• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 12
  • 2
  • Tagged with
  • 14
  • 12
  • 12
  • 9
  • 5
  • 5
  • 4
  • 4
  • 4
  • 4
  • 3
  • 3
  • 3
  • 3
  • 3
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
11

Klimatberäkningar i byggprojekt : Hur kan LFM30 bidra till utvecklingen?

Holmqvist, Philip, Radojevic, Stefan January 2021 (has links)
Environmental issues have been a trending topic for some time now due to constant changes. One of the most contributing industries is the construction sector. In Malmo, the construction industry is responsible for 20% of the total climate impact in the city. The first regional roadmap has been initiated in Malmo, which is called LFM30. Their focus is to increase the perspective of life cycle assessment (LCA), where different methods and materials are reviewed. The purpose of this degree project was to analyze and compare these to tools from different criteria, such as required knowledge, user-friendly, comparison-options, results and applicability in the early stages. These criteria have been analyzed in a case study, where a specific case has been examined. Climate impact has been calculated with BM and One Click LCA. The study was limited to Malmo and the initiative LFM30 and its affiliated companies. The case study shows that there’s good opportunity to develop this further, but to reach climate neutrality and climate positivity soon, it’s required that climate calculations are implemented as early as possible. The comparison between the two programs showed that BM is more limited function-wise but works more accurate and user-friendly than One Click LCA.
12

Effekten av olika logistiklösningar : En studie kring fördelar och nackdelar med tredjepartslogistik och inbärning till ett projekt i Dalarna

Andersson, Julia, Liedström, Matilda January 2021 (has links)
Inom byggbranschen har man börjat sett fördelar med att titta mer på logistiken iolika byggprojekt. Många olika studier har utförts kring vilka lösningar som finnsoch hur man kan använda dem.Denna studie utförs i samarbete med Skanska Sverige AB. Studien syftar till att påolika sätt undersöka vilka fördelar och nackdelar man kan se med att använda sigav logistiktjänsterna terminalisering och inbärning till ett byggprojekt i Dalarna.Byggprojektet som utgör det specifika fallet i studien är ett ombyggnadsprojekt aven grundskola. Elever vistas i detta skolområde samtidigt som ombyggnationenutförs etappvis inom det stängda arbetsområdet. Studien innefattar även tredje mandär trygghetsupplevelse kring arbetsplatsen undersöks. Inbärningens användbarhetdiskuteras därefter utifrån trygghetsupplevelsen kring och inom arbetsplatsen samtutifrån ekonomiskt och ekologiskt perspektiv.Metoder som används i studien är intervjuer med somliga från projektets ledning,en logistiker på Skanska, rektor för årskurs F-6, yrkesarbetare samt tredje man.Utöver dessa intervjuer utförs även en fältstudie som involverar observationer ochmätningar. Som avslut utförs överslagsberäkningar för att se om användning av ettexternt företag kan leda till ekonomisk lönsamhet.Studiens resultat visar hur man inom företaget ser på logistiklösningarnaterminalisering och inbärning idag. Här visas även vilka fördelar och nackdelarolika parter ser med tjänsterna. Fältstudiens mätningar visar hur många av tredjeman som rör sig kring arbetsområdet i anslutning till att skoldagen börjar.Överslagsberäkningar visar på att man kan se en besparing ifall man använder sigav ett inbärningsföretag som arbetar under kvällstid och detta sker i samband medatt man använder sig av terminalisering.Studiens slutsatser är att det inte finns en allmän lösning till hur logistikfrågan skalösas på olika projekt. Om det finns möjlighet för terminalisering i området ärdetta samt inbärning ett alternativ för projektet. / Within the construction industry the advantages of looking at the logistics todifferent projects has been acknowledged during the past couple of years.This study has been written in collaboration with Skanska Sverige AB. Thepurpose of the study is to, in different ways, examine what advantages anddisadvantages there are in using the logistics solutions terminalization (also knownto be a part of Third Party Logistics) and inside delivery to a specific project inDalarna, Sweden. This project is a remodeling project of a school with studentsfrom six to sixteen years old. Within the school area new parts of the school isbuilt while students are located in the yet existent buildings. This infer thatstudents move around the construction sites daily. The study also involves thirdparty people and how these people feel about the large transports connected to theproject. The inside delivery utility is then discussed based on the securityexperience within and around the construction site along with the economic andecological perspective of the service.The methods used in this study are interviews with three people of the projectmanagement, one person that works with logistics at the company, the headmasterof the younger students, skilled workers and third party people. Furthermore afield study is done that includes measurements and observations. As a close,calculations are done to determine if a economical profitability could be possibleby using inside delivery.Results from the study show how the logistics solutions terminalization and insidedelivery is looked at within Skanska today. Here, the advantages anddisadvantages with the different services are displayed from the perspectives of thepeople who were interviewed. The results from the measurements from the fieldstudy presents how many third party people that move adjacent to the two activeconstruction sites when the school day begins. The calculations show that it iseconomically beneficial to use inside delivery after the end of the workday whileused with terminalization.Conclusions of the study indicate that there are no overall solutions regarding howthe logistics must be used in different projects. If there is a possibility to use terminalization in the area where the project is situated, this, along with insidedelivery, is a good alternative for the project.
13

Klimatneutrala byggnader : En utredning av begreppet och jämförelse mellan olika definitioner / Climate-Neutral Buildings : An investigation of the definition and comparison between different interpretations

Hedberg, Agnes Holm January 2021 (has links)
Klimatförändringarna är idag ett av mänsklighetens största hot och om inte världens växthusgasutsläpp minskar drastiskt under de kommande åren kan detta medföra svåra konsekvenser både lokalt och globalt. I linje med detta har globala och nationella mål satts för att främja klimatneutrala samhällen och branscher. Byggsektorn står för en stor del av klimatpåverkan, varför det är viktigt att se över utsläpp från denna sektor. Under de senaste åren har flertalet definitioner för klimatneutralitet i byggsektorn presenterats där samtliga är överens om att detta är en viktig strategi för att minska påverkan från vår byggda miljö. Dock tycks en stor osäkerhet råda kring vad som ska inkluderas i en sådan definition. Detta projekt ämnade därför till att undersöka olika definitioner av klimatneutralitet inom byggsektorn med fokus på ‘klimatneutrala byggnader’. Sju olika verktyg inkluderas i denna analys, vilka utgör en blandning av regionala, nationella och internationella initiativ men med den gemensamma nämnaren att alla utvecklat en egen definition av en ‘klimatneutral byggnad’. En litteraturgenomgång ämnade att sätta projektet i en tydlig kontext vilket sedan följdes av en dokumentanalys av verktygen och en intervjustudie med verktygsutvecklare vilka har insyn i de olika definitionernas utformning.  Resultatet visade att det råder delade meningar gällande val av systemgränser och tillvägagångssätt för att uppnå klimatneutralitet. Samtliga var överens om att förnyelsebar energiproduktion och elektrifiering kommer vara avgörande för att uppnå detta men däremot uppmärksammades olika klimatåtgärder för att balansera klimatpåverkan. Dessa inkluderade framförallt följande: produktion (och export) av förnyelsebar energi, köpt klimatkompensation och lagringsvärde av biogent kol i trämaterial. Dessutom presenterades energieffektivisering i befintligt bestånd, tekniska lösningar för att långsiktigt lagra koldioxid såsom bio-CCS, karbonatisering av betong, tillgodoräkning av en återvinningsdeklaration, återvunnet material och energi samt effektreduktion inom befintlig byggnad. Även systemgränserna skiljde sig åt där detta varierade från att framförallt inkludera det viktigaste och mest tillförlitliga till att inkludera samtliga steg inom byggnadens livscykel. Vidare visade studien på utmaningar kopplat till detta område som framförallt inkluderar brist på data, både vad gäller kvantitet och kvalitet, behovet att inludera antaganden och fiktiva beräkningar och osäkerhet kring framtiden så som elnätets mix och hantering av elektrifiering i byggsektorn. Detta indikerade att det i nuläget saknas konsensus kring vad en ‘klimatneutral byggnad’ är och att det finns utmaningar kopplat till en sådan definition, vilket tyder på att begreppet skulle behöva utvärderas ytterligare. Av den anledningen kan det vara rimligt att fundera på om klimatneutrala byggnader är ett begrepp som i nuläget är redo att användas, eller om det ska undvikas för att förhindra missförstånd. / Climate change is one of today’s biggest threats for humanity and if the global greenhouse gas emissions do not drastically decrease during the near future, this could have severe consequences for the world. In line with these challenges, global and national goals have been developed which aim to foster climate-neutral societies and industries. Since the climate effect from the building industry has shown to be major, it is important to consider emissions from this sector. During the recent years, several definitions of climate-neutrality in the built environment have been presented, which is a strategy considered to be important in order to reduce the climate impact from this field. Therefore, this project aimed to investigate different definitions of climate-neutrality in the building industry with the focus ‘climate-neutral buildings’. Seven tools were included, with a mix of regional, national and international focus, which all have presented a unique definition of a climate-neutral building. To settle the project in a clear context, a literature review became the first step. Thereafter, a document analysis was conducted as well as an interview study with tool developers with good insight into the framing of the different tools that were investigated.  The result showed that the definitions differ in terms of defined system boundaries and actions chosen to achieve climate-neutrality. All of the investigated tools promoted that renewable energy and electrification lay the foundation for the climate-neutral building definition. However, the climate actions presented for compensating and balancing the emissions differed. The presented actions included, above all: production (and export) of renewable energy, carbon offsets, and storage capacity of biocarbon in wood material. Additionally, the tools presented other actions which included energy-efficiency in existing buildings, technical solutions for long-term storage of carbon, carbonization of concrete, value connected to reuse of material and energy, as well as reduced energy-peak demand. The system boundaries differed in terms of inclusion of life cycle modules, from focusing on the most important and accurate stages, to include the full lifecycle of a building. Furthermore, the study identified challenges connected to the definition of climate-neutral buildings. These included, above all, lack of (high-quality) data, the need to use fictitious numbers and assumptions, as well as insecurities connected to the future, including the composition of the electricity mix and how the electricity grid will handle the electrification of the built environment. All these aspects indicate that the term climate-neutral building as for now lacks consensus and that there are challenges connected to this field. Therefore, 2 more evaluation seems to be needed and it might be reasonable to consider if climate neutral buildings as a concept is mature enough to be used, or if this should be avoided to prevent confusion and misunderstandings.
14

Tillvägagångssätt och implementering av nya arbetsmetoder med hänsyn till Färdplan 2045 för en mer klimatneutral byggproduktion : En fallstudie som genomförts hos en byggentreprenör

David, Georgis January 2024 (has links)
Bygg- och fastighetssektorn stod för 22% av Sveriges totala växthusgasutsläpp år 2021 vilket är en ökning med 1,9 % jämfört med föregående år. Det tydliggör behovet av ett mer hållbart byggande för att uppnå Sveriges klimatmål att uppnå noll nettoutsläpp senast år 2045. Det krävs en branschomställning där traditionella byggmetoder byts ut mot mer klimatneutrala arbetsprocesser, något som är utmanande idag. För att möta utmaningar har Bygg- och anläggningsföretagen antagit en färdplan 2045 som presenterar nio åtgärder för byggsektorn för att uppnå klimatneutralitet. Syftet med denna studie är att undersöka tillvägagångssätt och nya arbetsprocesser för en byggentreprenör i enlighet med åtgärderna i Färdplan 2045. För att möjliggöra studien har sex projekt och konsult intervjuats med hjälp av semi-strukturerad intervjuteknik för att få en djupare inblick i projektet. De djupare inblicken kan bidra till en ökad förståelse kring vilka hinder och klimatneutrala åtgärder som en byggentreprenör använder sig av. Resultatet presenteras i tabeller för att skapa en överblick kring återkommande klimateffektiva arbetsprocesser och eventuella hinder som hämmar klimatneutrala byggprojekt i enlighet med Färdplan 2045.Studien har identifierat flera klimatneutrala arbetsprocesser som använts i fallstudierna i olika omfattningar. Anpassning av arbetsprocesser utgör till stor del av beställarkraven och hållbarhetsambitionerna i projektet. Varsamma renoveringar har varit centrala, i synnerhet för kulturminnesmärkta byggnader men även i fallstudier som har höga hållbarhetsambitioner. Mängdningsprocesser har använts för beräkna materialåtgången där ett identifierat hinder är stora säkerhetspåslag som inneburit en suboptimering. Byggvarubedömningen har använts i alla fallstudier som bidragit till en förenklad process att välja material med låg klimatpåverkan. Internt inom byggentreprenörens verksamhet förekommer återbruk internt tillsammans med prefabricering och måttbeställningar för minimering av avfall. Det har genomförts projektering för främja flexibla och demonterbara planlösningar som ökar nyttjandegraden i fastigheten kombinerat med främja framtida återbruk. Det har genomförts omfattande åtgärder för att minimera byggarbetsplatsens klimatpåverkan med hjälp av en intern framtagen mall för resursoptimering. Miljövänlig etablering har genomförts tillsammans med att byggarbetsplatsens hålls elektrifierad och energisnål belysning som är hållbara tillvägagångssätt. Hinder för transportoptimeringar har identifierats med hänsyn till bristande planering och låg prioriteringsgrads om kräver vidare utveckling. Ett återkommande hinder är tids- och resursbrist att arbeta med hållbarhetsfrågor. För att möjliggöra minskad klimatpåverkan i byggprojekt krävs en tidig involvering av byggentreprenören för att skapa enhetliga mål och hållbarhetsambitioner. En tidig integrering bidrar till hållbara processer som sprids genom hela värdekedjan med hjälp av ett tydligt ledarskap och agerande som tar hållbarhet i beaktande.  Hinder har identifierats i form av brist i förståelse och kompetens som berör hållbart byggande. Stora byggnadskomplex byggs idag med korta tidsplaner, något som gör att traditionella byggmetoder används i större utsträckning. Det har bidragit till utvecklingen av byggkompetens hämmats när av traditionella arbetsprocesser används i större utsträckning. För framtida studier rekommenderas att genomföra en identisk studie hos en annan byggentreprenör för att bedöma likheter i arbetsprocesser och hinder som uppstår. Det rekommenderas även att genomföra en identisk studie hos beställare för att framhäva problematik och arbetsprocesser ur ett beställarperspektiv. En likadan studie rekommenderas att genomföras i framtiden hos byggentreprenören för att identifiera nya arbetsprocesser och dess effekter för att bedöma ifall byggentreprenören är i linje med klimatmålen. Det rekommenderas att ta fram standardiserade säkerhetspåslag vid mängdningar för att skapa en balans mellan minskad materialåtgång och undvika produktionsstopp. Slutligen rekommenderas det att undersöka färdplanens nio åtgärder mer ingående. / The Construction- and Real Estate sector was accountable for 22 % of Sweden’s total emissions in 2021, which marks a 1.9 % increase compared to the previous year. This highlights the urgent for a sustainable construction and implement more sustainable building methods to achieve Sweden’s climate goals to achieve net-zero emissions by 2045. To address these challenges, the Construction and Civil Engineering Companies have adopted the Roadmap 2045, which presents nine measures with associated recommendations for achieving climate neutrality in the construction sector.The purpose of this study is to explore new approaches for a construction contractor that is in alignment with the measures outlined in Roadmap 2045. Semi-structured interviews have been held with six project representatives and one external consultant to gain a deeper insight into the climate-neutral measures and obstacles encountered in these projects. These deeper insights can contribute to understanding of climate-neutral measures and obstacles that a construction contractor is facing. The results are presented in tables to provide an overview of climate-efficient methods and obstacles that inhibits climate-neutrality in building projects in line with Roadmap 2045. The study has identified several work methods in various extents that contribute to lower emissions in the building projects. The adaption of work processes is dependent on the client’s sustainability ambitions in the construction project and requirements. Careful renovations have been central, particularly for building that have a high cultural heritage where demolitions are not an option but also in construction projects with high sustainability ambitions. Workprocess have been used to calculate material consumption in the building projects where an identified obstacle is large margins to the calculations which is a sub optimization. Assessments for building materials have been used in the building projects for contributing of an easier process of selecting materials with a low impact on the climate. Reuse of material is common, especially internally withing the contractor’s building projects which minimizes waste where also prefabrication and custom orders also plays a big role. There has been a planning to build demountable and flexible layouts which increase the buildings utilization rate combined with promoting future reuse. Big measurements have been taken to minimize the climate impact at the contractors building site with the help of a template that takes resource optimization into account. Environmentally friendly site has been implemented along with using energy-efficient light and using electrified machinery as sustainable approaches. Transport optimization is an obstacle that have been identified due to poor planning and low priority which requires further development of its working methods. A recurring obstacle is lack of resources and time to work further on the sustainability issues. To be able to reduce climate impact in the construction project, early involvement of the construction contractor is necessary to create the same sustainability ambitions and unified goal. Early integration does contribute to a sustainable approach that spread throughout the value chain with a clear leadership that takes sustainability into account. Obstacles have been identified where a lack of understanding and knowledge that relates to sustainability construction. Large building structures are being built with tight schedules today which promotes traditional construction processes and methods to a greater extent. This is a main reason why development of sustainable competence in constructions is being hindered when traditional processer is used more regularly rather than testing out new sustainable process. For future studies, its recommended to conduct an identical study with another construction contractor to identify similar if the obstacles and work processes are similar. It is also recommended to conduct an identical study with clients to highlight the problem from a client perspective and introducing new sustainable work methods for clients.  A similar study is recommended to conducted in the future at the same construction contractor do identify potential new work methods and processed and identify if the contractor is in line with Sweden climate goals. It is also recommended to develop standardized safety margins for building materials to creating a balance between avoiding production stoppages and reduced material consumption. Lastly, its recommended to examine roadmaps nine measures in more detail.

Page generated in 0.0596 seconds