Spelling suggestions: "subject:"enviromental management"" "subject:"anviromental management""
1 |
Energikartläggning av Försäkringskassans lokaler : rekommendationer för ett fortsatt energieffektiviseringsarbeteOllman, Erik January 2013 (has links)
With new energy directives in place, the Swedish Social Service (SSS) stands before the challenge how to reduce the energy demand in its locales. It is a complex matter, as the locales are rented from various property owners and it becomes a question of how to reduce the operational electricity and influence the property owners to work more with energy efficiency. This thesis takes a balanced research approach in three parts. Firstly a qualitative part in form of interviews with personnel at the SSS and its property owners, secondly a quantitative part of descriptive nature in form of energy statistics and thirdly a literature review of Energy Management (EM) Supply Chain Management(SCM), Green Supply Chain Management(GSCM) and Enviromental Performance Indicators (EPI). This in order to be able to give normative recommendations of how the SSS should act to reduce its energy consumption in its locales and provide new insights on how EM, SCM, GSCM and EPI can be applied in effect. The results show that the Swedish Social Service should act in the following areas to control its energy efficiency: statistics and follow-up, locale strategy and operational electricity. To get efficient statistical material the SSS should update their registers of property owners, update guidelines for energy statistics reporting and continue with the same collection method for data (e-mail survey) to get continuity. The literature review and interviews show that a segmentation of suppliers (property owners) based on factors like area in property, good relations, area of local and energy performance indicators should be useful as to know how to distribute resources to enable energy efficiency. Finally, the study shows that various locales has high rates of idling loads and have a energy saving potential of 10-15%.
|
2 |
Estrutura de gestão ambiental na fase pós-aprovação da avaliação de impacto ambiental: Trecho Sul do Rodoanel Mário Covas / Environmental management structure in the follow-up phase of the environmental impact assessment: Southern Section of the Rodoanel Mário Covas. Master\'sGrigio, Gledson Chamareki da Silva 27 July 2010 (has links)
Avaliação de Impacto Ambiental AIA é um instrumento de gestão ambiental que tem como objetivo identificar, prever e interpretar as conseqüências sobre o meio ambiente de uma dada ação humana. Se bem conduzida pode auxiliar o processo de tomada de decisão, incrementar a viabilidade ambiental de projetos e propostas de desenvolvimento, e constituir em instrumento de gestão ambiental. Apesar de existirem exemplos de aplicação bem sucedida, verifica-se que em muitos casos os resultados esperados não têm sido satisfatórios para o que se pretende com ela. Falhas, tanto na elaboração dos Estudos de Impacto Ambiental, como na condução das demais fases e, conseqüentemente, prejudicando a eficácia da AIA e naquilo que se pretende com esse instrumento de política pública, que é a proteção e a melhoria da qualidade ambiental, têm sido verificadas. Trabalhos recentes, têm enfatizado as variáveis de ordem gerencial do processo de AIA como determinantes do seu sucesso, muito mais do que a qualidade técnica ou o conteúdo científico de um EIA. Um bom sistema de gerenciamento da implantação e operação de um empreendimento pode corrigir imperfeições resultantes das etapas prévias do processo de AIA. A fase de acompanhamento do processo de AIA pode ser considerada como etapa crítica para seu sucesso. Impactos que não são corretamente identificados ou previstos pelo EIA, podem ser corrigidos por meio de medidas mitigadoras desenvolvidas depois da aprovação do projeto. Nesse contexto, o presente trabalho buscou analisar a estrutura de gestão ambiental adotada para o cumprimento da fase pós-aprovação do processo de AIA desenvolvido para o Trecho Sul do Rodoanel, com base em documentos disponíveis no órgão ambiental estadual responsável pelo licenciamento, informações obtidas com o empreendedor, visitas técnicas e entrevistas. Os resultados permitem observar que, apesar da existência de deficiências, o desempenho ambiental alcançado pode ser considerado satisfatório, ainda mais considerando o porte do empreendimento e a complexidade ambiental da região de inserção. As principais falhas que podem ser apontadas referem-se ao subdimensionamento de determinadas medidas preventivas, prevalecendo assim uma atuação mais corretiva. Se por um lado, não-conformidades ambientais observadas podem ser atribuídas, em alguns casos, à falta de equipes e de equipamentos suficientes, e em outros, à falta de capacitação ou de interesse quanto ao trato das questões ambientais, mesmo considerando a padronização de procedimentos, a incorporação de medidas ambientais nos editais de contratação e a execução de programas de treinamentos ambientais; por outro, avanços tecnológicos e investimentos garantiram bom desempenho ambiental de algumas medidas mitigadoras implementadas. Conclui-se que apesar das etapas iniciais (avaliação preliminar e análise detalhada) da AIA contituirem em excelentes ferramentas de planejamento e otimização de esforços e recursos, a etapa pós-aprovação, que compreende a gestão ambiental da implantação dos empreendimentos, a partir da efetivação das medidas preventivas e mitigadoras propostas anteriormente, constitui etapa crucial no sentido de alcançar os seus objetivos, que é a busca pela sustentabilidade ambiental do desenvolvimento. Se não for bem executada, pode colocar todo o esforço e recursos conferidos às etapas anteriores a perder. Em caso contrário, pode suprir eventuais deficiências. / The Environmental Impact Assessment - EIA is an environmental management tool that aims to identify, predict and interpret the consequences on the environment of a particular human action. If well managed can help the process of decision making, enhance the environmental sustainability of projects and development proposals, and constitute an instrument of environmental management. Although there are examples of successful implementation, it appears that in many cases the expected results have not been satisfactory for what we expect from it. Failures both in the preparation of environmental studies, as in the conduct of other phases and, consequently, undermining the effectiveness of EIA and what is meant by this instrument of public policy, which is the protection and improvement of environmental quality, have been verified. Recent studies have emphasized the variables of management of the EIA process as critical to their success, much more than the technical quality and scientific content of an environmental study. A good management system implementation and operation of an enterprise can correct imperfections resulting from previous stages of the EIA process. The follow-up phase of the EIA process can be regarded as critical step for its success. Impacts that are not properly identified or anticipated by the environmental study, can be addressed by mitigation measures developed after the approval of the project. In this context, the present work was developed to sought, based on documents available at the state environmental agency, responsible for the licensing process, information obtained from the entrepreneurial, technical visits and interview, to review the environmental management structure adopted for the implementation of follow-up phase of the EIA process developed for the Southern Section of Rodoanel. The results allow us to observe that despite the deficiencies, the environmental performance achieved can be considered satisfactory, especially considering the size of the enterprise and the environmental complexity of the region of insertion. The main flaws that can be highlighted refer to the undersizing of certain preventive measures and, therefore, there was a further corrective action. On the one hand, environmental non-compliances observed can be attributed in some cases, to the lack of sufficient staff and equipment, and in other, the lack of training or interest in the treatment of environmental issues, even considering the standardization of procedures, the incorporation of environmental measures in the contracts and implementation of environmental training programs. On the other hand, technological advances and investments assure good environmental performance of some mitigation measures implemented. We conclude that despite the initial stages of EIA (preliminary assessment and detailed analysis) form it into an excellent tool for planning and optimization of efforts and resources, the post-approval stage, which includes the environmental management of the implementation of projects, from the accomplishment of preventive and mitigating measures proposed earlier, it is a crucial step towards achieving its goals, which is the quest for environmental sustainability of development. If not well implemented, it can put all the effort and resources given to the previous steps to lose. Otherwise, it can overcome any shortcomings from previous steps.
|
3 |
Analise critica da aplicação do sistema de gestão ambiental - ISO 14001, no agronegocio na região metropolitana de Campinas / Critical analysis of implementing environmental management in agribusiness - ISO 14001, in the greater Campinas areaMattos, Silvia Rosangela Marchiori de 24 February 2006 (has links)
Orientador: Angelo Zanaga Trape / Dissertação (mestrado) - Universidade Estadual de Campinas, Faculdade de Ciências Médicas / Made available in DSpace on 2018-08-07T21:56:01Z (GMT). No. of bitstreams: 1
Mattos_SilviaRosangelaMarchioride_M.pdf: 984815 bytes, checksum: a3b8c8662993ddadc8fee0752c0cee1b (MD5)
Previous issue date: 2006 / Resumo: Com o aumento dos volumes de exportação de alimentos e em função da constatação da ausência de controles ambientais na produtividade agrícola, vislumbra-se a oportunidade de implantação da Norma NBR ISO 14001: 2004 com potencial melhoria tanto do ambiente da propriedade agrícola, quanto para seu resultado produtivo, quer seja em qualidade como em quantidade. A ausência de controles ambientais desencadeou o presente processo de pesquisa que busca apresentar uma alternativa para intensificação do equilíbrio ambiental através da ferramenta escolhida e disponível internacionalmente que é a Norma NBR ISO 14001, atualmente em sua versão revisada no ano de 2004. A área de estudo escolhida, foi a Região Metropolitana de Campinas (RMC) dada sua importância para o agronegócio na produção frutífera. Mais recentemente, através das interferências climáticas negativas na produção de alimentos e a necessidade de intensificação dos volumes de produção, para que ocorresse a evolução produtiva, passou a ser um requisito desses novos desafios, a utilização de maior área para o cultivo através do desmatamento de matas nativas, intensificação do uso de produtos químicos como agroquímicos e fertilizantes e estas ações tem como reflexo, uma série de outros resíduos e conseqüências resultantes do aumento da produtividade agrícola, o que levou à geração de intensos impactos ao Meio Ambiente e à sensibilização da saúde em geral. Neste sentido, a presente pesquisa propõe uma análise crítica da aplicação da Norma NBR ISO 14001: 2004 nas propriedades agrícolas, através de visitas às áreas produtivas para levantamento do nível de conhecimento do produtor agrícola a respeito do tema e o atual estágio de desenvolvimento deste mercado quanto à aplicação da Norma, através do registro gerado com auxílio de uma lista de checagem (checklist) . As atuais condições apresentam riscos de contaminação ambiental provocados por esse tipo de atividade produtiva dada suas características como utilização de agroquímicos, produção de rejeitos orgânicos, armazenagens diversas, não atendimento a requisitos legais entre outros. A busca de uma sugestão apropriada e aplicável se dá em decorrência do reconhecimento da necessidade que nos impõe a indústria, o comércio, a agricultura e a população ¿ é necessário produzir, com o menor impacto ambiental possível. Nas visitas e auditorias realizadas nas propriedades cujos empresários aceitaram participar da pesquisa, constatou-se o total desconhecimento da Norma e a não aplicação da mesma, tanto em conteúdo, requisitos de adequação e benefícios que ela gera. Para aplicação nas propriedades agrícolas, no momento das visitas e como guia das entrevistas, foi elaborado um checklist consolidado para avaliação do atendimento aos requisitos da Norma e fundamentado na mesma / Abstract: As a result of the food exports raise as well as to the lack of environmental controls over the agricultural productivity, the NBR ISO 14001:2004 implementation is highly expected. It could lead the agriculture to a potential improvement in its productivity rates and its production figures, concerned to quality and quantities. The lack of environmental controls has encouraged the present research. It aims at introducing and alternative to strengthen the environmental balance through a previously chosen tool. This tool, which is also internationally available, is the NBR ISO 14001:2004, presently in its 2004 reviewed version. The chosen research area was Greater Campinas Area due to its importance to the agribusiness, mostly the fruits sector. More recently, through the negative weather interferences in food production, the growing food production demands and in order to facilitate the production raise, the expansion of agricultural frontiers through further clearance of native forests became an essential requirement. Besides, the higher chemicals use, such as herbicides, insecticides and fertilizers also became a must. As a result of these actions, a number of changes have taken please and among them, higher residues levels, which have caused intensive impacts over the environmental and over the public health. Based on this picture the present research proposes a critical analysis of the NBR ISO 14001:2004 implementation in farms, through visits to productive rural areas. These visits aim at making a survey on the farmers awareness and on the present market¿s development level concerned to the NBR contents and implementation. This could be done through registers based of checklists. There are environmental contamination risks in the present conditions, due to production characteristics, such as agrochemicals use, organic residues, an extent range of storage technologies and the consequences related to legal requirements which have not been yet. The search for a proper and effective solution takes place is result of the necessary recognition imposed by the industry, the commerce, the agriculture and the population. Producing with lowest environmental impact as possible is a must. In visits and audits in farms whose farmers have accepted participating of the research, a total unawareness of the NBR ISO 14001:2004 was found as well as its non-implementation, concerned to its content, its adaptation requisites and its benefits. In order to implement it in farms, during the visits, and use as interviews guidelines, a NBR basis checklist was made to assess the extension of the NBR regulation requisites fulfillment / Mestrado / Epidemiologia / Mestre em Saude Coletiva
|
4 |
Estrutura de gestão ambiental na fase pós-aprovação da avaliação de impacto ambiental: Trecho Sul do Rodoanel Mário Covas / Environmental management structure in the follow-up phase of the environmental impact assessment: Southern Section of the Rodoanel Mário Covas. Master\'sGledson Chamareki da Silva Grigio 27 July 2010 (has links)
Avaliação de Impacto Ambiental AIA é um instrumento de gestão ambiental que tem como objetivo identificar, prever e interpretar as conseqüências sobre o meio ambiente de uma dada ação humana. Se bem conduzida pode auxiliar o processo de tomada de decisão, incrementar a viabilidade ambiental de projetos e propostas de desenvolvimento, e constituir em instrumento de gestão ambiental. Apesar de existirem exemplos de aplicação bem sucedida, verifica-se que em muitos casos os resultados esperados não têm sido satisfatórios para o que se pretende com ela. Falhas, tanto na elaboração dos Estudos de Impacto Ambiental, como na condução das demais fases e, conseqüentemente, prejudicando a eficácia da AIA e naquilo que se pretende com esse instrumento de política pública, que é a proteção e a melhoria da qualidade ambiental, têm sido verificadas. Trabalhos recentes, têm enfatizado as variáveis de ordem gerencial do processo de AIA como determinantes do seu sucesso, muito mais do que a qualidade técnica ou o conteúdo científico de um EIA. Um bom sistema de gerenciamento da implantação e operação de um empreendimento pode corrigir imperfeições resultantes das etapas prévias do processo de AIA. A fase de acompanhamento do processo de AIA pode ser considerada como etapa crítica para seu sucesso. Impactos que não são corretamente identificados ou previstos pelo EIA, podem ser corrigidos por meio de medidas mitigadoras desenvolvidas depois da aprovação do projeto. Nesse contexto, o presente trabalho buscou analisar a estrutura de gestão ambiental adotada para o cumprimento da fase pós-aprovação do processo de AIA desenvolvido para o Trecho Sul do Rodoanel, com base em documentos disponíveis no órgão ambiental estadual responsável pelo licenciamento, informações obtidas com o empreendedor, visitas técnicas e entrevistas. Os resultados permitem observar que, apesar da existência de deficiências, o desempenho ambiental alcançado pode ser considerado satisfatório, ainda mais considerando o porte do empreendimento e a complexidade ambiental da região de inserção. As principais falhas que podem ser apontadas referem-se ao subdimensionamento de determinadas medidas preventivas, prevalecendo assim uma atuação mais corretiva. Se por um lado, não-conformidades ambientais observadas podem ser atribuídas, em alguns casos, à falta de equipes e de equipamentos suficientes, e em outros, à falta de capacitação ou de interesse quanto ao trato das questões ambientais, mesmo considerando a padronização de procedimentos, a incorporação de medidas ambientais nos editais de contratação e a execução de programas de treinamentos ambientais; por outro, avanços tecnológicos e investimentos garantiram bom desempenho ambiental de algumas medidas mitigadoras implementadas. Conclui-se que apesar das etapas iniciais (avaliação preliminar e análise detalhada) da AIA contituirem em excelentes ferramentas de planejamento e otimização de esforços e recursos, a etapa pós-aprovação, que compreende a gestão ambiental da implantação dos empreendimentos, a partir da efetivação das medidas preventivas e mitigadoras propostas anteriormente, constitui etapa crucial no sentido de alcançar os seus objetivos, que é a busca pela sustentabilidade ambiental do desenvolvimento. Se não for bem executada, pode colocar todo o esforço e recursos conferidos às etapas anteriores a perder. Em caso contrário, pode suprir eventuais deficiências. / The Environmental Impact Assessment - EIA is an environmental management tool that aims to identify, predict and interpret the consequences on the environment of a particular human action. If well managed can help the process of decision making, enhance the environmental sustainability of projects and development proposals, and constitute an instrument of environmental management. Although there are examples of successful implementation, it appears that in many cases the expected results have not been satisfactory for what we expect from it. Failures both in the preparation of environmental studies, as in the conduct of other phases and, consequently, undermining the effectiveness of EIA and what is meant by this instrument of public policy, which is the protection and improvement of environmental quality, have been verified. Recent studies have emphasized the variables of management of the EIA process as critical to their success, much more than the technical quality and scientific content of an environmental study. A good management system implementation and operation of an enterprise can correct imperfections resulting from previous stages of the EIA process. The follow-up phase of the EIA process can be regarded as critical step for its success. Impacts that are not properly identified or anticipated by the environmental study, can be addressed by mitigation measures developed after the approval of the project. In this context, the present work was developed to sought, based on documents available at the state environmental agency, responsible for the licensing process, information obtained from the entrepreneurial, technical visits and interview, to review the environmental management structure adopted for the implementation of follow-up phase of the EIA process developed for the Southern Section of Rodoanel. The results allow us to observe that despite the deficiencies, the environmental performance achieved can be considered satisfactory, especially considering the size of the enterprise and the environmental complexity of the region of insertion. The main flaws that can be highlighted refer to the undersizing of certain preventive measures and, therefore, there was a further corrective action. On the one hand, environmental non-compliances observed can be attributed in some cases, to the lack of sufficient staff and equipment, and in other, the lack of training or interest in the treatment of environmental issues, even considering the standardization of procedures, the incorporation of environmental measures in the contracts and implementation of environmental training programs. On the other hand, technological advances and investments assure good environmental performance of some mitigation measures implemented. We conclude that despite the initial stages of EIA (preliminary assessment and detailed analysis) form it into an excellent tool for planning and optimization of efforts and resources, the post-approval stage, which includes the environmental management of the implementation of projects, from the accomplishment of preventive and mitigating measures proposed earlier, it is a crucial step towards achieving its goals, which is the quest for environmental sustainability of development. If not well implemented, it can put all the effort and resources given to the previous steps to lose. Otherwise, it can overcome any shortcomings from previous steps.
|
5 |
Att inkludera hållbarhet i projektledning : Ett arbetssätt eller personliga värderingar? / To include sustainability in project management : a way of work or personal values?Larsson, Aron January 2019 (has links)
Individuals and organisations are encouraged to reduce their climate impact every day. Companies are adapting and using sustainability policies as one way to demonstrate their work towards a sustainable future. The construction industry is one of the industries that affects the environment to a large degree. Within that industry, together with several others, project work is a common practice. Project managers have therefore an important role in making and guiding the projects to be more sustainable. Therefore, this thesis aimed to investigate how project managers in a consulting company experience that they can influence the sustainability work in their projects. A qualitative study was conducted. Background information and theories about corporate sustainability and competence needed to implement sustainability were performed through a literature review. Interviews were conducted with project managers from the consulting company WSP Management in Stockholm Sweden. The study shows that the project managers are aware about their opportunity to influence the sustainability work in their projects. However, the amount is strongly affected by the priority of the client and if resources are available. To improve and move towards a more sustainable approach the study shows that sustainability must be demanded from the permanent organization or the client, and not only be included because the project manager itself values it.
|
6 |
A estrutura da paisagem e sua relação com o risco de esquistossomose / Landscape structure and its link with the risk of schistosomiasisSant'Ana, João Moreno 13 August 2018 (has links)
Orientador: Rozely Ferreira dos Santos / Dissertação (mestrado) - Universidade Estadual de Campinas, Faculdade de Engenharia Civil, Arquitetura e Urbanismo / Made available in DSpace on 2018-08-13T10:13:20Z (GMT). No. of bitstreams: 1
Sant'Ana_JoaoMoreno_M.pdf: 2461217 bytes, checksum: 943fd4fa6d043693ecfc56254d16d9d7 (MD5)
Previous issue date: 2009 / Resumo: A esquistossomose é uma das principais doenças parasitárias de veiculação hídrica no mundo. A forma de ocupação humana dos espaços urbanos nas periferias das grandes cidades, aliada a alta vulnerabilidade social e associada à condições inadequadas de moradia, vem causando grande impacto na dinâmica desta e de várias outras doenças emergentes e re-emergentes no país. Esta proposta defende a hipótese de que a distribuição da esquistossomose em um território não é aleatória, sendo possível, portanto, estabelecer a relação entre as atividades humanas que interferem na estrutura da paisagem e o risco de ocorrência de focos de transmissão dessa endemia. Para tanto, foi desenvolvida uma estratégia metodológica, aplicada no Distrito de Saúde Sul do Municipio de Campinas (SP) que tem apresentado um expressivo número de casos dessa endemia. Este estudo analisou o padrão espacial da presença de esquistossomose e do hospedeiro intermediário com o objetivo de compará-lo às condições naturais e ao padrão atual de uso do território pela população. Foram espacializados e hierarquizados os indutores de risco de aquisição da endemia, sejam ambientais ou de uso territorial, o padrão de uso e ocupação do espaço territorial e a ocorrência de esquistossomose mansoni no sentido de definir áreas de risco desta endemia. Como resultado, foram estabelecidas áreas de diferentes classes de risco à transmissão de esquistossomose mansoni, compondo um mapa de risco ao agravo onde evidenciam-se regiões mais propensas à criação ou manutenção de focos da doença, designadas como hotspot endêmicos. Esta linha de pesquisa deverá servir, portanto, como uma geotecnologia de aplicação social, de fácil manejo e baixo custo, podendo auxiliar medidas de intervenção pública preventivas. / Abstract: Schistosomiasis is one of the main parisitic diseases in the world that are transmitted by water. The risk of these and several other diseases appearing and reappearing in the country has risen sharply as a result of the kinds of human dwellings that are found on the outskirts of the large cities, together with the fact that the inhabitants are socially vulnerable due to their unsuitable living conditions.This research project rests on the hypothesis that the spread of schistosomiasis does not occur in a country in a random manner but that a link can be established between human activities which disturb the environment and the risk of this endemic disease being transmitted. For this reason, a methodological strategy was employed at the Distrito de Saúde Sul of Campinas (São Paulo State) where there was a significant number of endemic cases. The spatial pattern of where schistosomiasis and its intermediary host can be found was analysed with the aim of comparing it to both natural conditions and the current way the land is being used. The factors that instigated the risk of contracting the endemic disease were classified in spatial and hierarchical terms as follows: whether they were due to the natural environment or the fact that the land was used, the way the land was used, the occupation of territorial space and the incidence of schistosomiasis mansoni. This was done so that the area of risk from this endemic disease could be clearly charted. As a result, different levels of risk for the transmission of schistosomiasis mansoni were determined and it was possible to draw a map to show the regions that witnessed a greater likelihood of engendering or maintaining the conditions required for the disease and thus allow its focal points to be designated as endemic hotspots. Thus, this line of research should serve as a socially applied form of geotechnology that is easy to undertake and of a low cost, and which can enable preventive public measures to be taken. / Mestrado / Recursos Hidricos, Energeticos e Ambientais / Mestre em Engenharia Civil
|
7 |
Otimização do problema de gerenciamento regional e integrado de resíduos sólidos utilizando o algoritmo Luus-Jaakola / Optimization if solid waste management using Luus-Jaakola algorithmMarcelo de Oliveira Dias 03 March 2008 (has links)
Fundação Carlos Chagas Filho de Amparo a Pesquisa do Estado do Rio de Janeiro / O presente trabalho apresenta a implementação de um modelo utilizado como ferramenta para aumentar a eficiência do sistema de gerenciamento regional integrado de resíduos sólidos. Este modelo desenvolvido com base no trabalho publicado por M. El-Fadel et al (2002) leva em consideração tanto as questões econômicas como as questões sócio-ambientais, e utiliza como fontes de entrada as seguintes variáveis: número total de fontes de geração de resíduos, número de estações de processamento de resíduos, número de instalações de tratamento térmico e de tratamento biológico dos resíduos sólidos, número de aterros sanitário e tempo. O problema foi abordado envolvendo a formulação de um modelo matemático linear, no qual uma função objetivo, que expressa a diferença entre todos os custos quantificáveis e os benefícios advindos da implementação do sistema de gestão e gerenciamento integrado de resíduos sólidos, deve ser minimizada através de métodos de otimização. Neste trabalho, o método de otimização utilizado foi o algoritmo de busca aleatória Luus-Jaakola. / This work presents a management model to improve the regional integrated solid waste management. Our model is developed based on a previous work, considering economic, social and environmental issues, and using as inputs the waste generation nodes, the number of thermal and biological treatment facilities, the number of landfills, and time. The problem formulation involves a linear problem formulation, where an objective function expressing the difference between costs and benefits must be minimized. In order to optimize this problem, we employed the random-search Luus-Jaakola algorithm.
|
8 |
Otimização do problema de gerenciamento regional e integrado de resíduos sólidos utilizando o algoritmo Luus-Jaakola / Optimization if solid waste management using Luus-Jaakola algorithmMarcelo de Oliveira Dias 03 March 2008 (has links)
Fundação Carlos Chagas Filho de Amparo a Pesquisa do Estado do Rio de Janeiro / O presente trabalho apresenta a implementação de um modelo utilizado como ferramenta para aumentar a eficiência do sistema de gerenciamento regional integrado de resíduos sólidos. Este modelo desenvolvido com base no trabalho publicado por M. El-Fadel et al (2002) leva em consideração tanto as questões econômicas como as questões sócio-ambientais, e utiliza como fontes de entrada as seguintes variáveis: número total de fontes de geração de resíduos, número de estações de processamento de resíduos, número de instalações de tratamento térmico e de tratamento biológico dos resíduos sólidos, número de aterros sanitário e tempo. O problema foi abordado envolvendo a formulação de um modelo matemático linear, no qual uma função objetivo, que expressa a diferença entre todos os custos quantificáveis e os benefícios advindos da implementação do sistema de gestão e gerenciamento integrado de resíduos sólidos, deve ser minimizada através de métodos de otimização. Neste trabalho, o método de otimização utilizado foi o algoritmo de busca aleatória Luus-Jaakola. / This work presents a management model to improve the regional integrated solid waste management. Our model is developed based on a previous work, considering economic, social and environmental issues, and using as inputs the waste generation nodes, the number of thermal and biological treatment facilities, the number of landfills, and time. The problem formulation involves a linear problem formulation, where an objective function expressing the difference between costs and benefits must be minimized. In order to optimize this problem, we employed the random-search Luus-Jaakola algorithm.
|
9 |
Água: o difícil percurso de preservação e acesso na sub-bacia paranaense do rio São Francisco VerdadeiroCesconeto, Eugênia Aparecida 22 May 2012 (has links)
Made available in DSpace on 2016-04-29T14:16:12Z (GMT). No. of bitstreams: 1
Eugenia Aparecida Cesconeto.pdf: 3560455 bytes, checksum: 3c2456133bfe65be172c715fc49bc02f (MD5)
Previous issue date: 2012-05-22 / Coordenação de Aperfeiçoamento de Pessoal de Nível Superior / The aim of this investigation was to clarify the role performed by the
Managing Committees of the Itaipu Binational Cultivating Good Water
Program and the management policies of the hydric resources integrated to
the sanitation of São Francisco Verdadeiro River subbasin, in which
environmental management is promoting the modification of the predatory
practices, which strengthen the natural resources exhaustion. One of the
objectives is to understand how the members of the managing committees
participate of the democratic management process to access the water in the
São Francisco Verdadeiro River subbasin by the Integrated System of Hydric
Resources Management (SIGRH), guaranteeing the basic sanitation
strengthening the social agreement necessary among the involved in this task
(state and municipal governments and the citizens). Despite the efforts of the
municipalities, little was altered in the environmental practices developed,
which are developed with strong centralism, carrying traces of privativism and
in a repressive way. Water: the difficult journey of preservation and access in
the São Francisco Verdadeiro River Subbasin in Paraná, for its thesis
elaboration the methodological resource study case was used, having
interviews with the Committees members managing the Itaipu Binational
Cultivating Good Water Program, with semi-structured interviews, primary
sources analyses and bibliographical reference. It is widely recognized that
the Cultivating Good Water Program, executed by the Managing Committees,
has supplied the conditions and enough water for the generation of energy for
Itaipu Hydroelectric Dam, but not as a socialization strategy and equal access
to the water. Despite the contribution to the improvement of some life quality
aspects of the population of São Francisco Verdadeiro River subbasin, the
implementation of the interface of the hydric resources with the sanitation is
not occurring, in which such hypothesis showed to be true / O tema desta investigação procura elucidar o papel desempenhado
pelos Comitês Gestores do Programa Cultivando Água Boa, da Itaipu
Binacional na gestão da política de recursos hídricos integrada à de
saneamento na sub- bacia do Rio São Francisco Verdadeiro, que no
processo de gestão ambiental buscam fomentar a modificação das práticas
predatórias que potencializam o risco de exaurimento dos recursos naturais.
Destaca-se como objetivo entender como os membros dos comitês gestores
participam do processo de gestão democrática de acesso à água na subbacia
paranaense do Rio São Francisco Verdadeiro, através do Sistema
Integrado de Gerenciamento dos Recursos Hídricos (SIGRH), garantindo o
saneamento básico, de modo a fortalecer o pacto social necessário entre
todos os envolvidos nesta tarefa (governo estadual e municipal e a sociedade
civil). Uma vez que, apesar dos esforços empreendidos pelos municípios,
pouco se alteraram as práticas ambientais desenvolvidas, sendo realizadas
com forte centralismo, com traços de privatismo e de cunho repressivo. Para
elaboração da tese Água: o difícil percurso de preservação e acesso na subbacia
paranaense do Rio São Francisco Verdadeiro, utiliza-se como recurso
metodológico o estudo de caso, com entrevistas aos membros dos Comitês
Gestores do Programa Cultivando Água Boa, da Itaipu Binacional pautadas
em roteiros semiestruturados, análise de fontes primárias e acervo
bibliográfico. Parti do pressuposto que o Programa Cultivando Água Boa, da
Itaipu Binacional, executado através dos Comitês Gestores, tem, com
certeza, fornecido as condições e a quantidade de água suficiente para a
geração de energia para a hidrelétrica de Itaipu, mas não como estratégia de
socialização e acesso igualitário à água, pois, apesar de ter contribuído para
a melhora de alguns aspectos da qualidade de vida da população da subbacia
paranaense do Rio São Francisco Verdadeiro, não vem ocorrendo a
implementação da interface da política de recursos hídricos com o
saneamento, hipótese que se mostrou verdadeira
|
10 |
Integration of Environmental Aspects in Product Development Process and Ship Design : a LEAP towards environmental awareness at Kockums ABKarlsson Sundqvist, Therese, Källmar, Karin January 2012 (has links)
The Swedish company Kockums AB, at the forefront within maritime and naval technology, is in need of a tool, document, and/or method to include environmental aspects in their product development process. This is mainly because of additional requirements put on Kockums AB from their main customer. Ship recycling is the major issue that has to be addressed and included in Kockums AB’sworking procedures. Moreover, ship recycling is a pressing issue to handle due to horrible conditions in South Asian countries, where most ship dismantling is taking place. For these reasons, the objective of this M.Sc. thesis was to integrate environmental aspects in the product development process at Kockums AB by designing and proposing a way of implementing a tool, document, and/or method. Environmental product requirements that Kockums AB is demanded to fulfill mainly derives from customers, classification societies, laws and legislations, and themselves. The Hong Kong Convention has been adapted, in 2009, but is yet to enter into force. Ship recycling is covered by the convention,and an ‘Inventory of Hazardous Materials’ has to be provided from the ship builder, and hence this is the main aspect for Kockums AB to consider. Naval ships are, however, excluded from the Hong Kong Convention. Kockums AB does not have a routine on how to handle environmental requirements nor are environmental aspects included in their product development process. Consequently, Kockums AB’senvironmental ambition should not be put too high and rather aim at follow laws. In an empiricalstudy, regarding environmental aspects at Kockums AB, difficulties were identified. Lack of environmental knowledge, communication problems, and misunderstandings regarding the ambiguous term environment showed to be most notable. The three most prominent success factors for asuccessful integration of ecodesign, from the conducted literature review and empirical findings, are education for employees, existence of an environmental champion, and top management support. A Long-term Environmental Action Plan (LEAP), which took the success factors into account and contains 18 Actions, was developed for Kockums AB, and is the ultimate result of this research. The LEAP was developed in accordance with ISO 14006, a new standard for incorporation of ecodesign in Environmental Management Systems, with the aim of reducing adverse environmental impactsthroughout a product’s lifecycle. Moreover, the proposed way of implementing the LEAP was based on a ”Plan, Do, Check, Act” methodology from Product-Oriented Environmental Management Systems (POEMS). POEMS focus on a product’s environmental efficiency throughout its lifecycle, by a systematic integration of ecodesign in the company’s strategies and practices, and hence continual improvements. This way of implementation should be familiar to Kockums AB because the company is certified according to ISO 14001, where continual improvement of environmental performance is a key factor. The proposed LEAP includes tools, documents, and methods that are to be used in daily work and product development at Kockums AB. It is a step towards environmentally conscious design and enhanced environmental knowledge at Kockums AB. Additionally, as a result of the LEAP, the expectation is that environmental conscious mindsets of employees arise.
|
Page generated in 0.1241 seconds