• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 456
  • 19
  • 19
  • 19
  • 19
  • 16
  • 12
  • 11
  • 11
  • 6
  • 3
  • 1
  • Tagged with
  • 464
  • 464
  • 315
  • 146
  • 128
  • 114
  • 113
  • 95
  • 78
  • 69
  • 61
  • 48
  • 47
  • 45
  • 42
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
351

UM ESTUDO SOBRE ESTRATÉGIAS DE PCP E SCO E UMA APLICAÇÃO DE UM MODELO PARA O SEQUENCIAMENTO DE PRODUÇÃO.

Assis, Arinéia Nogueira de 27 February 2014 (has links)
Made available in DSpace on 2016-08-10T10:40:21Z (GMT). No. of bitstreams: 1 Arineia Nogueira de Assis.pdf: 693374 bytes, checksum: dad2ec792a9f740945465bdeeb7830db (MD5) Previous issue date: 2014-02-27 / The first objective of this study is to classify the production planning and control (PPC) strategy and the ordering system (OS) of a clothing company, and the second is to propose a theoretical model based on PPC strategies and production sequencing for consequent practical implementation in industries with repetitive production system and multiple products. A study case was conducted, identifying reduction and qualification in inventory, increasing productivity as results. / O primeiro objetivo deste trabalho é classificar a estratégia de planejamento e controle de produção (PCP) e o sistema de coordenação de ordens (SCO) de uma indústria de confecção. E, o segundo, é propor um modelo teórico baseado em estratégias de PCP e sequenciamento de produção, para sua consequente implantação prática em indústrias com sistema de produção repetitivo e com múltiplos produtos. Realizou-se um estudo de caso e apresentou-se os resultados, identificando redução e qualificação de estoque, e aumento da produtividade.
352

A fábrica de skates: um caso didático em planejamento e controle da produção. / The skateboard factory: a teaching case for manufacturing planning and control.

Girotti, Leonel José 26 June 2013 (has links)
As altas exigências que impõe o mercado globalizado, a complexidade dos sistemas produtivos de manufatura atuais e os avanços na Tecnologia da Informação são fatos que resgatam a importância da Programação Detalhada da Produção para as empresas. A pesar de bastante consolidada e difundida, a abordagem clássica MRP / ERP não atende plenamente as necessidades em ambientes de produção intermitente. A Programação Detalhada da Produção com capacidade finita dos recursos, atualmente contemplada nos sistemas APS (Advanced Planning & Scheduling), constitui uma alternativa interessante para melhor cumprir prazos de entrega em ambientes com roteiros de produção complexos e produção make-to-order (MTO). O problema de pesquisa ora estudado contempla o ensino de modelos de Planejamento e Controle da Produção (PCP) em um ambiente de produção intermitente, com foco na Programação Detalhada da Produção e nos sistemas MRP e APS. Propõe-se um plano de ensino que busca apresentar e diferenciar essas abordagens. O plano contempla o uso de um caso didático A Fábrica de Skates. De uma forma lúdica, porém realista, o caso apresenta, nas suas cinco etapas, duas situações hipotéticas de uso de sistemas de programação. O primeiro, um MRP para planejamento da fábrica de skates e, no segundo, um APS utilizado pelo fornecedor de eixos. O plano foi aplicado pela primeira vez em uma turma de graduação do curso de Engenharia de Produção. Nesta dissertação, é apresentada uma descrição detalhada do caso didático, junto ao plano de ensino. A pesquisa verificou, mediante análise das atividades do caso e de um questionário de avaliação, a utilidade dos recursos elaborados, como também que as estratégias aplicadas ajudaram na aprendizagem. Nesta primeira aplicação, constatou-se também que a alta carga de trabalho dos alunos no semestre e o pouco peso dado à nota final do caso didático foram fatores que inibiram melhores resultados. Para futuras aplicações, o caso didático pode ser aprimorado: novas etapas contemplando outros assuntos importantes para a disciplina PCP e análise de alternativas para substituição dos softwares empregados são exemplos de melhorias. / The high standard of competition in global market, the complexity of current manufacturing systems and the advances in Information Technology highlight the importance of the detailed production scheduling. Although classical approaches such as MRP perform this function quite well in different situations, these systems do not perform well in make-to-order (MTO) production systems. The finite capacity scheduling currently embedded within the software called APS (Advanced Planning & Scheduling) is a more interesting approach to achieve better performance in meeting due dates in production environments with complex routings and MTO strategy. Thus, the problem addressed in this study concerns the teaching of Production Planning and Control (PPC) models for intermittent production, with focus on the detailed production scheduling using MRP and APS approaches. In order to that, a teaching plan is proposed to present and differentiate these approaches. It includes the use of an educational case study named \"The Skateboard Factory\". In a playful but realistic way, the case presents, in its five stages, two hypothetical situations of use of scheduling systems. First, an MRP approach for planning in the skateboard factory, and second, one APS approach used by the truck supplier. The teaching plan was first applied to an undergraduate degree Production Engineering program. In this dissertation, a detailed description of the educational case study, along with the teaching plan, is provided. The results achieved in the case study and the students evaluation attest to the usefulness of the resources designed, and also that the strategies applied really improved the learning process. In this first application, it was also observed that high workload and the little weight in the final grade of the case study inhibit better results. In future applications, the case can be enhanced to include new stages on other important issues of the PPC discipline and the replacement of the software used.
353

Uma contribuição para a formalização do processo de gestão da demanda no âmbito do planejamento e controle da produção de empresas MTS (Make-To-Stock) / not available

Santa Eulalia, Luis Antonio de 21 December 2001 (has links)
No atual contexto do planejamento e controle da produção, existe uma necessidade de uma melhor utilização do processo de negócio que norteia o desenvolvimento de todos os seus planos, conhecido como gestão da demanda. Nesse assunto, a existência de literatura adequada e de modelos ou formalismos que visam facilitar a compreensão e utilização do processo em si, é rara, e por muitas vezes, insuficiente. Dessa forma, a gestão da demanda acaba por não ser amplamente conhecida, e, por conseqüência, torna-se sub-utilizada nas organizações. Assim, este trabalho visa colaborar para a solução dessa questão, contribuindo para a geração de um modelo formal que possa ser útil tanto à comunidade acadêmica quanto à empresarial interessada. / In current context of the Manufacturing Planning and Control Systems there is a need for a better use of the business process that address the development of alI its plans, the Demand Management process. The existence of appropriate literature and models or formalisms that aims to help a better understanding and usage of this business process is rare and insufficient. ln that way, the Demand Management process is not being known thoroughly and, for consequence, it is not properly used in some organizations. Thus, this work aims to collaborate for the solution of this problem, contributing to a formal model generation that can be useful for the academic and managerial community interested.
354

Um estudo sobre os relacionamentos entre formas de distribuição da capacidade produtiva e sistemas de programação e controle da produção / A study on the relationship between types of productive capacity distribution and production planning and control systems

Souza, Fernando Bernardi de 20 December 2001 (has links)
A maioria das pesquisas na área de alocação de capacidades entre recursos de uma linha de manufatura propõe as formas balanceadas e em bowl como as mais eficientes para o desempenho de linha como um todo. A maior parte destes estudos é baseada em sistemas simplificados de empurrar a produção, desconsiderando sistemas mais atuais de planejamento e controle da produção (PCP). Por outro lado, estudos referentes à eficiência de sistemas de planejamento e controle da produção não consideram o efeito que critérios distintos de alocação de capacidades podem ter seus desempenhos. Este trabalho tem como objetivo estudar o relacionamento entre as políticas de alocação de capacidades e os sistemas de PCP. O principal critério de desempenho adotado foi o throughput, obtido segundo níveis médios e máximos de estoque em processo em uma linha de produção com cinco recursos. Foram estudados oito tipos de critérios de alocação de capacidades e quatro tipos de sistemas PCP, segundo três níveis de desbalanceamento de cargas, três níveis de coeficiente de variabilidade dos tempos de processamento dos recursos e cinco níveis máximos de estoque em processo. Foi utilizada uma ferramenta de simulação para criar modelos e simular 1386 cenários distintos. Como resultado, percebeu-se uma estreita interdependência entre políticas de alocação e sistemas de PCP. A pesquisa identificou; ainda, que não há um critério de alocação de capacidades nem um sistema de PCP que se mostre melhorem todas as condições testadas, contrariando diversos estudos sobre o tema. / Most of the researches on production capacity allocation among resources, proposes the use of balanced and bowI allocation as the most efficient methods in terms of performance. Such studies were generally based on simplified push production systems, not considering other production pIanning and controI systems (PPC). On the other hand, studies about efficiency of PPC systems don\'t consider the effect of different criteria of capacity allocation on the performance of the PPC systems. The purpose of this research is to investigate how different capacity allocation criteria and different PPC systems interreIate among each other. The major performance criteria used to rank each combination was the resulting throughput, considering several average and maximum levels of work in process (WIP) in a production line with five resources. Eight different types of capacity allocation criteria and four types of PPC systems were studied, with three levels of unbalanced loads, three levels of variability coefficient for processing times and tive maximum WIP levels. A simulation tool was used in order to generate the models and run 1386 different scenarios. As a result, it could be noticed a strong interrelationship between the allocation criteria and the PPC systems. The research also showed, on the contrary of many studies on this subject, that for all the combination tested, none of capacity allocation criteria nor PPC systems stood out on the best option.
355

Diretrizes para o planejamento e controle da produção em obras de sistemas construtivos metálicos

Fabro, Fabiana January 2012 (has links)
No setor da construção civil, tem ocorrido um aumento na utilização de sistemas industrializados, dentre eles sistemas construtivos metálicos, visto que o uso desses sistemas contribui para o aumento da velocidade de execução dos empreendimentos e para a redução de desperdícios. Esta mudança tem criado oportunidades para a aplicação de conceitos e métodos de gestão da produção, desenvolvidos em outras indústrias, tais como a Filosofia da Produção Enxuta, que tem trazido muitos benefícios ao setor da construção, tais como redução de desperdícios, aumento da produtividade e da confiabilidade nos prazos de entrega. Entretanto, há poucas pesquisas sobre a utilização de conceitos da produção enxuta no processo de PCP de obras de empresas que fornecem sistemas construtivos metálicos. O presente trabalho tem como objetivo geral propor diretrizes para a concepção e implementação de sistemas de Planejamento e Controle de Produção em obras de empresas que projetam, fabricam e montam sistemas construtivos metálicos. São também propostas adaptações no Sistema Last Planner ao contexto de montagem deste tipo de sistema. A estratégia de pesquisa adotada foi a pesquisa-ação, sendo desenvolvidos cinco estudos empíricos em obras de uma empresa líder neste setor. O trabalho iniciou pela realização de um diagnóstico relativo aos fluxos de materiais e informações entre os principais setores da empresa, assim como análise do processo de planejamento e controle existente no processo de montagem. Na sequência, foram definidas e implementadas melhorias no processo de PCP em três obras da empresa. Os principais resultados obtidos pela pesquisa estão relacionados à necessidade de ampliação do escopo do projeto do sistema de produção, à adaptação dos níveis de planejamento de médio e curto prazo do Sistema Last Planner para este contexto, assim como à necessidade de integração do planejamento e controle do processo de montagem a outros processos à montante da obra. São também propostos diferentes tipos de sistemas de planejamento e controle da produção, em função da complexidade e do tamanho da obra. / In the construction sector, there has been an increase on the use of industrialized building systems, including steel construction systems, due to the contribution of those systems in terms of reducing the duration of projects, and reduction of waste. This change has created opportunities for the application of production management concepts and methods that have been originated in other industries, such as the Lean Production Philosophy, which has brought several benefits for the construction sector, such as waste reduction, increase in productivity and reliability in delivery time. However, there have been only a few research studies on the application of Lean Production concepts on the production planning and control process of companies involved in the delivery of steel construction systems. The aim of this research work is to propose guidelines for the conception and implementation of production planning and control systems for projects delivered by companies that design, manufacture and assemble steel construction systems. Moreover, some adaptations in the Last Planner Systems are proposed for the context of assembling this type of system. Action research was the research strategy adopted in this investigation, which involved the development of five empirical studies in projects carried out by a Brazilian leading company. This investigation started by carrying out an analysis of the material and information flows among the main departments of the company, as well as by assessing the existing planning and control process for site assembly. Then, a set of improvements in that process were devised and implemented in three construction sites of the company. The main results of this research work are concerned with extending the scope of production system design, adapting the medium and short-term planning levels of the Last Planner System to this context, and integrating the planning and control process for site assembly with upstream processes. Moreover, different types of planning and control systems were proposed for different types of projects, according to their complexity and size.
356

Conceitos de gestão de projetos e teoria das restrições, aplicados ao planejamento e controle da produção de uma empresa aeronaútica /

Lemes, Carlos Alberto. January 2008 (has links)
Resumo: Este trabalho aborda planejamento e controle da produção para uma indústria de grande porte, no setor aeronáutico, cujos produtos têm alto grau de customização, ciclos elevados e uma exigência de alta qualidade e prazo por parte dos clientes. Uma produção bastante complexa, com muita movimentação de material, produto e pessoal e um considerável volume de dados a serem processados diariamente. Nesse cenário não há margem para erros e o caminho é a busca constante do diferencial competitivo. Com isso, a presente dissertação vem apresentar um modelo de planejamento e controle da produção utilizando conceitos de gestão de projetos através da programação das atividades de montagem por meio de rede de precedências juntamente com a aplicação da Corrente Crítica como recurso para minimizar as dificuldades de se trabalhar em ambientes multiprojetos. Um sistema estruturado e operado por aplicativos disponíveis no mercado, que permita a manipulação de informações oriundas do ambiente produtivo. O método adotado nesse trabalho foi a pesquisa-ação, contando com a participação efetiva e constante do pesquisador no equacionamento dos problemas encontrados. Tem-se como resultado da pesquisa o desenvolvimento e implantação de um sistema de gestão, com seus processos, bem como ganhos significativos de ciclo, mãode- obra e Work in Process - WIP, resultados estes determinantes para a conquista do diferencial competitivo e atendimento do alto grau de exigência do mercado aeronáutico. / Abstract: This work approaches production planning and control of a large company, in the aerospace industry, whose products have high degree of customization, high cycles and a demand of high quality and delivery on time by the customers. The production is very complex, too many material transportation, products and personnel movement and a considerable volume of information being processed daily. In this scenario there is no margin for error and the path is the constant search of competitive differential. This study presents a model for a production planning and control assembly using concepts of project management by programming activities with network precedence and the implementation of the Critical Chain Method as a resource to minimize the noxious effects of working in multiprojects. A system structured and operated by applications available on the market, allowing the manipulation of information originating from of the productive atmosphere The method adopted in this work was the action-research, with the effective participation of the researcher solving some problems during the study. As a result, the study shows the development and implementation of a management system, with its processes, as well as significant gains cycle, manpower and Work In Process - WIP, these results are decisive for the conquest of the differential competitive to assist with excellence the high degree of demand of the aeronautical market. / Orientador: Valério Antonio Pamplona Salomon / Coorientador: Fernando Augusto Silva Marins / Banca: Ubirajara Rocha Ferreira / Banca: Carlos Henrique Pereira Mello / Mestre
357

Um estudo sobre os relacionamentos entre formas de distribuição da capacidade produtiva e sistemas de programação e controle da produção / A study on the relationship between types of productive capacity distribution and production planning and control systems

Fernando Bernardi de Souza 20 December 2001 (has links)
A maioria das pesquisas na área de alocação de capacidades entre recursos de uma linha de manufatura propõe as formas balanceadas e em bowl como as mais eficientes para o desempenho de linha como um todo. A maior parte destes estudos é baseada em sistemas simplificados de empurrar a produção, desconsiderando sistemas mais atuais de planejamento e controle da produção (PCP). Por outro lado, estudos referentes à eficiência de sistemas de planejamento e controle da produção não consideram o efeito que critérios distintos de alocação de capacidades podem ter seus desempenhos. Este trabalho tem como objetivo estudar o relacionamento entre as políticas de alocação de capacidades e os sistemas de PCP. O principal critério de desempenho adotado foi o throughput, obtido segundo níveis médios e máximos de estoque em processo em uma linha de produção com cinco recursos. Foram estudados oito tipos de critérios de alocação de capacidades e quatro tipos de sistemas PCP, segundo três níveis de desbalanceamento de cargas, três níveis de coeficiente de variabilidade dos tempos de processamento dos recursos e cinco níveis máximos de estoque em processo. Foi utilizada uma ferramenta de simulação para criar modelos e simular 1386 cenários distintos. Como resultado, percebeu-se uma estreita interdependência entre políticas de alocação e sistemas de PCP. A pesquisa identificou; ainda, que não há um critério de alocação de capacidades nem um sistema de PCP que se mostre melhorem todas as condições testadas, contrariando diversos estudos sobre o tema. / Most of the researches on production capacity allocation among resources, proposes the use of balanced and bowI allocation as the most efficient methods in terms of performance. Such studies were generally based on simplified push production systems, not considering other production pIanning and controI systems (PPC). On the other hand, studies about efficiency of PPC systems don\'t consider the effect of different criteria of capacity allocation on the performance of the PPC systems. The purpose of this research is to investigate how different capacity allocation criteria and different PPC systems interreIate among each other. The major performance criteria used to rank each combination was the resulting throughput, considering several average and maximum levels of work in process (WIP) in a production line with five resources. Eight different types of capacity allocation criteria and four types of PPC systems were studied, with three levels of unbalanced loads, three levels of variability coefficient for processing times and tive maximum WIP levels. A simulation tool was used in order to generate the models and run 1386 different scenarios. As a result, it could be noticed a strong interrelationship between the allocation criteria and the PPC systems. The research also showed, on the contrary of many studies on this subject, that for all the combination tested, none of capacity allocation criteria nor PPC systems stood out on the best option.
358

Avaliação de Entrega dos Fornecedores sob a Ótica do Cliente e o PCP desses fornecedores: Um estudo de caso em Empresas do Pólo Industrial de Manaus

Azevedo, Marcos 11 December 2009 (has links)
Made available in DSpace on 2015-04-22T22:11:17Z (GMT). No. of bitstreams: 1 Marcos_Azevedo.pdf: 1641833 bytes, checksum: ea8db673a6d985bfda5c320c067eb052 (MD5) Previous issue date: 2009-12-11 / Coordenação de Aperfeiçoamento de Pessoal de Nível Superior / This work aims at identifying and analyzing the System Planning and Production Control (PCP) in existing companies that provide their inputs to automaker and motorcycle manufacturer correlate the management of PCP with the performance evaluation of delivery of this assembly. First is presented a theory about the planning and production control by addressing the basic concepts and features. Then, the focus is given to the case study conducted in these companies through a research methodology, which sought to verify and show what has been used effectively in terms of PCP, which techniques are used, which reflected the performance of these techniques production companies and which problems related to PCP firms face. A questionnaire was developed as a research tool for obtaining information. The data obtained are analyzed individually and then as a whole. We made a diagnosis on the subject, suggesting the adequacy of those systems to their needs in the short, medium and long term. / A presente dissertação procura identificar e analisar criticamente o Sistema de Planejamento e Controle da Produção (PCP) existente em empresas que fornecem seus insumos para montadora fabricante de motocicletas e correlacionar a gestão de PCP com a avaliação de desempenho de entrega desta montadora. Inicialmente é apresentada uma teoria sobre o planejamento e controle da produção abordando seus principais conceitos e características. Em seguida, o enfoque é dado ao estudo de caso realizado nessas empresas, através de metodologia de pesquisa, onde se procurou verificar e mostrar o que efetivamente vem sendo utilizado em termos de PCP, quais técnicas são utilizadas, quais os reflexos dessas técnicas no desempenho produtivo das empresas e quais os problemas relativos ao PCP que essas empresas enfrentam. Foi elaborado um questionário como instrumento de pesquisa para obtenção das informações. Os dados obtidos são apresentados analisados individualmente e depois no seu conjunto. Realizou-se um diagnóstico sobre o assunto, sugerindo a adequação dos referidos sistemas às suas necessidades nos horizontes de curto, médio e longo prazo.
359

Planejamento e controle da produção na pequena empresa: estudo de caso de fatores intervenientes no desempenho de um empreendimento metalúrgico da cidade de São Carlos-SP / Production planning and control in small business: case study of intervening factors in the performance of a metallurgic company in the city of São Carlos-SP

José Henrique de Andrade 02 October 2007 (has links)
O objetivo geral desta pesquisa foi identificar fatores relacionados ao planejamento operacional da produção que intervêm no desempenho de uma pequena empresa metalúrgica. Como objetivos específicos, pretendeu-se: identificar a existência de políticas e práticas de planejamento na empresa, bem como procedimentos de sua formalização; descrever as características e as atividades do planejamento operacional da produção e os fatores intervenientes em seu desempenho; identificar as características organizacionais específicas da pequena empresa que influenciam o funcionamento do planejamento operacional da produção. Diversos trabalhos da literatura destacam uma relação positiva entre as atividades de planejamento e o desempenho empresarial no âmbito das empresas de pequeno porte e isto motiva o estudo deste assunto. A pequena empresa, devido a suas características específicas tais como restrição de recursos (humanos, financeiros e materiais) e limitado poder de negociação diante de fornecedores, concorrentes e clientes, demonstra dificuldades na sua gestão, entre elas para planejar, controlar e programar a produção de modo a obter um bom desempenho. Para atingir o objetivo proposto, foi desenvolvido um estudo de caso em uma empresa metalúrgica de pequeno porte da cidade de São Carlos/SP, sendo o pesquisador um dos integrantes do quadro de funcionários da empresa, na função de supervisor de PCP, somado à revisão bibliográfica a cerca do tema. Isso, possibilitou o confronto entre a teoria e a prática e a obtenção de conclusões a respeito do tema estudado. Como principais resultados observou-se que: o planejamento operacional carece de informações e análises para a tomada de decisão; o desempenho de uma empresa é influenciado por diversos fatores, e não é possível isolar planejamento e desempenho desses demais fatores, foi verificado um ganho de desempenho expressivo registrado entre os anos de 2002 a 2006 na empresa, porém este trabalho não pôde afirmar que as mudanças realizadas e os fatores do planejamento operacional da produção, PCP, foram influentes no desempenho da empresa. O motivo que impossibilita esta afirmação é o fato de que outros fatores não analisados neste trabalho revelaram-se como de maior impacto sobre o desempenho, por exemplo, a ação da concorrência e a indisponibilidade de recursos de curto prazo em caixa. / The aim of this research was to identify related factors to the operational production planning that intervene in the performance of a small metallurgic company. As specific purposes, it was intended: to identify the existence of politics and practical planning in the company as well as procedures of its formalizing; to describe the characteristics and activities of the operational production planning and intervenient factors in its performance; to identify specific organizational characteristics of the small business that influence the functioning of the operational production planning. Several researches detach a positive relation between planning activities and enterprise performance in the scope of small businesses, which motivates the study of this subject. The small business, due to its specific characteristics such as restriction of resources (human, financial and material) and its limited negotiation approach over suppliers, competitors and customers, demonstrates difficulties in its management, such as to plan, control and program the production in order to get a good performance. To achieve the established goal, a case study was developed in a small metallurgic company in the city of São Carlos/SP, in which the researcher belongs to the employees board of the company as the supervisor of PPC, added up to a bibliographical review about the subject. This made possible the confrontation between the theory and practice and obtainment of conclusions regarding the subject studied. As main results it was observed that: the operational planning lacks information and analyses for decision making; a company\'s performance is influenced by many factors and it is not possible to separate planning and performance from these factors, a significant gain of performance was verified between the years 2002 and 2006 in the company, however this work could not assert that the carried through changes and the factors of the operational production planning, PPC, were influential in the performance of the company. The reason why this affirmation is disabled is the fact that other factors not analyzed in this study were brought out as the biggest impact in performance, for example, the action of the competitors and the unavailability of resources of short term in the company.
360

O modelo de simulação do GPCP-1 : o jogo do planejamento e controle de produção /

Cornélio Filho, Plínio January 1998 (has links)
Dissertação (Mestrado) - Universidade Federal de Santa Catarina, Centro Tecnológico. / Made available in DSpace on 2012-10-17T08:20:50Z (GMT). No. of bitstreams: 0Bitstream added on 2016-01-09T01:18:31Z : No. of bitstreams: 1 144562.pdf: 32080288 bytes, checksum: e0171166101e2b3bbb7c1edb1ce0fd9e (MD5)

Page generated in 0.1063 seconds