• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 413
  • 215
  • 175
  • 42
  • 27
  • 27
  • 25
  • 9
  • 7
  • 5
  • 5
  • 3
  • 2
  • 2
  • 2
  • Tagged with
  • 1047
  • 1047
  • 418
  • 368
  • 301
  • 148
  • 145
  • 130
  • 129
  • 128
  • 121
  • 114
  • 105
  • 100
  • 99
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
651

Automation of Risk Priority Number Calculation of Photovoltaic Modules and Evaluation of Module Level Power Electronics

January 2015 (has links)
abstract: This is a two part thesis: Part – I This part of the thesis involves automation of statistical risk analysis of photovoltaic (PV) power plants. Statistical risk analysis on the field observed defects/failures in the PV power plants is usually carried out using a combination of several manual methods which are often laborious, time consuming and prone to human errors. In order to mitigate these issues, an automated statistical risk analysis (FMECA) is necessary. The automation developed and presented in this project generates about 20 different reliability risk plots in about 3-4 minutes without the need of several manual labor hours traditionally spent for these analyses. The primary focus of this project is to automatically generate Risk Priority Number (RPN) for each defect/failure based on two Excel spreadsheets: Defect spreadsheet; Degradation rate spreadsheet. Automation involves two major programs – one to calculate Global RPN (Sum of Performance RPN and Safety RPN) and the other to find the correlation of defects with I-V parameters’ degradations. Based on the generated RPN and other reliability plots, warranty claims for material defect and degradation rate may be made by the system owners. Part – II This part of the thesis involves the evaluation of Module Level Power Electronics (MLPE) which are commercially available and used by the industry. Reliability evaluations of any product typically involve pre-characterizations, many different accelerated stress tests and post-characterizations. Due to time constraints, this part of the project was limited to only pre-characterizations of about 100 MLPE units commercially available from 5 different manufacturers. Pre-characterizations involve testing MLPE units for rated efficiency, CEC efficiency, power factor and Harmonics (Vthd (%) and Ithd (%)). The pre-characterization test results can be used to validate manufacturer claims and to evaluate the product for compliance certification test standards. Pre-characterization results were compared for all MLPE units individually for all tested parameters listed above. The accelerated stress tests are ongoing and are not presented in this thesis. Based on the pre-characterizations presented in this report and post-characterizations performed after the stress tests, the pass/fail and time-to-failure analyses can be carried out by future researchers. / Dissertation/Thesis / Masters Thesis Engineering 2015
652

Análise de riscos: um modelo de assinatura de risco voltada para segurança da informação

Corrêa Junior, Dioraci [UNESP] 13 July 2009 (has links) (PDF)
Made available in DSpace on 2014-06-11T19:29:40Z (GMT). No. of bitstreams: 0 Previous issue date: 2009-07-13Bitstream added on 2014-06-13T18:48:34Z : No. of bitstreams: 1 correajunior_d_me_sjrp.pdf: 2089339 bytes, checksum: 1ee032ed654c46455b435575845711de (MD5) / A Análise de Risco incorpora a avaliação do risco e seu gerenciamento, isto é, ela combina processos sistemáticos para a identificação do risco e suas consequências, e como lidar ou tratar estes riscos. Esta dissertação apresenta o desenvolvimento de uma Assinatura de Risco, suportada pelo sistema AISF – ACME! Intrusion Signature Format [SIL, 2002], voltada estritamente à segurança da informação e adequada de acordo com os padrões das normas ISO/IEC 17799 [ISO, 2005], ISO/IEC 27001 [ISO, 2006] e ISO/IEC 27002 [ISO, 2007]. O desenvolvimento desta assinatura está ligado à frente de pesquisa sobre Análise de Risco em sistemas computacionais e representa algo inédito na literatura, uma padronização para Análise de Risco. Com isso, o processo de armazenamento e análise de informação a respeito da Análise de Risco tornar-se mais simples e padronizado. / Risk analysis includes a risk assessment and management, that is, it combines systematic procedures for risk identification and its consequences, and how to deal and mitigate these risks. This dissertation presents the Signature Risk development, supported by AISF - ACME! Intrusion Signature Format [SIL, 2002] system, dedicated strictly to information security and appropriate under the standards of ISO/IEC 17799 [ISO, 2005], ISO/IEC 27001 [ISO, 2006] and ISO/IEC 27002 [ISO, 2007]. This signature development is linked with computer systems risk analysis research and represent something unprecedented in literature, a standard for risk analysis. Therefore, the storing and analyzing process of information about risk analysis become more simple and standardized.
653

Proposta de um método probabilístico de estimativa de custos de construção. / Purpose of a probabilistic method of construction cost estimate.

Fabrízio César Reis Fonseca 19 December 2013 (has links)
Projetos de construção são caracterizados pela escala, complexidade e seus riscos. Não é incomum encontrar planejamento e definição de escopo incompletos o que leva a aumento de custos e prazos. O objetivo desse trabalho é descrever um método de avaliação de riscos de forma a aumentar a previsibilidade da estimativa de custos do empreendimento. Para isso foram utilizados conceitos de gerenciamento de projetos, de simulação e de analise de riscos descritos na literatura para a constituição de um método de análise de riscos em estimativa de custos. A aplicação do método proposto em comparação com o método tradicional traz vantagens no que diz respeito à abrangência da análise. Enquanto pelo método tradicional a análise do empreendimento se faz por meio de suas tarefas, o método proposto analisa de forma distinta o planejamento do empreendimento nas suas três dimensões fundamentais: escopo, prazo e custo. / Construction projects are characterized by their scale, complexity, and their common risks. Its not uncommon to find incomplete project planning and scope definition which often leads to cost and schedule overruns. The objective of this work is to describe a method of risk assessment in order to increase the accuracy of the project cost estimate. To meet this objective, its been utilized project management, simulation and risk analysis concepts to build a cost estimate risk analysis method. The method proposed in this work has advantages in terms of the analysis broadness in comparison with the traditional method. By using the traditional method, the project analysis is oriented by work on the other hand by using the proposed method, the project is analyzed distinctively in its three fundamental dimensions: scope, cost and schedule.
654

Previsão de inadimplência e redes neurais artificiais / Forecast of insolvency and neural networks

Lourenço da Rocha Guimarães 02 August 2006 (has links)
O objetivo deste trabalho é a previsão de inadimplência. Foram implementados dois modelos de previsão de inadimplência, de modo que o primeiro modelo fez uso de uma rede neural feedforward utilizando o algoritmo de retro propagação, e o segundo utilizou uma rede não supervisionada (rede Kohonen). As características relevantes de usuários de crédito foram apresentadas para as redes neurais, para o seu treinamento e teste. Os resultados obtidos demonstram que tanto as redes neurais supervisionadas quanto as redes neurais não supervisionadas mostraram-se instrumentos eficazes para o processo de previsão de inadimplência. / The objective of this work is the insolvency forecast. They were implemented two insolvency forecast models, so that the first model used a feed forward neural network utilizing the retro propagation algorithm, and the second utilized a non-supervised neural network (Kohonen networks). The prominent characteristics of credit users were presented for the neural networks, for their training and test. The results obtained showed that the supervised network as well the non-supervised neural network showed themselves efficient instruments for the insolvency forecast trial.
655

Abordagens de segurança operacional da usina hidrelétrica Itaipu Binacional sob a perspectiva da engenharia de resiliência

Portela, Juliano Couto January 2016 (has links)
Acidentes graves em organizações com infraestruturas críticas, como a Usina Hidrelétrica Itaipu Binacional, embora raros, causam importantes impactos sociais e econômicos em sua área de influência. Portanto, eles devem ser evitados mesmo que, seja esperada uma taxa “normal” de acidentes por conta dos fatores de risco e complexidade da sua operação. Essa dissertação apresenta uma investigação das condições que levam a acidentes em casos específicos da operação da Itaipu Binacional sob o enfoque proativo da gestão da Segurança II de acordo com a Engenharia de Resiliência (ER). Ela se baseia na variabilidade da operação normal e, portanto, “no muito que dá certo”, em contraponto à visão tradicional da Segurança I, reativa, baseada na análise retrospectiva de acidentes e “no pouco que dá errado”. Com base em uma revisão da literatura quanto os requisitos, princípios e temas da ER e da Segurança-II e nas opiniões estruturadas de operadores foram desenvolvidos dois estudos: o primeiro traçou preocupações destes operadores em relação ao risco de incêndio em um transformador da Itaipu Binacional para desenvolver indicadores e planos de ação aderentes aos princípios da ER. O objetivo foi suplementar, com elementos de ER, uma análise de risco convencional baseada em árvore de falhas e árvore de eventos, e otimizar o plano de ação de emergência em caso de incêndio em transformador da unidade geradora Os resultados mostraram a oportunidade de melhoria para o desenvolvimento de indicadores proativos para a análise de risco. O segundo estudou, com base no método FRAM, a operação normal e a variabilidade de quatro manobras operacionais típicas selecionadas pelos operadores dentro dos quadrantes da matriz periodicidade-complexidade. Os resultados indicaram que as mesmas variabilidades influenciam nos passos operacionais, não importando a complexidade tampouco a periodicidade da manobra. Um comparativo entre a análise das variabilidades em situação normal e os relatórios das quatro falhas ocorridas entre 2006 e 2015 apontou que o sucesso e a falha advêm da mesma fonte, e que algumas variabilidades como “ambiente de manobra”, a “necessidade de confirmar os passos das manobras” e situações que tiram a atenção do operador atuam de forma decisiva em praticamente todas as manobras. Os resultados foram discutidos com os integrantes da equipe que propuseram adaptações necessárias para aumento da segurança operacional do trabalho normal sob a perspectiva de ER. / Serious accidents in organizations with critical infrastructures, such as the Itaipu Binacional Hydroelectric Power Plant, although rare, cause important social and economic impacts in their area of influence. Therefore, they must be avoided even if a "normal" rate of accidents is expected because of the risk factors and complexity of the operation. This dissertation presents an investigation on the conditions that lead to accidents in the operation of Itaipu Binacional under the proactive approach of Security II management according to Resilience Engineering (RE). It is based on the variability of the normal operation and, therefore, "in the many things that goes right", in contrast to the traditional and reactive view of Safety-I, based on the retrospective analysis of accidents and "the few things that went wrong". After a review of the literature on the requirements, principles and themes of RE and Security-II and on the structured opinions of the operational staff, two studies were developed: the first one brings the concerns of these operators in regard of the risk of fire in a transformer in order to develop indicators and action plans adherent to the RE principles. The objective was to supplement a conventional risk analysis based on fault tree and event trees with RE elements, optimizing the emergency action plan. The results showed the opportunity for improvement of proactive indicators for risk analysis The second one, inspired by the FRAM method, deals with the normal operation and variability of four typical operational maneuvers selected by operators within four quadrants of a periodicity-complexity matrix. The results indicated that the same variabilities influence the operational steps, regardless of the complexity or the periodicity of the maneuver. A comparison between the analysis of the variabilities in normal situation and the reports of the four operational failures occurred between 2006 and 2015 indicated that success and failure come from the same source, and that some variabilities such as “maneuver environment”, “necessity to confirm the maneuver steps” and “situations that take the attention of the operator” act decisively in virtually all maneuvers. The results were discussed with the team members who proposed the necessary adaptations to increase the operational safety of normal work from the RE perspective.
656

Aplicação de redes Bayesianas na análise de risco do processo de descarga do navio-tanque em um terminal portuário especializado. / Application of Bayesian networks in the risk analysis of the process of unloading of flammable bulk liquids from a tanker to a port terminal specified - the Bulk Liquid Terminal - BLT

Francisco de Assis Basilio de Moraes 13 March 2015 (has links)
Sistemas de transporte marítimo são essenciais para o Comércio Global, em especial, navios-tanques e seus centros de carga e descarga de produtos líquidos ou gasosos inflamáveis; portanto, é crucial entender como estes sistemas podem falhar, para que seus operadores sejam capazes de manter a sua capacidade de operação. É preciso que cada e toda análise quantitativa de risco compreenda algumas das atividades básicas que devem ser desenvolvidas, para permitir a quantificação dos riscos envolvidos e associados, na operação do sistema ou do processo. Basicamente, devem ser calculadas as probabilidades de ocorrência dos eventos indesejados identificados, bem como a magnitude de suas consequências. O objetivo deste trabalho é aferir se a técnica denominada Rede Bayesiana RB é a mais adequada, comparando-a com as técnicas de árvores de falhas e de eventos, para realizar uma Análise de Risco da operação ou processo de descarga de líquidos inflamáveis, como etanol anidro e/ou produtos petrolíferos, de um naviotanque para um terminal portuário específico Terminal de Granéis Líquidos TGL com foco na interface entre dois sistemas: o navio e o porto, observado o elemento humano, ou seja, o erro humano (Análise da Confiabilidade Humana). Além disso, será realizado um estudo das consequências do vazamento de um líquido inflamável transportado pelo navio, olhando para o pior cenário, a partir da ruptura da tubulação ou do compartimento do navio-tanque. A análise tem por base as recomendações da Organização Internacional Marítima OIM (em inglês, IMO). A OIM tem adotado a Avaliação Formal da Segurança AFS (em inglês, Formal Safety Assessment FSA), como seu modo oficial de receber as sugestões de seus membros para criar ou modificar qualquer regulamentação correlacionada. Este processo é composto de cinco passos que a OIM descreve na guia AFS (IMO, 2002). Este trabalho irá mostrar todas as etapas, mas irá focar, com especial atenção, a segunda etapa Risk Assessment, porque será aplicada ao caso sob análise, envolvendo o comportamento humano. Existem muitas técnicas e muito trabalho envolvido na estimação das probabilidades dos eventos. O mesmo ocorre para a avaliação de suas consequências. Uma vez definida a quantidade total de vazamento, um software poderá ser usado para calcular as consequências. O mesmo será feito para na Análise de Risco, utilizando RB, e, neste ponto, o trabalho apresenta uma nova contribuição. / Maritime transportation systems are essential for World Trade, in special, Tankers ships and yours loading and unloading facilities; therefore, it is crucial to understand how these systems may fail, to be able to maintain their capacity. It need that each and every quantitative risk assessment comprises some basic activities that have to be developed to allow the quantification of the risks involved in the operation of a system or process. Basically, it must be estimated the likelihood of the identified undesired events as well as the magnitude of their consequences. The objective of this study is to assess if the technique called Bayesian Networks BN is the best suited, with respect to the Fault Tree Analysis FTA and the Event Tree Analysis ETA, to perform an Risk Analysis of the operation or process of unloading of flammable bulk liquids, such as anhydrous ethanol and/or oil products, from a Tanker to a port terminal specified the Bulk Liquid Terminal BLT, focusing on the interface between the two systems: ship and port with the inclusion of the human factor, i.e., human error: Human Reliability Analysis HRA. Furthermore, a consequence analysis of a specific liquid bulk leakage will be performed, looking at the worst scenario case, from the rupture of a pipeline or tank from a Tanker. The analysis came from based on the recommendations of the International Maritime Organization IMO. The IMO has adopted the FSA (Formal Safety Assessment) as its official way of receiving suggestions of its members to create or modify any regulation correlated. It is a process composed by five steps that IMO has described in its Guidelines for FSA (IMO, 2002). This thesis will to show all steps, but will look carefully to step two (Risk Assessment) because it will be applied in the example situation, involving human behavior (HRA). There are many techniques and much work involved in the estimation of the likelihood of the events. The same occurs for the evaluation of their consequences. Once defined the total leaked quantity, software will be used to calculate the consequences. The same will be done to Risk Analysis, using BN, and at this point, the work is a new contribution.
657

Estudo sobre a modelagem da dispersão atmosférica de gases densos decorrente de liberações acidentais em análise quantitativa de risco. / Study on thedense gas atmospheric dispersion from accidental releases in quantitative risk analysis.

Márcio Piovezan Salazar 02 June 2016 (has links)
A percepção crescente da sociedade em relação aos perigos inerentes às instalações industriais que manipulam grandes inventários de substâncias perigosas faz com que a ferramenta análise quantitativa de risco ganhe importância na complexa discussão sobre a viabilidade destes empreendimentos, no intuito de promover a ocupação adequada do solo na área urbana e prevenir a ocorrência do chamado acidente maior. Contudo, para se chegar à expressão de risco de uma determinada instalação industrial deve-se aplicar um conjunto de técnicas e de modelos matemáticos, entre os quais estão os modelos de dispersão atmosférica, usados para se estimar a área afetada na vizinhança da mesma por liberações acidentais que levam à formação de nuvens de substâncias químicas na atmosfera. Em decorrência da complexidade inerente ao próprio processo de dispersão atmosférica, especialmente no que tange aos denominados gases densos, existe uma diversidade de modelos que podem ser aplicados no escopo da análise de risco, o que leva a seus usuários, naturalmente, ao questionamento sobre a suscetibilidade dos resultados finais ao tipo de modelagem adotada. Neste sentido, este trabalho estuda o processo de dispersão atmosférica de nuvens densas formadas em liberações acidentais, identificando as principais possibilidades de modelagem deste processo e, ao final, apresenta um estudo de caso demonstrando que diferentes modelagens desta dispersão, comumente empregadas em análise de risco de instalações industriais, podem produzir variações na estimativa do risco de uma mesma instalação e, portanto, influenciar as decisões baseadas em risco. / The concern of the society about the risks posed by activities that deal with hazardous substances has increased in an environment strongly industrialized and with high population density in view of the inherent potential hazards of them as well as the impact of recent accidental episodes, even though their benefits provided. In this context the quantitative risk analysis is presented as an essential tool to assess the risk of these activities and compose a complex discussion about its feasibility. Some of these accident scenarios may involve the formation of a hazardous product cloud and its subsequent air dispersion in the off-site region when an accidental released take place and one should apply the so-called atmospheric dispersion models for estimating the consequences of the releases. Due to the complexity involved in this atmospheric dispersion process, there is a wide variety of mathematical models that can be applied for estimating the offsite consequences of the accidental releases leading, naturally, to one wonder whether the final risk expression of a facility is susceptible to these differences. Often in the world of industrial use of hazardous materials, toxic or flammable there is a possibility that these accidental releases produce clouds that are denser than air, a situation that demands even more attention in terms of risk aspects involved. Then, this dissertation studies the process of atmospheric dispersion of heavier-than-air clouds produced after an accidental release, identifying the main ways of modelling the process and presents a case study comparing different dispersion models that demonstrates that the final expression of risk of a typical installation can be different when it is used different dispersion model in the process.
658

A análise de risco, segundo o método de Monte Carlo, aplicada à modelagem financeira das empresas

Soares, José Arnaldo Ribeiro January 2006 (has links)
Num mundo onde a competitividade ultrapassa as fronteiras nacionais, onde perturbações políticas e econômicas têm uma repercussão imediata em todo o globo, as empresas precisam cada vez estar preparadas para reagir rapidamente. A dinâmica dos movimentos globais não mais permite que as empresas e organizações possam esperar muito tempo para tomar medidas adaptativas. As respostas devem ser rápidas. O nível de incertezas onde a empresa opera deve ser melhor entendido, de forma que os riscos de uma tomada de decisão inadequada possam ser mitigados. Contudo, melhor que reagir aos fatos é buscar se antecipar aos mesmos. Mas a antecipação requer que os eventos possíveis sejam analisados, não apenas quanto aos seus possíveis impactos, mas também quanto à sua probabilidade de ocorrência. Este trabalho tem como objetivo maior propor um modelo de projeção e análise das demonstrações financeiras das empresas, segundo uma visão não apenas determinística, mas empregando técnicas probabilísticas, que permitam aos gestores das empresas passarem pelo processo de tomada de decisão com um nível de informação que permita a eles terem uma idéia muito clara do nível de risco que envolve as suas decisões. E este modelo torna isto possível ao se utilizar da metodologia de Monte Carlo. Esta metodologia permite que as variáveis críticas de uma empresa sejam tratadas a partir das suas distribuições de probabilidades de ocorrência. Assim, preços de produtos e insumos, variáveis externas tais como a taxa de juros, a taxa câmbio e a taxa da inflação podem ser avaliadas dentro de uma expectativa de ocorrência, como variáveis estocásticas, e não mais como constantes no problema. Com isto, podemos simular os resultados de uma empresa, que serão disponibilizados ao gestor segundo sua distribuição de probabilidade. Este processo permitirá que o gestor possa tomar quaisquer decisões, sejam de investimentos, de política de preços, de endividamento, etc., com um nível de informação muito mais adequado do que quando ele dispõe apenas de informações determinísticas com análise de sensibilidade, visto que esta última nada informa quanto à probabilidade de ocorrência do evento. / In a world where the competitiveness crosses the national borders, where political and economical instabilities have an immediate impact in the whole globe, the companies need to be prepared to give a fast response. The dynamics of the global movements no more allows that the companies and organizations take a long time to implement new alternatives. The answers should be fast. The uncertainties about company environment should be better understood, so the risks of a wrong decision can be mitigated. However, better than to react to the facts, is to anticipate them. The anticipation requests that the possible events must be deeply understood, not just as for their possible impacts, but also for its probability of occurrence. This work has as objective to propose a simulation and analysis financial model of companies, considering probabilistic techniques to allow managers go through decision process with a level of information sufficient enough to permit them to have a clear understanding about the risks involved in their decision. This model turns this possible through the utilization of Monte Carlo’s methodology. This methodology allows the critical variables of a company to be treated as random variables. Prices of products and macroeconomics variables such as interest rate, rate exchange and rate of inflation can be considered as random variables and not as constants in the model. The results of a company will be available to the managers with a statistic treatment and a probabilistic analysis. This process will facilitate the managers decisions process about investments, price policies, loans and others critical subjects to the future of the company with a much more appropriate level of information.
659

As contribuições da avaliação ambiental estratégica para a tomada de decisões sobre a liberação comercial de plantas geneticamente modificadas no Brasil / Contributions of strategic environmental assessment for decision-making on commercial release of genetically modified crops in Brazil

Denise Gallo Pizella 22 March 2010 (has links)
A liberação comercial de plantas geneticamente modificadas (PGMs) é assunto controverso, devido ao desconhecimento quanto aos potenciais impactos ambientais e sócioeconômicos que pode suscitar a curto, médio e longo prazo. De modo a regular as deliberações sobre o uso de organismos geneticamente modificados (OGMs) mecanismos regulatórios que se propõem a prever tais impactos estão sendo criados em diversas nações, sendo a análise de risco (AR) o instrumento de estudo ambiental normalmente empregado nos processos decisórios. No entanto, há contestações sobre seu uso como única ferramenta de análise ambiental de PGMs, já que não possibilita a avaliação dos impactos cumulativos, indiretos, de longo prazo e dos interesses das nações delineados em suas políticas, planos e programas (PPPs). Um instrumento proposto por alguns autores passível de abarcar tais considerações é a Avaliação Ambiental Estratégica, que busca inserir a variável ambiental durante as fases de planejamento que resultam na elaboração de PPPs. Este trabalho teve como objetivo avaliar o sistema regulatório envolvendo a liberação em escala comercial de PGMs no Brasil e as potenciais contribuições da AAE para o processo decisório, contemplando os princípios de uma boa governaça ambiental nos processos decisórios. Para tanto, aplicou-se um questionário eletrônico a agentes sociais interessados pelo tema visando identificar suas visões sobre o assunto, analisou-se os procedimentos utilizados na deliberação sobre o algodão MON1445 resistente ao herbicida glifosato e, por fim, efetuou-se a avaliação dos instrumentos análise de risco, estudo de impacto ambiental (EIA) e AAE quanto à inserção da variável ambiental nas tomadas de decisão. Os resultados obtidos foram: com relação ao sistema regulatório, cujos pressupostos encontram-se na Lei de Biossegurança, evidenciou-se a falta de legitimidade nas tomadas de decisão, as quais são realizadas pela CTNBio, enquanto que a Constituição brasileira atribui aos órgãos ambientais a deliberação sobre atividades potencialmente poluidoras, dentre estas aquelas que envolvam OGMs; a deficiência dos mecanismos de participação social, pois as audiências públicas ocorrem mediante decisão da CTNBio; a falta de acesso às informações, devido a não implementação do Sistema de Informações sobre Biossegurança (SIB), além do descumprimento de diversas legislações, que configuram no desrespeito à justiça ambiental. Em razão destes fatores, conclui-se que o sistema regulatório brasileiro sobre PGMs não se baseia em uma boa governança ambiental. Quanto aos instrumentos de avaliação de impactos ambientais, a análise de risco, em função dos aspectos acima levantados, não se adequa para a avaliação prévia de PGMs, podendo ser utilizada como uma metodologia que subsidie o EIA ou a AAE. O EIA, por sua vez, não tem a atribuição de avaliar ações que envolvam territórios abrangentes, mas sim de atividades pontuais que se dão em etapas posteriores de planejamento. Já a AAE contribuiria para a tomada de decisões no tocante à liberação comercial de PGMs, em função de seus princípios de transparência, envolvimento social, planejamento ambiental, abrangência de extensos recortes territoriais, avaliação de impactos cumulativos e de longo prazo e monitoramento ambiental contínuo. Deste modo, recomendou-se a utilização da AAE no planejamento ambiental envolvendo liberações comerciais de PGMs no Brasil. / The commercial release of genetically modified crops (GMCs) is controversial, due to the lack of knowledge about the potential environmental and socio-economic impacts that can lead to short, medium and long term. In order to regulate the deliberations on the use of genetically modified organisms (GMOs), regulatory mechanisms that are proposed to predict such impacts are being created in many nations, with risk analysis (RA) being the instrument normally used in environmental studies for decision-making. However, there are some doubts about its use as the only tool of environmental analysis of PGMs, since it does not allow the assessment of cumulative, indirect and long-term impacts and the interests of the nation outlined in their policies, plans and programs (PPPs). An instrument proposed by some authors likely to embrace such considerations is the Strategic Environmental Assessment, which seeks to insert the environmental variable during the planning stages that result in the development of PPPs. This thesis aimed to evaluate the regulatory system involving the commercial release of GMCs in Brazil and the potential contribution of SEA to decisionmaking process, incorporating the principles of good governance. To this end, we applied an electronic questionnaire to some social actors to identify their views on the subject, reviewed the procedures used in the deliberation of the glyphosate-resistant cotton MON1445 and, finally, we performed the evaluation of risk analysis, environmental impact statement (EIS) and SEA as tools of environmental parameter insertion in decision-making. The results obtained were: with respect to the regulatory system, whose assumptions are in the Biosafety law, there was a lack of legitimacy in decision-making, which are held by CTNBio, while the brazilian Constitution assigns the decision on potentially polluting activitities (among which is those related to the GMOs) to the environmental agencies; the deficiency of the mechanisms of social participation, since decisions for public hearings are taking by CTNBio; lack of access to information due to non-implementation of the Information Biosafety System (IBS), and the disrespect of various laws, whith disregard for environmental justice. Because of these factors, the brazilian regulatory system on PGMs is not based on good environmental governance. With regard to instruments for environmental studies, risk analysis, according to the aspects mentioned above, is not suitable for prior assessment of GMCs and can be used as a methodology that assists EIS or SEA. The EIS, in turn, does not have the assignment to assess actions that involve extensive territories, but the pontual activities that take place in later stages of planning. SEA, in turn, would contribute to the decision-making regarding the commercial release of GMPs, according to its principles of transparency, social involvement, environmental planning, coverage of extensive territorial areas, assessment of cumulative and long-term impacts and continuous environmental monitoring. Thus, recommendations were made for the use of SEA in environmental planning involving commercial releases of GMPs in Brazil.
660

AvaliaÃÃo dos Riscos Ambientais e EcotoxicolÃgicos do ReÃso de Ãguas ResiduÃrias em Piscicultura / Evaluation of Environmental and Ecotoxicological Risks of Wastewater Reuse for Fish Farming

Soraia Tavares de Souza Gradvohl 14 August 2006 (has links)
FundaÃÃo Cearense de Apoio ao Desenvolvimento Cientifico e TecnolÃgico / A preocupaÃÃo com relaÃÃo à qualidade e à quantidade de Ãgua potÃvel tem incentivado o reÃso de Ãgua como uma das alternativas para enfrentar este problema. O reÃso tornou-se, portanto, um importante instrumento de gestÃo ambiental, visando à liberaÃÃo da Ãgua de melhor qualidade para fins mais nobres. O reÃso com aplicaÃÃo na piscicultura constitui fonte alternativa de produÃÃo de proteÃna a baixo custo, alÃm de funcionar como uma forma de reciclagem de nutrientes. Mas, a sustentabilidade desta atividade està diretamente relacionada à qualidade do efluente tratado e seus efeitos sobre a qualidade da Ãgua nos tanques de peixes. Outro fato notÃrio à a crescente preocupaÃÃo com os riscos potenciais inerentes a esta atividade. Diante deste cenÃrio, surgiu a necessidade de realizar um estudo mais profundo dos riscos inerentes ao reÃso de Ãguas residuÃrias, tanto numa abordagem ambiental, como num ponto de vista ecotoxicolÃgico. Para isso, foram realizados testes de toxicidade aguda, de curta duraÃÃo, para avaliaÃÃo da toxicidade dos efluentes tratado e bruto provenientes de uma EstaÃÃo de Tratamento de Esgoto a nÃvel terciÃrio, composto por um sistema de lagoas de estabilizaÃÃo, tendo como organismos-teste peixes de Ãgua doce da espÃcie Oreochromis niloticus (tilÃpia do Nilo). Os testes objetivaram determinar o Ãndice de toxicidade aguda (LC50). O efluente tratado foi utilizado em duas etapas distintas, com peixes com idade superior a 60 dias e alevinos com tempo de vida inferior a 15 dias. Em ambos, nÃo foi observada mortalidade de nenhum organismo. No caso do esgoto bruto, o ensaio foi realizado com e sem aeraÃÃo, sendo obtido para o esgoto bruto sem aeraÃÃo os Ãndices de LC50-24h de 68,0% e LC50-96h de 35,4%. Jà com a aeraÃÃo mecÃnica aplicada Ãs duas diluiÃÃes de 50 e 100% de esgoto bruto, os LC50âs encontrados foram de 44,5% (24 h), 41,0% (48 h) e 36,7% (96 h). O ensaio foi tambÃm realizado para avaliaÃÃo do nÃvel de toxicidade da amÃnia, tendo em vista que a mesma tem sido considerada por vÃrios pesquisadores um produto tÃxico Ãs algas, ao zooplÃncton e aos peixes. Para estes ensaios foram determinados os LC50âs de 2,01 mg/L NH3-N (2 h), 1,97 mg/L NH3-N (4 h) e 1,66 mg/L NH3-N (atà 96 h). AlÃm disso, foi realizado um ensaio com nitrogÃnio amoniacal variando-se o pH para originar trÃs meios distintos â Ãcido, neutro e bÃsico â devido a influÃncia deste no Ãndice de toxicidade calculado. Os LC50âs encontrados neste caso foram: 8,70 mg/L para o tempo de 2 a 4 horas e 6,45 mg/L para 24, 48 e 96 horas para o meio Ãcido; 8,70 mg/L para 2 horas e 6,45 mg/L para 4, 24, 48 e 96 horas para o meio neutro; e, 1,96 mg/L de 2 horas em diante para o meio bÃsico. Por fim, foi utilizada uma metodologia de anÃlise de riscos buscando-se realizar um estudo dos efeitos potenciais à saÃde humana e ao meio ambiente, e ainda propondo-se medidas para tentar minimizar os possÃveis impactos adversos.

Page generated in 0.0605 seconds