• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2862
  • 38
  • 30
  • 15
  • 2
  • 1
  • 1
  • 1
  • Tagged with
  • 3099
  • 924
  • 815
  • 814
  • 813
  • 813
  • 813
  • 813
  • 794
  • 693
  • 652
  • 644
  • 635
  • 542
  • 499
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
191

Edificio Las Flores proyecto inmobiliario para la construcción de un edificio multifamiliar en el distrito de San Isidro

Alva Sánchez, Oswaldo Alejandro, Colichón Bolívar, Juan Carlos, Concha Chirinos, David Óscar 14 January 2014 (has links)
Actualmente nuestro país se encuentra en una etapa de crecimiento, en la que se está desarrollando, entre otras, la industria de la construcción. Este crecimiento a su vez alcanza los distintos rubros dentro de la construcción como son carreteras, puentes, canales y de manera particular la vivienda. Este crecimiento en la construcción de viviendas se vio estimulado por programas gubernamentales como lo son “MIVIVIENDA” y “Techo Propio” que a su vez estimularon al sector privado, en particular al sector financiero, a crear programas de créditos hipotecarios que se asemejasen a los programas gubernamentales con el fin de poder competir con estos e incluso superarlos. Motivados por las razones anteriormente expuestas es que proponemos el desarrollo integral del proyecto inmobiliario, “Edificio Las Flores” El proyecto se desarrollará en la acumulación de dos terrenos contiguos ubicados en la Av. Las flores N° 375 (con área. de 1,050 m2) y el segundo en el Pasaje Guatemala N° 175 (con área. 550 m2). Dichos terrenos están ubicados frente al Parque Guatemala, vale acotar que el terreno constituye un aporte del socio inversionista. El proyecto está dirigido a familias comprendidas dentro de los niveles socioeconómicos A1 y A2, de acuerdo con la clasificación que nos da APOYO, con ingresos mensuales netos de 2500 a más de 5000 dólares mensuales.
192

Proyecto edificio Los Corales Miraflores

Tueros Girón, Manuel, Vargas Tello, Rafael Santiago, Vargas Tello, Óscar Gian Carlo 14 January 2014 (has links)
Se ha previsto el desarrollo de un negocio inmobiliario entre dos accionistas, el cual consiste en la construcción y venta de un edificio en el distrito de Miraflores, ubicado a una cuadra del malecón Cisneros. El terreno pertenece a uno de los accionistas, quien aportará el terreno como capital y otra parte en efectivo, el otro accionista aportará el monto de capital, el cual hace que se nivele al aporte del otro accionista. El terreno está ubicado entre la Calle Trípoli y la Calle Bolognesi. Posee un área de 292 m². En base a la ubicación y a la actual demanda de edificaciones se ha realizado un estudio de mercado, tomando en cuenta el Décimo Estudio “El mercado de edificaciones urbanas en Lima Metropolitana y el Callao” realizado por CAPECO con la finalidad de identificar la demanda potencial y las necesidades que demandan al público objetivo al que se quiere llegar. Además se ha realizado un análisis del mercado inmobiliario en la zona, lo cual permite tener un mayor conocimiento de la competencia directa y el precio de venta del m² en la zona, con la finalidad de contar con un producto competitivo. Se ha desarrollado un esquema para la gestión del proyecto, el cual permite identificar las etapas involucradas en el desarrollo del proyecto, desde su concepción hasta la etapa de construcción del Edificio. Con este esquema se puede tener una visión más amplia de las etapas involucradas con el fin de desarrollar una mejor ejecución del proyecto. Para ver la rentabilidad del proyecto se ha efectuado un análisis contable del proyecto, reflejado en el TIR y VAN, lo cual arroja un porcentaje alentador para los inversionistas. Se ha desarrollado un plan de marketing, herramienta fundamental para la promoción y venta de los departamentos, con lo cual se puedan vender los departamentos de acuerdo al flujo económico y evitar la falta de liquidez en el transcurso del desarrollo de la construcción. Con estas herramientas se puede dar al inversionista un panorama real de la situación actual del mercado inmobiliario, el costo del producto y la utilidad a generarse en el tiempo de desarrollo del negocio, una utilidad que permita indicar si la inversión es rentable para ambos accionistas; o en caso contrario, evaluar si el desarrollo de un proyecto inmobiliario con tales características en la actualidad (parámetros urbanísticos en la zona, precio de venta del departamento, competencia, costo actual del terreno, etc.) es económicamente rentable, con la finalidad de evaluar otro proyecto o terreno.
193

Aplicación de estándares globales del PMI en el Proyecto de Ingeniería Y Construcción de 03 almacenes de techo autoportante para el almacenamiento de equipos y el adoquinado de vías de acceso y circulación – Planta YURA Arequipa

Chalco Vargas, Michel, Choquenaira Paccosoncco, Igor, Fuentes Cavides, Walter, Jiménez Vega, Pedro 01 October 2016 (has links)
El proyecto consiste en el desarrollo de la ingeniería de detalle, así como la ejecución de las obras civiles, mecánicas y eléctricas para la construcción de 03 Almacenes de Logística, ubicado en la planta Yura S.A. Arequipa, para la estructura se usará un sistema aporticado en Concreto Armado, con cerramiento lateral y plancha metálica traslucida, así mismo el techo será en arco autoportante. En el Capítulo 1 se desarrolla el tema de caso de negocio en donde se parte desde una descripción de la Constructora Zavaleta EIRL., Luego se procedió a realizar un Análisis del entorno, enfatizado en la ciudad de Arequipa y posteriormente en un ámbito nacional. Se realizó un Diagnostico interno de la Constructora Zavaleta EIRL., donde se definió la unidad de negocio, la cadena de valor, el Balance general de la empresa y se realizó un Análisis FODA. En el Capítulo 2 se desarrolló el Plan para la Dirección del Proyecto, utilizando como fuente principal la Guía del PMBOK en su Quinta Edición. Se desarrollaron los Planes de Gestión del Alcance, Costos, Tiempo, Calidad, Riesgos, Adquisiciones, RR.HH., Comunicaciones e Interesados. / Tesis
194

Planteamiento de una metodología para la implementación de proyectos de transmisión eléctrica en empresas de distribución del estado peruano

Idme Machaca, Victor 31 May 2018 (has links)
El presente trabajo tiene como objetivo determinar procedimientos eficaces y estandarizados basados en las buenas prácticas del PMI y su guía, que permita cumplir con los objetivos de implementación de un proyecto de transmisión de energía eléctrica en tiempo, costo y calidad previstos al inicio del proyecto para empresas distribuidoras de electricidad del Estado Peruano. No es nuevo que el Estado Peruano use los marcos de gestión en basados en el PMBOK, y la difusión de sus buenas prácticas es ampliamente difundido entre profesionales del sector eléctrico específicamente en las áreas de construcción de infraestructura eléctrica. En la actualidad, las áreas de proyectos tienen metodologías que se basan en la experiencia de las personas las que al dejar la empresa se van con todo el expertis adquirido, sin dejar registros de los procedimientos utilizados o registro de lecciones aprendida, poniendo en riesgo repetir errores en futuros proyectos de la empresa. Planificar los proyectos de transmisión mediante la guía y las buenas prácticas del PMI, como un mecanismo base para el control de proyectos, mejorara el aseguramiento del cumplimiento ene tiempo, costo y calidad en la ejecución de proyectos de transmisión. Debido a que la planificación y ejecución de dichos proyectos es similar en las empresas distribuidoras de electricidad, debido a uso de la misma normativa, concluimos que es aplicable a todas las empresas distribuidoras de electricidad comprendidas en la Corporación FONAFE. / Tesis
195

Implementación de una PMO bajo el estándar del PMBOK en el Sub Área de Infraestructura de la Caja Municipal de Ahorro y Crédito Cusco S.A.

Jiménez Escajadillo, Julio César 01 July 2018 (has links)
Una PMO es un grupo o departamento dentro de la empresa que define y mantiene estándares para la gestión de proyectos en la organización. Es decir, busca estandarizar y optimizar procesos en la ejecución de proyectos y ser el gestor de la documentación, las guías y las métricas asociadas a estos procesos. El fenómeno de la PMO se ha establecido como una realidad en organizaciones líderes de todo el mundo y luego de múltiples investigaciones, se ha descubierto mucho sobre esta entidad organizacional; sin embargo, después de cada descubrimiento, surgen nuevas preguntas, que muestran que aún hay mucho por entender sobre el comportamiento de la PMO en las organizaciones. Gran parte de esta complejidad se explica por la diversidad de estructuras encontradas en diferentes organizaciones. No es difícil ver que las PMO difieren considerablemente de una organización a otra, pasando por diferentes configuraciones que las hacen únicas en las estructuras organizativas a las que pertenecen. Implementar una PMO en una organización genera un alto beneficio pero debe ser llevado por profesionales con el debido conocimiento y experiencia. Una PMO aumenta la probabilidad de éxito de los proyectos y su rentabilidad. Genera nuevas oportunidades de negocio al incrementar la satisfacción de sus clientes y creando una imagen de organización más eficiente. La presente tesis desarrolla una propuesta de implementación de una Oficina de Gestión de Proyectos (PMO) para promover la estandarización de procesos, incrementando el nivel de madurez del Área de Infraestructura de la CMAC Cusco. / A PMO is a group or department within the company that defines and maintains standards for the management of projects in the organization. That is, it seeks to standardize and optimize processes in the execution of projects and be the manager of the documentation, guides and metrics associated with these processes. The phenomenon of the PMO has been established as a reality in leading organizations around the world and after multiple investigations, much has been discovered about this organizational entity; however, after each discovery, new questions arise, which show that there is still much to understand about the behavior of the PMO in organizations. Much of this complexity is explained by the diversity of structures found in different organizations. It is not difficult to see that the PMOs differ considerably from one organization to another, going through different configurations that make them unique in the organizational structures to which they belong. Implementing a PMO in an organization generates a high benefit but it must be carried out by professionals with due knowledge and experience. A PMO increases the probability of success of projects and their profitability. It generates new business opportunities by increasing the satisfaction of its customers and creating a more efficient organization image. This thesis develops a proposal for the implementation of a Project Management Office (PMO) to promote the standardization of processes, increasing the maturity level of the CMAC Cusco Infrastructure Area. / Tesis
196

Dirección de proyectos en la implementación de alimentadores de distribución primaria en la región San Martín bajo los estándares del PMI

De La Vega Trelles, Raúl, Mejía Cáceres, Carlos, Pajares Centeno, Sandra Elena 23 February 2017 (has links)
El presente trabajo de investigación fue desarrollado para incorporar un plan para la dirección de proyectos alineado a la estrategia del área de proyectos de Electro Oriente S.A., utilizando las buenas prácticas contenidas en la Guía del PMBOK® 5ta edición, 2013, el mismo se realizó en base al proyecto “Implementación de Alimentadores de Distribución Primaria en la Región San Martín” concluido en el año 2012 por Electro Oriente S.A, ejecutado en el distrito de Juanjuí, Provincia de Mariscal Cáceres, departamento de San Martín. Es importante implementar la dirección de proyectos en lineamiento con la guía del PMBOK® 5ta edición, 2013., pues ayudará eficientemente a aplicar conocimientos, procesos, habilidades, técnicas y herramientas para el éxito del proyecto. En la ejecución del proyecto se implementó cinco Alimentadores Rurales de Distribución Primaria, tres en 10.0 kV y dos en 22.9 kV, con un total de 14.735 km, ejecutar el proyecto involucró realizar la instalación de redes primarias nuevas, reforzar redes primarias existentes y la instalación de subestaciones de distribución nuevas en las redes primarias. Los requisitos del proyecto fueron cumplir con la ejecución en un periodo de 250 días, con un presupuesto de S/4’095,447.55 soles, según lo indicado en el acta de constitución, considerando como criterio de éxito no excedernos de 4.25% del presupuesto total del proyecto. Se evaluaron riesgos técnicos de ingeniería, externos por eventos naturales (climatológicos), organizacionales como recursos, y de dirección de proyectos. En el análisis financiero obtuvimos un valor actual neto (VAN) de S/11’666’37 soles proveniente de una evaluación de 6 años, y considerando un WACC de 8.6% calculado a partir de la comparación con otras empresas del mismo rubro y utilizando información del mercado como el rendimiento del mercado, la inflación y el riesgo país. Por lo tanto, Electro Oriente S.A. tuvo las aptitudes para ejecutar el proyecto eficientemente por contar con profesionales competentes y aplicar las buenas prácticas indicados en la guía del PMBOK® 5ta edición, 2013, cumpliendo con la calidad de los entregables del producto, realizando una buena gestión de cambio en todo el ciclo de vida del proyecto, imputando los costos a las cuentas de control, y haciendo una adecuada gestión de riesgos para el proyecto.
197

CÁLCULO DE BRECHAS DE COMPLEMENTARIEDAD BAJO EL PRISMA DE LA SOSTENIBILIDAD PARA LOS PROYECTOS ESTRATÉGICOS HÍDRICOS DE RIEGO Y PROPUESTA DE MITIGACIÓN. CASO DE LA REPÚBLICA DEL ECUADOR

GALLARDO CARRILLO, GALO 24 October 2016 (has links)
[EN] Water projects generally run the risk of being isolated and incomplete unfulfilled or partially do the objectives for which they were built to be assessed solely through the quality of construction of infrastructure, as evidenced by observing how projects present a reality in its planning stage and other very different when they are running or after completed, causing a deficit of services offered and finally a gap between the original intentions and actual needs. After justify the investigation based on the three pillars of sustainability, it was raised as a main objective: identify, select, characterize, measure and prioritize variables complementarity to measure gaps not constructive complementarity in strategic water irrigation projects with a sustainability focus. To meet the objective a rigorous study of the state of knowledge of policies and sustainable water management was conducted, establishing that there is a need to develop a methodology to identify, prioritize and select variables of sustainability. The methodological proposal contains 5 phases: Phase I uses 4 techniques: 1) review of the scientific-technical documentation, 2) collecting information through expert panels, 3) gathering information through interviews and 4) diagramming techniques, after which, 32 variables of complementarity were selected: 7 economic, 11 environmental and 14 social applicable to strategic water irrigation projects in its non-construction phase. How to measure the interaction between these 32 variables of complementarity is developed in Phase II through an online survey. 407 letters inviting Latin American experts were made by involving 42 experts. 27 projects were investigated: 16 in Ecuador, 2 in Peru, 1 in Chile, 1 in Argentina, 1 in Bolivia, 1 in Brazil and 5 in Spain. This phase is complemented with an analysis of the current status of implementation of complementarity variables selected in the management of water irrigation projects, and management styles depending on their NDU, NDD, NDI and NDG. In Phase III it explains how to measure gaps of complementarity developing a mathematical formula and a model to calculate the probability that no constructive gaps appear depending on the performance levels achieved in the study variables. Finally, the results obtained of the gap in Latin America versus those of the Republic of Ecuador are compared. Phase IV was performed using hierarchical cluster analysis to identify groups of projects with similar and different features with each other, which were categorized using a table with assessing risk approach gaps on a scale of 1 to 5. Finally, in Phase V a roadmap is done with mitigation proposals calculated based on reducing gaps. The results of the proposed methodology allow secured with a 95% chance to avoid mistakes among other findings: . What the experts say have a greater NDD and NDI in economic variables, secondly, the environmental variables and finally social variables. . That the Republic of Ecuador 3 Groups of projects with similar characteristics are identified as gaps unconstructive complementarity. Finally, as further research monetizing gaps arises to determine the costs of covering gaps of complementarity and awareness among policy makers and decision makers on such projects as can help the sustainable development of these projects implemented in natural regions and watersheds of the Republic of Ecuador and the like in any geographical location. / [ES] Los proyectos hídricos en general corren el riesgo de quedar aislados e incompletos sin cumplir o hacerlo parcialmente los objetivos para los cuales fueron construidos al ser evaluados únicamente a través de la calidad de la construcción de la infraestructura, lo que se evidencia al observar como los proyectos presentan una realidad en su etapa de planificación y otras muy distintas cuando están en ejecución o después de finalizados, ocasionando un déficit de los servicios finalmente ofrecidos y una brecha entre las intenciones originales y las necesidades reales. Luego de justificar la investigación en base a los tres pilares de la sostenibilidad, se planteó como objetivo principal: identificar, seleccionar, caracterizar, medir y jerarquizar variables de complementariedad para medir brechas de complementariedad no constructivas en los proyectos estratégicos hídricos de riego con un enfoque de sostenibilidad Para cumplir el objetivo se realizó un riguroso estudio del estado del conocimiento de las políticas y de la gestión sostenible del agua, estableciéndose que existe la necesidad de desarrollar una metodología para identificar, priorizar y seleccionar variables de sostenibilidad. La propuesta metodológica contiene 5 fases: La Fase I utiliza 4 técnicas: 1) revisión de documentación científica-técnica, 2) recopilación de información mediante paneles de expertos, 3) recopilación de información mediante entrevistas y 4) técnicas de diagramación, luego de lo cual se seleccionaron 32 variables de complementariedad: 7 económicas, 11 ambientales y 14 sociales aplicables a los proyectos estratégicos hídricos de riego en su fase no constructiva. Cómo lograr medir la interacción entre las 32 variables de complementariedad se desarrolla en la Fase II a través de una encuesta online. Se realizaron 407 cartas de invitación a expertos latinoamericanos logrando la participación de 42 expertos. Se investigaron 27 proyectos: 16 en Ecuador, 2 en Perú, 1 en Chile, 1 en Argentina, 1 en Bolivia, 1 en Brasil y 5 en España. Se complementa esta Fase realizando un análisis del estado actual de la aplicación de las variables de complementariedad seleccionadas en la gestión de proyectos hídricos de riego, y de los estilos de gestión en función de sus NDU, NDD, NDI y NDG. En la Fase III se explica cómo medir las brechas de complementariedad desarrollando una fórmula matemática y un modelo que permite calcular la probabilidad de que aparezcan brechas no constructivas en función de los niveles de desempeño alcanzados en las variables del estudio. Finalmente, se comparan los resultados de brecha obtenidos en Latinoamérica versus los de la República del Ecuador. La Fase IV se realizó mediante análisis de conglomerados jerárquicos para identificar los Grupos de proyectos con características similares y diferentes entre sí, a los cuales se les categorizó mediante una tabla con enfoque de riesgos evaluando las brechas en una escala de 1 a 5. Finalmente, en la Fase V se realiza un mapa de ruta con propuestas de mitigación basadas en reducir las brechas calculadas. Los resultados de la metodología propuesta permiten asegurar con un 95 % de probabilidad de no equivocarse entre otros hallazgos: . Que los expertos dicen tener un NDD y NDI mayor en las variables económicas, en segundo lugar, en las variables medioambientales y finalmente en las variables sociales. . Que en la República del Ecuador se identifican 3 Grupos de proyectos con características similares según las brechas de complementariedad no constructiva. Finalmente, como investigaciones futuras se plantea la monetización de las brechas para determinar los costos de cubrir las brechas de complementariedad y concienciar a los responsables políticos y tomadores de decisiones sobre este tipo de proyectos como pueden ayudar al desarrollo sustentable de estos proyectos implementados en regiones naturales y cuencas hidrográficas de la / [CAT] Els projectes hídrics en general corren el risc de quedar aïllats i incomplets, sense complir o fer-ho parcialment els objectius per als quals van ser construïts al ser avaluats únicament a través de la qualitat de la construcció de la infraestructura, la qual cosa es pot evidenciar a l'observar que els projectes presenten una realitat en la seua etapa de planificació i altres molt distintes quan estan en execució o després de finalitzar-se. Esta circumstància ocasiona un dèficit dels servicis finalment oferits i una bretxa entre les intencions originals i les necessitats reals. I després de justificar la investigació a desenrotllar-se basant-se en els tres pilars de la sostenibilitat, es va plantejar com a objectiu principal: identificar, seleccionar, caracteritzar, mesurar i jerarquitzar variables de complementarietat per a mesurar bretxes de complementarietat no constructives en els projectes estratègics hídrics. Per a desenrotllar l'objectiu general va ser necessari realitzar un rigorós estudi de l'estat del coneixement de les polítiques i de la gestió sostenible de l'aigua, establint-se que hi ha la necessitat de desenrotllar una metodologia per a la identificació, priorització i selecció de variables de sostenibilitat La proposta metodològica consistent en 5 fases: La Fase I es va realitzar utilitzant 4 tècniques: 1) revisió de documentació científica-tècnica, 2) panells d'experts, 3) entrevistes i 4) tècniques de diagramació, després de tot això es van seleccionar 32 variables de complementarietat: 7 econòmiques, 11 ambientals i 14 socials aplicables als projectes estratègics hídrics de reg en la seua fase no constructiva.Com aconseguir mesurar la interacció entre les 32 variables de complementarietat es desenrotlla en la Fase II, havent-se elaborat per a això una enquesta online. Es van realitzar 407 cartes d'invitació a experts coneixement integral i experiència en projectes estratègics hídrics de reg a Llatinoamèrica, aconseguint la participació de 42 experts i 27 projectes: 16 en Equador, 2 a Perú, 1 a Xile, 1 a Argentina, 1 a Bolívia, 1 a Brasil i 5 a Espanya. Es complementa esta Fase realitzant una anàlisi de l'estat actual de l'aplicació de les variables de complementarietat seleccionades en la gestió de projectes hídrics de reg, en funció dels seus NDU, NDE, NDI i NDG. En la Fase III s'explica com mesurar les bretxes de complementarietat, desenrotllar una fórmula matemàtica i un model que permet calcular la probabilitat que apareguen bretxes no constructives en funció dels nivells d'exercici aconseguits en les variables de l'estudi..La Fase IV es va realitzar per mitjà d'anàlisi de conglomerats jeràrquics per a identificar els grups de projectes amb característiques semblants i diferents entre si, als quals se'ls va categoritzar per mitjà de l'aplicació d'una taula enfocament de riscos avaluant les bretxes en una escala d'1 a 5. Finalment, en la Fase V es realitza un mapa de ruta amb propostes de mitigació basades a reduir les bretxes calculades. Els resultats de l' metodològica proposta permeten assegurar amb un 95 % de probabilitat de no equivocar-se entre altres troballes: . Que els experts diuen tindre un NDE i NDI major en les variables econòmiques, en segon lloc, en les variables mediambientals i finalment en les variables socials. . Identificar en la República de l'Equador 3 Grups de projectes amb característiques semblants segons les bretxes de complementarietat no constructiva. Finalment, ha permés provocar investigacions futures com la monetització de les bretxes a fi d'aconseguir determinar els costos que representen en un projecte cobrir les bretxes de complementarietat i, conscienciar els responsables polítics i els responsables de prendre decisions sobre este tipus de projectes per a ajudar al desenrotllament sustentable dels projectes de reg implementats en regions naturals i conques hidrogràfiques concretes de la República de / Gallardo Carrillo, G. (2016). CÁLCULO DE BRECHAS DE COMPLEMENTARIEDAD BAJO EL PRISMA DE LA SOSTENIBILIDAD PARA LOS PROYECTOS ESTRATÉGICOS HÍDRICOS DE RIEGO Y PROPUESTA DE MITIGACIÓN. CASO DE LA REPÚBLICA DEL ECUADOR [Tesis doctoral no publicada]. Universitat Politècnica de València. https://doi.org/10.4995/Thesis/10251/72638 / TESIS
198

Planeamiento del estudio de impacto ambiental de la ampliación del proyecto Tantahuatay

Guerra Huamaní, Sarah Elena 19 March 2013 (has links)
El Perú es uno de los países más ricos en minerales, pero a su vez es el que menos protege el medioambiente cuando se realiza la explotación de los recursos; no se tiene una concientización del efecto de las acciones tomadas al realizar la explotación de los minerales, ni se toma en cuenta a la población de la zona, ni a los animales, ni el hábitat que existe, los cuales han estado ahí desde hace mucho tiempo y cualquier cambio en los hábitats ya existentes podrían afectar o peor aún, destruir lo que a la naturaleza le tomó años o siglos desarrollar. Es por éso que se implementaron una serie de normas, leyes establecidas en cada gobierno para lograr la protección de la biodiversidad y proteger a la población que habita en la zona. Existen muchas empresas mineras irresponsables que con el fin de rebajar costos y obtener mayores utilidades, no cumplen con esta reglamentación. La Ley 27446 del Sistema Nacional de Evaluación de Impacto Ambiental (SEIA), establece un procedimiento único para la revisión y aprobación de los instrumentos de gestión ambiental y/o sus modificaciones en cada sector, señalando en el tercer artículo que no podrá iniciarse la ejecución de proyecto, ni las actividades de servicios que sean señalados en el D.S.019-2009-MINAM, Reglamento de la Ley del SEIA y que ninguna autoridad nacional, sectorial, regional o local podrá aprobarlas, autorizarlas, permitirlas, concederlas o habilitarlas, si no cuentan previamente con la certificación ambiental contenida en la Resolución expedida por la respectiva autoridad competente. La presente tesis se trata sobre el Planeamiento para la realización del Estudio de Impacto Ambiental (EIA) de la Ampliación del Proyecto de Tantahuatay Ciénaga Norte ubicado en el departamento de Cajamarca en la provincia de Hualgayoc y distrito de Chugur. El Planeamiento del Estudio de Impacto Ambiental (EIA) se ha realizado usando los estándares globales del Project Management Institute (PMI®). / Tesis
199

Elaboración de un plan de prevención para no conformidades críticas en la ejecución de proyectos de edificaciones

Espejo Gavilano, Carlos Enrique 01 January 2015 (has links)
El primer capítulo explica el fundamento teórico que debemos comprender cuando hablamos de calidad. Se muestran las herramientas de calidad que son las técnicas a utilizar para realizar los análisis, y cómo también las herramientas estadísticas utilizadas en las tablas, sirven para la elección de los datos a tratar. El segundo capítulo, presenta el caso de estudio: La constructora e inmobiliaria Edifica, de la cual se expondrá su historia, y su estructura organizacional. Se muestra también su área de calidad, y por último los proyectos de edificaciones involucrados en la investigación. El tercer capítulo, trata acerca de la identificación, recolección y clasificación de “No Conformidades” de los proyectos de edificaciones involucrados, con ello mediante las herramientas de calidad y estadísticas, se podrá distinguir las “No Conformidades” críticas, siendo estas las de interés para brindar posibles acciones preventivas y soluciones. En el cuarto capítulo, se identifica las causas de las “No Conformidades Críticas” (NCC) mediante encuestas a los expertos de la empresa, y con ello determinar las posibles soluciones y acciones preventivas para evitar la presencia de NCC.Finalmente presenta las conclusiones. / Tesis
200

Propuesta de diseño de una Oficina de Gestión de Proyectos para la Empresa AGROPECUARIA DEL PERÚ S.A.

Arias Huallullo, Daniel Alexander, Ortiz Mantilla, Eduardo Alberto, Roque Espinoza, Javier Teodocio 03 June 2020 (has links)
El presente trabajo tiene como objetivo principal elaborar una propuesta de diseño de una PMO que brinde soporte a la Gestión de Proyectos en el área de TI de la empresa AGROPECUARIA DEL PERÚ S.A., con la finalidad de poder atender la creciente demanda de servicios de gestión de proyectos y mejorar el desempeño de los proyectos, dotando así a la organización de procesos estandarizados siguiendo buenas prácticas de gestión de proyectos. Toma como referencia la metodología PMO Value Ring, la cual brinda un conjunto de beneficios, procesos e indicadores, en base a los cuales se elabora la propuesta de diseño de la PMO. PMO Value Ring permite adaptarse a diferentes modelos de negocio, partiendo de la premisa que no existe un modelo de PMO ideal, sino más bien uno personalizado para cada organización y que debe estar alineada con las expectativas de los interesados. Para lograr obtener los beneficios esperados de implementar una PMO, se deben seguir los siguientes pasos: Primero, se elabora un análisis de interesados para conocer los principales problemas relacionados con la gestión de proyectos de TI. Segundo, se propone una estructura organizativa de la PMO para dar soporte al área de TI en la gestión de proyectos. Tercero, se diseñan los procesos que darán a soporte a la PMO. Cuarto, se elabora un plan de implementación de los procesos de la PMO a corto, mediano y largo plazo. Finalmente, se realiza una evaluación financiera utilizando el caso de negocio, donde se muestran los beneficios financieros y no financieros luego de la implementación de la PMO. Además de la rentabilidad de inversión en el proyecto. / The main objective of this work is to prepare a design proposal for a PMO that supports Project Management in the IT area of ​​the company AGROPECUARIA DEL PERÚ SA, in order to meet the growing demand for management services projects and improve the performance of projects, thus providing the organization with standardized processes following good project management practices. It takes the PMO Value Ring methodology as a reference, which provides a set of benefits, processes and indicators, based on which the PMO design proposal is prepared. PMO Value Ring allows adapting to different business models, based on the premise that there is no ideal PMO model, but rather a personalized one for each organization and that it must be aligned with the expectations of those interested. To achieve the expected benefits of implementing a PMO, the following steps must be followed: First, a stakeholder analysis is developed to learn about the main problems related to IT project management. Second, an organizational structure of the PMO is proposed to support the IT area in project management. Third, the processes that will support the PMO are designed. Fourth, an implementation plan for the PMO processes is prepared in the short, medium and long term. Finally, a financial evaluation is made using the business case, where the financial and non-financial benefits are shown after the implementation of the PMO. In addition to the return on investment in the project. / Trabajo de investigación

Page generated in 0.292 seconds