• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 271
  • 15
  • 11
  • 9
  • 9
  • 8
  • 8
  • 6
  • 6
  • 6
  • 1
  • 1
  • 1
  • 1
  • 1
  • Tagged with
  • 302
  • 302
  • 141
  • 106
  • 103
  • 74
  • 62
  • 60
  • 48
  • 42
  • 40
  • 38
  • 33
  • 22
  • 22
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
201

Uma análise dos principais riscos que contribuem para o agravamento (escalation) de projetos de TI da administração pública / An analysis of the main risks that contribute to the escalation of it projects in public administration

Souza, Enock Godoy de 03 August 2012 (has links)
Sistemas de informação do setor público tem apresentado historicamente uma baixa taxa de conclusão com sucesso. O tamanho e a complexidade dos projetos de sistemas de informação de porte grande em organizações de governo estão aumentando ainda mais. Entretanto, muitas organizações governamentais não possuem a habilidade para gerenciar esse tipo de projeto. Um caso extremo de projeto problemático é o que ocorre na situação de agravamento, na qual recursos continuam sendo comprometidos em um curso de ação destinado ao fracasso. O agravamento do projeto aparenta ser consequência de uma combinação de fatores. As principais teorias que explicam o agravamento de projetos focam principalmente nos fatores psicológicos, sociais e organizacionais, os quais são aplicáveis tanto a projetos de sistemas de informação quanto a projetos de outras áreas de aplicação. Esta pesquisa preenche uma lacuna na literatura por focar nas características específicas do projeto que levam um projeto de Governo Eletrônico a se tornar problemático e entrar em situação de agravamento. Logo, o propósito desta pesquisa é aprimorar o entendimento dos fatores de projeto (riscos) que levam projetos de Governo Eletrônico à situação de agravamento. Para investigar o fenômeno do agravamento em projetos reais de Governo Eletrônico, esta tese apresenta um estudo de casos múltiplos com três casos, dois da Secretaria da Fazenda do Estado de São Paulo e um terceiro de uma organização pública brasileira anônima. Os casos deste estudo são analisados sob o ponto de vista de um modelo de referência baseado na teoria de problemas complexos (Wicked Problems Theory). Esta pesquisa concluiu que os principais riscos que levam um projeto de Governo Eletrônico a situação de agravamento são os riscos de complexidade, e os riscos de escopo e requisitos. Esta pesquisa também apresenta algumas maneiras para tratar esses problemas: buscar a simplificação consciente das regras de negócio (requisitos), para aumentar a viabilidade técnica do projeto; aplicar uma metodologia mais adequada às características do projeto; e proteger o projeto da interferência dos prazos políticos. / Information systems (IS) projects in the public sector have historically been a problematic area with a very low rate of successful completion. The size and complexity of large-scale information systems projects in government organizations are on the rise, but most government organizations lack the ability of managing such projects. An extreme case of project problems is the escalation situation, where resources continue to be committed to a failing course of action. Project escalation seems to be promoted by a combination of factors. The main theories that explain project escalation focus mostly on psychological, social and organizational factors related to escalation, which are common for both information systems and non-information systems projects. This research fills a gap in the literature by focusing on the project characteristics that lead an e-government project to become problematic and escalate. Thus, the purpose of this research is to improve the understanding of project factors (risks) that lead e-government projects to escalation. In order to investigate the escalation phenomenon in real world e-government projects, this thesis presents a collective case study with three cases, two from the Treasury Secretary of São Paulo State and a third one from an anonymous Brazilian public organization. The case studies are analyzed through the eyes of a reference model based on the Wicked Problems Theory. This research shows that the main risks that lead an e-government project towards escalation are complexity risks, and scope and requirements risks. This research also reveals some ways of dealing with these issues: seeking to consciously simplify business rules (i.e., requirements) in order to increase technical feasibility; applying a methodology better suited to the project characteristics; and protecting the project from the interference of political deadlines
202

Superendividamento empresarial / Corporate over-indebtedness

Lages, Leandro Cardoso 21 September 2017 (has links)
Submitted by Filipe dos Santos (fsantos@pucsp.br) on 2017-10-06T12:50:35Z No. of bitstreams: 1 Leandro Cardoso Lages.pdf: 1778690 bytes, checksum: ae0d22f7d6bfdba6d3183b0df5933738 (MD5) / Made available in DSpace on 2017-10-06T12:50:35Z (GMT). No. of bitstreams: 1 Leandro Cardoso Lages.pdf: 1778690 bytes, checksum: ae0d22f7d6bfdba6d3183b0df5933738 (MD5) Previous issue date: 2017-09-21 / This paper addresses the corporate over-indebtedness, especially the assumption of civil liability of financial institutions for the facilitated granting of credit to over-indebted companies that will not be able to meet the new financial obligations and, for this reason, will suffer with the increase of debt due to the incidence of interest and default charges, with repercussions on the default of financial obligations with other creditors. Therefore, the genesis of the work is based on the following question: Is there a responsibility for the financial institution that grants credit to a company that it is known that it will not be able to honor with the commitment assumed? If so, what are the contours of this responsibility? At first, the legislative matrix of over indebtedness is analyzed, whose concept arose in the Consumer Law, but also can reach the business activity. Subsequently, the mechanisms of analysis of credit risk, used by financial institutions and that allows them to check the possibility of payment of the applicants to credit, are verified. Finally, it is addressed the hypothesis of civil liability of financial institutions for the granting of credit to over-indebted companies focusing on the social function of contracts, the duty of collaboration, as well as the principles of company preservation, inherent risk and linkage to contracts. In the whole work there is reference to the repercussion of the debate on the legal protection of private investment / Este trabalho aborda o superendividamento empresarial, em especial a hipótese de responsabilidade civil das instituições financeiras pela concessão facilitada de crédito a empresas superendividadas que não conseguirão adimplir as novas obrigações financeiras e, por esse motivo, sofrerão com o incremento da dívida em virtude da incidência de juros e encargos moratórios, com repercussão no inadimplemento de obrigações financeiras junto a outros credores. Portanto, a gênese do trabalho parte do seguinte questionamento: há responsabilidade para a instituição financeira que concede crédito a uma empresa que sabidamente não terá condições de honrar com o compromisso assumido? Em caso positivo, quais os contornos desta responsabilidade? Em um primeiro momento analisa-se a matriz legislativa do superendividamento, cuja noção surgiu no direito do consumidor, mas também pode atingir a atividade empresarial. Em seguida, verificam-se os mecanismos de análise de risco de crédito utilizados pelas instituições financeiras e que lhes permite verificar a possibilidade de pagamento dos pretendentes a crédito. E, por fim, aborda-se a hipótese de responsabilidade civil das instituições financeiras pela concessão de crédito a empresas superendividadas sob o enfoque da função social dos contratos, do dever de colaboração, bem como dos princípios da preservação da empresa, da inerência do risco e da vinculação aos contratos. Em todo o trabalho há referência à repercussão do debate na proteção jurídica do investimento privado.
203

A manutenção do equilíbrio econômico de contratos de obras públicas empreitadas: parâmetros para o estudo de riscos vinculados a atrasos no encaixe do preço / The maintenance of the economic contract balance of public works you take over on a contract basis: parameters for the study of entailed risks the delays in the rabbet of the price

MATTOS, Renato Marinho Meira 12 January 2004 (has links)
Made available in DSpace on 2011-03-23T21:19:40Z (GMT). No. of bitstreams: 0 / Item created via OAI harvest from source: http://www.bdtd.ufpa.br/tde_oai/oai2.php on 2011-03-23T21:19:40Z (GMT). Item's OAI Record identifier: oai:bdtd.ufpa.br:307 / In the Civil Engineering field, one of the most important segments is the global piecework, the one that is made by an agreement and by the right and total price. Public works, that are meant to attend a public utility, and whose contracts are ruled by the 8.666/93 Law, are often bided this way. Article 58 of this Law determines that the economic-financial balance of these contracts must be kept. The theoric fundamentation concerns of public works concepts, the most important aspects of 8.666/93 Law, economic-financial analysis and risks analysis. This paper presents, also, a systematic and numeric simulation to piecework undertaking im Civil Engineering field. The goal of this paper is to create parameters for the establishment of protection margins for due-date extension, and respective price receiving, as determined by 8.666/93 Law, thus keeping the original balance. Based on 63 analyzed construction works, the economic-financial balance is verified, comparing the expected restricted return rate at the bidding moment, with the one that was actually obtained in the operation. From the deviation detected in the return rates between those two different moments, parameters for covering the referred risks are created by a simulation process and sensibility analysis. First, at the bidding moment, the restrict return mean rate is 9,45% a month. At the second moment, this rate falls to 5,16% a month. It represents, in mean, 45,39% of variation. The atractive mean rate based on the analysed public construction works is between 6% to 13% a month. The calculated parameters for due-date extension and respective price receiving is between 1,5% to 11,5% of price. Therefore, in the analysed public works, dont exist the economic-finacial maintaining balance. / Dentre os diversos segmentos do Setor da Construção Civil, um dos principais é o de obras por empreitada global, que são aquelas contratadas por preço certo e total. As obras públicas, que têm como finalidade atender a uma utilidade pública e cujos contratos são regidos pela Lei 8.666/93, são geralmente contratadas sob esse regime de execução. O artigo 58 desta Lei determina que deva ser mantido o equilíbrio econômicofinanceiro dos contratos celebrados com o Poder Público. A fundamentação teórica trata dos conceitos de obras públicas, dos principais aspectos da Lei 8.666/93, de análise econômico-financeira e de análise de riscos. Este trabalho apresenta também uma sistemática e uma simulação numérica para formação de preços para obras empreitadas de Construção Civil. O objetivo geral deste trabalho é a criação de parâmetros para o estabelecimento de margens de proteção para a dilatação do prazo e respectivos encaixes de preços, visando, como determina a Lei 8.666/93, a manutenção do equilíbrio original. Com base na análise dos resultados de 63 obras, verifica-se a manutenção do equilíbrio econômico-financeiro, comparando-se a taxa de retorno restrita esperada pelas empresas no momento das licitações com a realmente alcançada na operação. A partir dos desvios detectados nas taxas de retorno nesses dois momentos, cria-se, pelo processo de simulação e análise de sensibilidade, parâmetros para cobertura dos referidos riscos. No momento da licitação, a taxa de retorno restrita média das obras analisadas é de 9,45% ao mês. No segundo momento, essa taxa cai para em média para 5,16% ao mês. Isto representa, em média, uma variação de 45,39%. A taxa média de atratividade das obras públicas analisadas está dentro do intervalo de 6% a 13% ao mês. Como parâmetro de cobertura de riscos quanto aos desvios de prazo e encaixe do preço, tem-se o intervalo de 1,5% a 11,5% do preço. Portanto, entre as obras analisadas, não existe o equilíbrio econômico-financeiro.
204

Fatores críticos de sucesso associados à implementação do Enterprise Risk Management

Oliveira, Kyllbert Wougran Nogueira de 12 May 2016 (has links)
Submitted by Joana Azevedo (joanad@id.uff.br) on 2017-08-22T14:04:05Z No. of bitstreams: 1 Dissert Kyllbert Wougran.pdf: 2480740 bytes, checksum: e0cfe25e9cd0bcff174b7d88759b1608 (MD5) / Approved for entry into archive by Biblioteca da Escola de Engenharia (bee@ndc.uff.br) on 2017-08-24T13:58:40Z (GMT) No. of bitstreams: 1 Dissert Kyllbert Wougran.pdf: 2480740 bytes, checksum: e0cfe25e9cd0bcff174b7d88759b1608 (MD5) / Made available in DSpace on 2017-08-24T13:58:40Z (GMT). No. of bitstreams: 1 Dissert Kyllbert Wougran.pdf: 2480740 bytes, checksum: e0cfe25e9cd0bcff174b7d88759b1608 (MD5) Previous issue date: 2016-05-12 / Apesar da evolução do conceito de Enterprise Risk Management – ERM e difusão no contexto das organizações, existem poucas pesquisas que abordam o referido tema, o que é um ponto fraco frente ao desafio de apoiar as empresas na importante missão de garantir a sobrevivência, crescimento e perpetuidade dos negócios em um ambiente de forte integração tecnológica, concorrência global e diversos contextos políticos, culturais e econômicos. Nesta linha argumentativa, esta pesquisa tem como principal objetivo identificar quais fatores críticos de sucesso mais influenciam na implementação das ações de gestão de riscos corporativos no ambiente de projetos. Para tanto, realizou-se uma revisão de literatura de forma estruturada e sistematizada com o apoio das bases de pesquisas com maior abrangência de artigos científicos sobre a temática abordada, com o objetivo de descrever e esclarecer as questões centrais da pesquisa a luz do estado da arte sobre o tema em questão. Com a conclusão desta etapa, foram identificados dez Fatores Críticos de Sucesso - FCS que serviram como base para fundamentar a pesquisa e para desenvolver o questionário, que foi utilizado para mapear a percepção dos especialistas de uma corretora de seguros em relação aos fatores que podem influenciar no sucesso das iniciativas de gerenciamento de riscos corporativos. Por fim, com a análise dos dados obtidos com o auxílio do referido instrumento de pesquisa, foram propostas ações com foco na maximização de oportunidades relacionadas aos principais fatores identificados como críticos para o sucesso de iniciativas de ERM. / Despite the evolution of the concept of Enterprise Risk Management – ERM - and it’s dissemination in the organizations context, there are few researches that cover the theme, which is a weak point considering the challenge to support companies in the important task of ensuring the survival, growth and perpetuity of the business in an strong technological integration environment, global competition and diversified political, cultural and economic contexts. In this sense, this research has the main objective of identifying which critical success factors influences the most on Enterprise Risk Management implement in project environment. To achieve this goal, a structured and systemized review of the literature was performed, supported by the research bases with the widest coverage of scientific articles on the subject addressed, in order to describe and clarify the central problem of the research according to the state of the art on the topic researched. After completing this stage, ten Critical Success Factors - FCS - were identified, and served as the basis to support the research and to develop the questionnaire that was used to map the perceptions of experts of an insurance broker company, regarding the factors that can influence the success of the Enterprise Risk Management initiatives. In the end, after analyzing the data obtained with the support of the aforementioned research instrument, actions were proposed focusing on maximizing opportunities related to the main identified factors as critical for the success of ERM initiatives.
205

Análise de estratégias de hedging estáticas aplicadas a commodities agrícolas. / Analysis of static hedging strategies applied to agricultural commodities.

Cláudio Antonio Rossi 11 August 2008 (has links)
Dentre as diversas ferramentas disponíveis para gestão de risco no mercado financeiro, este trabalho analisa estratégias de hedging para commodities agrícolas, utilizando o mercado futuro. Isto posto, efetua-se uma revisão das diferentes estratégias apresentadas pela literatura e analisa-se sua aplicação para o mercado brasileiro. Ao construir uma estratégia de hedging no mercado futuro, busca-se determinar o número de contratos a ser adquirido ou vendido, de forma a reduzir o risco financeiro, resultante de oscilações adversas no preço dos ativos. Ou seja, considerando-se um portfólio composto por dois ativos, um no mercado à vista e outro no futuro, as diferentes medidas de desempenho caracterizadas pelas diversas estratégias - conduzem a diferentes portfólios ótimos. Dessa forma, pretende-se analisar qual a melhor estratégia, determinando, implicitamente, qual a composição de portfolio mais adequada a um agente específico no mercado de commodities. São analisados o mercado do café, da soja, do açúcar e do álcool. Ativos financeiros, como o câmbio e o Ibovespa, também são considerados, a fim de averiguar eventuais diferenças de comportamento das estratégias, resultantes de peculiaridades do mercado de commodities. As estratégias estudadas foram: de mínima variância; de mínima variância condicionada ao período de carregamento, de maximização do índice de Sharpe; de maximização da utilidade esperada; de minimização do coeficiente de Gini estendido; de regressão linear; de regressão linear condicionada ao conjunto de informações e regressão linear condicinada ao conjunto de informações e ao período de carregamento. Apesar de o trabalho considerar somente estratégias estáticas, que se caracterizam por, uma vez determinado a quantidade de contratos a se posicionar no mercado futuro, não mais se alterar até o vencimento dos mesmos, adotou-se uma abordagem dinâmica para análise, presumindo que o portfólio pudesse ser reestruturado ao longo do tempo, de acordo com o comportamento do mercado, permitindo empregar uma abordagem mais próxima da realidade. Os resultados indicaram que as estratégias possuem diferenças, derivadas de sua estrutura, mas não variaram significativamente em função do tipo de commodity analisada. Não foi possível também identificar uma estratégia que fosse superior às demais, ou mais adequada, para uma commodity específica, do ponto de vista de resultado financeiro. Os resultados sugerem entretanto, que a seleção de uma estratégia por parte do investidor, deverá considerar as tendências de mercado, abrindo espaço para a incorporação desta informação nos modelos empregados. / Among the various tools available for managing risk in the financial market, this research analyzes hedging strategies for agricultural commodities, using the future market. It given makes up a review of different strategies presented by the literature and looks to its application to the Brazilian market. By constructing a strategy of hedging in the future market, seeks to determine the number of contracts to be purchased or sold, in order to reduce the financial risk, resulting from adverse fluctuations in the price of assets. In other words, considering a portfolio consisting of two assets, one in the spot market and one in the future, the various measures of performance - characterized by different strategies - leading to different portfolios optimum. Thus, it is intended to examine the best strategy, determining, implicitly, what the composition of portfolio best suited to a specific agent on the market of commodities. The markets analyzed were the coffee market, soybean market, sugar and alcohol market. Financial assets, such as exchange and the Ibovespa Index, are also considered in order to ascertain any differences in behavior of strategies, from peculiarities of the commodities market. The strategies studied were: the minimum- variance, the minimum-variance on the time lifted, the maximum Sharpe index; the maximum expected utility, the minimum extended Gini coefficient; the regression method; the regression method conditional on the set of information, and regression method conditional on the set of information and the time lifted. Although this research considered only static strategies which have since determined the amount of contracts to position itself in the future market, no more changes until the expiration of them, took up a dynamic approach for analysis, assuming that the portfolio could be restructured over time, according to the behavior of the market and will allow an approach closer to reality. The results indicated that strategies have differences, derived from its structure, but did not vary significantly depending on the type of commodity examined. Unable also identify a strategy with superiority than other, or more appropriately, for a specific commodity, from the viewpoint of financial results. The results suggest, however that the selection of a strategy by the investor should consider the trends of the market, opening up space to incorporate this information into the model employed.
206

Gestão de riscos corporativos: um estudo multicaso sobre seus métodos e técnicas / Enterprise risk management: a multicase study about its methods and techniques

Ferro, Daniel dos Santos 07 October 2015 (has links)
Esta pesquisa trata da gestão de riscos corporativos em empresas do setor não financeiro. Sabe-se que existem normas, ferramentas e métodos que auxiliam as empresas na gestão de seus riscos, entretanto verifica-se que há uma lacuna no que tange a impossibilidade de estabelecimento de um modelo padrão para gerir riscos, pois, uma metodologia única não seria capaz de abarcar as especificidades de cada empresa. Sendo assim, cada organização precisa desenvolver sua própria forma de gerir seus riscos, segundo o seu perfil, porte, setor e recursos disponíveis. Nesse sentido, o objetivo deste estudo é analisar o processo de gestão de riscos corporativos em empresas do setor não financeiro, buscando identificar quais são os aspectos fundamentais considerados para estruturação de uma área de riscos; descrever os elementos da análise do ambiente (interno e externo) no qual a empresa está inserida; e verificar quais são os principais agentes processos, metodologias, normas e ferramentas adotadas para gerir os riscos nessas empresas. Para tanto, este estudo foi desenvolvido a partir de uma pesquisa qualitativa e descritiva, baseada em estudo de casos múltiplos, que permitiu um aprofundamento na realidade organizacional das unidades de análise escolhidas com a finalidade de compreender como elas estruturam seu processo de gestão de riscos corporativos. Os resultados decorrentes da análise realizada nos mostram que as empresas estudadas demonstram um alinhamento com os principais direcionamentos apontados pela literatura para gerir riscos, divergindo apenas com relação a pontos particulares decorrentes de especificidades suas realidades organizacionais / This is a research about enterprise risk management in non-financial sector companies. There are rules, tools and methods that assist companies in managing their risks, however it turns out that there is a gap regarding the impossibility of establishing a standard model to manage risk, because a single methodology would not be able to deal with the specificities of each company. Consequently, each organization needs to develop its own way of managing their risks, according to his profile, size, industry and available resources. Accordingly, the main objective of this study is to analyze the process of enterprise risk management in non-financial sector companies in order to identify what are the key issues considered for structuring a risk area; describe the analysis of the environmental (internal and external) in which the company operates; and see which are the main agents, processes, methodologies, standards and tools used to manage risks in these companies. In order to achieve that, this study was developed from a qualitative and descriptive research, based on multiple case study, permitting a deep analysis of the organizational reality of the companies chosen; in order to understand how they structure their enterprise risk management process. The results show that in the studied companies demonstrate alignment with the main directions indicated in the literature to manage risks, differing only about particular issues arising from their specific organizational realities.
207

Riscos corporativos em uma rede de cooperação: o caso das empresas associadas à Rede Arrozeiras do Sul / Corporate risks in a network for co-operation: the case of companies associated to the Brazilian southern rice processing network

Reske Filho, Antônio 26 May 2014 (has links)
Esta tese trata das Redes de Cooperação e seus riscos corporativos. As Redes de Cooperação ficam definidas como associações de empresas atuantes em um mesmo setor da economia, explorando mercados de fatores e mercados de produção. A Rede Arrozeiras do Sul, com sede em Santa Maria/RS, organizada em 2005, é a primeira rede de indústrias orizícolas do Brasil. Surgiu com onze empresas associadas, para fortalecer suas cooperadas, abrangendo inicialmente toda a região central do Estado do Rio Grande do Sul. Atualmente, conta com dezesseis indústrias de beneficiamento de arroz e tem como missão criar diferenciais competitivos às cooperadas no que diz respeito à compra, industrialização e comercialização de arroz. As associadas à Rede Arrozeiras do Sul recorrem praticamente aos mesmos fornecedores de matérias-prima e insumos, e/ou concorrem pela preferência dos mesmos clientes em potencial. Quando bem gerenciado, esse tipo de empreendimento, que alguns veem como uma associação que se destina a unir esforços e interesses comuns a todos os cooperados, reduz os riscos decorrentes de se operar em mercados competitivos no curto e médio prazo. Paradoxalmente, no longo prazo, podem surgir riscos de um ou mais participantes colocarem seus interesses particulares acima e em oposição aos objetivos da Rede. Em outras palavras, a possibilidade de ocorrerem procedimentos conflitantes, que possam impedir a realização dos objetivos da Rede no longo prazo, demanda gerenciamento estratégico de tais riscos. No contexto desse trabalho, considerando-se os conceitos propostos pelo IBGC, COSO e ISO 31000, riscos gerenciais são definidos como a consequência lógica e natural de se ousar a ter uma atitude. E quando se ousa a fazer algo em conjunto ou com a participação de varias entidades - sejam elas pessoas físicas, ou jurídicas - os riscos se multiplicam na razão direta do número de participantes. A estratégia, por sua vez, é definida como o conjunto de planos e medidas necessárias para atingir-se a um objetivo ou finalidade colimada. Assim, esta pesquisa buscou responder à seguinte pergunta: quais as possibilidades e as limitações de a gestão estratégica de risco apoiar a gestão da Rede Arrozeiras do Sul? Com esse questionamento, o objetivo básico e fundamental foi o de propor uma sistematização de riscos corporativos (normativo e descritivo), para a Rede de Cooperação. O método empregado para identificar tal instrumento foi de uma pesquisa de natureza qualitativa, classificada como uma pesquisa do tipo avaliação e aplicação, cuja população foi composta por dezesseis [16] empresas integrantes da Rede Arrozeira do Sul. Os resultados obtidos apontam que a rede encontra-se plenamente implantada, mas que os associados não exploram todas as possibilidades e vantagens que uma rede pode lhes propiciar. Verificou-se que as compras de matérias-prima e insumos, por meio da entidade \"Rede Arrozeiras do Sul\", ficavam limitadas ao intervalo de 2% a 20% do volume requisitado nos processos produtivos dos associados. Entretanto, para 75% dos entrevistados, os interesses dos associados à rede são efetivamente compartilhados. Os principais riscos existentes para a Rede Arrozeiras do Sul, na opinião dos entrevistados, são a questão tributária, seguida por políticas governamentais e negociações externas, ocorridas após decisões tomadas na rede em relação as compras/vendas e redução nos padrões de qualidade dos produtos. A tabulação dos dados coletados nos questionários e/ou obtidos por meio de entrevistas permitiu apresentar um esboço de proposta para um modelo teórico, a fim de sistematizar riscos corporativos para uma Rede de Cooperação. / This thesis deals with the Networks for co-operation and its corporate risks. The Networks for co-operation are defined as associations of companies that operate in a same sector of the economy, exploring its factors and production markets. The southern Brazil rice processing Network was established in the city of Santa Maria, Rio Grande do Sul state, in 2005 and was the first of its kind in Brazil. It arose from the association of eleven companies in order to strengthen all of them, initially encompassing the whole central region of Rio Grande do Sul state. Nowadays it has sixteen rice processing companies members and its mission is to create competitive differences for its members regarding to rice purchasing, processing and selling. Those companies associated to the Southern rice processing Network practically deal with the same suppliers of raw materials, and compete for the preference of the same potential customersen it is well managed, this type of project, which is seen as an association to join common efforts and interests to all members, contributes to reduction of risks of operating in competitive markets, in the short or medium term. Paradoxically, in the long run, it can present stronger risks to members in the case one or more of them place personal interests above or contrary to the objectives proposed by the network. In other words, the chance of such conflict may prevent the association to achieve its long term objectives, and claims for the risk management. In the context of this work, in the light of concepts proposed by IBGC, COSO and ISO 31000, management risk is defined as the natural and logical consequence of daring to have an attitude. When someone dares to do something together or with the participation of several entities - physical or legal persons - the risk is increased in the direct reason of the number of participants. In turn, the strategy is defined as the set of plans and measures necessary to achieve an objective or to collimated purpose. Therefore, this research aimed answer the following question: what are the possibilities and limitations of the risk management strategy to support the management of the southern Rice processing network? With this question, the basic and fundamental objective was to propose a systematic corporate risk (normative and descriptive) for the Network. The method used to identify such instrument was a qualitative research, classified as an assessment and application research, whose population consisted of sixteen [16]members of the Southern rice processing network. The results showed that the network is fully established, but members don\'t take advantage of the possibilities the network offers, because it was announced that the purchases of raw materials and other supplies, by the Network are limited to 2% to 20% of the required volume by a member productive process. However, for 75% of the interviewees, the interests of the network members are effectively shared. The main existing and / or potential risks for the southern brazil rice processing network, according to the interviewees, are the tax issues, followed by governmental policies and external negotiations occurred after decisions taken into the network regarding to product purchasing, selling and reducing quality standards. The tabulation of data collected allows to draft a proposal for a theoretical model in order to systematize corporate risks for a co-operative Network.
208

Responsabilidade social em projetos de construção civil. / Social responsability in construction projects.

Coutinho, Michelle de Oliveira 25 February 2019 (has links)
Os projetos de construção civil são de modo geral impactantes na sociedade, uma vez que afetam a vida das pessoas envolvidas, tanto positiva quanto negativamente. Os benefícios de projetos deste tipo são inegáveis, visto que geram emprego, renda e desenvolvimento. Todavia, os aspectos negativos também são consideráveis, pois alteram dramaticamente o meio ambiente. Hoje, vários autores defendem a ideia de que os projetos de construção civil devem incorporar valores éticos e sociais, porque deste modo, podem manter os melhores funcionários, melhorar a produtividade e evitar problemas legais. Dentro desta visão, o objetivo desta pesquisa teve como objetivo principal entender como empresas ligadas a projetos de construção civil desenvolvem e operacionalizam o tema responsabilidade social em seus projetos. Traçando um panorama das ações desenvolvidas, das dificuldades encontradas e avaliando se o tema está inserido no planejamento e orçamento dos projetos. O desenvolvimento do trabalho foi realizado em três etapas: a primeira, uma revisão sistemática da literatura; a segunda, a aplicação de questionários online (survey) sobre o tema e a terceira etapa foi o tratamento análises estatísticas dos dados obtidos. Como resultado, foi identificado que as empresas ligadas a projetos de construção civil seguem a tendência empresarial geral, ou seja, atuam fortemente no entorno de suas obras. Em seus projetos, as ações de responsabilidade social são endereçadas aos funcionários e às comunidades locais, com grande atenção para questões de capacitação e educação; em seguida, há destaque para questões de direitos humanos; e, por último, questões de meio ambiente. As ações de responsabilidade social são contempladas no planejamento e orçamento de 51% dos projetos. Verificou-se que existem diferentes motivações iniciais para a atuação na área social dos projetos, variando de acordo com a localização geográfica do respondente. No Brasil, a grande maioria das empresas ligadas à projetos são motivadas pela crença de que as suas ações podem fazer a diferença nas comunidades dos entornos das obras. / Construction projects are generally impacting on society as they affect the lives of the people involved, both positively and negatively. The benefits of such projects are undeniable as they generate jobs, income and development. However, the negative aspects are also considerable, as they dramatically change the environment. Today, several authors defend the idea that civil construction projects must incorporate ethical and social values, because in this way, they can maintain the best employees, improve productivity and avoid legal problems. Within this vision, the main objective of this research was to understand how companies linked to civil construction projects develop and operationalize the theme social responsibility in their projects. Outlining the actions developed, the difficulties encountered and evaluating whether the theme is part of the planning and budgeting of the projects. The development of the work was carried out in three stages: the first, a systematic review of the literature; the second, the application of online questionnaires (survey) on the subject and the third stage was the statistical analysis of the data obtained through the survey. As a result, it was identified that the companies involved in civil construction projects follow the general business trend, that is, they act strongly in the surroundings of their works. In their projects, social responsibility actions are addressed to employees and local communities, with great attention to training and education issues; then there is a focus on human rights issues; and, finally, environmental issues. The social responsibility actions are contemplated in the planning and budgeting of 51% of the projects. It was verified that there are different initial motivations for the performance in the social area of the projects, varying according to the geographical location of the respondent. In Brazil, the great majority of the companies involved with projects are motivated by the belief that their actions can make a difference in the communities of the work environment.
209

Dimensão socioambiental na gestão de risco dos assentamentos precários do Maciço do Morro da Cruz, Florianópolis - SC

Saito, Silvia Midori January 2011 (has links)
Tese (doutorado) - Universidade Federal de Santa Catarina, Centro de Filosofia e Ciências Humanas, Programa de Pós-Graduação em Geografia, Florianópolis, 2011 / Made available in DSpace on 2012-10-26T08:45:18Z (GMT). No. of bitstreams: 1 294394.pdf: 22061693 bytes, checksum: 9c722f22b44ea70b91f693436d0832ca (MD5) / A acelerada expansão urbana em áreas com restrições à ocupação, como encostas íngremes ou planícies de inundação, resulta cada vez mais em prejuízos lato sensu à população. No Brasil, os últimos desastres naturais evidenciaram que a situação econômica não é a única condição para ser afetado. Contudo, as populações mais empobrecidas são aquelas que ainda mais sofrem com perdas materiais e humanas. A área de estudo dessa pesquisa é o Maciço do Morro da Cruz (MMC), em Florianópolis, SC, Brasil, em cujas encostas estão localizadas dezesseis comunidades carentes. O objetivo da presente tese é analisar a vulnerabilidade socioambiental a escorregamentos dos moradores dos assentamentos precários do MMC com vistas à gestão de riscos. Além de indicadores consagrados nos estudos dessa temática, como idade, educação e habitação, considerou-se que o capital social também contribuiria para caracterizar a vulnerabilidade. Ainda investigou-se o que poderia prejudicar a consolidação da coesão social dos moradores, como a violência, relacionada principalmente com o tráfico de entorpecentes. Para a hierarquização da vulnerabilidade socioambiental utilizou-se dados do Cadastro Único (CADUNICO) e foi aplicada a técnica Analytic Hierarchy Process (AHP). A avaliação foi realizada sob duas perspectivas, pela capacidade de resposta e pela exposição física dos moradores. O capital social foi analisado através de dados do Cadastro Habitacional (CADASTRO HABITACIONAL), da Prefeitura Municipal de Florianópolis. A análise desses resultados permitiu a identificação dos elementos agregadores de capital social no MMC. Com base em referências internacionais, analisou-se o contexto da gestão de riscos no MMC, entre ações e agentes envolvidos nesse processo. O Alto da Caieira foi o assentamento que apresentou a maior vulnerabilidade socioambiental, seguido do Morro do Mocotó e Morro da Queimada. A vulnerabilidade socioambiental no MMC tem correlação mais forte com a exposição física do que com a capacidade de resposta. Identificou-se baixa participação comunitária dos moradores do MMC, em instituições sociais, ao contrário do inicialmente suposto. Dentre aqueles que participam de atividades comunitárias, destacou-se a participação em entidades religiosas, associação de moradores, Organizações Não Governamentais e escolas de samba, identificados como elementos agregadores de capital social. A análise da configuração da paisagem ao longo do período de 2004 a 2010 permitiu verificar uma intensa alteração, relacionada, sobretudo, com a melhoria da infra-estrutura. Os resultados obtidos conduziram ao reconhecimento das práticas da gestão de risco na área de estudo. Constataram-se inúmeras ações isoladas que foram realizadas para a avaliação e a redução do risco no MMC. Todavia, há ainda muitos desafios para a plena gestão do risco no MMC, relacionadas principalmente com o efetivo desempenho dos atores envolvidos.
210

Determinants for political risk insurance of direct investments in emerging markets

Moreira Filho, Omar Penna 02 March 2012 (has links)
Submitted by Omar Moreira Filho (opmf@terra.com.br) on 2012-04-03T18:31:03Z No. of bitstreams: 1 dissertacao_final.pdf: 2675820 bytes, checksum: 96d91b6e68962aa8c01ca4c65a419197 (MD5) / Approved for entry into archive by Gisele Isaura Hannickel (gisele.hannickel@fgv.br) on 2012-04-03T19:14:39Z (GMT) No. of bitstreams: 1 dissertacao_final.pdf: 2675820 bytes, checksum: 96d91b6e68962aa8c01ca4c65a419197 (MD5) / Made available in DSpace on 2012-04-03T19:16:46Z (GMT). No. of bitstreams: 1 dissertacao_final.pdf: 2675820 bytes, checksum: 96d91b6e68962aa8c01ca4c65a419197 (MD5) Previous issue date: 2012-03-02 / Esta dissertação analisa os principais determinantes para investidores contratarem seguro de proteção de riscos políticos (PRI) para seus investimentos diretos, assim com o racional de sair de um PRI não renovando suas políticas. Esta dissertação contribui para a literatura existente sobre PRI, investigando os principais motivadores para PRI, tais como, riscos políticos, riscos econômicos, capacidade do patrocinador, instrumento utilizado para realizar o investimento (horizonte do investimento) determina combinações de PRI utilizando um modelo binário de resposta não linear. Um banco de dados único da Multilateral Investment Guarantee Agency (MIGA) no período de 1990 até 2010, contendo informações sobre 693 investimentos incluindo sua cobertura para: seguro de risco de conversibilidade, seguro para risco de expropriação, riscos de guerras e distúrbios civis e riscos de quebra de contrato. Entretanto, percebemos que 47% destes seguros não permanecem ativos até o prazo originalmente contratado. Adicionalmente, instituições financeiras como garantidoras utilizam proporcionalmente mais dívida do que capital como instrumento de investimento e são largamente seguradas dentro da União Européia (EU). Por outro lado, investidores nos BRICs tendem a cobrir primariamente seus investimentos em infraestrutura. Resultados empíricos incluem que um aumento nos riscos de quebra de contrato e guerra civil estão totalmente correlacionados com a renovação de contratos de seguro, assim como um aumento da percepção de risco do pais que está recebendo o investimento.

Page generated in 0.0849 seconds