• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 12
  • 1
  • Tagged with
  • 13
  • 13
  • 7
  • 7
  • 6
  • 5
  • 4
  • 3
  • 3
  • 3
  • 3
  • 2
  • 2
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Reläskyddssystem för småskalig vattenkraft : En fallstudie för rekommenderad uppgradering av reläskyddssystem

Edberg, Anders January 2016 (has links)
This thesis aims to propose a recommended upgrade for the generator protectionsystems in small hydropower stations. The hydropower stations examined areBrantafors, Djupafors, Horkoneryd, Kallinge ,Karlsnäs, Ronneby and Verperyd. Therecommended generator protection systems are developed from regulations basedon constitutions from Svenska Kraftnät and Elsäkerhetsverket. The recommendationpresented in this thesis is a lowest recommendation for the generator protectionsystems of small hydropower stations and in some cases the owner of the powerplant may request above this lowest level of protection. The overall documentation of the stations has been inadequate and many parametersare unknown in the stations and therefore assumptions have been made. Theassumptions have a big influence on the short circuit calculations which affects therecommended settings for short circuit protection and therefore a conservativeapproach has been used. The result of this thesis is that the hydro power station Ronneby can’t manage therequirements specified from Svenska Kraftnät, and therefore the protection system inthe hydro power station need to be adjusted. The hydropower stations Brantaforsand Verperyd can with minor adjustments meet the recommended generatorprotection. On the stations Djupafors, Horkoneryd, Kallinge and Karlsnäs largerupgrades of the generator protection systems need to be done to fulfill therecommended protection system.
2

Kartläggning av problem inom småskalig vattenkraft och faskompensering av asynkrongenerator i ett vattenkraftverk / Survey for what causes disruptions in small hydropower stations and phase compensation of an asynchronous generator

Nilsson, Emil, Persson, Erik, Nevanperä, Pontus January 2016 (has links)
I rapportens första del behandlas vad som orsakar omfattande driftstörningar och krav från nätägare som ställs på mindre vattenkraftsstationer med asynkrongeneratorer. Det gjordes med hjälp av en enkätundersökning som skickades ut till ett antal medlemmar i Svensk vattenkraftsförening (SVAF). Rapporten tar upp allmänt om småskalig vattenkraft i Sverige, olika typer av vattenkraftverk och dess uppbyggnad. Resultatet från undersökningen visar att de som drabbas av kortare driftstopp på upp till en vecka oftast beror på nätbortfall medan längre driftstopp beror på mekaniska problem inne i vattenkraftverket. De elektriska felen som beror på t.ex. kondensatorbatterier eller generatorer har bara i några få fall inneburit längre driftstopp. Undersökningen har visat att kraven hos olika vattenkraftägare varierar i stor utsträckning. Majoriteten av de som svarade på enkäten uppger att de faskompenserar sin asynkrongenerator men ytterst få ligger inom AMP:ens rekommendationer gällande effektfaktor. Rapportens andra del behandlar ett mindre vattenkraftverk i Östebyn där en asynkrongenerator som förbrukar mer reaktiv effekt än vad avtalet med nätägaren tillåter är installerad. Avsikten är att ta fram ett lösningsförslag för att minska den reaktiva förbrukningen genom installation av ett kondensatorbatteri. Vattenkraftverket har för tillfället ingen faskompenseringsutrustning och ägaren behöver välja mellan att faskompensera sin asynkrongenerator eller bli debiterad för överuttaget. Rapporten behandlar även problem och vad man bör ta hänsyn till vid installation av ett kondensatorbatteri. Vid tomgångskompensering med kondensatorbatteri kan den reaktiva förbrukningen minskas så att inget överuttag sker. Ett intervall på storleken beräknades fram med hjälp av mätdata till 21,2 – 26,1 kVAr. Priset på ett kondensatorbatteri och kostnaden för debiteringen har lett fram till en payback-tid för investeringen på ungefär sex år. / The first part of this thesis includes what causes disruptions in small hydropower stations with asynchronous generators and what requirements the power grid owners have. This was made through a survey that was sent to a group of members in Svensk vattenkraftförening (SVAF). The thesis includes general information about small hydropower stations and how they are constructed. The survey shows that the ones that are affected by short disruptions in production is often caused by grid loss while longer disruptions, over a week, is often caused by mechanical failure. The electrical failures that are caused by problems in capacitor banks or generators have only in a few cases caused disruption for a longer period of time. The survey shows that the requirements from the power grid owners towards the owners of the hydropower station vary. The majority of the responders claim that they have reactive power compensation installed but only a few of them are within the recommended interval that is set by the AMP. In the second part of the report a small hydropower station where an asynchronous generator consumes more reactive power than the agreement with the power grid owner allows. Therefore the owner needs to reduce the reactive power usage from the grid or pay a fee. The purpose is to find a solution on how to reduce the required reactive power from the grid. The thesis also includes different aspects to consider when installing a capacitor bank. To reach an accepted level of reactive power usage from the grid, an idle current compensation is recommended. The conclusion of this thesis is that a capacitor bank within the size interval of 21,2 - 26,1 kVAr is required and the payback time of this investment will be approximately six years.
3

Leverantörer av utrustning och tjänster försmåskalig vattenkraft / Suppliers of equipment and services to small hydropower

Åsman, Christer, Wahldén, Henning January 2013 (has links)
Svensk Vattenkraftförening har upplevt behov av att hänvisa till branschens tjänsteleverantörer och leverantörer av komponenter till småskaliga vattenkraftverk vid förfrågningar från internationellt och inhemskt håll. Detta examensarbete har gjorts med syfte att möta detta behov, genom att kartlägga företag aktiva inom branschen småskalig vattenkraft. Utifrån initiala undersökningar och litteraturstudier bearbetas en modell fram för hur enkätundersökningen ska presentera samlad information. De samlade koncept och meningar som skapats under förstudien används för att utforma en lista av aktiviteter som hör till processen att starta, driva och underhålla ett vattenkraftverk. Stöd för att aktiviteternas förekomst tas från olika register över liknande branschers kategoriseringar och branschföretags verksamhetsbeskrivningar. Detta sammanvägt med de svar som samlats in från intervjuer och enkäter skapar ett ramverk med fördefinierade aktiviteter. De huvudsakliga metoder som använts för att identifiera branschens aktörer, är att intervjua en handfull ägare av småskaliga kraftverk samt kontakta de kraftverksägare och medlemmar i Svensk Vattenkraftförening som uppgett e-postadress. Den grundläggande frågan är vilka företag man varit i kontakt med under sin kraftverksamhet. En tidig bearbetning av de fördefinierade aktiviteterna användes som stöd. Kompletterande metoder är att välja företag som förekommit i svensk vattenkrafts medlemsmatrikel, som stödmedlemmar samt företag som gjort reklam i branschtidningen SERO-journalen de senaste fem åren. Företagen presenteras i ett separat kompendium. Enkäten utformas utifrån de samlade koncept och meningar som skapats under förstudien och den fördefinierade listan av aktiviteter utgör ramverket för hur företagens respektive verksamhetsområde beskrivs. Därutöver presenteras allmän information, så som kontaktpersoner på företaget och en verksamhetsbeskrivning i fritext. / By request of the Swedish Hydropower Association a market survey of companies that operates in or in close cooperation with the small hydro power market was undertaken during the spring of 2012. The association has noticed a surge in interest regarding small hydro power from both domestic and foreign entities and wants to proactively engage this interest. The main methods used to survey the market was to interview a handful of small hydropower plant owners and contact owners of hydropower plants and members of the Swedish Hydropower Association that had listed an e-mail address. The fundamental question is what companies the interviewees have come in contact with in regards to things related to the power plant. An early draft of the pre-defined criteria is used as support. Besides choosing the companies in regards to their responses to the interviews, some companies are also selected from appearing in the Swedish Hydropower Association members cadastral who are supporting members and companies that have published adverts during the last five years in the SERO-journal, a trade journal. The design of the survey sets the standard for how the companies are presented. The first part describes general information, if available. This is information such as company representative and a brief description of what the company does. The information following is what services and products the company offer in what categories. The categories has been determined by comparing how similar trade organizations have set up their categories, this combined with the results from interviews and surveys sets the structure for our categorization of activities.
4

Strömmande vattenkraft i Amazonas : En förstudie i Leticia, Colombia

Granebring, Johanna, Andersson, Sara January 2010 (has links)
Den här rapporten är ett resultat av ett examensarbete i ämnet maskinteknik med inriktning bistånd genomfört vårterminen 2010. Arbetet är ett samarbete med den svenska organisationen Ankarstiftelsen, som har bistått studenterna med kontakter i Leticia, Colombia. Arbetet har varit förlagt dels i Sverige och dels i Leticia, Colombia och har bestått av en förstudie i Leticia samt en litteraturstudie. Målet med arbetet har varit att ta fram ett förslag på lämplig placering och val av turbinsystem, utifrån de förutsättningar som finns i området. Rapporten presenterar olika metoder för elproduktion i Amazonasregionen, turbinsystem anpassade för strömmandevattenkraft och resultat från förstudien. Rapporten presenterar ett förslag där en turbin av modellen Darrieus installeras på en ponton vid samhället Milagrosa. Turbinen beräknas i dagsläget täcka det elbehov som finns i samhället. Dock kvarstår finansieringsfrågan. / This report is the result of a thesis project in mechanical engineering with focus on development assistance, completed spring term 2010. The work is collaboration with the Swedish organization Ankarstiftelsen, which has assisted the students with contacts in Leticia, Columbia. The work has been taken place in both Sweden and Leticia, Colombia. A literature review was carried out in Sweden and a pilot study in Leticia. The goal of this work has been to develop a suggestion on a proper placement and selection of turbine systems, based on the parameters that have been encountered. The report presents various methods of electricity production in the Amazon region, turbine systems suitable for hydrokinetic power and the results from the pilot study. The report presents a suggestion where a Darrieus turbine is installed on a pontoon close to the community Milagrosa. The turbine is expected in the current situation to cover the electricity needs of the community. However, the funding issue still remains to be solved.
5

Strömmande vattenkraft i Amazonas : En förstudie i Leticia, Colombia

Granebring, Johanna, Andersson, Sara January 2010 (has links)
<p>Den här rapporten är ett resultat av ett examensarbete i ämnet maskinteknik med inriktning bistånd genomfört vårterminen 2010. Arbetet är ett samarbete med den svenska organisationen Ankarstiftelsen, som har bistått studenterna med kontakter i Leticia, Colombia.</p><p>Arbetet har varit förlagt dels i Sverige och dels i Leticia, Colombia och har bestått av en förstudie i Leticia samt en litteraturstudie. Målet med arbetet har varit att ta fram ett förslag på lämplig placering och val av turbinsystem, utifrån de förutsättningar som finns i området.</p><p>Rapporten presenterar olika metoder för elproduktion i Amazonasregionen, turbinsystem anpassade för strömmandevattenkraft och resultat från förstudien.</p><p>Rapporten presenterar ett förslag där en turbin av modellen Darrieus installeras på en ponton vid samhället Milagrosa. Turbinen beräknas i dagsläget täcka det elbehov som finns i samhället. Dock kvarstår finansieringsfrågan.</p> / <p>This report is the result of a thesis project in mechanical engineering with focus on development assistance, completed spring term 2010. The work is collaboration with the Swedish organization Ankarstiftelsen, which has assisted the students with contacts in Leticia, Columbia.</p><p>The work has been taken place in both Sweden and Leticia, Colombia. A literature review was carried out in Sweden and a pilot study in Leticia. The goal of this work has been to develop a suggestion on a proper placement and selection of turbine systems, based on the parameters that have been encountered.</p><p>The report presents various methods of electricity production in the Amazon region, turbine systems suitable for hydrokinetic power and the results from the pilot study.</p><p>The report presents a suggestion where a Darrieus turbine is installed on a pontoon close to the community Milagrosa. The turbine is expected in the current situation to cover the electricity needs of the community. However, the funding issue still remains to be solved.</p>
6

Nya utmaningar för småskalig vattenkraft : Konsekvensutredning av Vattenverksamhetsutredningens delbetänkande 2013:69.

Hagner, Emma January 2014 (has links)
I oktober 2013 publicerade Vattenverksamhetsutredningen delbetänkandet SOU 2013:69 med förslag på förnyade vattenrättsliga regler. Förslaget är att genomföra en nyprövning av alla de vattenverksamheter som inte har tillstånd enligt miljöbalken för att på så sätt uppdatera miljökraven i deras äldre tillstånd till dagens nivå. Enligt utredningen är detta nödvändigt för att Sverige ska uppnå de miljömål som satts enligt EU:s ramdirektiv för vatten. Enligt förslaget i delbetänkandet skulle ca 98 % av de svenska vattenkraftverken genomgå en nyprövning och det finns en oro över hur de nya miljökraven kan komma att minska den förnybara energiproduktionen. Syftet med detta examensarbete var att utreda vilka konsekvenser den småskaliga vattenkraften står inför om Vattenverksamhetsutredningens förslag skulle bli verklighet. Fokus har lagts på anläggningar med en installerad effekt under 1,5 MW, så kallad minkraft, och tre exempelfall har valts ut och utretts. Det har antagits att de nya miljökraven skulle innebära att anläggningarna ska anlägga fiskpassager, upp- och nedströms, och att de fall där det finns torrlagda åfåror skulle införa en minimitappning av vattendragets medellågvattenföring (MLQ). Inom de tre exempelfallen finns även de tre ägargrupperna privat, kommunal och elbolag representerade av en vardera. Kostnader har beräknats för flera olika åtgärdsalternativ som antingen innefattar en nyprövning och anläggandet av fiskvägar, en utrivning av anläggningen eller en effektivisering av befintlig anläggning i samband med en nyprövning. I och med bortledda flöden till fiskväg och minimitappning påverkas anläggningen av ett produktionsbortfall vilket har beräknats för vardera anläggning och berörda åtgärdsalternativ. Produktionsbortfallen som beräknats för exempelfallen är i storleksordningen 2-40 % av anläggningarnas årsproduktion och påverkas främst av om anläggningen har minimitappning eller inte. Vid en effektivisering av befintlig anläggning bör det vid dimensioneringen av turbinen tas hänsyn till volymen på det bortledda flödet till fiskväg och minimitappning för att minimera produktionsbortfallet från detta. Den tid som anläggningen tas ur drift på grund av för låga flöden ökar nämligen när ett flöde leds bort och denna tid kan minimeras. Resultaten visar även att de investeringskostnader som kan komma att krävas i samband med en nyprövning är höga sett till anläggningarnas årliga omsättning och risken är därför stor att verksamhetsägare inte kommer ha de ekonomiska förutsättningar som krävs. Detta särskilt i dagsläget då elpriset är lågt och flera av anläggningars elcertifikat nyligen gått ut, vilket innebär minskade marginaler och mindre utrymme för investeringar. Vidare visar fallstudien att en utrivning av anläggning ofta innebär en större kostnad än den för en nyprövning. Det finns alltså en stor risk att de verksamhetsägare som inte har möjlighet att genomföra en nyprövning inte heller kan bekosta den utrivning som de kommer åläggas om nyprövningen inte genomförs. I dessa fall kan en konkurs vara den enda utvägen och det är då oklart vad som sker med anläggningen vilket bör utredas vidare. / In October 2013 a proposition was made that all hydropower plants with permits made out before the incorporation of Miljöbalken (1999) should be forced to apply for a renewal of their permits and in this way give way to an update of their environmental standards. The aim of this report is to present the consequences that could be expected for small hydropower in Sweden as a result of the proposition and focus has been set on stations with an installed effect of less than 1.5 MW. It has been assumed that an update of environmental standards will include construction of fish ways and also a set minimum discharge in the dry riverbeds that exist as a result of the construction of the power plant. A case-study was made with three hydropower plants and costs as well as production losses were calculated. The results show that 2 to 40 % of the stations yearly production would be lost because of the spillage in fish ways and as minimum discharge. The cost of fish ways will amount to an average of 5 million SEK for each station which is high related to the stations’ turnover that varies between 350 thousand and 4 million SEK for the investigated cases. There is a risk that many owners will not have sufficient funds to apply for a new permit as well as constructing fish ways. If a new permit is not granted or sought the station will be declared illegal and a removal of it will be demanded by the environmental court (Mark- och miljödomstolen). However, the costs investigated for removal of station and dams tend to be higher than the ones connected to a renewal of permit and will therefore not prove a solution to owners who lacked sufficient funds for a renewal of permits. What to be done in these cases remains to be investigated and is suggested for further studies.
7

Småskalig vattenkraft : Dagsläge och framtidsplaner / Small Scale Hydropower : Present situation and future plans

Ström, Marcus January 2012 (has links)
This study focuses on small scale hydropower in Sweden. This means plants with a capacity of up to 10 MW. The study has a special focus on plants with a capacity up to 2 MW. The study has three aims. It strives to describe the small-scale hydroelectric industry in Sweden. It lists some of the challenges of positive and negative character that owners of small hydro are facing today. The last is to find out the owners' plans for their business for the future.The basis for the analysis is a literature review, visits to hydropower plants and interviews with owners and a questionnaire. The questionnaire was answered in the spring of 2011. 128 hydropower owners with together 165 plants participated. This represents about 9 % of the total amount of small scale hydropower plants. The owners rank economy, new environmental ruling, requirements for fish ways and lack of time as the biggest challenges. The owners' concern about the new environmental ruling ispreceded by a debate on the subject in which some County Boards (Länsstyrelser) raised theissue. 38 % of plants in the survey have fish ways and another 7 % plan to get it in within a period of 10 years.Small hydropower produces about 4.3 TWh per year. Calculations made on the respondents' answers show that 80% of plants have the potential to increase its effect. 55% plan to do so within 10 years. If the plants in the survey are representative for the industry as a whole, small scale hydropower in the range of 0 - 2 MW, has a potential to increase its production by 6.1 TWh per year. / I detta arbete studeras den småskaliga vattenkraften i Sverige med ett fokus på de mindre verkenmed en effekt upp till 2 MW. Studien har tre syften. Den skall beskriva den småskaliga vattenkraftverksbranschen i Sverige. Den skall redogöra för några av de utmaningar av positiv och negativ karaktär som ägare av småskalig vattenkraft står inför idag. Det tredje är att ta reda på ägarnas planer för framtiden. Som underlag för analysen ligger en litteraturstudie, besök i kraftverk och intervjuer med ägare samt en enkät. Enkäten besvarades under våren 2011 av 128 vattenkraftsägare med tillsammans 165 verk. Detta utgör ungefär 9 % av det totala antalet småskaliga vattenkraftverk. Ägarna rankar ekonomi, krav på nytt miljötillstånd, krav på fiskväg och brist på tid som de största utmaningarna. Ägarnas oro för krav på nya miljötilltsånd har föregåtts av en debatt i ämnet där ett antal länsstyrelser krävt detta. 38 % av verken i undersökningen har fiskväg och ytterligare 7 % planerar att skaffa det inom 10 år. Det finns en stor spridning i ägarnas bakgrund, utbildning och hur man kom in i branschen. Generellt har ägarna ett stort teknikintresse. De vanligaste utbildningarna är inom teknik, lantbruk eller elektriker. En tredjedel av ägarna är i pensionsåldern. Den småskaliga vattenkraften producerar ungefär 4,3 TWh per år. Beräkningar som har gjorts på respondenternas svar visar att 80 % av verken har en potential att öka sin effekt. 55 % planerar att göra det inom 10 år. Om de verk som deltog i enkäten är representativa för branschen i sin helhet skulle den småskaliga vattenkraften i spannet 0-2 MW kunna öka sin produktion med 6,1 TWh.
8

Fish Friendly Turbines forDownstream Migration : Literature review and case studies / Fiskvänliga turbiner för nedströms vandring : Litteraturgenomgång och fallstudier

Rosenblad, Signe January 2023 (has links)
As the energy consumption is constantly increasing, the demand of renewable energy is increasing too. Thirtythree percent of the renewable energy production in Europe constitutes of hydropower. Hydropower is animportant energy source as it has stabilizing and storing functions, but it heavily affects biodiversity. This is mainlyby the dam constructions creating migration barriers for migrating species. This has severe impacts on the wholepopulations of fish, which are decreasing in number of individuals as the reproduction and growth is affected. Onesolution to enable downstream migration is fish friendly turbines. To assess the fish friendliness of these turbines,mathematical models can be used. They estimate the mortality of a fish during turbine passage, by calculating theprobability of a fish getting struck by a runner blade. The aim of this study is to investigate if passage through fishfriendly turbines could be an alternative for downstream migration of fish in hydropower plants, and examine theapplicability, especially for small-scale hydropower. To fulfill the aim, a literature review of fish friendly turbinesand two case studies were conducted. The fish friendly turbines included in the literature review were the MinimumGap Runner, Alden Turbine, Restoration Hydro Turbine (RHT), Archimedes’ Screw, Low Pressure Turbine andVery-low Head Turbine. The case studies were conducted on two small-scale hydropower plants owned byVattenfall Hydropower in the river Upperudsälven in the southwest of Sweden, using a turbine mortality modelmade by Johanna Stålered. The fish friendly turbines that were modeled in the case studies was the Alden Turbineand the RHT. After modeling and analyzing the results, conclusions regarding the applicability for the two powerplants and small-scale hydropower could be drawn. Modeling showed that for both Taxviken and Källsviken theAlden turbine gave the lowest mortality rate. However, the mortality of the Alden turbine was significantly lowerin Källsviken than in Taxviken, as it reached 58% for the largest fish in Taxviken and not even 3% for the largestfish in Källsviken. In Taxviken, both the RHT and the Alden turbine gave decreased mortality compared to theFrancis turbine. It was concluded that fish friendly turbines might not be the best option for small-scale powerplants, since in these power plants everything is of smaller size (turbine, guiding vanes etc.). That makes it difficultfor larger fish to fit, which increases the mortality, even if the turbine itself have fish friendly characteristics. Inaddition, what parameters should be included in decision-making regarding installation of fish friendly turbinesand areas for further investigation was suggested. / Med en ständigt ökande energiförbrukning ökar även efterfrågan på förnyelsebar energi. I Europa utgörs trettiotreprocent av den förnyelsebara energiproduktionen av vattenkraft. Vattenkraften är även en viktig energikälla avanledningen att den är stabiliserande och att det är möjligt att planera produktionen, men den har också storpåverkan på den biologiska mångfalden. Detta är främst genom att dammkonstruktionerna skaparmigrationsbarriärer för migrerande arter. Detta har allvarliga konsekvenser för fiskpopulationer, som minskar iantal individer. En lösning för att möjliggöra nedströms migration är fiskvänliga turbiner. För att bedöma hurfiskvänliga dessa turbiner är kan matematiska modeller användas. Dessa uppskattar dödligheten för en fisk underturbinpassage, genom att beräkna sannolikheten för att en fisk ska träffas av en löpskovel. Syftet med denna studieär att undersöka om passage genom fiskvänliga turbiner skulle kunna vara ett alternativ för nedströms vandring avfisk i vattenkraftverk, och undersöka tillämpbarheten, särskilt för småskalig vattenkraft. För att uppfylla syftetgenomfördes en litteraturgenomgång av fiskvänliga turbiner samt två fallstudier. De fiskvänliga turbinerna sominkluderades i litteraturgenomgången var Minimum Gap Runner, Alden Turbine, Restoration Hydro Turbine(RHT), Archimedes’ Screw, Low Pressure Turbine och Very-low Head Turbine. Fallstudierna genomfördes på tvåsmåskaliga vattenkraftverk ägda av Vattenfall Vattenkraft i Upperudsälven i sydvästra Sverige, med hjälp av enturbinmortalitetsmodell gjord av Johanna Stålered. De fiskvänliga turbinerna som modellerades i fallstudierna varAlden-turbinen och RHT. Efter modellering och analys av resultaten kunde slutsatser angående tillämpbarhetenför de två kraftverken och småskalig vattenkraft dras. Modellering visade att för både Taxviken och Källsvikengav Alden-turbinen den lägsta dödligheten. Dödligheten i Aldenturbinen var dock betydligt lägre i Källsviken äni Taxviken, då den nådde 58 % för de största storlekarna på fisk i Taxviken och inte ens 3 % för de störstastorlekarna på fisk i Källsviken. I Taxviken gav både RHT och Alden-turbinen minskad dödlighet jämfört medFrancisturbinen. Slutsatsen att fiskvänliga turbiner kanske inte är det mest fördelaktiga alternativet för småskaligakraftverk drogs, eftersom allt i dessa kraftverk är av mindre storlek (turbin, ledskenor, etcetera). Det gör det svårtför större fiskar att få plats, vilket ökar dödligheten, även om själva turbinen har fiskvänliga egenskaper. Dessutomföreslogs vilka parametrar som bör ingå i beslutsfattande om installation av fiskvänliga turbiner, samt områdensom bör undersökas vidare i framtiden.
9

Småskalig vattenkraft i Tyresån : En undersökning av ekologiska åtgärder utifrån de globala hållbarhetsmålen / Small scale hydro power in Tyresån : Evaluating ecological measures based on the sustainable development goals

Pirak Kuoljok, Simon, Wallin, Tony January 2019 (has links)
I Sverige finns det ungefär 2 100 vattenkraftverk som står för ca 40 % av Sveriges elproduktion.Ungefär 1 700 av dem är småskaliga vattenkraftverk och utgör 2,1 % av vattenkraftens elproduktion.Vattenkraften har negativa ekologiska konsekvenser på vattendragets konnektivitet vilket skaparproblem för den biologiska mångfalden. Tyresån vattensystem ligger i Stockholms län och är reglerat.Vattensystemet har tre vandringshinder, inklusive ett småskaligt vattenkraftverk – Uddby kvarn,vilket medför att vattensystemet har en dålig ekologisk status utifrån konnektivitet. Syftet medrapporten är att sammanställa de nyttor och problem som finns kopplade till den småskaligavattenkraften i Sverige och utifrån detta ta reda på vilka av FN:s globala hållbarhetsmål som påverkasav den småskaliga vattenkraftens verksamhet. För att undersöka det genomförs en litteraturstudiesamt en fallstudie, med inslag av intervjuer från sakkunniga informanter, som fokuserar på Tyresånsvattensystem. Platsbesök har även förekommit vid två tillfällen. De värden som är kopplade till småskalig vattenkraft är betydelsen för elsystemet, ekologiskaeffekter samt sociala och kulturella värden. I nedre Tyresån finns de tre strömmarnaFollbrinksströmmen, Nyfors och Uddby kvarn som alla är reglerade på olika sätt. Uddby kvarnlevererar el till ungefär 500 hushåll. Utifrån intervjuerna är närheten till höga naturvärden samt högakulturvärden positivt i Tyresån och bör behållas. Tyresåns ekologiska status utifrån konnektivitet ochfisk är dålig samt näringsämnen och bottenfaunan är måttlig. De åtgärder som tas upp för förbättradkonnektivitet är inlöp, anpassad reglering, återställning i Nyfors, biotopvård i Follbrinksströmmen,fingaller och uppsamling av ål. Sex globala hållbarhetsmål har tagits fram som går att koppla tillTyresåns vattensystem. Målkonflikter och synergier diskuteras, likaså ekologiska effekter kontra elproduktion och betydelsenav den småskaliga vattenkraften i Sverige. Den åtgärd som skulle gynna alla globala målen förTyresån är en återställning i Nyfors. Det finns även synergier mellan de globala målen rent vatten ochekologisk mångfald samt hållbar energi och bekämpa klimatförändringarna. Den störstamålkonflikten mellan de globala målen hållbar energi för alla och ekosystem och biologisk mångfald. / In Sweden, there are approximately 2 100 hydropower plants, which account for about 40 % ofSweden's electricity. Approximately 1 700 of them are small-scale hydropower plants and constitute2,1 % of the hydroelectric power generation. Hydroelectric power has negative ecologicalconsequences on the water's connectivity, which creates problems for biodiversity. Tyresån islocated in Stockholm County and is regulated. The water system has three migratory obstacles,including a small-scale hydropower plant - Uddby kvarn, which means that the water system has apoor ecological status based on connectivity. The aim of the report is to compile the benefits andproblems associated with the small-scale hydropower in Sweden and investigate which of the UN'ssustainable development goals that are affected by the small-scale hydropower. A literature study isconducted along with a case study which focus on Tyresån’s water system where two interviews andtwo site visits has been carried out. The values linked to small-scale hydropower are the importance for the electricity system, ecologicaleffects as well as social and cultural values. In the lower Tyresån there are the three streamsFollbrinksströmmen, Nyfors and Uddby kvarn which are all regulated in different ways. Uddby kvarnsupplies electricity to approximately 500 households. Based on the interviews, the proximity tonature and high cultural values are positive in Tyresån and should be sustained. Tyresån's ecologicalstatus is poor, due to lack of connectivity, fish, nutrients and bottom fauna. The actions suggested forimproved connectivity are inlets, custom regulation, restoration in Nyfors, biotope care inFollbrinksströmmen, grid and collection of eels. Six sustainable development goals can be linked tothe Tyresån water system. Conflicts and synergies are discussed. The main conflict is between ecological effects versuselectricity production and the importance of small-scale hydropower in Sweden. The action thatwould benefit all sustainable development goals for Tyresån is a restoration in Nyfors. There are alsosynergies between the sustainable development goals of clean water and sanitation and life on land,as well as affordable and clean energy and climate action. The largest conflict between thesustainable development goals related to small scale hydro power are affordable and clean energyand life on land.
10

Optimeringsverktyg för automatisk planering och reglering av produktion i småskaliga vattenkraftverk / Optimisation tool for automated planning and control of production in small-scale hydropower plants

Möller, Jenny, Wiklund, Johan January 2018 (has links)
Småskaliga vattenkraftverk regleras vanligtvis med avseende på vattennivån i magasinet eller vattenflödet, utan hänsyn till efterfrågan på elkraft. Examensarbetet utfördes på uppdrag av Fortum Generation som önskade att undersöka möjligheten att istället automatiskt optimera planeringen och regleringen av de småskaliga vattenkraftverken med hänsyn till prisbild, verkningsgrad, vattensituation, miljödomar, miljöhänsyn samt mekaniskt slitage. En optimeringsalgoritm framtagen i en parallellt pågående studie låg till grund för examensarbetet. En prototyp som skulle autoplanera produktionen och reglera ett enskilt vattenkraftverk skulle utvecklas, där det genom simulering skulle fastställas om en realisering av optimeringsalgoritmen i ett verktyget är möjlig och lönsam. Båthusströmmen, som användes som testobjekt för examensarbetet, ägs av Fortum och är ett småskaligt vattenkraftverk i Österdalälven. En kostnadseffektiv prototyp av ett optimeringsverktyg för automatisk planering och reglering av småskaliga vattenkraftverk utvecklades och testades genom simulering. Prototypen utvecklades i form av en mjukvara vilken utför optimeringen och kommunicerar kontinuerligt med befintliga optimerings-, övervaknings- och styrsystem. Resultaten av utförda kommunikationstester och simulerade optimeringar visade att en realisering av algoritmen i ett optimeringsverktyg är möjlig och förväntas öka effektiviteten för Båthusströmmen och därmed öka intäkterna för kraftverket. / Small-scale hydropower plants are usually controlled considering either the reservoir level or the water flow, regardless of the electricity demand. This thesis was conducted on behalf of Fortum Generation that wanted to investigate the possibility to automatically optimise the production plans and control of small-scale hydropower plants based on electricity price, generator efficiency, water situation, environmental restrictions, environmental concerns, and mechanical wear. The thesis is a continuation of a study where an optimisation algorithm was developed. A prototype that could automatically plan the production and control of an individual hydropower plant would be developed, and then based on simulations it would be determined if an implementation of the algorithm in an optimisation tool is possible and profitable. Båthusströmmen, the test case for this thesis, is owned by Fortum and is a small-scale hydropower plant in Österdalälven. A cost-effective prototype of an optimisation tool for automated planning and control was developed and tested through simulations. The prototype was developed as a software that performs the optimisation and communicates continuously with the existing optimisation, supervisory and control system. The results of the communication tests and optimisation simulations showed that an implementation of the algorithm in an optimisation tool is possible and is expected to increase the efficiency of Båthusströmmen and therefore increase the profit of the power plant.

Page generated in 0.1292 seconds