• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 48
  • 12
  • Tagged with
  • 60
  • 60
  • 60
  • 60
  • 12
  • 7
  • 6
  • 5
  • 5
  • 5
  • 5
  • 4
  • 4
  • 4
  • 4
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
21

Utfackningsvägg i fältfabrik : en studie av arbetsmiljö och enhetstider

Larsson, Mattias January 2009 (has links)
<p>Construction companies are frequently criticized for high prices and long construction time. At the same time, statistics shows that construction workers are on the sick-list for occupational injuries or casualties more than other groups at the labour market.</p><p>Skanska built a block of flats with tenant-ownerships in Gävle. The construction consists of concrete walls with in-fill walls in the front. The purpose with this degree project is to perform a risk analysis in work environment with focus on repetitive strain injuries and control the time report for in-fill walls manufactured in a field factory. The result of this project will help to make more realistic cost predictions in the future.</p><p>This degree project has been performed in cooperation with the construction company Skanska. It based on literature studies, interviews and field studies.</p><p>The result shows that the work environment is satisfactory with few exceptions and the time report is a lot higher than calculated</p>
22

Säkrare byggarbetsplatser : Säkerhet integrerad i visuell styrning / Safe buildning sites : Integration of satefy into the visual planning

Nilsson, Michael, Tellin, Christian January 2008 (has links)
<p>I rapporten ges förslag på hur arbetsmiljön och säkerheten kan förbättras på Skanskas byggarbetsplatser i Värmland genom att integrera säkerheten i den visuella styrningen.</p><p>På skyddsrondsprotokollen finns det vissa anmärkningar som ofta återkommer, nämligen fallskydd, allmän oreda och personlig skyddsutrustning. Bakom dessa anmärkningar och många olyckor som sker ute på byggarbetsplatserna ligger ofta den mänskliga faktorn, vilket innebär att många av olyckorna som skett skulle ha kunnat förebyggas.</p><p>Visuell styrning är en metod som tidigare provats på Skanskas arbetsplatser med syftet att öka produktiviteten genom kommunikation och synlighet för arbetarna. Genom deras delaktighet i visuell styrning ökar engagemanget och det skapas en ”vi-känsla” ute i produktion, något som skulle kunna lösa många av de problem som finns på arbetsplatserna.</p><p>Visuell styrning hos Skanska fungerar praktiskt så att en whiteboardtavla sätts upp ute på byggarbetsplatsen, där man samlar ihop medarbetarna framför tavlan varje morgon innan man börjar producera och går igenom det som är prioriterat i produktionen på tavlan.</p><p>Vår idé är att integrera säkerheten i den visuella styrningen genom att sätta upp punkter på tavlan som är viktiga ur säkerhetssynpunkt. Till dessa kan en skala sättas där man enkelt kan se hur den aktuella säkerheten för varje punkt är på bygget. Den som är ansvarig för tavlan gör en bedömning i slutet på varje arbetsdag där han markerar på tavlan vart han tycker att säkerheten gällande dessa punkter ligger. Att enbart markera på tavlan hur säkerheten ser ut är enligt vår mening inte nog. Den ansvarige för tavlan bör tala om grunden för bedömningen och påpeka brister men får inte glömma positiv kritik. Genom att hela tiden påpeka och påminna bör det ge resultat då det är medarbetarnas egna säkerhet som diskuteras.</p><p>Detta är en metod som tros fungera då den är enkel, tydlig och sätter fokus på de viktigaste problemen. Utformningen på tavlan och vilka punkter som tas upp kan lätt ändras vilket innebär att tavlan kan anpassas till alla byggarbetsplatser.</p> / <p>The report shows how to improve the working environment and safety on working sites of Skanska in Värmland through integrating safety by visual monitoring.</p><p>On the safety regulation protocols, some remarks appear frequently and those are the remarks about fall-arrest safety netting, untidyness in general and personal safety equipment. Behind these remarks, and behind the many accidents occuring on the building sites, the human factor is the main cause, which implies that many of these accidents could have been prevented.</p><p>Visual monitoring is a method that earlier has been tested on the worksites of Skanska with the purpose of increasing productivity through communication and visibility for the workers. Through their participation in visual planning, their commitment increases and a feeling of togetherness in production is created, something that could solve many of the problems occuring on the building sites.</p><p>At Skanska, visual monitoring in reality works out in a way that a white board is put up on the building site where the workers assemble every morning before production commences, and all priorities concerning production are gone through.</p><p>Our idea is to integrate safety into visual monitoring through putting up points on the white board that are important from a safety aspect. To these points a scale could be added where one easily could view the current safety situation for every point on the building site. The person responsible for the white board makes a judgement in the end of every working day by indicating where he thinks the level of safety is among the points put up. But just indicating the judgement of safety is in our opinion not enough. The person responsible for the white board should explain the basis used in forming his judgement and call attention to shortcomings, while not forgetting positive feedback. Through constant remarks and reminders, this should produce a result as it is the workers own security that is being discussed.</p><p>This method is thought to work because it is simple and straightforward and puts focus on the most important issues. The formulation on the white board and the matters discussed can easily be altered which means that the whiteboard can be adjusted to all building sites.</p>
23

Rutinbeskrivning : en fältstudie av polsk arbetskraft

Örtendahl, Elinor January 2006 (has links)
<p>Detta arbete har framkommit efter ett nära samarbete med NCC Construction Sverige AB då en efterfrågan på en rutinbeskrivning vid anlitandet av polsk arbetskraft fanns. Rutin- beskrivningen som gjorts inriktar sig på att kunna användas när anställningen av polsk arbetskraft övervägs för att se vilka rutiner som bör följas vid anställning och under anställning. Rutinbeskrivningen har delats upp i tre delar; innan ankomst till Sverige, under arbetstid i Sverige och efter utresa från Sverige.</p><p>Innan ankomst till Sverige tar upp punkter som Arbetsmiljö- och säkerhetsutbildning, att medföljande arbetsledare skall prata en god engelska, alla arbetare ha yrkesbevis och att den svenska byggarbetsplatsen skall ordna mat, boende och hyrbil.</p><p>Under arbetstid i Sverige tas punkter om händelser med Migrationsverket och Skatteverket upp. Även frågan om vart social försäkring skall betalas och hur detta utreds tas upp.</p><p>Efter utresa från Sverige är deklaration i Sverige en viktig post, men även avstämning med facket.</p><p>En checklista har gjorts utifrån rutinbeskrivningen för att ge en enklare blick över vilka punkter som ingår i anställandet av polsk arbetskraft. Checklistan bör vid varje projekt anpassas så att en mer specifik arbetstagare (ex. platschef, personalman) anges som ansvarig. Detta för att det bör vara en ansvarig på varje post så att någon kontrollerar att posten verkligen utförts.</p><p>Denna rutinbeskrivning och checklista är fullt användbar även vid anlitande av arbetskraft från andra EU/ESS-länder än Polen, men då kanske med anpassning av föreskrifter hos Skatteverket, Migrationsverket och Försäkringskassan.</p><p>Detta arbete har också utvärderat positiva och negativa faktiska händelser runt om den polska arbetskraften på byggarbetsplatsen Gurkburken. Vid NCC Värmland är detta första gången utländsk arbetskraft används och idrottshallen Gurkburken i Fagerås är ett pilotprojekt som förhoppningsvis skall bana vägen för framtida projekt med utländsk arbetskraft i Värmland. Fyra yrkesarbetare och en arbetsledare från NCC Polska har arbetat under fyra månader med att bygga bl.a. innerväggar i den tillagda omklädningsdelen och innerpanel i själva hallen. De har sammanfattningsvis varit mycket effektiva och punktliga i sitt arbete. NCC i Värmland har ordnat boende, mat och hyrt en minibuss, samt hjälpt till med all kontakt med de olika myndigheterna.</p>
24

Säkrare byggarbetsplatser : Säkerhet integrerad i visuell styrning / Safe buildning sites : Integration of satefy into the visual planning

Nilsson, Michael, Tellin, Christian January 2008 (has links)
I rapporten ges förslag på hur arbetsmiljön och säkerheten kan förbättras på Skanskas byggarbetsplatser i Värmland genom att integrera säkerheten i den visuella styrningen. På skyddsrondsprotokollen finns det vissa anmärkningar som ofta återkommer, nämligen fallskydd, allmän oreda och personlig skyddsutrustning. Bakom dessa anmärkningar och många olyckor som sker ute på byggarbetsplatserna ligger ofta den mänskliga faktorn, vilket innebär att många av olyckorna som skett skulle ha kunnat förebyggas. Visuell styrning är en metod som tidigare provats på Skanskas arbetsplatser med syftet att öka produktiviteten genom kommunikation och synlighet för arbetarna. Genom deras delaktighet i visuell styrning ökar engagemanget och det skapas en ”vi-känsla” ute i produktion, något som skulle kunna lösa många av de problem som finns på arbetsplatserna. Visuell styrning hos Skanska fungerar praktiskt så att en whiteboardtavla sätts upp ute på byggarbetsplatsen, där man samlar ihop medarbetarna framför tavlan varje morgon innan man börjar producera och går igenom det som är prioriterat i produktionen på tavlan. Vår idé är att integrera säkerheten i den visuella styrningen genom att sätta upp punkter på tavlan som är viktiga ur säkerhetssynpunkt. Till dessa kan en skala sättas där man enkelt kan se hur den aktuella säkerheten för varje punkt är på bygget. Den som är ansvarig för tavlan gör en bedömning i slutet på varje arbetsdag där han markerar på tavlan vart han tycker att säkerheten gällande dessa punkter ligger. Att enbart markera på tavlan hur säkerheten ser ut är enligt vår mening inte nog. Den ansvarige för tavlan bör tala om grunden för bedömningen och påpeka brister men får inte glömma positiv kritik. Genom att hela tiden påpeka och påminna bör det ge resultat då det är medarbetarnas egna säkerhet som diskuteras. Detta är en metod som tros fungera då den är enkel, tydlig och sätter fokus på de viktigaste problemen. Utformningen på tavlan och vilka punkter som tas upp kan lätt ändras vilket innebär att tavlan kan anpassas till alla byggarbetsplatser. / The report shows how to improve the working environment and safety on working sites of Skanska in Värmland through integrating safety by visual monitoring. On the safety regulation protocols, some remarks appear frequently and those are the remarks about fall-arrest safety netting, untidyness in general and personal safety equipment. Behind these remarks, and behind the many accidents occuring on the building sites, the human factor is the main cause, which implies that many of these accidents could have been prevented. Visual monitoring is a method that earlier has been tested on the worksites of Skanska with the purpose of increasing productivity through communication and visibility for the workers. Through their participation in visual planning, their commitment increases and a feeling of togetherness in production is created, something that could solve many of the problems occuring on the building sites. At Skanska, visual monitoring in reality works out in a way that a white board is put up on the building site where the workers assemble every morning before production commences, and all priorities concerning production are gone through. Our idea is to integrate safety into visual monitoring through putting up points on the white board that are important from a safety aspect. To these points a scale could be added where one easily could view the current safety situation for every point on the building site. The person responsible for the white board makes a judgement in the end of every working day by indicating where he thinks the level of safety is among the points put up. But just indicating the judgement of safety is in our opinion not enough. The person responsible for the white board should explain the basis used in forming his judgement and call attention to shortcomings, while not forgetting positive feedback. Through constant remarks and reminders, this should produce a result as it is the workers own security that is being discussed. This method is thought to work because it is simple and straightforward and puts focus on the most important issues. The formulation on the white board and the matters discussed can easily be altered which means that the whiteboard can be adjusted to all building sites.
25

Utfackningsvägg i fältfabrik : en studie av arbetsmiljö och enhetstider

Larsson, Mattias January 2009 (has links)
Construction companies are frequently criticized for high prices and long construction time. At the same time, statistics shows that construction workers are on the sick-list for occupational injuries or casualties more than other groups at the labour market. Skanska built a block of flats with tenant-ownerships in Gävle. The construction consists of concrete walls with in-fill walls in the front. The purpose with this degree project is to perform a risk analysis in work environment with focus on repetitive strain injuries and control the time report for in-fill walls manufactured in a field factory. The result of this project will help to make more realistic cost predictions in the future. This degree project has been performed in cooperation with the construction company Skanska. It based on literature studies, interviews and field studies. The result shows that the work environment is satisfactory with few exceptions and the time report is a lot higher than calculated
26

Energiförbrukning och utsläpp av koldioxid vid byggande av väg

Al agedi, Bilal, Ibrahim, Maytham January 2010 (has links)
Markförstärkning i ett vägbygge kan göras på olika sätt. I detta examensarbete jämför vi två av dessa metoder, nämligen massutskiftningsmetoden och användning av kalkcementpelare ur energi- och miljösynpunkt. För att jämföra dessa två metoder togs fram ett excelbaserat räkneverktyg där resultatet av energiförbrukningen fås i kWh och koldioxidemissioner i ton CO2. Denna jämförelse gjordes för ett specifikt vägprojekt som använde massutskiftningsmetoden för vägunderbyggnaden. Det som ingick i beräkningen var schaktning, fyllning, krossning, sprängning, transporter och kalkcementpelare. För denna uträkning användes data från både entreprenörer som var med i projektet och företag som hade dokumenterade data. Metoden som förbrukade minst energi och som släppte ut minst koldioxidemissioner var massutskiftningsmetoden. Det som gjorde att kalkcementpelare till en sämre metod var den höga energiförbrukningen som krävdes för tillverkningen av kalk och cement. Det som krävde mest energi i tillverkningsprocessen var ugnar där höga temperaturer krävdes. Skillnaden mellan utskiftningsmetoden och kalkcementpelare i objektet var att i massutskiftningsmetoden krävdes urgrävningar för att schakta bort jordmaterial med dålig hållfasthet och ersätta det med bergmaterial med hög hållfasthet. I denna metod går energi åt till schaktning, fyllning och transport. Medan förstärkningsmetoden med kalkcementpelare förbrukar energi för tillverkning, transport och installation. Eftersom metoden går ut på att vägbyggnaden ska vila på pelarna genom att borra ner dessa i marken istället för att schakta bort stora volymer och transportera dem till fyllningen så är det lätt att tro att kalkcementpelare sparar energi genom att minska massförflyttning och långa transporter. Resultatet av detta examensarbete har visat motsatsen.
27

Granskning av kvalitets- och miljöledningssystemet hos Skanska Hus Sydost Linköping : “Vårt sätt att arbeta”

Pettersson, Sara January 2010 (has links)
För att effektivisera och uppnå de krav som ställs på företaget har Skanskas Sverige AB, i likhet med många andra företag, lagt upp ett kvalitets- och miljöledningssystem som Skanska kallar ”Vårt sätt att arbeta”. Det råder idag osäkerhet om i hur stor utsträckning systemet tillämpas och förenklar arbetet. Samt om det finns en gemensam bild av systemet bland de anställda. I denna uppsats kommer endast produktionsförberedelsefasen och produktionsstyrningsfasen behandlas. Uppsatsen består av en kortfattad beskrivning av ”Vårt sätt att arbeta”, byggprocessen och ISO. Den utredande delen av rapporten innehåller data från intervjuer och enkäter. Skanska har utvecklat ett mycket bra system för att hjälpa sina anställda i sitt arbete. Utifrån svaren i intervjuerna kan man tydligt se att det finns en gemensam bild av ”Vårt sätt att arbeta” och att det används och uppskattas i stor utsträckning. Men det finns alltid saker som kan förbättrs för att göra systemet ännu mer funktionellt. Det efterfrågas till exempel någon slags uppdelning i systemet.
28

Transport av volymelement : Förutsättningar ur ett företags perspektiv

Andersson, Paul, Ladan, Igor January 2011 (has links)
Building with volume element is relatively new and has started to increase more and more. The regulations that exist to regulate and determine how the transports of volume elements are to be conducted are diffuse and not very well adjusted to address the issues with transporting volume elements. Today there are a number of instances that a company has to turn to in order to get a somewhat different view, what regulations say and interpret it in order to know what applies and not applies regarding the transportation of volume elements. regulations. The rules that are in place make it tough for the volume element producing companies to develop and continue to be active on the market. New stricter laws regarding environment safe building leads to the volume elements getting larger which makes it even harder to transport them from a law and rules point of view.
29

Informations- och kunskapsflöde i byggbranschen : En studie av informations- och kunskapsflöde till och från produktionsledare

Eriksson, Stefan, Levén Svensson, Hampus January 2011 (has links)
This report that is written in cooperation with Peab Sverige AB, studies the information and knowledge management from the production support to the production management.   The conclusion of this report is that to have a good and functional information and knowledge management it is necessary that the company has a good way of regain and handling experiences from its projects. The way to do this is to develop the managing system on the production management’s terms. It is also critical to find an easy way for the production management to use the system.
30

Arbetsberedningar : för att minska slöseri i byggproduktion / Work preperations : to reduce wastage in production

Johnsson, Tobias January 2011 (has links)
Med produktionsplanering menas att på ett effektivt sätt koordinera ett projekts aktiviteter och resurser. Genom god planering kan potentiella konflikter förutspås. Arbetsberedningar är ett verktyg som ser över arbetsmomenten, kartlägger arbetsflöden och kan hitta det mest effektiva sättet att genomföra arbetet på. Arbetsberedningar kan användas för att dela erfarenheter och standardisering av arbetsmoment inom företaget. Syftet med rapporten är att studera arbetsberedningar, samt vilka uppgifter produktionsledning och yrkesarbetare har vid framställning av arbetsberedningar. Undersökningen har genomförts som en fallstudie med två datainsamlingsmetoder; litteraturstudie och intervjuer. I undersökningen har produktionschefer, arbetsledare och yrkesarbetare intervjuats med syfte att kartlägga hur Skanska arbetar med arbetsberedningar i distriktet Kristianstad. Syftet är även att analysera nuläget och jämföra det med litteratur och med kunskap om detta påvisa förbättringsmöjligheter. I Skanskas verksamhetsledningssystem, Vårt sätt att arbeta, beskrivs arbetsberedningen som en detaljerad planering av ett arbetsmoment. Syftet är att ta tillvara allas kompetens, säkra arbetsmiljö, kvalitet och miljö samt öka förutsägbarheten avseende produktivitet. Risker som bedöms vara betydande för projektets tid, ekonomi, kvalitet, miljö eller arbetsmiljö ska arbetsberedas på en detaljerad nivå i produktionen. Från intervjuerna framgår hur anställda på Skanska arbetar med arbetsberedningar idag. Arbetssätten varierar mellan olika individer och arbetsplatser. Samtliga anser att arbetsberedningen är ett bra verktyg för planeringsarbetet i produktion och använder sig gärna av det, men att tidsbrist är en av orsakerna till att arbetsberedningar inte görs till fullo. Respondenterna inser också vikten av att nyttja alla medarbetares kompetens och kunskaper vid framställning av arbetsberedningen och ser gärna samarbete på arbetsplatsen. Medverkande i undersökningen har en positiv inställning till arbetsberedningar och tycker det är ett bra hjälpmedel i produktionen. Således behöver inte synsättet på arbetsberedningar ändras, däremot är inte samtliga införstådda med betydelsen av vad arbetsberedningar kan medföra för effekter. Förståelse för att denna typ av produktionsplanering är viktig måste öka. Ledningen bör förmedla syftet och målen med arbetsberedningar tydligare till alla medarbetare, på så vis kan förståelsen för arbetsberedningar förbättras och en reduktion av slöseri i byggproduktion kan ske. Arbetsberedningar tar tid att göra och därför prioriteras de ofta bort, men tid sparas snabbt in när aktiviteten börjar genom att frågor och osäkerheter elimineras samt att tid sparas in för åtgärder av de fel som uppstår. Brist på tid borde alltså inte vara en orsak till att göra mindre arbetsberedningar, tvärtom. För att arbetsberedningar ska bli en standardisering i produktionsledningens arbete krävs att de arbetar mer rutinmässigt med arbetsberedningar. / The meaning of production planning is to effectively coordinate a project's activities and resources in the most effective way possible. Through good planning, potential conflicts can be avoided. Work preparations is a tool that reviews the operations, mapping workflow and can find the most effective way to carry out work on. Work preparations can be used to share experiences and standardize operations within the company. The purpose of this report is to study work preparations and what tasks production management and skilled workers have when work preperations are done. The study was conducted as a case study with two methods of data collection, a literature review and interviews. In the study, production managers, supervisors and skilled workers were interviewed to identify how Skanska is working with work preparations in the district of Kristianstad. The study also aims to analyze the situation and compare it with literature and with established knowledge in order to highlight possible improvements. In Skanska’s business management system, Vårt sätt att arbeta, work preparations is described as a detailed planning of an operation. The aim is to take advantage of everyone’s skills, safe work environment, quality and environment, and to increase predictability regarding productivity. Risks that are deemed significant to the project's time, finances, quality, environmental or health should be prepared at a detailed level of  production. The interviews show how employees at Skanska are working with work preperations. Approaches vary between individuals and workplaces. All respondents believe work preperations is a good tool for planning in production and gladly uses it. But one of the reasons for not using it, is the lack of time. Respondents also recognize the importance of utilizing all coworkers’ skills and knowledge when producing work preperations, and encourages cooperation in the workplace. Respondents in the study has a positive attitude to work preperations and think it aids them in production. Thus, do not the opinion of work preperations have to change, however, not all respondents understand the importance of work preperations and what effects they can have. The understanding of how important this kind of planning is must increase. Skanska’s management should convey the purpose and objectives of work preperations to all employees, in that way the understanding of work preperations can improve and reduction of wastage in construction can take place. Work preperations takes time and therefor they are not always prioritized. There is however time to be saved when activities begin due to questions and uncertainties are eliminated. Time can also be saved by not having to take measures of produced errors. The lack of time shouldn’t be a reason for not doing work preperations, on the contrary work preperations saves time. To make work preperations a standardization in production, the management are required to work more routinely with work preperations.

Page generated in 0.0862 seconds