• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • 1
  • Tagged with
  • 3
  • 3
  • 3
  • 3
  • 3
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

The establishment of the documentsconnected to the detailed development plan –with focus on the aesthetic design program / Upprättande av detaljplanens dokument –med fokus på gestaltningsprogrammet

Hedman, Karolina January 2013 (has links)
Aesthetic  design  programs  are  often  used  as  a  complimentary  document  to  detailed development plans in Sweden and they focus on the areas architecture and design. The content varies between programs because there are no requirements in the Swedish Planning and Building Act (plan- och bygglagen, PBL) of neither the establishment nor the content. The general development of the detailed development plans and the connected aesthetic design program is that they are getting more and more detailed early in the spatial planning process which violates the intentions of PBL by not using brief outlines in the beginning of the spatial planning process. Due to the lack of requirements of the establishment of the aesthetic design program there is also no clear or statutory way of linking the two documents together. How the linking is done is the municipalities own decision, which leads to many variants that affect the municipality in its work in different ways. The purpose of my master thesis is to create an understanding of why the spatial planning process  is  conducted  the  way  it  is  and  how  the  detailed  development  plans  become  so detailed. This by conducting an empirical qualitative spatial planning process description of 10 detailed development plans in Stockholm County, with emphasis on the aesthetic design program, and interviews with the plan architect of each detailed development plan. The study showed that the project leaders and the project group from the municipality have the  biggest  influence  on  the  spatial  planning  process.  They  decide  which  documents  to establish, when to establish them, they take care of all the mandatory parts of the process and they decide the content of the aesthetic design program after discussion with the developer and consultants. The developer produces the documents required by the municipality as a basis for decision making and the aesthetic design program with the help from its consultants. The developers probably establish the aesthetic design program due to lack of competence from the municipality but also out of practical reasons. Because the developers very often act as initiators to the process they already have made sketches of the area with the help from consultants which easily can produce the aesthetic design program because they are already so involved in the project. The politicians have not been involved in the making of the aesthetic design program, neither has the public used its opportunities of public influence (samråd, granskning) to get their point across regarding the aesthetic design program. / Gestaltningsprogram är idag ett vanligt kompletterande dokument till detaljplaner i Sverige för   att   beskriva   ett   områdes   utformning   med   fokus   på   estetik   och   arkitektur. Gestaltningsprogrammens innehåll varierar från program till program då det inte finns något krav på att ett gestaltningsprogram måste upprättas och kopplas till detaljplaner enligt PBL. Gestaltningsprogrammen kan beskriva områdena väldigt övergripande för att bara skapa en idé om hur de önskar att området skall upplevas. De kan även vara mer detaljerade och illustrera arkitekturen för området och vilka material som skall användas. Den generella utvecklingen av detaljplaner och tillhörande gestaltningsprogram är att de blir mer  och  mer  detaljerade  tidigt  i  processen  vilket  strider  mot  PBLs  intentioner  om översiktlighet i den inledande planprocessen. Då det inte finns något krav på upprättandet av gestaltningsprogram finns det inte heller lagstadgat hur kopplingen mellan detaljplan och gestaltningsprogram skall göras. Hur denna koppling löses är upp till kommunerna själva vilket leder till många olika varianter med olika konsekvenser för kommunen i dess arbete. Syftet med mitt arbete är att skapa förståelse för varför processen ser ut som den gör idag och hur det kommer sig att detaljplanerna blir så detaljerade. Detta genom en empirisk kvalitativ detaljplaneprocessbeskrivning av 10 stycken upprättade detaljplaner i Stockholms län, med fokus på gestaltningsprogrammet, och intervjuer med respektive planarkitekt. Det visade sig att det största inflytandet på detaljplaneprocessens gång har projektledarna och projektgruppen  från  kommunen.  De  beslutar  vilka  dokument  som  skall  upprättas,  när dokumenten skall upprättas, de handhar den formella hanteringen av ärendet, de upprättar de obligatoriska handlingarna till detaljplanen och bestämmer hur gestaltningsprogrammet skall utformas samt dess innehåll efter gemensamma diskussioner med representanter från både kommunen, exploatören och konsulterna. Exploatörerna i sin tur tar fram de dokument som kommunen kräver som beslutsunderlag och gestaltningsprogrammet med hjälp av konsulter. Exploatörerna  tar  förmodligen  fram  gestaltningsprogrammet  då  kommunen  inte  besitter tillräcklig kompetens för det, men även av praktiska skäl då exploatören väldigt ofta har agerat initiativtagare till detaljplaneprocessen och därmed redan har en arkitektkonsult som har tagit fram idéskisser för området och därmed är insatt i arbetet och enkelt kan fortsätta med det arbetet och handha upprättandet av gestaltningsprogrammet. Vidare  har  politikerna  inte  varit  inblandande  i  gestaltningsprogrammets  utformning,  inte heller har privatpersoner i kommunen använt sig av möjligheterna vid samråd och granskning för att lämna synpunkter på gestaltningsprogrammet.
2

Kartläggning av allmänna gång- och cykelvägar på kvartersmark : utan rättsligt genomförande

Dalhammer, Ida January 2015 (has links)
Detaljplaner reglerar hur Sveriges mark och vatten ska användas. Detaljplanering regleras i plan- och bygglagen (2010:900). En detaljplan ska ange vad som är allmän plats, kvartersmark och vattenområde. Allmän plats får beträdas av allmänheten och ägs av kommunen. Kvartersmark kan ägas av olika aktörer men framförallt av privatpersoner. På kvartersmark kan ändamål såsom bostäder, kontor, handel, skola m.m. förekomma. Frivilliga planbestämmelser kan tillämpas i en detaljplan. Den här studien handlar om den frivilliga planbestämmelsen "x". Ett gement "x" i en detaljplan symboliserar ett markreservat för allmän gång- och cykelväg vilken planläggs på kvartersmark. Vid planläggning av "x", inskränks den berörda fastighetsägaren i sin äganderätt.Genom att bilda en rättighet för x-området undviks fastighetsägarens möjlighet att stänga ute allmänheten från fastigheten. Oklarheter rörande drift och underhåll undviks också när en rättighet bildats. Rättigheten i fråga skapas lämpligast genom bildande av servitut eller nyttjanderätt. Det finns två olika typer av servitut, avtalsservitut och officialservitut. Officialservitut skrivs in automatiskt i fastighetsregistret och är ett säkrare alternativ än avtalsservitutet. Bildande av officialservitut sker efter ansökan till lantmäterimyndigheten som bland annat prövar om servitutet är av väsentlig betydelse för den fastighet som får förmån av servitutet. Vid bildande av servitut för x-område bör den fastighet som får förmån av servitutet (härskande fastighet) vara en kommunal fastighet, med tanke på dess allmänna ändamål. Genomföranderegler saknas för x-områden vilket medför en risk för att en rättighet aldrig bildas för dem. När en rättighet inte bildas finns det ingen rätt för kommunen att använda marken för allmän gång- och cykelväg. Det medför även oklarheter rörande drift och underhåll i och med att gång- och cykelvägen är lokaliserad till en fastighet som inte ägs av kommunen men som nyttjas av allmänheten.Vid avsaknad av bildad rättighet kan fastighetsägaren om så önskas stänga ute allmänheten, till exempel genom förbudsskyltar eller bommar vilket antagligen bidrar till att x-området inte uppfyller sin funktion. Tidigare studier har visat att x-områden används i större utsträckning än vad som var ämnat med införande av bestämmelsen. Det har även tidigare framgått att "x" kombineras med "g" med syfte att undvika kostnader, som istället överlåts från kommunen på de delägande fastighetsägarna i gemensamhetsanläggningen. Ett "g" i en detaljplan innebär att en gemensamhetsanläggning ska bildas inom området. Det har även uttryckts under föreläsningar vid Högskolan Väst att oklarheter gällande vem som ansöker om officialservitut förekommer vid exploateringar. Syftet med studien är att undersöka förändring av användningsfrekvensen för "x". Studien gäller beslut mellan 1 januari 2002 och 31 december 2011 i de tre kommunerna Motala, Linköping och Mjölby i Östergötlands län. Syftet är även att utreda hur många av x-områden som ett officialservitut har bildats för.Resultatet av studien visar att inrättande av x-områden minskar. De två sista åren i studien har få inrättningar av x-områden ägt rum. Motala kommun har till skillnad från Linköpings och Mjölby kommun en uppåtgående trendlinje. Dock avviker 2011 i Motala då inga x-områden inrättats. Det avvikande resultatet tyder på en förändring även i Motala kommun. Resultatet från de intervjuer som hållits med planarkitekter i de olika kommunerna kompletterar resultatet ovan. Planarkitekterna bekräftar att de inrättar "x" mer sällan idag än för några år sedan. Av samtliga x-områden i studien har 44 % inte genomförts genom bildande av officialservitut. Markåtkomst kan ha lösts genom annan rättighet eller saknas helt. / Detailed development plans regulate how Sweden's land and water should be used. Statutes on detail planning are to be found in the Swedish planning and building act. A detailed development plan must specify public area, private property area and water area. Everybody may enter the public areas which the municipality owns. The private property area is private and has owners like a housing company or an individual. Optional rules can be used in the detailed development plan. This study deals with the optional regulation "x", which is a land reserve for public pathways. "X" is located on the private property areas.The private property owner may suffer from a restriction of their property rights by getting an "x" over the property. To avoid the risk that the public is prevented from passing through the x-field, a right is formed. If no right is formed, the owner of the property can choose to shut the public out. The right in question occurs appropriate by official easement which occurs by an application. An application can be made to the land survey to create an official easement. The land survey investigates if the official easement has an essential use for the property that has the advantage of the easement.Implementation rules are missing for x-areas, which results in that no right is formed. When no rights are formed there is no legal right for the public to use pedestrian and bicycle pathways. The property owner can choose to put up prohibiting signs and barriers to exclude the public, which results in that the x-areas are not filling their purpose. Previous studies have shown that the x-areas are used more often than intended. Its also used as a combination with "g", to avoid costs for the municipality. A "g" in a detail development plan means that a joint facility will be formed, that consist of the property owners in the area. The cost transfer to the members instead. During lectures at University West it has aroused uncertainties who it is that applies for official easement. The purpose of this study is to investigate how often x-areas have been applied for in the three municipalities of Motala, Linköping and Mjölby in Östergötland County, January 1, 2002 – December 31, 2011. The purpose is also to see how many official easements that have been formed for the x-areas.The result of this research shows that the use of x-areas decreases. The last two years very few x-areas have been established. Motala municipality has unlike Linköping and Mjölby an increasing trend of x-areas. However, in 2011 Motala municipality had no establishment of x-areas. The abnormal result indicates a change, even in Motala. Interviews with plan architects in the different municipalities confirm the result above. The plan architects admit to establish fewer x-areas today than a few years ago. Of all x-areas in the study, 44 percent have no official easement. It may have another easement but it is also possible that they have no easement at all.
3

Samarbetet mellan kommunen och byggherren i detaljplaneprocessen : Vilka är framgångsfaktorerna? / The Collaboration between the Municipality and the Housing Developer in the Detail Development Planning Process

Gyllberg, Johan January 2017 (has links)
I Sverige är behovet av bostäder stort och en utbredd bostadsbrist råder. Av den anledningen behövs det fram till år 2025 uppföras cirka 710 000 bostäder, där det största behovet finns i storstadsregionerna.  En förutsättning för att bostadsbristen ska kunna motverkas är att detaljplaner tas fram, vilka möjliggör ett ökat bostadsbyggande. Detaljplanerna tas fram i form av en detaljplaneprocess, vars syfte är att reglera mark- och vattenanvändningen. Under de senaste åren har denna process fått kritik för att vara ineffektiv och bromsa bostadsbyggandet, där en del av problemet är bristfälligt samarbete mellan kommun och byggherre. Av den anledningen har en undersökning kring relationen mellan parterna utförts i samverkan med Institutionen för Fastigheter och Byggande på KTH.  Denna undersökning syftar till att identifiera framgångsfaktorerna i relationen mellan kommunen och byggherren. Rapporten har avgränsats till detaljplaneläggning av bostäder i Stockholmsregionen, där kommunen och byggherren arbetar i samverkan. Aspekter som har undersökts är samarbete, kommunikation, tillit och lagprestationer.  Inledningsvis utfördes en litteraturstudie av tidigare forskning kring planprocessen och projektledning, där syftet var att skapa översiktlig kunskap kring ämnet samt utgöra underlag för frågemallar till intervjuer. Därefter genomfördes elva djupgående och semistrukturerade intervjuer med sakkunniga representanter från olika kommuner och byggherrar. Målet med intervjuerna var att inhämta empiri för att kunna besvara undersökningens frågeställning: Vilka är de viktigaste framgångsfaktorerna i relationen mellan kommunen och byggherren vad gäller samarbete, kommunikation, tillit och lagprestationer?  Undersökningen påvisar att den enskilt största framgångsfaktorn i relationen mellan parterna är att ett kompetent projektledarskap finns representerat. I en projektledarroll ingår att skapa goda förutsättningar för samarbete, kommunikation, tillit och lagprestationer. Detta gör att relationen mellan parterna kommer att fungera bättre om en kompetent projektledare är ansvarig för processen. Kommunen verkar som planmyndighet och bör därför säkerställa att en kompetent projektledare finns representerad för att leda processen. För ett framgångsrikt samarbete krävs framförallt en gemensam och genomförbar målbild, samt att hålla fast vid det som är överenskommet för att motverka riktningsförändringar i processen vid hög personalomsättning. Dessutom bör parterna inneha förståelse för varandras roller och drivkrafter samt hur respektive organisation styrs, leds och verkar.  För att skapa goda förutsättningar för en bra kommunikation bör parterna sträva mot att ha en så öppen och rak dialog som möjligt, där ställningstaganden och beslut skall motiveras. Dessutom bör parterna vara lyhörda mot varandra och förebygga konflikter genom att i ett tidigt skede diskutera känsliga frågor som exempelvis exploateringsgrad, tidplan och detaljeringsnivå.  De största framgångsfaktorerna för att skapa tillit mellan parterna är att vara så transparenta som möjligt och undvika att dölja angelägenheter för varandra. Dessutom anses det vara viktigt att förvalta det förtroende som den andra parten har gett genom att utföra det som utlovats.  Framgångsfaktorer för att skapa lagprestationer är att involvera lösningsorienterade och engagerade individer, samt som ovan nämnts, involvera en kompetent projektledare. Dessutom bör byggherren bidra med kompetens kring genomförandet för att i ett tidigt skede säkerställa att det som planläggs är möjligt att bygga med en god arbetsmiljö.  Övriga framgångsfaktorer för att skapa en god relation mellan kommunen och byggherren är att tidseffektivisera processen, dock under förutsättningen att kvaliteten inte påverkas negativt av detta. Dessutom bör parterna genomföra en erfarenhetsåterföring efter avslutat projekt, för att dels dra lärdomar och utveckla processen men även för att förbättra relationen mellan varandra.  Om ovan nämnda framgångsfaktorer finns representerade i processen anses förutsättningarna finnas för att skapa en god relation mellan kommunen och byggherren. Detta är viktigt eftersom en god relation med tillfredställande samarbete parterna emellan anses skapa gynnsammare förutsättningar för planläggningen av bostäder. Detta underlättar framtagandet av fler detaljplaner, vilket leder till att fler bostäder kan byggas och motverka bostadsbristen som råder. / In Sweden the need for housing is extensive, with a widespread housing shortage as an outcome. There is a need of approximately 710 000 units to be built until year 2025, where the highest demand is in the metropolitan regions. A precondition for the ability to meet the housing demand is an increased number of detailed development plans, which is needed when developing housing. The detailed development plan’s purpose is to regulate the land and water usage. During the last years the process of developing the plans has been criticized for being ineffective and to decelerate the building of new housing. A part of the problem is an inadequate collaboration between the municipality and the housing developer. Due to this problem, the relationship between the municipality and the housing developer have been closer studied in this thesis in cooperation with the Department of Real Estate and Construction Management at the Royal Institute of Technology KTH.  The purpose of this study is to identify the success factors in the relationship between the municipality and housing developer. The report has been delimited to only include detailed development planning of housing in the Stockholm region, where the municipality and housing developer collaborate. The aspects which are studied closer are collaboration, communication, trust and team performance.  First of all, a literature review of previous research on the detail development planning process and project management was conducted. This to create broad and general knowledge of the subject. The purpose of the literature study was to gain knowledge of the subject and design question templates for upcoming interviews. As a next step, eleven in-depth and semi-structured interviews were conducted with experts from different municipalities and housing development companies. The goal was to collect empirical data in order to answer the research question: What are the most important success factors in the relationship between the municipality and the housing developer in terms of collaboration, communication, trust and team performance?  The findings reveal that the main success factor in the relationship between the parties is the presence of professional project management. The role of a project manager includes creating preconditions for collaboration, communication, trust and team performance. Meaning, that the relationship between the parties will work more adequate if an individual highly competent within these areas is leading the project. The municipality is the planning authority and should therefore ensure that a competent project manager is represented in the process.  For a successful collaboration, there need to be a common and buildable goal. Also, it is important that one sticks to what is agreed upon, especially when there is a change in management due to high staff turnover. Both parties also need to understand each other’s roles and drivers, and how the different organizations are structured. In order to create good conditions for communication, the parties should try to have an open and straightforward dialogue where all decisions are argued for. The parties should be responsive to each other and prevent conflicts by discussing sensitive issues such as the floor space index, schedules and the degree of details at an early stage of the process. Success factors for establishing trust between the parties are transparency and avoiding to hide things from each other. It is also considered of importance to keep the trust by delivering what is promised. Important factors for a good team performance are to involve solution-oriented and dedicated individuals, led by a competent project manager. The housing developer should also contribute with constructability skills in order to ensure that the detailed development plan is buildable with a safe working environment. Other success factors for establishing a good relationship between the municipality and the housing developer is to make the process more time-effective, without compromising the quality. In addition, the parties should implement experience feedback sessions at the end of the project in order to learn from the process and improve the relationship between the parties. If the above-mentioned success factors are taken into account in the process, the conditions for the relationship can be considered as good. A good relationship with satisfactory collaboration between the parties will benefit the planning process of housing. Hopefully this will result in more detailed development plans and increase the construction rate of housing in order to meet the high demands.

Page generated in 0.0707 seconds