• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 48
  • 12
  • Tagged with
  • 60
  • 60
  • 60
  • 60
  • 12
  • 7
  • 6
  • 5
  • 5
  • 5
  • 5
  • 4
  • 4
  • 4
  • 4
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
11

En Jämförelse av våtrum : Prefab VS platsbyggt

Volden, Henrik January 2007 (has links)
<p>I arbetet görs en jämförelse mellan platsbyggda- och prefabricerade våtrum. Jämförelsen görs utifrån kriterierna ekonomi, kvalité och miljöpåverkan.</p>
12

Checklista för projektledaren vid ROT-arbete av verksamhetslokal : En sammanfattning av risker och åtgärder

Norling, Ola, Wikström, Therese January 2006 (has links)
<p>Problemet vid ROT-arbete är att många delar av upprustningen kan orsaka tidsfördröjning, vilket är extra känsligt för projekt under stor tidspress. Om det handlar om att återställa en byggnad som inhyser en verksamhet, så arbetas det mot en mycket större tidspress än vid återställande av bostadshus. Förseningar är något som man varken har tid eller råd med. Det gäller att få igång verksamheten så fort som möjligt, dels för att inte ägarna ska förlora inkomst och dels för att försäkringsbolaget vill betala ut rätt försäkringspengar.</p><p>Examensarbetet visar de viktigaste momenten i både teori och praktik. Det har gjorts en litteraturstudie inom ämnet för att få en bred kunskapsbas. En intervju har också genomförts med en i dag erfaren projektledare, som pekat på de viktigaste arbetsuppgifterna för en projektledare i ett ROT-projekt.</p><p>Syftet är att finna de faktorer som kan försena ett ROT-projekt och precisera dessa i en checklista för att projektledaren ska kunna upprätta en säkrare tidsplanering.</p><p>Det är viktigt att projektledaren, trots det pressade tidsschemat, genomför riskhanteringsmetoden vid ROT-arbeten. En planerare som för första gången ska analysera risker med ett ROT-arbete bör gå efter riskhanteringsmallen för att undvika att förbise viktiga riskmoment och hanteringsmetoder.</p><p>Vissa av projektledarens viktiga åtaganden beskrivs inte i teorin, vilket gör det svårt för en projektledare utan tidigare erfarenhet från yrket. Därför är denna studie användbar, då den belyser både teori och praktik.</p>
13

Husdeklaration av Stadiums nya distributionscentral / Description of Building Materials used in Stadium´s new Distribution Centre

Landberg, Niklas January 2006 (has links)
The distributioncentral of Stadium has an area of 31,6 acre and is being build in Herstadberg in the region of Norrköping. It is Mattssons Fastighetsutveckling (Mattssons Real-estate development) who also has ordered the building. They will also take care of the operation and support of the distributioncentral. Peab has got the assignment as a total contractor and it is for them I have done my degree project. I have been drawing-up a description of the goods in the distributioncenter. In the declaration a description of the goods will be found, there substance for all the materials that has been built in to the building describes. All the descriptions of the goods has been put together in folders. If some of the sustance could be found in Peabs list of liquidate and forbidden materials, that can also been seen in the folders. The project should also result in folders for operation and support for the distributioncenter. In the work I have hade many contacts with contractors, assemblers and suppliers. Everybody has helpt me get hold of all the documents I have needed. When it comes to operation and support, many of the bigger contractors and assamblers will put together there own instructions in folders, and then deliver them to the orderer in connection with the final inspection. The documents from from remaining contractors, assemblers and suppliers will I put together in a folder. After this work I have detected that the head of the contract, who has the responsibility for the declaration of goods dont have the time that needs. A person have to be appointed as responsible for the declaration. A full time employed is not needed, at the most a halftime. / Den engelska titeln i uppsatsen (pdf-filen) är felaktig och ska vara "Description of Building Materials used in Stadium´s new Distribution Centre".
14

En Jämförelse av våtrum : Prefab VS platsbyggt

Volden, Henrik January 2007 (has links)
I arbetet görs en jämförelse mellan platsbyggda- och prefabricerade våtrum. Jämförelsen görs utifrån kriterierna ekonomi, kvalité och miljöpåverkan.
15

Organisationsplan för Skanska Direkt Värmland

Ludvigsson, Pontus January 2009 (has links)
<p><strong>Abstract</strong></p><p>Skanska Sweden has decided to split the organization that earlier handled both large and small projects into two different subsidiaries. A consequence of this is that all construction service handling will from now on be enforced under the name Skanska Direkt AB. The management of Skanska sees this as an opportunity to develop the organization and in the long term achieve higher earnings.   </p><p>The task which Skanska in connection with the reorganization wanted to be investigated was a proposal on how the organization of work with the insurance work in the future should look like.</p><p>The organization that is handled is from production manager to professional workers and includes damage handling that has been obtained from insurance companies in the southern and northern parts of Värmland. </p><p>The purpose with this work is to present a different kind of view to the problem with developing this branch of the company. The main target was to work out a proposal of an organizational plan for the damage handling in Skanska Direkt AB that is possible to apply, less sensitive for dismissals, results in higher earnings, obtains higher customer satisfaction and also a staff stab that develops their skills at their own.</p><p>The report and work progressed as following:</p><ol><li>Opening theory study of strategies to obtain the objectives set.</li><li>Restructuring of existing organization with theories as support.</li><li>Interviews with the actors involved to verify feasibility of the developed organization plan</li></ol><p> </p><p> Organization chart, the result of work means that some workers at each location shall be responsible for a small group of workers and work independently. They shall manage the process of invoicing and calculate costs at the same time as they work out on the workplace. In support of integration and development shall it be resource persons and development managers.</p><p>The conclusion of the work done was that the organization chart is feasible and that in the existing organization is gaps that this organizational structure may be a possible solution of.</p>
16

Organisationsplan för Skanska Direkt Värmland

Ludvigsson, Pontus January 2009 (has links)
Abstract Skanska Sweden has decided to split the organization that earlier handled both large and small projects into two different subsidiaries. A consequence of this is that all construction service handling will from now on be enforced under the name Skanska Direkt AB. The management of Skanska sees this as an opportunity to develop the organization and in the long term achieve higher earnings.    The task which Skanska in connection with the reorganization wanted to be investigated was a proposal on how the organization of work with the insurance work in the future should look like. The organization that is handled is from production manager to professional workers and includes damage handling that has been obtained from insurance companies in the southern and northern parts of Värmland.  The purpose with this work is to present a different kind of view to the problem with developing this branch of the company. The main target was to work out a proposal of an organizational plan for the damage handling in Skanska Direkt AB that is possible to apply, less sensitive for dismissals, results in higher earnings, obtains higher customer satisfaction and also a staff stab that develops their skills at their own. The report and work progressed as following: Opening theory study of strategies to obtain the objectives set. Restructuring of existing organization with theories as support. Interviews with the actors involved to verify feasibility of the developed organization plan    Organization chart, the result of work means that some workers at each location shall be responsible for a small group of workers and work independently. They shall manage the process of invoicing and calculate costs at the same time as they work out on the workplace. In support of integration and development shall it be resource persons and development managers. The conclusion of the work done was that the organization chart is feasible and that in the existing organization is gaps that this organizational structure may be a possible solution of.
17

Peabs arbetsberedning i produktionen : Finns det en koppling mellan arbetsberedning och Lean construction? / Working preparations in production at Peab

Larsson, Linus, Andersson, Henrik January 2009 (has links)
Statistik har visat att byggbranschens byggnationskostnader i Sverige har ökat de senaste åren. Dessa kostnader beror enligt Josephson &amp; Saukkorippi på kvalitetsproblem och kostnader för omprojektering, samt att det i nuläget görs aktiviteter som inte tillför något kundvärde.   Ett arbetsmoment som idag är en viktig del hos många byggföretag är arbetsberedning. Syftet med arbetsberedningen är att hitta den optimala metoden att utföra ett moment på.   Grunden till uppslaget är att Peab anser att det råder brister i deras nuvarande arbetsberedning. Intervjuer och enkätundersökning har gjorts för att kartlägga eventuella brister i Peabs arbetsberedning samt deras synsätt på Lean.
18

Peabs arbetsberedning i produktionen : Finns det en koppling mellan arbetsberedning och Lean construction? / Working preparations in production at Peab

Larsson, Linus, Andersson, Henrik January 2009 (has links)
<p><p><strong></strong></p><p>Statistik har visat att byggbranschens byggnationskostnader i Sverige har ökat de senaste åren. Dessa kostnader beror enligt Josephson & Saukkorippi på kvalitetsproblem och kostnader för omprojektering, samt att det i nuläget görs aktiviteter som inte tillför något kundvärde.</p><p> </p><p>Ett arbetsmoment som idag är en viktig del hos många byggföretag är arbetsberedning. Syftet med arbetsberedningen är att hitta den optimala metoden att utföra ett moment på.</p><p> </p><p>Grunden till uppslaget är att Peab anser att det råder brister i deras nuvarande arbetsberedning. Intervjuer och enkätundersökning har gjorts för att kartlägga eventuella brister i Peabs arbetsberedning samt deras synsätt på Lean.</p></p>
19

<em>Granskning av kvalitets- och miljöledningssystemet hos Skanska Hus Sydost Linköping </em> : <em>“Vårt sätt att arbeta”</em>

Pettersson, Sara January 2010 (has links)
<p>För att effektivisera och uppnå de krav som ställs på företaget har Skanskas Sverige AB, i likhet med många andra företag, lagt upp ett kvalitets- och miljöledningssystem som Skanska kallar ”Vårt sätt att arbeta”. Det råder idag osäkerhet om i hur stor utsträckning systemet tillämpas och förenklar arbetet. Samt om det finns en gemensam bild av systemet bland de anställda.</p><p>I denna uppsats kommer endast produktionsförberedelsefasen och produktionsstyrningsfasen behandlas. Uppsatsen består av en kortfattad beskrivning av ”Vårt sätt att arbeta”, byggprocessen och ISO. Den utredande delen av rapporten innehåller data från intervjuer och enkäter.</p><p>Skanska har utvecklat ett mycket bra system för att hjälpa sina anställda i sitt arbete. Utifrån svaren i intervjuerna kan man tydligt se att det finns en gemensam bild av ”Vårt sätt att arbeta” och att det används och uppskattas i stor utsträckning. Men det finns alltid saker som kan förbättrs för att göra systemet ännu mer funktionellt. Det efterfrågas till exempel någon slags uppdelning i systemet.</p>
20

Energiförbrukning och utsläpp av koldioxid vid byggande av väg

Al agedi, Bilal, Ibrahim, Maytham January 2010 (has links)
<p>Markförstärkning i ett vägbygge kan göras på olika sätt. I detta examensarbete jämför vi två av dessa metoder, nämligen massutskiftningsmetoden och användning av kalkcementpelare ur energi- och miljösynpunkt. För att jämföra dessa två metoder togs fram ett excelbaserat räkneverktyg där resultatet av energiförbrukningen fås i kWh och koldioxidemissioner i ton CO<sub>2</sub>. Denna jämförelse gjordes för ett specifikt vägprojekt som använde massutskiftningsmetoden för vägunderbyggnaden. Det som ingick i beräkningen var schaktning, fyllning, krossning, sprängning, transporter och kalkcementpelare. För denna uträkning användes data från både entreprenörer som var med i projektet och företag som hade dokumenterade data.</p><p>Metoden som förbrukade minst energi och som släppte ut minst koldioxidemissioner var massutskiftningsmetoden. Det som gjorde att kalkcementpelare till en sämre metod var den höga energiförbrukningen som krävdes för tillverkningen av kalk och cement. Det som krävde mest energi i tillverkningsprocessen var ugnar där höga temperaturer krävdes.</p><p>Skillnaden mellan utskiftningsmetoden och kalkcementpelare i objektet var att i massutskiftningsmetoden krävdes urgrävningar för att schakta bort jordmaterial med dålig hållfasthet och ersätta det med bergmaterial med hög hållfasthet. I denna metod går energi åt till schaktning, fyllning och transport. Medan förstärkningsmetoden med kalkcementpelare förbrukar energi för tillverkning, transport och installation. Eftersom metoden går ut på att vägbyggnaden ska vila på pelarna genom att borra ner dessa i marken istället för att schakta bort stora volymer och transportera dem till fyllningen så är det lätt att tro att kalkcementpelare sparar energi genom att minska massförflyttning och långa transporter. Resultatet av detta examensarbete har visat motsatsen.</p>

Page generated in 0.1154 seconds