Metodologia de implanta??o da constru??o enxuta: estudo de caso em construtora de porte m?dioOliveira, Erikson Ricardo Marques de 16 August 2013 (has links)
Made available in DSpace on 2014-12-17T14:48:15Z (GMT). No. of bitstreams: 1
EriksonRMO_DISSERT.pdf: 2593729 bytes, checksum: e7be854fab647e1f1602ce7096cdca4c (MD5)
Previous issue date: 2013-08-16 / In recent years, the Brazilian construction industry has gone by changes like
currency stability, increasing competition, shortage of skilled labor and increasing
quality importance required by the customer, who made the sector companies seek
solutions through new management practices in order to become more efficient. A
alternative to these management practices is known as Lean Construction which is
derived from the Toyota System Production. Lean Construction main goals are to
reduce parts of activities that do not add value, increase product value by considering
customer needs, reduce variability and production cycle time, simplify process by
reducing the number of parts or steps, increase the flexibility in the product execution
and transparency process, focus the control on overall process, introduce continuous
improvement process, maintain a balance between improvements in flows and
conversions and seek to learn from practices adopted by competitors. However, the
construction industry is characterized by having nomadic activity, which undertakes
an unique product with high cost of production and big inertia for behavioral change,
making it difficult to implement the philosophy of lean construction in companies. In
this sense, the main objective of this study is to develop a methodology for
implementation of the principles of Lean Construction. The method of implementing
the proposed management system was designed with the aid of 5W2H tool, and the
implementation process is divided into three phases. The first one aims to know in a
macro way the current operation of construction, identify who is its target audience
and what are the products and services offered to the Market. The second phase
aims to describe what actions should be taken and which documents are needed to
be created or modified; finally, the third step goal consists in how to control and
monitor established processes, where through Strategic Planning the company goals
would be set along with their respective targets and indicators in order to keep the
system working, aiming for continuous improvement with focus on the customer. This
methodology was conceived as a case study analyzing a medium size construction
with more than 18 years of activity and certified for almost 10 years with ISO9001
and level A in PBQP-H. We also conclude that this implementation process can be
used in any developer and / or builder / A constru??o civil brasileira, nos ?ltimos anos, tem passado por mudan?as
como estabilidade da moeda, aumento da concorr?ncia, escassez de m?o de obra
qualificada e aumento da import?ncia da qualidade requerida pelo cliente, obrigando
que as empresas do setor procurem solu??es atrav?s de novas pr?ticas de gest?o,
buscando se tornarem mais eficientes. Uma alternativa dessas pr?ticas de gest?o ?
conhecida como constru??o enxuta (Lean Construction), sendo derivada do Sistema
Toyota de Produ??o. A constru??o enxuta visa a reduzir a parcela de atividades que
n?o agregam valor, aumentar o valor do produto atrav?s da considera??o das
necessidades do cliente, reduzir a variabilidade e o tempo do ciclo de produ??o,
simplificar o processo atrav?s da redu??o do n?mero de passos ou partes, aumentar
a flexibilidade na execu??o do produto e a transpar?ncia do processo, focar o
controle no processo global, introduzir melhoria cont?nua no processo, manter um
equil?brio entre melhorias nos fluxos e nas convers?es e, ainda, buscar aprender
com as pr?ticas adotadas pelas empresas concorrentes. A ind?stria da constru??o
civil ? caracterizada por possuir atividade n?made, que empreende produto ?nico,
com custo elevado de produ??o e grande in?rcia para mudan?a comportamental;
desse modo, torna-se dif?cil a implanta??o da filosofia da constru??o enxuta nas
empresas. Sendo assim, buscando facilitar a aplicabilidade da constru??o enxuta
nas empresas, o objetivo principal deste trabalho ? elaborar uma metodologia de
implanta??o dos princ?pios desta nova filosofia de gest?o. O m?todo de implanta??o
do sistema de gest?o proposto foi concebido com aux?lio da ferramenta 5W2H,
tendo o processo de implanta??o dividido em tr?s etapas, sendo a primeira com a
finalidade de elaborar diagn?stico da empresa, visando a entender o funcionamento
da construtora, identificando qual ? seu p?blico-alvo e quais s?o os produtos e os
servi?os oferecidos por esta ao mercado. A segunda etapa consiste em descrever
quais a??es devem ser tomadas e quais documentos precisam ser criados ou
modificados; e, por fim, a meta da terceira etapa compreende como controlar e
acompanhar os processos estabelecidos, extraindo do planejamento estrat?gico os
objetivos da empresa com suas respectivas metas e indicadores com a finalidade de
manter o sistema funcionando e almejando a melhoria cont?nua com foco no cliente.
A presente metodologia foi concebida utilizando como estudo de caso uma
construtora de porte m?dio com mais de 18 anos de atividade e certificada h? quase
10 anos com a ISO9001 e n?vel A do PBQP-H. Conclui-se, ainda, que esse processo
de implanta??o possa ser utilizado em qualquer incorporadora e/ou construtora do
segmento da constru??o
|
322 |
Análise das variáveis contingenciais nas adaptações das práticas de produção enxuta na implementação de sistemas de produção específicos (XPS)Medeiros , Nayara Cardoso de 17 August 2016 (has links)
Submitted by Leonardo Cavalcante (leo.ocavalcante@gmail.com) on 2018-06-05T15:34:46Z
No. of bitstreams: 1
Arquivototal.pdf: 1835964 bytes, checksum: 16c49455a49433521718fd2d6d19319b (MD5) / Made available in DSpace on 2018-06-05T15:34:46Z (GMT). No. of bitstreams: 1
Arquivototal.pdf: 1835964 bytes, checksum: 16c49455a49433521718fd2d6d19319b (MD5)
Previous issue date: 2016-08-17 / Conselho Nacional de Pesquisa e Desenvolvimento Científico e Tecnológico - CNPq / Facing the need for adaptations of lean production to the characteristics of each organization, researchers have questioned the universality of this production system. These adjustments may be related to the contextual characteristics of the manufacturing system of each organization and can lead to the development of company-specific production systems, or simply XPSs. Thus, the aim of this research is to analyze how the contingency variables of a manufacturing system influence the adaptations of lean production practices for the implementation of an XPS. The research was developed through case studies conducted in two manufacturing plants, one of the electronics industry and other from the home appliances sector, both located in the city of Manaus/AM. The data were collected mainly through semi-structured interviews and on-site observation. Through this research, adaptations have been identified, not in the lean practices but in the manufacturing system of the companies, i.e., instead of the contingency variables demand adaptations to the formation of a company-specific production system, the Toyota system (universal approach) remains as the main driver of change in their own manufacturing system variables. Based on this observation, two potential outcomes can be inferred: either the influences of contingency variables may be irrelevant or they are not perceived by managers. Finally, in neither of the cases studied was identified the creation of specific practices tailored to the company. On the contrary, it was found the use of the same traditional practices of TPS. On the other hand, it was clearly observed the intention of creating an identity for the XPS, much more as a motivational factor than as a true adaptation. This evidence allowed the development of three propositions that deserve further research. / Diante da necessidade de adaptações da produção enxuta às características de cada organização, pesquisadores têm questionado sobre a universalidade desse sistema de produção. Essas adaptações podem estar relacionadas às características contextuais do sistema produtivo de cada organização e que podem levar ao desenvolvimento de sistemas de produção específicos, ou simplesmente XPS’s. Dessa forma, o principal objetivo dessa pesquisa é analisar como as variáveis contingenciais dos sistemas de produção influenciam nas adaptações das práticas de produção enxuta para a implementação de um XPS. A pesquisa foi desenvolvida por meio de estudos de caso conduzidos em duas fábricas, sendo uma do setor de eletroeletrônico e outra do setor de eletrodomésticos, ambas localizadas no município de Manaus/AM. Os principais instrumentos de coleta de dados adotados foram entrevistas semiestruturadas e observação in loco. Por meio da pesquisa, foram identificadas adaptações, mas não nas práticas e sim no próprio sistema produtivo das empresas, ou seja, ao invés das variáveis contingenciais demandarem adaptações para a formação de um sistema de produção específico, o sistema Toyota (abordagem universal) permanece como o guia principal da mudança nas próprias variáveis que representariam as contingências da adaptação. Diante dessa constatação, surgiram dois potenciais desdobramentos: ou as influências das variáveis contingenciais podem ser irrelevantes ou não são percebidas pelos gerentes. Por fim, em nenhum dos dois casos estudados foi identificado o desenvolvimento de práticas específicas para a empresa. Pelo contrário, o que se constatou foi a utilização das mesmas práticas tradicionais do TPS. Por outro lado, foi observada claramente a intenção da criação de uma identidade para o XPS da empresa, mais como um fator motivacional do que por uma real adaptação. Tais evidências permitiram o desenvolvimento de três proposições que merecem um aprofundamento em pesquisas futuras.
|
323 |
Implementação da gestão enxuta em empresas de mineração a partir de um modelo de gestão integrada : uma perspectiva de sinergia entre a engenharia de minas e a engenharia de produçãoKlippel, Altair Flamarion January 2007 (has links)
A produção de matérias-primas minerais é feita através de tecnologia conhecida mundialmente. No entanto, a crescente competição econômica mundial faz com que este domínio tecnológico não seja, por si só, suficiente para assegurar a sobrevivência das empresas de mineração. É necessário, também, que os métodos de gestão utilizados pela indústria de mineração estejam alinhados com a lógica da competitividade, visando maximizar os resultados econômicos financeiros das organizações como forma de sustentação no cenário globalizado atual. Esta tese está relacionada com a maximização dos resultados passíveis de serem alcançados nas indústrias de mineração, a ser obtida através de uma forma de gestão que integre a tecnologia intrínseca da Engenharia de Minas com a tecnologia de gestão da Engenharia de Produção. Esta integração é realizada através de um Modelo de Gestão Integrada, proposto nesta tese. A construção deste modelo teve como ponto de partida a experiência realizada pelo autor desta tese na mineração de fluorita no final dos anos 90, quando foram implementados alguns conceitos de Engenharia de Produção nesta atividade mineral.A partir desta experiência, sedimentada com a agregação de conceitos teóricos, foram selecionados três outros cenários na indústria de mineração para o desenvolvimento desta tese, nos quais foram utilizadas duas metodologias de pesquisa. Na mineração de calcário e na mineração de ametista, a Pesquisa-Ação foi a metodologia de pesquisa selecionada, enquanto que na mineração de carvão utilizou-se o Estudo de Caso. Na mineração de fluorita, a implementação de melhorias no processo de produção, devido à integração dos dois ramos da Engenharia considerados, resultou na redução dos gastos totais por tonelada de produto final, em função da eliminação de perdas no sistema de produção. A empresa transformou-se em uma organização de aprendizagem. Na mineração de calcário, a disseminação de conhecimentos da Engenharia de Produção através de processos de aprendizagem, propiciou o desenvolvimento de uma visão sistêmica do processo de produção por parte dos colaboradores, bem como a implementação de uma forma de gestão com o objetivo de otimizar o uso da capacidade existente. Neste cenário foi considerado, também, o desenvolvimento de novos produtos. Na mineração de ametista, o modelo de gestão proposto propiciou a realização de melhorias não somente no fluxo de produção, mas tambémna qualidade de vida dos trabalhadores devido à melhoria nas condições de trabalho desta atividade mineral. Na mineração de carvão, este trabalho procurou evidenciar a importância de se desenvolver novos produtos buscando a plena utilização da capacidade instalada. Neste cenário foram abordadas, também, questões relacionadas com o controle do meio ambiente. A análise e o estudo dos quatro cenários resultaram na construção de uma estrutura de mudanças e de um processo de mudanças para o Modelo de Gestão Integrada. A estrutura de mudanças do modelo é suportada pela integração das técnicas de lavra e beneficiamento mineral com as técnicas de gestão bem como pela inovação, que pode ser de produtos, serviços, métodos e mercado e, ainda, na forma de como é feita a gestão na Organização. Ela propicia a obtenção de melhores resultados nas organizações através da maior utilização dos ativos, com a ampliação do mercado, a redução dos custos operacionais e o aumento do lucro.O processo de mudanças do modelo tem início a partir da realização de um diagnóstico situacional para avaliar a sinergia existente na empresa entre os dois ramos da Engenharia considerados e tende a transformar a mesma em uma organização de aprendizagem para assimilação, integração e sedimentação dos conceitos, técnicas e ferramentas de Engenharia de Minas e de Engenharia de Produção. / Mineral raw material production is done through a well known worldwide technology. However, the technological domain seems to be insufficient to cope with the survival of mining industries in view of the increasing world economic competition. In addition, it is necessary that the management methods adopted by the mining industry be aligned with the logic of competitiveness aiming to maximize the financial and economic outcomes of the organizations as a way of supporting themselves in the current globalized scenario. This thesis deals with the maximization of outcomes to be achieved in the mining industries through a form of management that integrates Mining Engineering intrinsic technology with managing technology from Industrial Engineering. This integration is carried out through an Integrated Management Model proposed. The model was first devised by the author in the fluorspar mining in the late 90’s as some concepts from Industrial Engineering were being implemented. Drawing on the author’s experience, rooted in the aggregation of theoretical concepts, three other sites in the mining industry were chosen as a scenario for the work where two research methods were used. As for limestone and amethyst mining, the Survey-Action method was applied, while Case Study was used for coal mining. For fluorspar mining, the improvement in production based upon the integration of the Engineering areas resulted in a reduction of the total costs per ton for finished product, allowing the elimination of waste in such production system. The company became a learning organization. For limestone mining, the Industrial Engineering knowledge spread through learning steps provided a systemic view of the production process and implemented a management approach aiming to optimize the use of the existing capacity. In this setting, the development of new products was also taken into account. For amethyst mining, the management model provided improvements in the production flow and also improved the employee’s life quality due to better working conditions. In the last case study, coal mining, this work attempted to emphasize the importance of developing new products by using the company’s full capacity. In addition, issues related to environmental polution control were addressed. The analysis and study of the four scenarios led to the construction of a structure and a process of changes for the Integrated ManagementModel. The model changing structure is supported by the integration of mining and processing techniques with management through the innovation of products, services, methods and market. It provides better outcomes with the expansion of market share, operational costs reduction and higher profitability. The model changing process starts by a situational diagnostic to access the existing synergy between the two areas of Engineering previously mentioned and tends to transform the same into a learning organization to assimilate, integrate and consolidate the concepts, techniques and tools from Mining Engineering and Industrial Engineering.
|
324 |
Integrated production planning and control model for engineer-to-order prefabricated building systemsViana, Daniela Dietz January 2015 (has links)
A industrialização da construção civil é uma das possíveis estratégias adotadas para melhorar a qualidade e produtividade da produção neste ambiente altamente competitivo. Entretanto para uma melhoria na eficiência da produção, a simples implantação de uma tecnologia industrializada não é o suficiente. Existe a necessidade de melhorar os sistemas de gestão como um todo. O sucesso da implementação de sistemas de planejamento como o Last Planner, desenvolvidos especialmente para a construção civil, instiga o desenvolvimento de estudos em diferentes processos produtivos. Em relação à implementação de princípios da produção enxuta, o sistema é apontado como um ponto de partida para uma empresa atingir uma estabilidade básica. Este estudo foca-se em um tipo específico de sistema de produção industrializadas chamado engineer-to-order (ETO), quando a requisição de produto pelo cliente é realizada na fase de projeto. Neste tipo de sistema construtivo há uma necessidade de integrar a fabricação das peças conforme as necessidades do canteiro de obras. Esta pesquisa visa a desenvolver um modelo integrado de planejamento e controle da produção de sistemas ETO pré-fabricados para construção civil, integrando o projeto, manufatura e montagem em obra. A pesquisa faz parte de uma parceria da Universidade Federal do Rio Grande do Sul com uma empresa de fabricação e montagem de estrutura (Empresa A) metálica interessada em melhorar seus processos de planejamento e controle da produção. O método de pesquisa é baseado na pesquisa construtiva, ou design science, em que há um esforço do pesquisador em produzir um artefato como resultado da pesquisa, que neste caso, é um modelo de planejamento e controle da produção. O processo de implementação de mudanças da empresa adotou a estratégia da pesquisa-ação, de forma que as soluções eram coletivamente acordadas com as pessoas responsáveis pela sua utilização, para garantir que a mesma se efetivasse nos procedimentos da empresa. Neste tipo de estratégia procura-se estabelecer ciclos de aprendizagem ao longo da pesquisa, em que as soluções são continuamente avaliadas e adaptadas para melhoria dos processos em análise. Os resultados da empresa A foram divididos em quatro fases de implementação. Na primeira fase houve um esforço em consolidar uma integração nos planos de curto prazo. Na segunda fase o foco foi no sistema como um todo, promovendo mecanismos para coletar informações sobre o andamento das obras para retroalimentar a fábrica. As barreiras enfrentadas para garantir esta retroalimentação demonstraram a necessidade da utilização de outros métodos. Por isso, a terceira fase se concentrou no desenvolvimento de ferramentas de gestão visual para melhorar os processos analisados nas fases anteriores. A quarta fase do estudo foi baseada no estudo dos processos logísticos da empresa, visto que representam a interface entre fábrica e obra. Terminado o estudo na empresa A dois estudos foram conduzidos no exterior para compreender contextos distintos de sistemas de produção ETO. O primeiro (empresa B) responsável pelo sistema de climatização da edificação. A empresa realiza o projeto, fabricação e instalação dos sistemas de dutos em metal laminado, assim como o maquinário necessário para as trocas de ar. O estudo foi baseado no fornecimento do sistema para uma obra específica. Neste estudo foram desenvolvidas ferramentas de planejamento para facilitar a sincronização entre fabricação e instalação do material em obra. O segundo estudo (empresa C) foi realizado em uma empresa de estrutura metálica que desenvolveu uma conexão inovadora, facilitando seus processos produtivos. Este estudo teve caráter descritivo, analisando como a sua tecnologia facilitou o sistema de planejamento e controle da produção. A partir dos resultados obtidos nos estudos foi possível desenvolver o modelo final de planejamento e controle da produção para sistemas ETO de pré-fabricados. A maioria dos processos propostos neste modelo foi testada na empresa A. Embora a empresa estudada ainda necessite implantar algumas melhorias no seu sistema de planejamento e controle para se adequar ao modelo proposto, as mudanças realizadas trouxeram benefícios na comunicação e sistematização das informações entre os diferentes níveis de planejamento e controle. As contribuições teóricas do trabalho foram um modelo conceitual para compreender a complexidade neste tipo de sistema de produção; a identificação dos principais requisitos para desenvolver sistemas de planejamento e controle da produção para este ambiente; e a adaptação do conceito de WIP utilizando o status dos produtos. / The industrialization of construction work is one of the ways it is possible to achieve better quality and productivity in this competitive environment. However, in order to improve efficiency using industrialized technologies is not enough. There is a need to improve planning and control systems. Although the Last Planner System has been developed for the construction environment, since it was devised the successful results promoted its implementation in different production environments. Regarding lean production implementations, the system has been pointed out as a starting point for a company to achieve the basic stability. This study is focused in one type of industrialized production system: the engineer-to-order. By industrialized, it is the prefabrication that has been addressed. In these kinds of production systems, there is a need to integrate the prefabrication plant with the construction site needs. This research project aims to develop an integrated planning and control production planning and control model for ETO prefabricated systems, integrating design, manufacturing and site assembly. The research is part of a partnership with a steel fabricator company (Company A) that was interested in improving its production planning system. The research method is grounded in the design science research, in which there is an effort from the researcher to develop an artefact as an output of the research process, in this case, a planning and control model. The implementation adopted some strategies from the action-research, so some solutions needed to be collectively constructed between the researcher and the practitioners, in order to have an effective use in the organization. Following this strategy, it is possible to have same learning cycles during the implementation of the solutions, which are continually assessed and adapted in order to improve the processes analysed. The results are divided into four phases of implementation. In the first step the main effort was in consolidating an integrated planning and control process for the short-term in the production units. In the second step the focus was the overall system, mainly providing mechanisms to collect the status of all construction sites for the plant. The barriers to improve this feedback process brought to light the need for using visual management tools. This development concerned the third step of implementation, further improving the changes made in the previous phases. The fourth step was based on the analysis of the logistics processes, as the interface between the plant and site assembly. After the main empirical study on Company A, two studies were carried out abroad in order to understand a different context of ETO production systems. The first concerns a mechanical contractor situated in a high complex project. In this study, it was possible to develop some planning tools to facilitate the analysis between the fabrication and site installation of the products. The second concerns a steel fabricator focused on the structural system. This was a descriptive study that analysed the differentiation of the products provided by this company and the impact of it in the planning and control system. Based on the results obtained in the implementation process, the integrated planning and control model for ETO building systems was devised. Most of the processes proposed in the model were assessed in Company A. Although there is still a need to improve the production planning and control system of that company, the implementation enhanced the communication between the operational and tactics level and also promoted a systematic way to collect information for each level of the production planning and control system. The theoretical contributions of the research were the development of a framework to understand the complexity of this kind of production system; the identification of the main requirements for developing a planning and control system for this environment; and the adaptation of the concept of WIP using the status of the product.
|
325 |
Proposta de metodologia de implantação de plano para cada peça e introdução do sistema de abastecimento por kitsSalaverry, Pietro Barbiani January 2014 (has links)
Esta dissertação contempla uma proposta de metodologia para implantação de Plano Para Cada Peça e introdução do sistema de abastecimento por kits. Contemplados em dois artigos, onde respectivamente no primeiro foi desenvolvida uma ferramenta para captura de dados, um método de como estruturá-los, como organizá-los em um banco de dados e interpretá-los de acordo com as características do produto e produtivas para definição do método de abastecimento. No segundo artigo, foi proposta uma metodologia de introdução do processo de abastecimento por kits, onde de acordo com as características do produto e do processo produtivo, foram definidos: os layouts das áreas de separação e sequenciamento de peças, a quantidade de entradas de abastecimento, a quantidade de peças necessárias em cada kit, a disposição das peças e layout dos kits, o processo de separação de peças e montagem dos kits, assim como os carros de movimentação e abastecimento na linha. / This dissertation includes a methodology proposal for deploying Plan For Every Part and implement the kit line feeding. Conceived respectively in two articles, on the first one was developed a tool for data capture, a method of how to structure, arrange in a database and interpret it according to product and production characteristics for setting the supply method. The second article presents a method to introduce the process by kits supply, which according to the product characteristics and the production process were defined: the parts picking and sequencing area layouts, the amount of supply inputs, the required quantity of parts in each kit, the layout and parts arrangement of kits, the picking process and kits assembly, as well as the handling and supply cars to the assembly line.
|
326 |
Lean e a melhoria de processos de Backoffice : implantação de ferramentas Lean no gerenciamento de um CSCSum, Fabiane Flores January 2016 (has links)
Processos de backoffice apresentam um grande impacto nos custos de uma empresa. Centros de Serviço Compartilhados têm sido implementados a fim de controlar e melhorar tais processos. O lean, por sua vez, tem em comum com os CSC o objetivo de trazer excelência a processos. Uma análise da literatura indica haver sinergia entre os métodos e que as ferramentas lean possam promover melhorias que a implantação exclusiva de um CSC não tenha atingido. O objetivo deste trabalho é implantar princípios e ferramentas lean visando a busca de excelência em processos de backoffice, que pertençam a um CSC maduro. Para analisar essa possibilidade foi realizado um estudo de caso em empresa do ramo metalúrgico que já dispõe de um CSC considerado maduro em pesquisas de benchmarking na área. Foram implementados: um estudo de estabilidade e capacidade, posteriormente a prática de gerenciamento diário para implementação de melhorias, ocorrendo coleta de dados qualitativa e quantitativa para avaliação dos seus impactos. Por fim, um questionário foi aplicado para detectar a percepção dos colaboradores a respeito das mudanças obtidas com as ferramentas. Os resultados indicaram que mesmo em um CSC já completamente implantado, havia instabilidade e incapacidade nos processos, detectadas através do estudo de capacidade e estabilidade que são usadas na metodologia Lean. Em relação à utilização de gerenciamento diário, agregado à gestão visual, observou-se ser a abordagem que possibilitaria melhores resultados Em uma pesquisa realizada com todos os níveis hierárquicos envolvidos, que comparava o cenário anterior às ferramentas, um mês após a implantação e a expectativa para o cenário em um ano, foi possível comprovar que 64% dos princípios Lean apresentados por Liker (2005) foram melhorados no primeiro mês e que existe uma expectativa de melhorar 95% dos princípios Lean e das funções da comunicação no próximo um ano com os estudos de capacidade/estabilidade e gerenciamento diário. Observou-se que, enquanto os estudos de capacidade e estabilidade detectam as falhas, o gerenciamento diário permite operacionalizar as mudanças, ao mesmo tempo em que reforça os princípios lean. Embora não possam ser generalizáveis os resultados obtidos, pode-se dizer que neste estudo foi possível atingir melhores níveis de desempenho dos processos de um CSC maduro utilizando ferramentas lean, confirmando a hipótese inicial. / Backoffice processes have a high impact on the costs of a company. Shared Service Centers (SSC) has been implemented in order to control and improve these processes. The lean methodology, in turn, has in common with the SSC the aim to bring excellence to processes. A literature review indicates that there is synergy between the methods and the lean tools can make improvements that exclusive implementation of a CSC has not reached. The aim of this study is to implement lean principles and tools aimed at the pursuit of excellence in backoffice processes, belonging to a mature SSC. To test the initial hypothesis it was conducted a case study in a metal industry that already has a mature SSC. It was implemented: stability and capacity analysis and the practice of daily management to implement improvements, occurring qualitative and quantitative data collection to assess its impact. Finally, a questionnaire was applied to detect the perception of employees about the changes obtained with the tools. The results indicated that even in a SSC already fully deployed, there is instability and failure in processes, detected by stability and capacity analysis that are used in lean methodology. Regarding the use of daily management, added to the visual management, was noted to be the approach would enable better results In a survey of all levels involved, which compared the previous scenario before the tools, one month after implantation and the expectation for the scenario in a year, it was possible to prove that 64% of the lean principles have been improved in the first month and it is expected to improve 95% of the lean principles and communication functions in one year with stability and capacity analysis and daily management. It was observed that, while the stability and capacity analysis detect faults, the daily management enables operational changes at the same time that increases lean principles perception. Although the results obtained may not be generalizable, it can be said that in this study it was possible to achieve better performance levels of processes of a mature CSC using lean tools, confirming the initial hypothesis.
|
327 |
Modelo econômico-probabilístico para seleção e priorização de projetos de produção enxutaOldoni, Verônica Possebon January 2017 (has links)
A Produção Enxuta vem sendo aplicada em diversos setores, e a implantação dos seus princípios e práticas, elimina perdas nos processos e contribui para manter a competividade das empresas. Desse modo, o objetivo principal desta dissertação é desenvolver um modelo econômico-probabilístico que auxilie a seleção e priorização de projetos de produção enxuta. Este modelo quantifica os investimentos, benefícios e incertezas associadas através de uma análise econômica-probabilística que apresenta o retorno esperado dos projetos. Com base nesse retorno, a priorização dos projetos de produção enxuta torna-se mais precisa de ser executada pelos tomadores de decisão. O modelo contém 38 critérios qualitativos e quantitativos, os quais estão divididos em: (i) descrição do projeto, (ii) quantificação dos investimentos e (iii) quantificação dos benefícios. Para atingir o objetivo deste trabalho, foram necessárias cinco etapas: (i) selecionar os principiais critérios para avaliação de projetos de produção enxuta; (ii) escolher o método para seleção e priorização dos projetos de produção enxuta; (iii) estruturar um modelo genérico que avalie o retorno e o impacto das incertezas envolvidas no resultado dos projetos de produção enxuta, baseado nos critérios e método selecionados nas etapas anteriores; (iv) aplicar o modelo em uma empresa; (v) analisar e verificar os resultados da aplicação prática para validar o modelo desenvolvido. A principal contribuição desta dissertação é fornecer ao tomador de decisão um modelo que o auxilie a quantificar o retorno dos projetos de produção enxuta, combinando métodos econômicos e probabilísticos. Os métodos econômicos são de fácil entendimento e mais amigáveis aos tomadores de decisão, já os métodos probabilísticos avaliam as incertezas associadas aos projetos de produção enxuta, permitindo uma visão mais completa do retorno esperado. / Lean Manufacturing has been applied in several sectors and the implementation of its principles and practices eliminate losses in the processes, contributing to sustain companies’ competitiveness. Thus, this thesis main objective is to develop an economic-probabilistic model to aid lean manufacturing projects selection and prioritization. This model quantifies the investments, benefits and associated uncertainties based on an economic-probabilistic analysis, which presents the projects expected return. With the expected return, lean manufacturing projects prioritization becomes more precise to be performed by decision makers. The model contains 38 qualitative and quantitative criteria, divided into: (i) project description, (ii) investment quantification and (iii) benefits quantification. To achieve this study’s objective, five steps were performed: (i) selecting the main criteria for lean production projects evaluation; (ii) choosing the method for lean manufacturing projects selection and prioritization; (iii) developing a generic model to evaluate return and associated uncertainties impact on results of lean manufacturing projects, based on the criteria and method selected in previous steps; (iv) applying the model in a company; (v) analyzing and verifying the results from practical application to validate the developed model. The main contribution of this study is to provide to the decision maker a model to quantify lean manufacturing projects returns, connecting economic and probabilistic methods. Economic methods are easy to understand and more user-friendly to decision makers and probabilistic methods can evaluate associated uncertainties on lean manufacturing projects, allowing a more complete vision of the expected returns.
|
328 |
Modelo para gestão dos processos logísticos em obras de sistemas pré-fabricados engineer-to-orderBataglin, Fernanda Saidelles January 2017 (has links)
A crescente necessidade de reduzir os prazos e os custos dos empreendimentos de construção e de melhorar a qualidade das edificações e as condições de trabalho tem incentivado a adoção de sistemas pré-fabricados. Entretanto, a adoção desses sistemas exige uma intensa troca de informações entre a obra e a fábrica, de forma a sincronizar a fabricação dos componentes, as operações logísticas e o processo de montagem na obra, principalmente em ambientes engineer-to-order (ETO). Em sistemas do tipo ETO, o pedido do cliente é realizado nas etapas iniciais do projeto, e existe um elevado grau de incerteza principalmente pelo desconhecimento das atividades a serem realizadas. Em ambientes com esse tipo de complexidade, a literatura sugere o uso de Building Information Modeling (BIM) para facilitar o compartilhamento de informações e apoiar a tomada de decisões nesses ambientes, assim como a aplicação de conceitos e princípios da filosofia da Produção Enxuta. Particularmente em relação aos processos de montagem, o uso de BIM 4D pode ser utilizado para simular e analisar algumas operações, apoiando o processo de planejamento e o controle da produção. Esta pesquisa teve como objetivo desenvolver um modelo para gestão dos processos logísticos em obras de sistemas pré-fabricados do tipo engineer-to-order com o apoio da modelagem BIM 4D A abordagem metodológica adotada foi Design Science Research (DSR), sendo desenvolvidos dois estudos empíricos. O primeiro foi realizado em colaboração com uma empresa responsável pelo projeto, fabricação e montagem de estruturas pré-fabricadas de concreto, sendo implementadas diversas melhorias em uma obra de uma universidade. O segundo, de caráter descritivo, foi desenvolvido em um empreendimento de construção de shopping center, sendo envolvidas uma empresa gerenciadora de obra e uma empresa que produziu e montou na obra a estrutura pré-fabricada de concreto. As principais contribuições da aplicação de BIM 4D como suporte à tomada de decisão referem-se ao aumento da confiabilidade do processo de montagem e da produtividade, principalmente pela clareza e rápida atualização das informações geradas pelos modelos 4D. / The growing need to reduce construction project duration and cost, as well as to improve building quality and working conditions, have encouraged the adoption of prefabricated building systems. However, the adoption of those systems requires an intense exchange of information between the construction site and the plant, in order to synchronize the production of components, logistic operations and site assembly, especially in an engineer-to-order (ETO) environment. In ETO systems, the client’s order is placed at the early design stages, and a high degree of uncertainty exists mostly due to the lack of knowledge about the tasks to be carried out. The literature suggests the use of Building Information Modeling (BIM) to facilitate the sharing of information and to support decision-making in this type of environment, as well as the application of Lean Production concepts and principles. Particularly in relation to assembly process, the use of 4D BIM modelling can be used to simulate and analyze some operations, supporting production planning and control This research work aims at to devise a model for the management of logistic processes for engineer-to-order prefabricated building systems, with the support of 4D BIM modelling. Design Science Research was the methodological approach adopted in this investigation, and two empirical studies were carried out. The first one was undertaken in close collaboration with a company that designs, manufactures, and assemble prefabricated concrete structures, and some improvements were implemented in a project for a higher education institution. The second was undertaken in a shopping mall project, and two companies were involved: a project management company, and a company that produced and assembled on-site pre-fabricated structures. As a result of this research work, the application of 4D BIM to support decision-making contributed to improve the reliability of the assembly process and to increase productivity, mainly due to the clarity and timeliness of the information made available by 4D models.
|
329 |
Framework para avaliação de projetos de melhoria contínua sob a visão da complexidade : um estudo na área da saúdeFerreira, Dayane Maximiano Carvalho January 2018 (has links)
Sistemas de saúde têm sido cada vez mais exigidos a serem mais eficientes, o que encorajou o uso de iniciativas de melhoria de processos. A partir de então, a Produção Enxuta (PE) surgiu como uma abordagem amplamente utilizada. Alguns resultados insatisfatórios da PE podem ser, parcialmente, explicados pela falta de considerar a complexidade dos serviços de saúde. Os sistemas de saúde são classificados como sistemas sócio-técnicos complexos (SSTC) devido à incerteza, diversidade e interações não-lineares. De acordo com a literatura, as implementações de Lean em serviços de saúde geralmente envolvem Kaizen, que tende a produzir ganhos significativos de eficiência e segurança através de mudanças relativamente pequenas e localizadas. Contudo, as melhorias locais podem implicar resultados globais indesejados, uma vez que as interações entre os elementos de sistemas complexos podem não ser lineares. Para isso, este trabalho desenvolve e aplica uma framework que visa avaliar projetos de melhoria em SSTC. O estudo foi realizado em uma unidade de internação de um hospital escola. As interações entre os projetos foram modeladas através do desenvolvimento de um diagrama de loop causal, o qual representou variáveis relacionadas a cinco projetos de melhoria analisados e um modelo FRAM. Os projetos também foram avaliados quanto ao seu impacto no sistema e sua adesão a boas práticas em Kaizen, identificadas na literatura. A framework demonstrou-se eficaz em elencar as variáveis para que possam influenciar positivamente os resultados dos projetos e embasar recomendações para a condução de novos projetos de melhoria por meio de uma visão sistêmica. / Healthcare systems have been increasingly demanded to be more efficient, which has encouraged the use of process improvement initiatives. From these, lean production has emerged as a widely used approach. Some disappointing results of lean production can be partially due to the lack of consideration of the complexity of healthcare. Health systems are classified as Complex socio-technical systems (CSTS) due to the uncertainty, diversity, and non-linear interactions. According to the literature, the implementation of Lean in healthcare usually involves Kaizen, which tends to produce significant gains in efficiency and safety through relatively small and localized changes. However, local improvements may imply unwanted overall results, since interactions between elements of complex systems may not be linear. For this, this work develops and applies a framework that aims to evaluate improvement projects in CSTC. The study was performed in an in-patient surgical ward of a teaching hospital. The interactions between the projects were modelled through the development of a causal-loop diagram, which accounted for variables related to all five projects, and a FRAM model. The projects were also evaluated as to their impact on the system and their adherence to good Kaizen practices identified in the literature. The framework proved to be effective in highlighting the variables so that they can positively influence the projects results and support recommendations for conducting new improvement projects through a systemic view.
|
330 |
Planejamento de atividades da construção predial visando a redução de perdas de processo na ótica da construção enxuta. / Planning activities of building land in order to reduce optical losses in the process of building lean.Vanessa da Silva de Azevedo 30 June 2010 (has links)
Fundação de Amparo à Pesquisa do Estado do Rio de Janeiro / Adaptada dos conceitos da produção enxuta, a construção enxuta é uma filosofia de gestão da produção voltada à construção civil. Dos cinco princípios enxutos em que se baseia, o que mais tem se estudado desde a publicação do Relatório Técnico n72 Aplicação da Nova Filosofia de Produção à Construção (publicado pelo CIFE Center for Integrated Facility Engineering, ligado à Universidade de Stanford, EUA) é o Fluxo Contínuo. A idéia de manter o fluxo contínuo está diretamente ligada à continuidade da produtividade, ou seja, manter a produtividade em uma taxa constante. Aplicar o conceito enxuto de fluxo contínuo através da manutenção das taxas de produtividade significa gerenciar o empreendimento de modo que a execução das atividades se mantenha de acordo com os parâmetros estabelecidos durante a fase de planejamento. Por meio de ferramentas enxutas de gerenciamento é feita a simulação em Excel de três atividades pertencentes ao processo de execução de lajes prediais de edifícios construídos em estruturas metálicas: steel deck, armação e concretagem. A elaboração da planilha possibilita a avaliação das perdas ocorridas durante a execução das atividades sob a ótica do conceito de atrasos e esperas. A soma destas perdas resulta ainda em dois efeitos distintos considerados como perdas acumuladas e perdas compensadas, proporcionando ao gerente do empreendimento dados consistentes para traçar estratégicas para eliminação do desperdício ou uma antevisão dos desperdícios que podem estar associados à execução das atividades se estas forem mal planejadas. / Adapted from the concepts of lean production, lean construction is a management philosophy of the production directed to construction. Of the five lean principles what else has been studied since the publication of Technical Report No. 72 - Application of New Production Philosophy to Construction (published by CIFE - Center for Integrated Facility Engineering, connected to Stanford University, USA) is the continuous flow. The idea of maintaining the continuous flow is directly linked to continued productivity, ie keep productivity at a constant rate. Apply the concept of lean stream by maintaining productivity rates means managing the project so that the execution of activities is maintained in accordance with the guidelines established during the planning phase. Through lean management tools is done in Excel simulation of three activities from the implementation process of building slabs of buildings constructed in steel structures, steel deck, frame and concrete. The elaboration of the sheet allows the evaluation of the losses occurred during the execution of activities from the perspective of the concept of delays and waits. The total of these losses still result in two distinct effects considered to accumulated losses and offset losses, providing the manager of the project consistent data to plot strategy for disposal of waste or a preview of wastes that may be associated with the implementation of the activities if they are badly planned.
|