• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • 1
  • Tagged with
  • 3
  • 3
  • 3
  • 3
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Climate declaration 2022 : A study on the impact of the climate declaration on the construction industry / Klimatdeklaration 2022 : En studie om klimatdeklarationens påverkan på byggbranschen

Andersson, Jonas, Edsman, William January 2021 (has links)
From 2022 the Swedish housing council (Boverket) is requiring that all new production houses,with a few exceptions, calculate their climate impact in a climate declaration. This is the firststep of many in order to reach climate neutrality in 2045. The plan is to set limits for maximumemissions from a building project in 2027. Any numbers on what the maximum limit might behas not yet been presented.The climate declaration will include the emission from transports and a few mandatory buildingparts. These parts are load-bearing structural parts, interior walls and climate screens. Thedeveloper has the responsibility that the climate declaration will be sent to the housing councilwhen the project is finished.With this law many actors in different parts of the construction value chain will be affected andwill have to change their routines. The thesis aims to present what adjustments different actorsneed to make and what problems may arise in the making of a climate declaration.The thesis is mainly based on interviews and the practical climate calculation that was done inconnection to the study. Results from the interview shows that much of the climate calculationwork will be sent over to the next instance, for example the developer will most likely requirethat the entrepreneur is responsible for the climate calculation, in turn the entrepreneur ordeveloper will require that the material supplier will calculate their emissions on transports andthe material.The material suppliers are those who likely will be affected the most. Customers will demandEPDs and precise transport distances on their orders to make sure their climate declaration iscorrect. Material suppliers with EPDs on many of their products will be much more attractive tocustomers.The results from the practical climate calculation shows that producing a climate declarationdigitally will not be especially complicated as there is intuitive software to ease the transition,without the need for any greater knowledge. The critical moment will be the resourcecompilation and making sure that the amount of material used is correct. This can be done byestablishing templates and routines at an early stage, and continuously post transports andmaterials used throughout the project. / Från och med 2022 ställer boverket krav att alla nyproducerade byggnader, med ett fåtalundantag, skall redovisa sin klimatpåverkan i en klimatdeklaration. Detta är ett första steg avflera för att minska utsläppen i byggbranschen och senare kunna uppnå klimatneutralitet 2045 ienighet med det klimatpolitiska regelverk som röstades igenom i riksdagen 2017. Planen är attår 2027 kommer referensvärden och gränsvärden att träda i kraft, några precisa siffror har pågränsvärden har ännu inte presenterats.Klimatdeklarationen skall visa utsläppet från transporter, energiåtgång i byggprocessen samt ettantal obligatoriska byggnadsdelar. De byggnadsdelar som måste ingå i en klimatdeklaration ärbärande konstruktionsdelar, innerväggar samt klimatskärmar. Byggherren innehar det ytterstaansvaret att klimatdeklarationen lämnas in till boverket när projektet är färdigställt.I och med lagkravet kommer många företag i olika delar av värdekedjan behöva göraomställningar i sina rutiner och arbetssätt. Undersökningen syftar att presentera vilkaomställningar olika aktörer behöver göra samt vilka problem som kan uppstå i samband medframställning av en klimatdeklaration.Arbetet är till stor del baserat på intervjuer och det praktiska klimatberäkningsarbetet som utförtsi samband med studien. Resultatet från intervjuerna visar att nya krav kommer ställas iupphandlingarna angående klimatdeklarationen, likt det vi ser i arbetet med energideklarationeridag. Byggherren kommer ställa krav i upphandlingen att entreprenören skall utföraklimatberäkningen till exempel. I sin tur kommer entreprenören eller byggherren ställa krav påbyggmaterialleverantören att dessa ska redovisa utsläpp för material och transporter.Aktörerna i värdekedjan som med stor sannolikhet kommer påverkas mest ärmaterialleverantörerna. Kunderna kommer begära EPD-underlag på produkterna och precisatransportsträckor för att enkelt kunna säkerställa att deras klimatdeklaration är korrekt.Materialleverantörerna med EPDer på många av sina produkter kommer bli konkurrenskraftigaframöver.Resultatet från det praktiska arbetet visar att framställandet av klimatdeklarationen inte medförstörre svårigheter då det finns flera effektiva programvaror som är lätta att förstå utan störreförkunskaper. Det kritiska momentet kommer vara att resurssammanställningen är korrekt gjordoch att mängderna stämmer. Detta kan göras genom att tidigt upprätta mallar och rutiner för attkontinuerligt kunna bokföra transporter och material i projektets gång.
2

HÅLLBAR STADSPLANERING. Örebro kommuns strategier för minskad klimatpåverkan / SUSTAINABLE URBAN PLANNING - Örebro municipality´s strategies for reducing climate impact

Gustavsson, Jennifer, Nolåkers, Emma January 2022 (has links)
En femtedel av Sveriges klimatpåverkan kommer från bygg- och anläggningssektorn och år 2017 röstade riksdagen igenom att Sverige, senast år 2045, ska nå nettonollutsläpp av växthusgaser. Örebro kommun har tagit fram ett eget styrdokument, Klimatstrategi för Örebro kommun, som beskriver klimatpåverkan, vad kommunen behöver göra samt vilka etappmål och delmål som finns i det geografiska området.  Avsikten med denna studie är att undersöka hur Örebro kommun arbetar aktivt för att minska klimatpåverkan genom samhällsplaneringen i samband med att staden växer. Studien har baserats på litteraturstudier och intervjuer med fyra deltagare från Örebro kommun och tre deltagare från Länsstyrelsen i Örebro län. Studien har avgränsats till ett specifikt delmål i Örebro kommuns klimatstrategi och på vilka sätt de arbetar för att uppnå delmålet - klimatsmart samhällsplanering. Resultatet tyder på att Örebro kommun har många dokument att förhålla sig till för att minska klimatpåverkan. Ett av dessa dokument är översiktsplanen. Detta dokument anses vara det främsta verktyget för samhällsplaneringen, då andra planeringsdokument arbetats in i översiktsplanen. Trafikstrategin är ett av dessa planeringsdokument som utgör underlag för att främja hållbart resande.   Länsstyrelsen har i uppgift att förse kommunerna med olika planeringsunderlag och anordna olika träffar med kommunerna. Inom samhällsplanering finns det många aspekter att ta hänsyn till och då kan Länsstyrelsen ge goda exempel, sprida kunskap samt ge vägledning till kommunerna.  Örebro kommun har framställt ett eget verktyg för att kunna effektivisera och påverka markanvisningsprocessen som kallas Örebromodellen. Kommunen har makten att bestämma vem som ska bli tilldelad mark genom utvärdering av byggaktörernas genomförandeambitioner i intresseanmälningarna. Dessutom kan kommunen ha önskemål om att byggaktörernas genomförandeambitioner ska vara klimatrelaterade. För att möjliggöra klimatarbetet i kommunen ännu mer är slutsatsen att det behövs en förändrad lagstiftning samt tydligare ställningstaganden i politiken. Om politiken ska kunna ta ställning krävs det att tjänstemännen har kompetensen och möjligheten att förmedla vilka åtgärder som behövs. / One fifth of Sweden's climate impact comes from the building and construction sector, and in 2017 the Parliament voted that Sweden, by 2045 at the latest, will achieve net zero emissions of greenhouse gases. Örebro municipality has produced its own governing document, Climate strategy for Örebro municipality, which describes the climate impact, what the municipality needs to do and what milestones and stage goals are in the geographical area. The purpose of this study is to investigate how Örebro municipality works actively to reduce climate impact through community planning in connection with the city's growth. The study has been based on literature studies and interviews with four participants from Örebro municipality and three participants from the County Administrative Board in Örebro County. The study has been limited to a specific stage goal in Örebro municipality's climate strategy and the ways in which they work to achieve the stage goal - climate-smart community planning. The results indicate that Örebro municipality has many documents to relate to in order to reduce the climate impact. One of these documents is the master plan. This document is considered to be the main tool for community planning, as other planning documents have been worked into the master plan. The traffic strategy is one of these planning documents that forms the basis for promoting sustainable travel.  The County Administrative Board has the task of providing the municipalities with different planning documents and arranging different meetings with the municipalities. In community planning, there are many aspects to take into account and then the County Administrative Board can set good examples, disseminate knowledge and provide guidance to the municipalities. The municipality of Örebro has produced its own tool to be able to streamline and influence the land allocation process known as the Örebro model. The municipality has the power to decide who will be allocated land by evaluating the construction actors' implementation ambitions in the expressions of interest. In addition, the municipality may want the construction actors’ implementation ambitions to be climate-related. To enable climate work in the municipality even more, the conclusion is that a change in laws and clearer positions in politics are needed. If policy is to be able to take a stand, it is required that civil servants have the competence and the opportunity to convey what measures are needed.
3

Tillvägagångssätt och implementering av nya arbetsmetoder med hänsyn till Färdplan 2045 för en mer klimatneutral byggproduktion : En fallstudie som genomförts hos en byggentreprenör

David, Georgis January 2024 (has links)
Bygg- och fastighetssektorn stod för 22% av Sveriges totala växthusgasutsläpp år 2021 vilket är en ökning med 1,9 % jämfört med föregående år. Det tydliggör behovet av ett mer hållbart byggande för att uppnå Sveriges klimatmål att uppnå noll nettoutsläpp senast år 2045. Det krävs en branschomställning där traditionella byggmetoder byts ut mot mer klimatneutrala arbetsprocesser, något som är utmanande idag. För att möta utmaningar har Bygg- och anläggningsföretagen antagit en färdplan 2045 som presenterar nio åtgärder för byggsektorn för att uppnå klimatneutralitet. Syftet med denna studie är att undersöka tillvägagångssätt och nya arbetsprocesser för en byggentreprenör i enlighet med åtgärderna i Färdplan 2045. För att möjliggöra studien har sex projekt och konsult intervjuats med hjälp av semi-strukturerad intervjuteknik för att få en djupare inblick i projektet. De djupare inblicken kan bidra till en ökad förståelse kring vilka hinder och klimatneutrala åtgärder som en byggentreprenör använder sig av. Resultatet presenteras i tabeller för att skapa en överblick kring återkommande klimateffektiva arbetsprocesser och eventuella hinder som hämmar klimatneutrala byggprojekt i enlighet med Färdplan 2045.Studien har identifierat flera klimatneutrala arbetsprocesser som använts i fallstudierna i olika omfattningar. Anpassning av arbetsprocesser utgör till stor del av beställarkraven och hållbarhetsambitionerna i projektet. Varsamma renoveringar har varit centrala, i synnerhet för kulturminnesmärkta byggnader men även i fallstudier som har höga hållbarhetsambitioner. Mängdningsprocesser har använts för beräkna materialåtgången där ett identifierat hinder är stora säkerhetspåslag som inneburit en suboptimering. Byggvarubedömningen har använts i alla fallstudier som bidragit till en förenklad process att välja material med låg klimatpåverkan. Internt inom byggentreprenörens verksamhet förekommer återbruk internt tillsammans med prefabricering och måttbeställningar för minimering av avfall. Det har genomförts projektering för främja flexibla och demonterbara planlösningar som ökar nyttjandegraden i fastigheten kombinerat med främja framtida återbruk. Det har genomförts omfattande åtgärder för att minimera byggarbetsplatsens klimatpåverkan med hjälp av en intern framtagen mall för resursoptimering. Miljövänlig etablering har genomförts tillsammans med att byggarbetsplatsens hålls elektrifierad och energisnål belysning som är hållbara tillvägagångssätt. Hinder för transportoptimeringar har identifierats med hänsyn till bristande planering och låg prioriteringsgrads om kräver vidare utveckling. Ett återkommande hinder är tids- och resursbrist att arbeta med hållbarhetsfrågor. För att möjliggöra minskad klimatpåverkan i byggprojekt krävs en tidig involvering av byggentreprenören för att skapa enhetliga mål och hållbarhetsambitioner. En tidig integrering bidrar till hållbara processer som sprids genom hela värdekedjan med hjälp av ett tydligt ledarskap och agerande som tar hållbarhet i beaktande.  Hinder har identifierats i form av brist i förståelse och kompetens som berör hållbart byggande. Stora byggnadskomplex byggs idag med korta tidsplaner, något som gör att traditionella byggmetoder används i större utsträckning. Det har bidragit till utvecklingen av byggkompetens hämmats när av traditionella arbetsprocesser används i större utsträckning. För framtida studier rekommenderas att genomföra en identisk studie hos en annan byggentreprenör för att bedöma likheter i arbetsprocesser och hinder som uppstår. Det rekommenderas även att genomföra en identisk studie hos beställare för att framhäva problematik och arbetsprocesser ur ett beställarperspektiv. En likadan studie rekommenderas att genomföras i framtiden hos byggentreprenören för att identifiera nya arbetsprocesser och dess effekter för att bedöma ifall byggentreprenören är i linje med klimatmålen. Det rekommenderas att ta fram standardiserade säkerhetspåslag vid mängdningar för att skapa en balans mellan minskad materialåtgång och undvika produktionsstopp. Slutligen rekommenderas det att undersöka färdplanens nio åtgärder mer ingående. / The Construction- and Real Estate sector was accountable for 22 % of Sweden’s total emissions in 2021, which marks a 1.9 % increase compared to the previous year. This highlights the urgent for a sustainable construction and implement more sustainable building methods to achieve Sweden’s climate goals to achieve net-zero emissions by 2045. To address these challenges, the Construction and Civil Engineering Companies have adopted the Roadmap 2045, which presents nine measures with associated recommendations for achieving climate neutrality in the construction sector.The purpose of this study is to explore new approaches for a construction contractor that is in alignment with the measures outlined in Roadmap 2045. Semi-structured interviews have been held with six project representatives and one external consultant to gain a deeper insight into the climate-neutral measures and obstacles encountered in these projects. These deeper insights can contribute to understanding of climate-neutral measures and obstacles that a construction contractor is facing. The results are presented in tables to provide an overview of climate-efficient methods and obstacles that inhibits climate-neutrality in building projects in line with Roadmap 2045. The study has identified several work methods in various extents that contribute to lower emissions in the building projects. The adaption of work processes is dependent on the client’s sustainability ambitions in the construction project and requirements. Careful renovations have been central, particularly for building that have a high cultural heritage where demolitions are not an option but also in construction projects with high sustainability ambitions. Workprocess have been used to calculate material consumption in the building projects where an identified obstacle is large margins to the calculations which is a sub optimization. Assessments for building materials have been used in the building projects for contributing of an easier process of selecting materials with a low impact on the climate. Reuse of material is common, especially internally withing the contractor’s building projects which minimizes waste where also prefabrication and custom orders also plays a big role. There has been a planning to build demountable and flexible layouts which increase the buildings utilization rate combined with promoting future reuse. Big measurements have been taken to minimize the climate impact at the contractors building site with the help of a template that takes resource optimization into account. Environmentally friendly site has been implemented along with using energy-efficient light and using electrified machinery as sustainable approaches. Transport optimization is an obstacle that have been identified due to poor planning and low priority which requires further development of its working methods. A recurring obstacle is lack of resources and time to work further on the sustainability issues. To be able to reduce climate impact in the construction project, early involvement of the construction contractor is necessary to create the same sustainability ambitions and unified goal. Early integration does contribute to a sustainable approach that spread throughout the value chain with a clear leadership that takes sustainability into account. Obstacles have been identified where a lack of understanding and knowledge that relates to sustainability construction. Large building structures are being built with tight schedules today which promotes traditional construction processes and methods to a greater extent. This is a main reason why development of sustainable competence in constructions is being hindered when traditional processer is used more regularly rather than testing out new sustainable process. For future studies, its recommended to conduct an identical study with another construction contractor to identify similar if the obstacles and work processes are similar. It is also recommended to conduct an identical study with clients to highlight the problem from a client perspective and introducing new sustainable work methods for clients.  A similar study is recommended to conducted in the future at the same construction contractor do identify potential new work methods and processed and identify if the contractor is in line with Sweden climate goals. It is also recommended to develop standardized safety margins for building materials to creating a balance between avoiding production stoppages and reduced material consumption. Lastly, its recommended to examine roadmaps nine measures in more detail.

Page generated in 0.0505 seconds