• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • Tagged with
  • 2
  • 2
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Lantmäterimyndighetens yttranden under samråd och granskningstiden samt kommunernas ställningstagande / The cadastral authority's opinions during the review time and how the municipalities respond

Yousofi, My January 2019 (has links)
Detaljplaner används av kommuner som ett sätt att reglera användningen av mark- och vattenområden. Plankartan som hör till detaljplanen är det juridiska dokumentet där kommunen använder sig av planbestämmelser vid utformningen av planområdet. Till plankartan följer det en planbeskrivning som anger syftet och redovisar hur planen ska genomföras och vilka konsekvenser den har på sakägare, miljön och andra som kan komma att beröras av detaljplanen. Vid bristfälliga planbestämmelser och planbeskrivningar kan konsekvenserna för de drabbade medföra kostsamma och utdragna processer. Enligt tidigare studier innehöll 17 % av antagna detaljplaner olämpliga planbestämmelser. Enligt tidigare bestämmelser så var kommunen inte tvungen att samråda med lantmäterimyndigheten vid alla planförfaranden. Lantmäterimyndighetens roll var under samrådet att verka för att planbestämmelser som kunde påverka det fastighetsrättsliga genomförandet var utformade på ett ändamålsenligt sätt. Lantmäterimyndighetens roll ändrades dock i samband med den lagändring som trädde i kraft 1 januari 2015. Regeringen ville effektivisera plangenomförande och detta ledde till att lantmäterimyndigheten fick en tydligare och utökad roll i planprocessen. Denna studie har som syfte att undersöka hur kommunernas ställningstagande till yttranden från lantmäterimyndigheten i samband med samråd och granskningstiden ser ut. Resultatet efter samråd visar att 12 % av detaljplanerna innehöll brister som påtalats av lantmäterimyndigheten men som kommunerna inte åtgärdat. Efter granskningstiden så gick procentandelen ner till 7 % av detaljplanerna. Vid granskning om det var någon skillnad i ställningstaganden mellan kommuner med kommunal lantmäterimyndighet och kommuner med statlig lantmäterimyndighet visade undersökningen att det inte förekom några större skillnader. Studien tyder på att kommunerna lyssnar på de synpunkter och råd lantmäterimyndigheten framför och följaktligen åtgärdar påtalade brister. Detta i sin tur leder förhoppningsvis till ett effektivare plangenomförande. / Detail development plans are a way for the municipalities to regulate the use of land and water territories. The map that follows with the detail development plan is a legal document used by the municipalities to shape the area of the plan by using plan regulations. With the map follows a plan description which describes the purpose of plan, presents the implementation of the plan and the consequences it has on interested parties, the environment and other parties that could be affected by the detail development plan. In the case of deficient plan regulations och plan description the consequences for the afflicted parties can lead to costly and drawn out processes. Earlier studies showed that 17 % of all approved detail development plans contained deficient plan regulations. According to earlier regulations, the municipalities did not have to consult with the cadastrial authorities for every planning proposal. During this time, the role of the cadastral authority was to make sure the plan regulations refering to property law were correct in their configuration not to cause negative consequenses to the implementation of the detail development plan. The role of the cadastral authories changed in conjunction with a constitutional amendment to the law which took effect 1 januari 2015. The government wanted to make the planning implementation more effective and one way to achieve this was to give the cadastral authority a more distinct and extended role during the planning process. The purpose of this study is to examine how the municipalities respond to comments made by the cadastral authority during the review time. The result shows that after the first review time 12 % of the detail development plans that the cadastral authority made remarks on had not been corrected by the municipalities. After the second review time, the procentage had decreased to 7 % of all detail development plans. When comparing the actions taken by municipalities with communal cadastral authority and municipalities with state cadastral authority the analysis showed that there where no significant differences between them. The studie indicates that the municipalities listen to the opinions and advice given by the cadastral authority, thereby deficient plan regulations and plan descriptions are amended accordingly. This will hopefully lead to a more effective implementation of the detail development plans.
2

En studie av Lantmäteriets beaktande av strandskyddet och samråd i fastighetsbildning för bostadsfastigheter inom strandskyddsområden / A study of the Swedish Land surveys consideration of national shorelines and consultation for residential properties in areas of protection for the Swedish shoreline

Karlsson, Oscar January 2018 (has links)
Lantmäteriet tog beslut under 2017 att avskaffa principsamråd med Länsstyrelsen. Syftet var att korta ner handläggningstiderna och minimera antalet onödiga samråd som sker. Detta arbete har avsett att undersöka hur frekvent det sker samråd för fastighetsbildning av bostadsfastigheter inom strandskyddsområden. För att kunna undersöka detta har en kartläggning av var fastighetsbildnings har skett i Västra Götalands län för bostadsfastigheter. Arbetet har gjorts i samarbete med Plan- och bygg avdelningen på Länsstyrelsen i Västra Götalands län. Materialet som legat till grund för undersökningen är de ärenden i form av underrättelser som inkommit till denna avdelning. I undersökningen har en geografisk kartläggning skett för denna typ av förrättningar i Västra Götaland. De ärenden som berör denna typ av förrättningar har sedan granskats i syfte att undersöka hur frekvent någon typ av samråd har skett med kommunen eller Länsstyrelsen. Kartläggningen visade tyngdpunkter av var fastighetsbildning för bostadsfastigheter skett inom Västra Götalands län för 2017 års förrättningar. Undersökningen visar på att det samråddes i 31 % av fallen för bostadsfastighetsbildning inom strandskydd av ärenden av 2017 års inkomna underrättelser. Undersökningen visade också på att förrättningslantmätarna inte har motiverat strandskyddet för förrättningsåtgärden alls eller bristande i förrättningsprotokollet i 23 % av inkomna underrättelser. Resultatet visade att förrättningslantmätarna gjorde ett eget beslut i 46 % av ärenden för 2017. Resultaten av undersökningen ger en indikation om att detta är något som behöver undersökas ytterligare och öppnar upp för många nya frågeställningar som behöver besvaras. / Lantmäteriet decided during 2017 to cancel principle consultation with Länsstyrelsen (county administrative board). The goal was to shorten the time for each case and reduce the number of unnecessary consultations. The purpose of this paper was to examine how frequently consultation takes place for residential properties in areas of protection of the Swedish shoreline. To examine this subject a mapping of this type of residential properties were made for Västra Götalands län. This study has been in cooperation with Plan- och bygg avdelningen (The Department of Community Planning and Building) for county administrative board in Västa Götalands län. The data underlying this study consists of cases that have been sent to this department during 2017. In the examination of this study a mapping of this type of properties has been made. The reason for this is to examine how frequently at consultation have taken place with county administrative board or the specific county. The mapping showed that there was more of this type of cases in some parts of Västra Götalands län in 2017. The study showed that consultation took place in 31 % of the cases for this type of properties in protective shoreline areas. It also showed that in 23 % of the cases no consultation took place and/or the protection was not taken into account. The result of the study showed that cadastral surveyors decide for them self without consolation in 46 % of the cases. The study showed an indication that this subject has to be further resourced, not only in this part of Sweden but in all of Sweden.

Page generated in 0.1037 seconds