätenHerrmann, Juliane 31 August 2012 (has links)
Mobile Endgeräte beeinflussen unseren Alltag und sind allgegenwärtig. Besonders die Vielfalt der Nutzungsmöglichkeiten entwickeln sich stetig weiter. Die meisten Funktionen dieser Geräte basieren auf der visuellen Informationsein- und Ausgabe. Hingegen sind die nicht-visuellen Aktionsmöglichkeiten weniger verbreitet.
In der Bachelorarbeit werden darum die Parameter und die Symboldarstellung der nicht-visuellen Informationsausgabe untersucht. Des Weiteren wird eine Auswahl verschiedener Forschungsprojekte, externer Geräte und anwendungsbereiter Software vorgestellt, die sich größtenteils mit der Navigation besonders im Bezug auf Smartphones beschäftigt.
Aus den gewonnenen Erkenntnissen ist die konzeptionelle Idee einer Navigationsanwendung für Smartphones entstanden. Im Bezug dazu ist eine denkbare Teststrecke im Elbsandsteingebirge für mögliche Experimente und Versuche vorgeschlagen worden, welche vielfältige Bereiche der Navigationsmöglichkeiten abdeckt. / Mobile devices are upiquitous these days and influence our everyday life dramatically, especially as the variety and use of applications is ever-evolving. However, most of the functions of these devices are based on input and output of visual information data. Non-visual features are not yet particularly common. This is why the different parameters and depictions of symbols of the non-visual data output type have been analysed in this paper. Moreover, there are some research projects, additional equipment and applications presented in here which are primarily concerned with the navigational functionality deployed by Smart phones.
The study and research undertaken for this paper has lead to the creation of a concept for an application program which relates to navigational functionality based on smart phones. A test track in the Sächsische Schweiz National Parl, "Elbsandsteingebirge", has already been developed for the purpose of conducting further experiments in this area.
|
5 |
Applying Cognitive Principles to the Delivery of Engineering Information by Different MediumsDadi, Gabriel B 01 January 2013 (has links)
Construction project performance and worker productivity are often tied to the availability and effective presentation of information, tools, materials, and equipment. While advancements in technology have improved much of the processes on a construction project, the medium of information dissemination at the construction work face has consistently relied on the use of two dimensional drawings and specifications.
Industry initiatives are driving increased collaboration through three dimensional BIM (Building Information Modeling) models. However, the added dimension partially loses its effect when presented on a two dimensional computer monitor. Other computer forms of presentation intended for mobility (PDAs, laptops, and tablets) can be difficult to use in the field due to glare, durability in a harsh working environment, and the required skill level for effective use. Three dimensional (3D) physical printers now provide the capability to develop scaled and color models of a project directly from a BIM model. 3D physical printers represent a potential transformative change of providing engineering information to construction crews, but how to develop 3D models that leverage the cognitive benefits of viewing engineering information in a physical 3D form is unknown.
The primary contribution to the overall body of knowledge of this dissertation is to scientifically examine the effect that different engineering information mediums have on an individual’s cognitive ability to effectively and accurately interpret spatial information. First, the author developed a robust scientific experiment for construction practitioners and students to complete. This experiment included outcomes measures on mental workload, cognitive demand, productivity, efficiency, demographics, and preferences. After collecting data, the author analyzed the outcomes through a series of statistical analyses to measure the differences between groups and quantify the affect and relationship among key variables.
From the results, there are statistically significant improvements in productivity and efficiency of practitioners and students when using a physical model compared to two dimensional drawings and a three dimensional computer model. In addition, the average cognitive demand for a physical model was lower than the average cognitive demand for two dimensional drawings and three dimensional computer model.
|
6 |
BIM I TOTALENTREPRENAD: PROJEKTERINGENS INFORMATIONSLEVERANSER FÖR PRODUKTIONENS GRUNDLÄGGNING / BIM IN A DESIGN-BUILD CONTRACT: THE INFORMATION DELIVERIES OF THE DESIGN PROCESS FOR THE FOUNDATION WORK OF THE PRODUCTIONLindell, Frans January 2017 (has links)
Syfte: Byggsektorn karaktäriseras av att till stor del bestå av temporära projektorganisationer med mycket samarbete mellan discipliner men utan någon vidare processkontinuitet mellan de unika projekten. Det finns ett stort fokus på tid och omedelbar handling som en del av aktörernas referensram och varje aktivitet och nytt arbetssätt bör ge omedelbara fördelar i form av tidsvinster och effektivare utförande för att villigt accepteras. Behoven av standardiserade arbetssätt blir mycket synliga när man börjar införa BIM i projekten. Att aktivt använda BIM-modellen på bygget skapar krav på innehållet och att man följer ett projekteringsschema. BuildingSMART International (2010) skriver: ”Om den nödvändiga informationen är tillgänglig när den behövs och kvalitén på informationen är tillfredställande, så blir själva byggprocessen signifikant förbättrad”. Målet med detta examensarbete är att ta fram ett förslag på hur sekvensen av informationsleveranser bör se ut för den inledande produktionen av bärande system i en totalentreprenad. Metod: För att nå målet har en litteraturstudie genomförts för att skapa arbetets teoretiska ramverk. En fallstudie på en totalentreprenad med djupgrundläggning har genomförts. I fallstudien har empiri insamlats genom intervjuer med några av projektets aktörer samt en dokumentanalys av relevanta ritningar, protokoll och övriga dokument i projektet. Resultat: Rapporten har kartlagt sekvensen av informationsleveranser (inklusive vilket informationsinnehåll och vilken detaljeringsnivå de behöver ha) för den inledande produktionen av bärande system i en totalentreprenad. Detta kunskapsbidrag med processkarta och informationsbehov kan byggas vidare på, för att kunna implementeras i BIM-verktygen och därigenom underlätta arbetet och föra BIM-användningen framåt. Konsekvenser: Rapporten har med ovan resultat bidragit med några påbörjade pusselbitar i ett stort pussel av information och leveranser i rätt sekvens och detaljeringsgrad. För att pusslet ska bli komplett måste även informationsleveranser från förfrågningsunderlaget fungera korrekt. Arbetet har belyst fördelar att arbeta med BIM i denna del av byggprocessen. Rapporten föreslår förtydligande av innebörd genom att ha både detaljeringsnivå och utvecklingsnivå som benämningar i Sverige. Begränsningar: Rapporten begränsas till att beskriva vad byggentreprenören behöver för informationsleveranser från konstruktören som rör pålning, grundsulor och fundament. Rapporten beskriver också de informationsleveranser konstruktören behöver för att uppfylla byggentreprenörens informationsbehov. / Purpose: The building industry is characterised by mainly consisting of temporary project organizations with much interdisciplinary cooperation but with little continuity of process between the unique projects. There is a big focus on time and immediate action as part of the actors’ frame of reference, and every activity and new work method should give immediate advantages in time savings and more efficient work to be readily accepted. The need for standardised work methods is very visible when BIM is introduced in the projects. To actively use the BIM-model on site creates demands on the content and that a design schedule is followed. BuildingSMART International (2010) writes: ”If the information required is available when it is needed and the quality of information is satisfactory, the construction process will itself be significantly improved”. The aim of this work is to produce a suggestion of how the sequence of information deliveries should be in the starting production of the loadbearing system in a design build project. Method: To reach the aim a literature study has been conducted to create the theoretical framework for the study. A case study has been conducted on a design build project with a deep foundation. Empirical data has been collected by means of interviewing some of the project actors and conducting a document analysis of project documents such as drawings and protocols. Findings: The report has mapped the sequence of information deliveries (including what information content and what level of development they need to have) for the initial production of the loadbearing system in a design build project. This contribution of knowledge with the process map and information demands can be built upon, to allow for implementation in the BIM tools and thus make the work easier and push the use of BIM forward. Implications: With the above results the report has contributed with a few started puzzle pieces in a big puzzle of information and deliveries in the correct sequence and level of development. To complete the puzzle the information deliveries from the specifications also needs to work correctly. The report has shown advantages by working with BIM in this part of the building process. The report suggests clarification of meaning by using both names, level of detail and level of development, in Sweden. Limitations: The report is limited to describe what information deliveries the contractor needs from the structural designer when it comes to piling and foundations. It also describes the information deliveries needed by the structural designer to be able to meet the information need of the contractor.
|
7 |
Digital förvaltning : En studie av kravställningar för BIM inom fastighetsförvaltning / Digital Facility managementGhasemi, Ahmad, Shafa, Amir January 2020 (has links)
Ett stort steg in den digitala världen är att arbeta med BIM – byggnadsinformationsmodell. Tekniken har under senaste decenniet använts i stor utsträckning under både projekterings- och produktionsskeden, men under förvaltningsskedet är användningen begränsat. Denna studie undersöker därför hur förvaltningsorganisationer arbetar med BIM. De flesta BIM-modeller utarbetas under projekterings- och produktionsskeden och kan innehålla väldigt mycket användbar information för den framtida förvaltande organisationen. Förvaltningsorganisationer behöver således veta vilken information från projekterings- och produktionsskeden är användbara för just deras organisation. Detta hjälper organisationerna att ställa lämpliga krav på leverans av information. Studien undersöker därför förvaltningsorganisationers informationsbehov och kravställningar gällande BIM. Rapporten är baserat på en intervjustudie tillsammans med en dokumentanalys där BIM-manualer från fyra förvaltningsorganisationer undersöks. En BIM-manual är ett styrande dokument som föreskriver en organisations krav och anvisningar gällande BIM. Även en litteraturstudie är genomförd för att kunna samla relevant data till intervjufrågor och dokumentanalysen. Vid intervjustudien har personer som arbetar aktivt med både BIM-frågor och digitalisering inom bygg- och förvaltningsbransch valts. Resultatet visar att användning av BIM är lågt i förvaltningsbranschen. Den främsta skälen till att BIM inte används i stor utsträckning är att en stor del av dagens fastighetsbestånd saknar BIM-modeller vilket gör att det anses som en extra kostnad av de flesta fastighetsägare. De existerande BIM-modeller inom förvaltningen varken används eller uppdateras. I studien framgår att förvaltningsbolag kravställer endast namngivning, numrering, litterering och redovisning av utrymmen i sina manualer. Rapportens resultat visar att det saknas branschmässiga standarder för informationsleverans och informationsnivå. För att kunna möjliggöra ett oavbrutet informationsflöde måste branschmässiga standarder upprättas. / A big step into a digital world is to work with BIM- buildinginformation model. The technology has been used extensively duringthe last decade in both the design and production phases, but thetechnology is not used actively during the facility managementphase. This study looks therefore through how facility managementorganizations work with BIM. The most BIM models are developed during the design and productionphases and can contain a lot of useful information for the futurefacility management organization. Facility managementorganizations need therefore to know what information from thedesign and production phases is useful for their organization. Itwill help the organization to set appropriate requirements for theprovision of information. The study will therefore examinefacility management organizations' information needs and theirrequirements regarding BIM. The report is based on an interview study together with a documentanalysis where BIM manuals from four different facility managementorganizations are examined. A BIM manual is a governing documentthat prescribes an organization's requirements and instructionsregarding BIM. A literature study has also been carried out inorder to gather relevant information and data for interviewquestions and the document analysis. In the interview study,people who work actively with both BIM and digitization in bothconstruction- and facility management industry have been chosen. The result shows that the use of BIM is low in the facilitymanagement industry. The main reason to why BIM is not widely usedis that a large part of today's buildings does not have any BIMmodels which makes it as an extra cost for most property owners.The organizations have many BIM models in their archives, butthese models are neither used in practical activities nor updatedif a change is made. The study shows that facility management companies haverequirements regarding naming, numbering, code marking andaccounting of spaces. The report's results show that there are noprofessional standards for information delivery and informationlevel. The facility management organizations must establishprofessional standards in order to enable an continuously flow ofinformation.
|
Page generated in 0.1106 seconds