• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 47
  • 1
  • Tagged with
  • 48
  • 48
  • 36
  • 36
  • 36
  • 36
  • 36
  • 34
  • 34
  • 17
  • 16
  • 14
  • 13
  • 11
  • 10
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Muro mecánicamente reforzado para la estabilización de taludes de gran altura en suelos gravosos expuestos a la brisa marina

Rodriguez Aparicio, Luz Evelín, Rosas Milla, Jesús Silverio 09 January 2020 (has links)
Haciendo un análisis de la zona en cuestión es importante desarrollar ingeniería geotécnica, en específico la estabilidad de taludes, puesto que hay variedad de suelos en la zona peruana, donde la capacidad portante del terreno dependerá de la historia de formación del suelo. Hasta la actualidad hay diversas formas de resolver la inestabilidad de taludes, pero lo que se busca es solucionar efectivamente en cuanto a tiempo, costo y durabilidad. Este trabajo de tesis presenta una propuesta efectiva para mitigar el riesgo de la falla Global en el acantilado de la costa verde-Chorrillos usando muro de tierra mecánicamente estabilizada, siendo la particularidad del terreno un suelo gravoso de relleno no controlado con material proveniente del desmonte ocasionado durante la construcción de las principales avenidas de la ciudad de lima en los años 60. La estructura tiene la finalidad de comprender las herramientas necesarias y adecuadas para una propuesta de diseño de sistemas de estabilidad. Se parte del reconocimiento de la zona, con una descripción general del proyecto con los parámetros geotécnicos necesarios como datos de entrada para cumplir con nuestros objetivos planteados. Asimismo, se presenta una descripción teórica de los parámetros de ingeniería básica y su campo de aplicación. También, se hace un enfoque detallado del diseño en este tipo de estructuras a través de la metodología LRFD, con los elementos necesarios para garantizar su estabilidad global. Finalmente se presenta un modelo estructural con la comprobación de los principales factores haciendo uso de herramientas digitales de ingeniería: SOFTWARE MSEW y SLIDE 6.0. / Making an analysis of the area in question, it is important to develop geotechnical engineering, specifically the slope stability, since there is a variety of soils in the Peruvian area, where the bearing capacity of the land will depend on the history of soil formation. Until today there are several ways to solve the instability of slopes, but what is sought is extremely difficult solutions in time, cost and durability. This thesis work presents an effective proposal to mitigate the risk of the Global fault in the cliff of the green coast-Chorrillos using the mechanically stabilized earth wall, the land's peculiarity being a land of uncontrolled landfill with material from the dismantling caused during the construction of the main avenues of the city of Lima in the 60s. The structure intends to understand the necessary and appropriate tools for a design proposal for stability systems. It is based on the recognition of the area, with a general description of the project with the necessary geotechnical parameters as input data to meet our stated objectives. Likewise, a theoretical description of the basic engineering parameters and their field of application is presented. Also, a detailed approach to design is made in this type of structures through the LRFD methodology, with the necessary elements to specify its overall stability. Finally, a structural model is presented with the verification of the main factors using digital engineering tools: MSEW 3.0 and SLIDE 6.0. / Trabajo de investigación
2

Sistema de Control Interno basado en el modelo COSO 2013 y su impacto en la Gestión Empresarial en las empresas del sector construcción de edificios, en el distrito de El Agustino, año 2018 / Internal Control System based on the 2013 COSO Model and its impact on Business Management in companies in the construction sector of buildings, in the district of El Agustino, year 2018

Centeno Vilchez, Hugo Junior, Zavaleta De la cruz, Jorge Alan 13 July 2019 (has links)
La presente investigación tiene como objetivo determinar el impacto del Sistema de Control Interno basado en el modelo COSO 2013 respecto a la Gestión Empresarial en las empresas de sector construcción de edificios en el distrito de El Agustino, año 2018. Para determinar el impacto, es preciso validar las pruebas de hipótesis, realizar análisis de consistencia estadística, entre otros estudios que finalmente permitan producir resultados y conclusiones de la investigación. La tesis inicia con la introducción, posteriormente se desarrolla a través de los siguientes cinco capítulos: Capítulo I - Marco Teórico, se desarrolla las principales definiciones, importancia, evolución, entre otros relacionados con el marco teórico de las variables de estudio; asimismo, un análisis de la relación entre las dos variables y del sector construcción. Capitulo II – Plan de Investigación, se presenta a nivel general y específicas, los problemas, objetivos e hipótesis; además, se establece la metodología a utilizarse para el desarrollo de la investigación. Capitulo III – Metodología de la Investigación, se define la población y muestra para el desarrollo de la investigación cuantitativa y cualitativa. Capitulo IV - Desarrollo de la Investigación, se ejecuta las encuestas y entrevistas en profundidad, desarrollando también el caso práctico para aplicar el sistema de control interno y su influencia en una empresa del sector de construcción de edificios. Capítulo V - Análisis de los Resultados, se realiza el análisis de los instrumentos y del caso práctico, y la validación de las hipótesis. Finalmente, se realiza las conclusiones y recomendaciones de la presente investigación. / The objective of the research is to determine the impact of the Internal Control System based on the 2013 COSO model in relation to the Business Management in companies in the construction sector of buildings in the El Agustino district on 2018. It is necessary to validate hypothesis tests, perform statistical consistency analysis and other different studies that allow to get the results and conclusions of the research. The thesis begins with the introduction, later it is developed through the following five chapters: Chapter I - Framework, develops the main definitions, importance, evolution and among others related to the theorical framework of the study variables. This chapter also present an analysis of the relationship between the two variables and the construction sector. Chapter II - Research Plan, introduce in a general and specific way, the problems, objectives and hypotheses; In addition, the second chapter establishs the methodology to be used for the development of the research. Chapter III - Research Methodology, the population is defined and the sample for the development of the research quantitative and qualitative. Chapter IV - Development of Research, to apply surveys and qualitative interviews, developing the case of study putting in practice the internal control system and its influence on a company in the building construction sector. Chapter V - Analysis of the results, this chapter analyzes the instruments and the practical case of study, and the validation of the hypotheses. Finally, the thesis presents the conclusions and recommendations of the present investigation. / Tesis
3

Análisis del uso de herramientas modernas en empresas constructoras medianas de la Ciudad de Arequipa que brindan servicios de infraestructura en minería caso de estudio constructora B&B Murillo SAC

Calderón Colca, Yaneth Verónica, Gutiérrez Borda, Paola Consuelo, Gutiérrez Chávez, Peter Johnny 30 June 2018 (has links)
El trabajo describe el uso de las herramientas de Gestión del caso de estudio de la Empresa B&B Murillo S.A.C, dedicada al rubro de construcción en minería, siendo su principal cliente Sociedad Minera Cerro Verde S.A.A., el objetivo de este trabajo es analizar el modelo de gestión y plantear mejoras para optimizar los procesos internos que contribuirán a las actividades y toma de decisiones, de una manera eficiente y eficaz y contribuirá en el crecimiento de la producción y finanza de la empresa. Se realizó un análisis de la situación actual que presenta la empresa BYB Murillo SAC, analizando sus falencias según datos proporcionados por el área de planeamiento. En este escenario los esfuerzos se concentran en asegurar la ejecución del Plan Estratégico. / The research work describes the use of the Case Study Management tools of the B&B Murillo SAC Company, dedicated to the construction sector in mining, being its main client Sociedad Minera Cerro Verde SAA, the objective of this work is to analyze the model of management and propose improvements to optimize the internal processes that will contribute to the activities and decision making, in an efficient and effective way and will contribute to the growth of the production and finance of the company. An analysis was made of the current situation presented by the company BYB Murillo SAC, analyzing their shortcomings according to data provided by the planning area. In this scenario, efforts are concentrated on ensuring the execution of the Strategic Plan. / Trabajo de investigación
4

Algunas consideraciones en torno al régimen de los pagos a cuenta del Impuesto a la Renta aplicable a las empresas de construcción

Rivera Silva, Manuel 12 April 2018 (has links)
No es raro que en estos últimos años, el crecimiento económico que viene desarrollando el país se deba, entre otras cosas, a la expansión del mercado inmobiliario. Lo que busca el presente artículo es realizar un análisis sobre la legislación tributaria aplicable a este sector, con el propósito de determinar si ésta evoluciona a la misma velocidad que el negocio inmobiliario o  si se está quedando relegada. Por otro lado, se analiza cómo la normativa tributaria se comporta en cada una de las fases del negocio constructor, empezando por el financiamiento de obra al momento de su ejecución y, finalmente, en la etapa de comercialización. Así, se resuelven inquietudes que nacen a partir de la interpretación y aplicación del Impuesto a la Renta, valiéndose el autor de informes, indicadores y la propia legislación tributaria. In recent years, we have seen that the economic growth has been developing in the country and that is due to the expansion of the housing market. What this article looks for is to analyze about the applicable tax law in this area, in order to determine if it evolves at the same speed of the housing market or if it is being relegated. On the other hand, the author analyzes how the tax legislation behaves in each phase of the construction business, starting with the construction financing at the time of its execution and, finally, the marketing. In this way, the author tries to solve the concerns that arise from the interpretation and application of the income tax, using reports, indicators and tax legislation itself.
5

Propuesta de mejora en el proceso de compras mediante herramientas Lean Procurement en una empresa de construcción / Proposed improvement in the procurement process through Lean Procurement in a construction company

Dadic García, Ilinka Jelena, Herrera Tello, Grace Aralita 13 July 2020 (has links)
La investigación aborda la problemática del proceso de compras de una empresa de construcción. Se identificó el problema de incumplimiento de plazo planeados para las compras y el incremento anual del costo del proceso de compras. Se emplearon herramientas de Lean Procurement para mejorar el plazo para las compras y reducir los costos anuales del proceso. La propuesta de mejora involucra la elaboración del Value Stream Map actual y futuro, así como también la medición de los tiempos y costos actuales versus la mejora implementada. Los resultados que se obtuvieron fueron la reducción del tiempo de compras en 22% y la reducción de costos en un 2%. / The research addresses the problems of the purchasing process of a construction company. The problem of non-compliance with the planned term for purchases and the annual increase in the cost of the purchasing process was identified. Lean Procurement tools were used to improve the term for purchases and reduce the annual costs of the process. The improvement proposal involves the preparation of the current and future Value Stream Map, as well as the measurement of the current times and costs versus the improvement implemented. The results that were obtained were the reduction of the time of purchases in 22% and the reduction of costs in a 2%. / Trabajo de Suficiencia Profesional
6

Propuesta de mejora de la disponibilidad de una flota de equipos móvil mixer con un sistema basado en el mantenimiento centrado en la confiabilidad / Proposal to improve the availability of a fleet of mobile mixer equipment with a system based on maintenance focused on reliability

Inga Maita, Henrry Danny 04 September 2020 (has links)
En los últimos años el sector construcción ha experimentado altibajos en la demanda de concreto premezclado, por ello, las empresas de construcción se han vuelto más exigentes con respecto a la puntualidad y compromiso de sus proveedores, esta realidad no es ajena en la empresa Mixercon, que está posicionada en el sector construcción por más de 16 años brindando un servicio personalizado a sus clientes en la entrega de concreto premezclado; en el último año la empresa ha experimentado una baja rentabilidad en sus ingresos, y se ha detectado que el problema es la baja disponibilidad y confiabilidad de sus equipos móvil mixer, por este motivo esta investigación tiene como objetivo mejorar la disponibilidad y confiabilidad de sus equipos, enfatizando que dichos equipos representan los principales activos de la empresa, por ende, para poder cumplir con el objetivo planteado se realizó en la empresa un reconocimiento y levantamiento de información de la flota de equipos móvil mixer y se ha encontrado que con el transcurso de los años se iba incrementado los equipos móvil mixer, debido a la demanda de concreto premezclado, pero al mismo tiempo no se ha tomado un correcto manejo de la gestión de los equipos más antiguos, la antigüedad de estos, es uno de los factores por el cual se tiene una baja disponibilidad y confiabilidad en la operación dado a que no se lleva una adecuada gestión de renovación de sus activos, la mayoría de las empresas solo tienen en cuenta los costos directos de mantenimiento, sin embargo, no visualizan los costos indirectos de una mala gestión de mantenimiento y como estos afectan en los resultados de la empresa, más aún si es una empresa de servicios. La presente investigación da a conocer que una adecuada gestión de mantenimiento tiene como propósito mejorar la rentabilidad de la empresa y la disponibilidad de sus activos al 100%, para lo cual tiene como base un buen sistema de gestión de mantenimiento como pilar principal para su buen desarrollo, además permite la integración de todas las áreas de la empresa. / In recent years the construction sector has experienced ups and downs in the demand for ready-mixed concrete, therefore, construction companies have become more demanding with respect to the punctuality and commitment of their suppliers, this reality is not alien to the Mixercon company, which is positioned in the construction sector for more than 16 years providing a personalized service to its clients in the delivery of ready-mix concrete; In the last year the company has experienced a low profitability in its income, and it has been detected that the problem is the low availability and reliability of its mobile mixer equipment, for this reason this research aims to improve the availability and reliability of its equipment , emphasizing that said equipment represents the main assets of the company, therefore, in order to meet the proposed objective, a survey and information gathering of the fleet of mobile mixer equipment was carried out in the company and it has been found that over the course of Over the years mobile mixer equipment has increased, due to the demand for ready-mixed concrete, but at the same time a correct management of the older equipment has not been taken, the age of these is one of the factors for the which has a low availability and reliability in the operation given that an adequate management of the renewal of its assets is not carried out, Most companies only take into account the direct costs of maintenance, however, they do not visualize the indirect costs of poor maintenance management and how these results in the results of the company, especially if it is a service company. This research reveals that an adequate maintenance management aims to improve the profitability of the company and the availability of its assets to 100%, for which it is based on a good maintenance management system as the main pillar for its good development, in addition to allowing the integration of all areas of the company. / Trabajo de Suficiencia Profesional
7

Plan para la dirección del proyecto “Construcción de las Obras Civiles Central Térmica Recka II” aplicando las buenas prácticas de la Guía del PMBOK ® sexta edición / Plan for the management of the "Construction of Civil Works Thermal Power Plant Recka II" applying the good practices of the PMBOK ® sixth edition guide

Cahuana Galiano, Vladimir 04 October 2019 (has links)
Ingenieros Ejecutores (IE) es una empresa que busca diversificar y hacer sostenible su cartera de negocios con la incursión y sostenibilidad en el sector construcción de Obras Civiles para obras energéticas. Para este importante objetivo es necesario que los contratos ya ganados apliquen las mejores y más modernas prácticas de la industria, que reducirán los riesgos sobre los compromisos asumidos ante su Cliente. En este contexto, en el presente proyecto de investigación, se desarrolla el Plan para la dirección del proyecto “Construcción de las Obras Civiles Central Térmica Recka II” aplicando las buenas prácticas de la Guía del PMBOK ® sexta edición, en Chiclayo para las fases de iniciación y planificación del proyecto. El Plan para la dirección del proyecto se ha desarrollado en base a los planes subsidiarios que son: Plan para la Gestión del Alcance, Plan para la Gestión del Cronograma, Plan para la Gestión del Costo, Plan para la Gestión de los Recursos, Plan para la Gestión de las Comunicaciones, Plan para la Gestión de los Riesgos, Plan para la Gestión de los Interesados, así como otras herramientas como EDT / WBS, Cronograma y Presupuesto como parte de la aplicación de los procesos y herramientas. La aplicación de estos planes se espera que brinde como consecuencia el éxito del presente proyecto, el cual permitirá a IE acercarse a sus objetivos, alcanzando los beneficios esperados para los interesados. / Ingenieros Ejecutores (IE) is a company that seeks to diversify and make its business portfolio sustainable with the incursion and sustainability in the Civil Works construction sector for energy works. For this important objective it is necessary that the contracts already won apply the best and most modern practices of the industry, which will reduce the risks on the commitments assumed before your Client. In this context, in the present research project, the Plan for the direction of the “Construction of Civil Works Thermal Power Plant Recka II” project is developed, applying the good practices of the Guide of the PMBOK ® sixth edition, on Chiclayo, for the phases of initiation and Project planning. The Project Management Plan has been developed based on the subsidiary plans that are: Integration Management Plan, Scope Management Plan, Schedule Management Plan, Cost Management Plan, Plan for Resource Management, Communications Management Plan, Risk Management Plan, Stakeholder Management Plan, as well as other tools such as EDT / WBS, Schedule and Budget as part of the process application and tools The implementation of these plans is expected to result in the success of this project, which will allow IE to approach its objectives, achieving the expected benefits for those interested. / Trabajo de investigación
8

Relación entre las acciones de Customer Experience - Capacitaciones en los retailers de construcción - y la decisión de compra de los maestros especializados en acabados del sector construcción de 25 a 60 años de NSE C / Relationship between the actions of Customer Experience - Training in construction retailers - and the purchase decision of the masters specialized in finishes of the construction sector from 25 to 60 years of NSE C

Williams Belleza, Victor Alonso 08 July 2020 (has links)
El presente trabajo de investigación tiene por objetivo general determinar la relación entre las acciones de Customer Experience - Capacitaciones en los retailers de construcción - y la decisión de compra de materiales en los retailers del mejoramiento del hogar por parte de los maestros especializados en acabados del sector construcción de 25 a 60 años de NSE C. Se analizó el impacto de las capacitaciones bajo tres dimensiones. Primero se analizó si existía una relación directa entre la decisión de compra y el beneficio de las capacitaciones en términos de su trabajo, como el desarrollo de nuevas habilidades, mejora en el tiempo de acabados y calidad de sus trabajos. Luego, se analizó la relación con la conveniencia de la capacitación para el maestro en términos de tiempo/duración. En la última dimensión se analizó el impacto económico de las capacitaciones para el maestro. Se realizó un estudio mixto. En la investigación cualitativa se tuvo como finalidad recolectar información de los maestros de obra y expertos sobre el tema. En la investigación cuantitativa se tuvo la opinión de los maestros de obra mediante las encuestas y el análisis estadístico para contrastar los resultados con el estudio cualitativo. Las conclusiones comprobaron que existe una relación positiva entre la decisión de compra y en la primera dimensión (beneficio de las capacitaciones en términos de su trabajo), la tercera dimensión (términos económicos), más no en la segunda dimensión (términos de tiempo/duración) porque se comprobó que no existe una relación con la decisión de compra. / The objective of this research work is to determine the Relationship between Customer Experience actions - Training in construction retailers – and the purchase decision of materials in specialized retailers by masters that are specialized in finishes of the construction sector from 25 to 60 years of NSE C. The impact of the training was analyzed under three dimensions. First, it was analyzed if there was a direct relationship between the purchase decision and the benefit of the training in terms of their work, such as the development of new skills, improvement in the finishing time and quality of their work. Then, we analyzed the relationship with the convenience of the training for the masters in terms of time / duration. In the last dimension, the economic impact of training and the purchase decision were analyzed. A mixed study was conducted. The purpose of the qualitative research was to collect information that was provided by the construction masters and experts on the subject. Also, in the quantitative research the opinion of the construction masters was taken through surveys and statistical analysis to contrast the results with the qualitative study. The conclusions verified that there is a positive relationship between the purchase decision with the first dimension (the benefit of the training in terms of their work) and the third dimension (economic terms), but not with the second dimension (terms of time / duration) because it was verified that there is no relationship with the purchase decision. / Trabajo de investigación
9

Propuesta de mejora de los procesos de planificación, abastecimiento y ejecución para reducir los sobrecostos operacionales en una empresa constructora mediante la gestión por procesos

Alvarado Barcenes, Luis Aarón, Santos Villarroel, José Humberto 28 January 2020 (has links)
El presente trabajo tiene como finalidad diseñar, desarrollar y validar una propuesta de mejora basada en la gestión por procesos y las herramientas de planificación PERT-CPM y MRP en una empresa constructora. A través de la identificación de la situación actual de la misma, se determina un escenario desfavorable en base a la relación de sus utilidades proyectadas y obtenidas, sobre el cual se identificó el problema principal de deficiente gestión operativa y las causas raíz relacionadas a ineficientes procesos de planificación, abastecimiento y ejecución. Se busca la optimización sistemática y estructurada de los procesos mencionados a través del desarrollo de un proyecto de investigación aplicada, con el objetivo de reducir el problema identificado a través de la utilización de metodologías, técnicas y herramientas referentes a la ingeniería industrial. La investigación se centró en el estudio de los procesos de Diarco, empresa constructora peruana dedicada a la construcción de obras civiles, los cuales se analizaron y rediseñaron a través de la gestión por procesos e incorporando las herramientas de planificación antes mencionadas, planteando una propuesta estructurada del nuevo sistema de trabajo diseñado que resultó viable en el sentido funcional, económico, ambiental, social y tecnológico, respaldado por el desarrollo de un piloto de estudio. La propuesta de mejora concluyó en la disminución de materiales, horas hombre y penalidades por entregas tardías dentro de los proyectos de construcción realizados, concretándose en un proyecto viable económicamente con un VAN de S/. 324,101.34, un TIR de 79% y un índice B/C 3.81. / The purpose of this work is to design, develop and validate a proposal for improvement based on process management and planning tools PERT-CPM and MRP in a construction company. Through the identification of its current situation, an unfavorable scenario is determined based on the ratio of its projected and obtained profits, on which the main problem it’s the poor operational management and the root causes related to inefficient processes of planning, sourcing and execution. The systematic and structured optimization of the aforementioned processes is sought through the development of an applied research project, with the objective of reducing the problem identified through the use of methodologies, techniques and tools related to industrial engineering. The research it’s focused on the study of the processes of Diarco, a peruvian construction company dedicated to the construction of civil works, which were analyzed and redesigned through Business Process Management and incorporating the aforementioned planning tools, proposing a structured proposal of the new designed work system that proved to be viable in the functional, economic, environmental, social and technological sense, backed by the development of a study pilot. The improvement proposal concluded in the reduction of materials, man hours and penalties for late deliveries within the construction projects carried out, concretizing in an economically viable project with a VAN of S /. 324,101.34, a TIR of 79% and a B/C index 3.81. / Trabajo de Suficiencia Profesional
10

El gasto por penalidades contractuales y su impacto en la determinación del impuesto a la renta en las empresas del sector construcción de Lima metropolitana centro año 2018

Adrianzen Zegarra, Melba Marleny, Ventura Ventura, Alexis Martin 30 September 2019 (has links)
El presente trabajo de investigación tiene como objetivo determinar cómo impacta la deducción de las penalidades contractuales en la determinación del impuesto a la renta en las empresas del sector construcción en Lima metropolitana centro del 2018. Esta investigación busca indagar los impactos que tendrán las penalidades contractuales en la determinación del impuesto a la renta en las empresas del sector construcción de Lima metropolitana centro en el periodo 2018, considerando los criterios adoptados y posturas que ha presentado la administración tributaria, en casos muy empíricas como a la vez proponiendo alternativas que permitan que las penalidades contractuales puedan ser de deducción para el determinado periodo. Para el desarrollo de esta investigación, se ha tomado en cuenta el reglamento de la ley del impuesto a la renta, resoluciones de Intendencia, resoluciones del Tribunal Fiscal que han tratado sobre las penalidades contractuales, además de ello tenemos referencias de la Casación N° 8407-2013-LIMA que se llevó en la Corte Suprema de Justicia de la República. El trabajo de investigación cuenta con cinco capítulos, estructurados de la siguiente manera, capítulo I “Marco Teórico”, donde se encuentra toda la información transcendental y relevante de diversas fuentes que han tratado sobre el tema de investigación; después el capítulo II “Plan de Investigación”, donde se identifica el problema, hipótesis y objetivos tanto generales como específicos; luego en el capítulo III “Metodología de Investigación”, se define el tipo y diseño de investigación a emplear, asimismo se detalla el tamaño de la muestra y las herramientas a usar para nuestro análisis cualitativo y cuantitativo. En donde la primera herramienta consta de una entrevista a profundidad a expertos del rubro y la segunda de una encuesta a las empresas del sector. Luego, en el capítulo IV “Desarrollo de la investigación” se realizó la aplicación de las dos herramientas planteadas en la investigación; para luego desarrollar un caso práctico para analizar cómo es el impacto de las penalidades contractuales en la determinación del impuesto a la renta. Para concluir, en el capítulo V “Análisis de Resultados”, se brinda los resultados de la investigación y aprobación de las hipótesis en base a las herramientas usadas, para luego brindar las presentes conclusiones y recomendaciones al trabajo de investigación. / The purpose of this research work is to determine how the deduction of contractual penalties impacts in the determination of the income tax in the companies of the construction sector in Lima Center of 2018. This research seeks to investigate the impacts that will have the contractual penalties in the determination of the income tax in the companies of the construction sector of Lima metropolitan Centro in the period 2018, considering the adopted criteria and positions that the tax administration has presented, in empirical cases and at the same time proposing alternatives that depend on contractual penalties can be of deduction for the given period. For the development of this investigation, the regulation of the law of income tax, Intendance resolutions, resolutions of the Fiscal Court that have dealt with contractual penalties has been taken into account, in addition to this we have references from Cassation No. 8407 -2013-LIMA that was taken in the Supreme Court of Justice of the Republic. The research work has five chapters, structured as follows, chapter I "Theoretical Framework", where all the transcendental and relevant information from other sources that have dealt with the subject of research; after is chapter II "Research Plan", where the problem, hypotheses and objectives are identified as in general and specific; then, in chapter III "Research Methodology", is defined the type and design of investigation , as well it’s detail the sample size and the tools to use for our qualitative and quantitative analysis. Where the first tool consists of an in-depth interview with experts in the field and the second of a survey of companies in the sector. Then, in chapter IV "Research development" the application of the two tools proposed in the research was carried out; then develop a case study for analyze how is impact of contractual penalties on the determination of income tax. To conclude, in Chapter V "Analysis of results", it’s provided the results of the investigation and the approval of the hypotheses based on the tools used, and then it is provide the conclusions and recommendations to the research work. / Tesis

Page generated in 0.0514 seconds