Finansiering av vindkraft : fallstudie av Lau Vind AB / Financing of wind power : a case study of Lau Vind LtdLewander, Christian, Westberger, Jon January 2012 (has links)
The wind power increase of Gotland as well as other parts of Sweden during the last ten year period has meant that this renewable energy source has increased its share over other fossil sources. The year of 2011 became the first when the wind power produced more energy than an average nuclear reactor. Now that wind power is in an expansive phase, the land issue will be of great interest. Land with good wind resources will be of interest to wind energy developers. The problems that this essay is based on are; how can landowners altering the economic conditions at a wind power establishment? What opportunities and obstacles exist for landowners who choose to set up wind power on their land? The purpose of this essay is to highlight the economic conditions that exist for landowners for the establishment of wind farms, with regard to compensation for the leasing and return on invested capital. The authors will also clarify the difficulties and opportunities arising from the process at an imaginary wind power establishment, which have emerged through interviews and research articles. The primary sources consist of interviews with actors for a planned wind farm in southeast Gotland, as well as representatives of a trade association of companies working with wind power. Interviews were also made with a bank, where the experience in question funding for wind energy has been important for our problem as well with a wind turbine manufacturer for real facts about wind turbines. Landowner’s interest in wind energy as a long term investment has in Lau on Gotland resulted in a project where local landowners have chosen to form a joint company to invest in a wind farm, with the goal that the park generally will be owned by local residents in the parish. Conclusions to be drawn from this study is that landowners who form a joint company, in this case Lau Wind AB will open an opportunity for landowners to take a larger share of the ownership and profits as wind power turbines on their land supplies. But also for locals who have opportunity to become owners of the wind through the purchase of shares in wind farm.
|
2 |
Kommunikation och samarbete i ett byggprojekt : Hur uppfattar vi varandra? / Communication and cooperation in a construction project : How do we intrepret each other?Edman, Robert, Lunde, Christopher January 2014 (has links)
Byggbranschen anses vara en konservativ bransch både vad gäller teknik och samarbetsformer. Det oerhörda trycket på byggbranschen och det stora antalet byggprojekt som utförs idag gör att en del komplikationer uppstår. Detta kan bl. a. bero på tidsbrist, kompetensbrist och samarbetsproblem. I vissa projekt fungerar samarbetet utmärkt mellan projektets olika parter men i allt för många projekt är samarbetet mellan parterna bristfällig. Detta kan medföra ”onödiga” ekonomiska och eller tidsmässiga konsekvenser. I samhället idag är kommunikation nyckeln till ett lyckat samarbete. Även i byggbranschen belyses kommunikation som en nyckel till ett lyckat projekt. Branschen är i ett läge där denna debatt är intressant men ännu inte riktigt kommit upp på bordet. Vårt mål med projektet är att väcka denna debatt och undersöka hur samarbetet mellan parterna egentligen fungerar, varför det fungerar/inte fungerar och hur det eventuellt kan förbättras. I examensarbetet granskas samspelet mellan de 4 aktörerna Beställare, Projektledare/Byggledare, projekterande Konsult och Entreprenör för att utreda vad som ibland skapar denna kommunikationsbrist och samarbetsproblem. Genom intervjuer och empiriska undersökningar har vi skapat oss en uppfattning om hur parterna uppfattar samarbete och kommunikation i tidigare och nuvarande projekt. Vad har de saknat? Vad tycker de fungerar? Hur skulle de vilja samarbeta och utveckla kommunikation till det bättre? Som en stöttepelare till intervjuerna har en elektronisk undersökning gjorts där 113 svar redovisats, behandlats, analyserats. De som fått tillgång till den elektroniska undersökningen är de företag där intervjuerna gjorts samt tjänstemän från ett ytterligare tiotal olika företag med varierande storlek och omsättning. Utifrån intervjuerna och den elektroniska undersökningen kan vi konstatera att den generella synen mot andra parter i ett byggprojekt är mycket god med några få reservationer. Utefter den frågeställning vi gjorde inledningsvis kan vi nu konstatera att entreprenadform har mindre betydelse för kommunikation och samarbete i ett projekt. Dock har vi kommit fram till att det existerar vissa nyckelord för att uppnå god kommunikation och ett gott samarbete i ett projekt. Nyckelorden vi har kommit fram till är: starten i ett projekt, gemensamma mål, personkemi, beslutskraft, tydlighet och kunskap. / The construction industry is considered to be a conservative industry both in technology and forms of cooperation. The immense pressure on the construction industry and the large number of construction projects that are currently being undertaken in a number of complications arise. This may be due to time constraints, skill shortages and cooperation problems. In some projects the cooperation between the project partners works very well, but in too many projects the collaboration between the parties is inadequate. This can result in "unnecessary" financial and or timing implications. In society today, communication is the key to a successful cooperation. Even in the construction industry communication are highlighted as a key to a successful project. The industry is in a position where this debate is interesting but not yet being highlighted. Our goal with this study is to bring this debate and examine how cooperation between the parties really works, why it works/does not work and how it might be improved. The thesis examines the interplay between the four actors Client, Project Manager/Construction Manager, project planning Consultant and Contractor to investigate what sometimes creates this lack of communication and cooperation problems. Through interviews and empirical studies, we have created an impression of how the parties perceive cooperation and communication in past and current projects. What have they missed? How do they work? How would they like to work together and develop communication for the better? As a mainstay of the interviews, an electronic survey carried out in which 113 responses recorded, processed, analyzed. Those who had access to the electronic survey are companies where the interviews made and officers from an additional ten different companies of varying size and turnover. Based on the interviews and the electronic survey, we can conclude that the general perception to other parties on a construction project is very good with a few reservations. Along the issue we did initially, we can now conclude that the contract form is less important for communication and collaboration in a project. However, we have concluded that there are certain keywords in order to achieve good communication and good cooperation in a project. The key words we've come up with is: the start of a project, shared goals, personal chemistry, decisiveness, clarity, and knowledge.
|
3 |
Verktygslådan : Effektivisering av projekteringsskedet med hjälp av en tilläggsfunktion i Revit / The toolbox : Increased efficiency of the planning stage by using an additional function in RevitAtabas, Burak, Unlu, Busra January 2017 (has links)
For more time and cost efficient projects, the construction industry needs to develop modern and integrated working methods. The preparation of construction documents is now in transition from 2D (AutoCAD) to 3D (Revit) modelling with an aim to streamline the workflow. This study aims to streamline the construction designing and planning stages by implementing specific commands that are adapted for Revit. The function of these commands is to provide complete structural components. These components will reduce the time to complete a construction drawing set compared to a traditional 2D method. Qualitative studies were conducted in the form of interviews with construction engineers. The interviews were based on different sub-areas that affect different parts of the planning stages. Based on these interviews, the toolbox was designed, containing the previously mentioned commands. Some conclusions that have been drawn after the study completion are that the construction industry is in need for a change, and that the building sector requires a systematic and united working method to streamline work methodology. In addition to the reduction of time and additional costs, this tool will reduce the frustration that may arise in the search of building components using traditional methods. / För ett effektivt arbete behöver byggbranschen utveckla mer moderna- och integrerade arbetsmetoder. Evolutionen inom bygg med avseende på framställningen av konstruktionshandlingar övergår från 2D- till 3D-handlingar och övergången effektiviserar arbetet. Denna studie har i syfte att effektivisera arbetet för konstruktörerna i projekteringsskedet genom att beakta behoven som efterfrågas om Revit och tillgodose dessa. Genom en fallstudie utvärderades för-och nackdelarna med den befintliga arbetsmetoden som bidragit till idén om en tilläggsfunktion i Revit. I de kvalitativa studierna utreddes behovet av en tilläggsfunktion som genomfördes i form av intervjuer med konstruktörer. Behovet tillgodosågs med hjälp av tilläggsfunktionen Verktygslådan som tillhandahåller olika knappar som representerar olika byggkomponenter. Det var den kvalitativa studien som bidrog till utvecklingen av idén där konstruktörers åsikter och råd tog i akt. Effekten av Verktygslådan blev en reducering av projekteringstiden som samtidigt minskade störningar i arbetet. Slutsatser som har dragits efter avslutad studie är att byggbranschen indikerar ett behov av förändring, där sektorn kräver ett mer systematiskt och enhetligt arbetssätt för att effektivisera arbetsmetodiken. Genom att tillhandahålla konstruktionshandlingar på ett effektivare sätt reduceras tidsåtgången och merkostnaderna samtidigt som sektorn erhåller högre kvalité och tillförlitlighet i de olika skedena.
|