• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 41
  • 41
  • 40
  • 9
  • 7
  • 6
  • 6
  • 3
  • 3
  • 2
  • 1
  • 1
  • Tagged with
  • 177
  • 23
  • 23
  • 21
  • 21
  • 19
  • 18
  • 17
  • 16
  • 16
  • 16
  • 16
  • 15
  • 15
  • 14
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
111

Zaměření části Dominikánského kláštera ve Znojmě / The Mapping Survey of the Dominican Convent in Znojmo city

Balák, Martin January 2017 (has links)
The subject of this diploma thesis is a survey of the Dominican monastery in Znojmo. The thesis deals with the requirements for building documentation. The thesis contains floor plans of the second floor, the ground plan of the third floor and the vertical section of the building. The resulting documentation will serve the National Monument Institute for the planned reconstruction of the building.
112

Měření nerovností povrchů vozovek / Measurement of pavement surface roughness

Ďuriš, Samuel January 2020 (has links)
The subject of the master thesis is to verify the possibility of application of geodetic methods to determine longitudinal and transverse pavement surface roughnesses. Geodetic techniques are compared to techniques specified in ČSN 73 6175. Subject of testing is absolute and relative accuracy of altitude measurement and accuracy of roughness parameter determination. As a result, the graphic interpretation of these parameters and deviations from reference values are presented in the current document. Practical use of the surveying methods is evaluated based on the application of the above mentioned techniques and the results of accuracy analysis.
113

Geodetické měření posunů a deformací mostu "Gagarin" / Geodetic Deformation Measurements of "Gagarin" Bridge.

Kováč, Michal January 2013 (has links)
The content of this master´s thesis is a geodetic measuring of movements and deformations of skeleton and underwork of „Gagarin“ railway bridge during the seventh period and processing of the data got. This was done by comparison of the movements according to the fifth and sixth period. The work includes also the calibration of appliance used. The results involve figures of the movements with their graphic interpretation and calibration sheets of the appliance.
114

Ein automatisches Verfahren für geodätische Berechnungen

Lehmann, Rüdiger January 2015 (has links)
Das in diesem Beitrag beschriebene automatische Verfahren findet bei klassischen geodätischen Berechnungsaufgaben ausgehend von gegebenen Startgrößen (z. B. Festpunktkoordinaten, Messwerte) Berechnungsmöglichkeiten für alle anderen relevanten Größen. Bei redundanten Startgrößen existiert meist eine Vielzahl unterschiedlicher Berechnungsmöglichkeiten, die alle gefunden und deren Ergebnisse berechnet werden. Wenn die Berechnung mehrdeutig ist, aber nur endlich viele Lösungen existieren, werden alle Lösungen gefunden und berechnet. Durch den Vergleich unterschiedlicher Berechnungsergebnisse besteht die Möglichkeit, grobe Fehler in den Startgrößen aufzudecken und ein robustes Endergebnis zu generieren. Das Verfahren arbeitet nicht stochastisch, setzt also kein stochastisches Modell der Messwerte voraus. Die Beschreibung wird mit Beispielen illustriert. Das Verfahren wurde als Webserver-Script realisiert und ist frei im Internet verfügbar. / This contribution describes an automatic method, which can be applied to classical geodetic computation problems. Starting from given input quantities (e. g. coordinates of known points, measurements) computation opportunties for all other relevant quantities are found. For redundant input quantities a multitude of different computation opportunties exists, which are all found automatically, and their results are computed. If the computation is non-unique, but only a finite number of solutions exist, then all solutions are found and computed. By comparison of the different computation results there is the opportunity to detect gross errors in the input quantities and to produce a robust final result. The method does not work stochastically, so no stochastic model of the observations is required. The description of the algorithm is illustrated with the help of examples. The method was implemented as a webserver script and is available for free in the internet.
115

Zaměření románských sklepních prostor v Praze / The Measurement of the Roman cellars in Prague

Krbálková, Marcela January 2012 (has links)
This diploma thesis concerns in the real measurement of Roman cellar areas in Prague 1 – Lesser Town, Karmelitská Street. A surveying structure for detailed area geodetic measurement is built up in given part of town. The surveying structure is connected to the binding reference systems – the S-JTSK coordinate system and Bpv altitude system. A detailed measurement is carried out in this cellar areas and recorded data are processed in a suitable programme. A three-dimensional model and drawing documentation – a ground plan and sections in required areas are drawn up according to this data. The ground plan of cellar areas in its drawing documentation is in 1:50 scale and the sections in 1:50 scale. Thesis outcomes will serve to document the current conditions of Roman cellar areas.
116

Gyromätning i tunnelnät : Gyromätningens påverkan på kortare stomnät i tunnelmiljö / Gyro measurements in tunnelling networks : The effects of gyro measurements in short tunnelling networks

Wängdahl, Oskar January 2023 (has links)
Geodetic measurements with a gyro theodolite are an important technique for establishing control networks in tunnelling projects. The observations are used as a separate control point outside the main network while checking the angle of the tunnels direction as it is difficult to connect the underground network to a superior network outside the tunnel.  This study aims to investigate the usefulness of gyro surveys in tunnel networks and evaluate how much they improve the positional accuracy of underground control networks. The study compares a total of four network simulations (with and without gyro observations) that have been divided into 12 sections. The sections are then compared to each other to determine the influence of gyro observations on the positional uncertainty in the network. Gyro observations were found to contribute to significant improvements in measurement data. Without them the tunnel would have an uncertainty greater than five centimetres within approximately 1000 m. The results provide valuable insights into the impact of gyro measurements on geodetic control network in tunnels and how they can be used to improve measurement data. / Gyromätningar och gyroteodoliter har idag en viktig roll på grund av de höga krav på noggrannhet som ställs inom många av dagens tunnelprojekt vid stomnätsmätning i tunnlar. Gyroobservationerna används för att få en utomstående kontroll av stomnätet då detta på grund av tunnelns utformning är problematiskt att koppla mot ett överordnat nät. Det finns dock inte mycket skrivet om hur dessa bör användas samt hur stor effekt mätningarna har på ett vanligt tunnelbygge idag. Studiens syfte är att undersöka gyromätningar användbarhet i tunnelnät samt utvärdera hur mycket dessa förbättrar noggrannheten på kortare stomnät i tunnelmiljö. I rapporten har sammanlagt fyra nätsimuleringar för en tunnelbana i Stockholm jämförts med varandra där två tillhör byggnätet och två bruksnätet (med och utan gyroobservationer). Dessa har delats upp i totalt 12 sektioner varav 6 stycken innehåller gyroobservationer och 6 är utan gyroobservationer. Sektionerna har sedan jämförts med varandra för att ta reda på hur stor inverkan gyroobservationerna har på osäkerheten i näten samt om det är möjligt att nå upp till en teoretisk osäkerhet i nätet på max fem centimeter. Resultatet visar att den radiella medelosäkerheten minskade från 1,69 cm till 0,93 cm i sektion 1, 1,24 cm till 0,64 cm i sektion 2 och 7,13 cm till 1,64 cm i sektion 3. Vid genomslaget mellan sektion 1 och 2 minskade osäkerheten från 5,10 cm till 1,14 cm i sektion 1 och i sektion 2 från 4,41 cm till 1,48 cm. Sträckan på fackverksnätet innan osäkerheten översteg fem centimeter blev 794m i sektion 1 och 846 m i sektion 3. I sektion 2 översteg aldrig osäkerheten fem centimeter trots att längden på fackverket var 971 m. Sektion 1 och 2 i bruksnätet visade ingen betydande förändring beroende på om gyroobservationer användes eller inte. I sektion 3 minskade dock den radiella medelosäkerheten med 2,29 cm vilket kan förklara genom att stomnätet inte har något anslutningsnät i slutet på denna sektion. Generellt visades gyroobservationerna bidra till stora förbättringar av mätdata i byggnätet och utan dessa skulle tunneln inom ca. 1000 m ha en osäkerhet större än fem centimeter. Resultatet ger en bra inblick i hur stor påverkan gyromätningar har på stomnät i tunnlar samt hur dessa kan användas för att förbättra mätvärden.
117

Investigations into Green's function as inversion-free solution of the Kriging equation, with Geodetic applications

Cheng, Ching-Chung 19 October 2004 (has links)
No description available.
118

Deformationsmätning och uppdatering av geodetiskt nätverk i Mårtsbo provfält

Erlandsson, Axel, Frelin, Alexander January 2019 (has links)
Geodetiska provfält är viktiga för att geodetiska instrument kan kontrolleras och kalibreras. Exempelvis så kan en längdbas användas för att kontrollera nollpunktsfelet hos en Electronic Distance Measuement. Provfältets höga noggrannhet möjliggör även att detaljpunkterna exempelvis kan användas för att kontrollera noggrannheten vid utsättning eller inmätning. Att hålla provfältets koordinater uppdaterade är viktigt för att bibehålla den höga noggrannheten. Tidigare forskning visar att kända punkter kan vara bra för att kontrollera GNSS-antenner innan de sätts i bruk. Precisionen av mätningar var något man valde att utveckla på Statens Institution för Byggnadsforskning i Gävle på 70-talet (Statens Institut för Byggnadsforskning, 1984). Byggforskningen byggde ett provfält i Mårtsbo där punkter mättes in som sedan redovisats i en koordinatlista. Till en början användes provfältet för att kontrollera olika instrument och mätmetoder, men nu har det stått orört under en längre tid. Denna studie görs för att ta reda på om punkterna i området har rört sig något sen 1977 då fältet upprättades och därigenom avgöra om punkterna måste tilldelas nya koordinater innan användningen av fältet återupptas.   Innan mätning kontrollerades och kalibrerades instrumenten som skulle användas. För att koppla stomnätet till SWEREF 99 16 30 och RH 2000 gjordes en statisk GNSS-mätning på de två mest öppna punkterna i nätet. Vinklar och avstånd mellan punkterna erhölls genom att använda satsmätning med multistation. För att få med alla detaljpunkter gjordes en koordinattransformation med hjälp av de gamla koordinaterna och de nya som mätts in. I efterarbetet bearbetades GNSS-mätningarna i programvaran Leica Geo Office. Satsmätningarna behandlades i programvaran SBG Geo och där gjordes två nätutjämningar, en med lokala koordinater och en med koordinater i  SWEREF 99 16 30 och RH 2000. Slutligen transformerades resterande koordinater från det lokala systemet till SWEREF 99 16 30 och RH 2000 i  programvaran Gtrans. Baserat på resultatet har signifikant deformation uppstått på flera av punkterna. De största förändringarna som skett är i plan 2,2 mm i P5 och i höjd 1,7 mm i P7. Noggrannheten som uppnåtts i denna studie är inte lika bra som tidigare, men ändå tillräckligt för att använda fältet. / Geodetic test fields are important because they allow geodetic instruments to be tested and calibrated. For example, the baseline can be used when checking the zero-point error in an Electronic Distance Measurement. The high accuracy of the test field will also make it possible to use the detail points for checking the accuracy of the measurements when surveying. Keeping the coordinates of the field updated is important to maintain the high accuracy of the points. Previous research shows that known points were used to check GNSS-antennas before commercial use. The precision of measurements was something that the Swedish Institute of Constructional Science chose to develop even further in the late 1970s. A geodetic test field was constructed in Mårtsbo where points were established and presented in a coordinate list. The field was at first used to control different measuring equipment and methods, but in later years it has not been used at all. The aim of this study is to re-measure and update the coordinates of the test field. For this study, the instruments was controlled and calibrated before any measurements. To link to the well-established points with known coordinates in the control network static GNSS-measurements were performed on the two points located in the most open areas and positioned in SWEREF 99 16 30 and RH 2000. The angles and distances between the points were given by using rounds of measurements. To get coordinates for every detail point a coordinate transformation was used with the measured points as control points. During the post-processing of the GNSS-data the Leica Geo Office software was used to compute the coordinates. The rounds of measurements with multistation were processed in the software SBG Geo and network adjustments with both old and new coordinates were carried out. Finally, the rest of the coordinates were transformed into the new coordinate system which was done in the software Gtrans.. The result shows that significant local deformation has occurred on several points. The largest of deformation in plane is 2,2 mm in P5 and in height is 1,7 mm in P7. The uncertainties of the measured points are a bit higher in this study compared to earlier one, but they are still good enough to be use in this test field.
119

Etablering av ett nytt höjdnät i RH 2000 vid Högskolan i Gävle

Faisal Ali, Ali, Wennberg, David January 2021 (has links)
RH 2000 är Sveriges nationella höjdsystem och det bygger på den tredje precisionsvägningen som genomfördes i Sverige mellan 1979 och 2003. Nätet för RH 2000 har en starkare geometri och är mer homogent än vid de tidigare två precisionsavvägningarna och höjdnäten (RH 00, RH 70). Under de senaste 14 åren har mycket arbete lagts ned på att få kommuner, myndigheter och andra samhällsaktörer att byta till RH 2000, detta för att få enhetlighet och främja datautbyte. Nu har de flesta aktörer anslutit sig till det nya nätet, men det finns fortfarande de som använder de äldre referenssystemen från den de två tidigare precisionsavvägningarna.  Högskolan i Gävle har länge använt sig av ett höjdnät som anslutits till RH 70. Man har visserligen gjort en preliminär anslutning till RH 2000, men denna har gjorts genom mätning med Global Navigation Satellite System (GNSS) och den nationella geoidmodellen. Höjdnätet skall ligga till grund för högskolan inom utbildning och forskning inom lantmäteriteknik, det är därför ett bra höjdnät behövs vid HiG. Nätet bör vara av hög kvalité, och det är därför viktigt att etablera nätet genom avvägning. Höjdbestämning med GNSS har högre osäkerhet jämfört med den traditionella metoden för etablering av höjdnät (avvägning). Ett syfte med denna studie är att etablera ett nytt stomnät i höjd som är hållbart över tid vid Högskolan i Gävles campus och genom finavvägning ansluta detta till riksnätet för det nationella höjdsystemet RH 2000 på ett så bra och tillförlitligt sätt som möjligt. Ett annat syfte är också att undersöka och jämföra skillnad i höjd mellan de nya och äldre höjdnätsrealiseringarna vid skolan, samt även att undersöka hur de nya avvägda RH 2000-höjderna stämmer med geoidmodellen lokalt med hjälp av höjder bestämda från GNSS- mätning och SWEPOS tjänst för Nätverks Real Time Kinematic (NRTK).  I detta examensarbete har finavvägning genomförts med det digitala avvägningsinstrument Leica DNA03 för att etablera ett anslutningsnät för samhällsbyggnad (klass A2 enligt Handbok i mät- och kartfrågor,HMK). Utvärdering av mätosäkerhet har gjorts i enlighet med de styrdokument som examensarbetet följer, nämligen HMK och SIS-TS 21143:2016. Stegvis utförda utjämningar av nätet resulterade i bra skattade höjder med standardosäkerheter på millimeternivå i RH 2000. Genom det nya höjdnätet anslutet till RH 2000 har Högskolan i Gävle erhållit ett nytt höjdnät med låga osäkerheter som möter kraven för anslutningsnät och framtida övningar på högskolan kommer att göras i en högkvalitativ realisering av RH 2000. / RH 2000 is the national height system/frame of Sweden. It is based on the third precision precise levelling that was carried out in Sweden between 1979 and 2003. The network for RH 2000 has a stronger geometry and is more homogeneous than for the previous two Swedish precise levellings and the height networks (RH00, RH70). During the last 14 years, a lot of work has been put into getting municipalities, state authorities and other community operators to switch to RH 2000, in order to achieve uniformity and promote data exchange. Most have now joined the new network, but some still use the older reference systems of the two previous precise levellings.  The University of Gävle has for a long time used a height network that has been connected to RH 70. Although a preliminary connection has been made to RH 2000, it has been made through Global Navigation Satellite System (GNSS) measurements and with the national geoid model. The height network shall form the basis for the university in education and research in surveying, which is why a good height network is needed at HiG. The network should have a high quality; therefore, it is important to establish the network by levelling. The determination of height with GNSS has higher uncertainty compared with the traditional method for establishing a height network (levelling). A purpose of this study is to establish a new geodetic control network in height that is sustainable over time at the Campus of the University of Gävle and through to connect it to the national height network/system RH 2000 in the best and most reliable way. Another purpose is also to investigate and compare differences in height between the new and older height networks, and it is also investigated whether the levelled RH 2000 heights match with the national geoid model locally by using heights determined from GNSS measurements and SWEPOS service for Network Real Time Kinematic (NRTK).  In this thesis, digital levelling has been carried out with the digital level instrument Leica DNA03 to establish a control network for urban management (class A2 according to Handbook of measurement and map issues,HMK). Evaluation of measurement uncertainty has been made in accordance with the governing documents that the thesis follows, namely Swedish HMK and SIS-TS 21143: 2016. Step-by-step adjustments of the network resulted in well estimated heights with standard uncertainties at the millimeter level in RH 2000. Through the heights in RH 2000 for the new network, the University of Gävle has received a new height network with low uncertainties that meets the requirements for connection networks and future exercises at the university can be made in a high-quality realization of RH 2000.
120

Desarrollo y análisis de un sistema para la determinación de la dinámica del movimiento más general de la azotea de un edificio de gran altura y su evolución en el tiempo

Quesada Olmo, María Nieves 01 December 2019 (has links)
[EN] The goal of this research is to analise and to develop a system that allows the determination of the most general movement dynamics of a tall building, as well as to quantify its evolution over time by means of Gaussian algorithms revision and by applying GNSS techniques and methodologies. In this thesis, the oscillation of the control quadrilateral located on the roof of the ``Torre Espacio'' bulding and determined by a high precision survey network is assessed rigorously with the method of sequential solution with addition of variables or parameters using VRS-RTK techniques. It is the data processing, together with the gaussian adjustment methodology based on a conditional tax own physical reality and analysis of partial and final results allowing us to achieve a high level of confidence that translates into effective management real-time risk. In parallel, the instantaneous and simultaneous precision of each antenna in every moment is determined. That is the error surface and the individual, simultaneous reliability of each GNSS receiver. Prior to assessing the structure dynamics, the sensitivity threshold is computed, under which nothing can be affirmed or denied with respect to the displacement produced in the control structure. It involves testing the accuracy of the instrumentation GNSS and gaussian initial adjustment mathematical model. The project concludes with the development of a warning system that is activated at the time when the movement of the building reaches a preset threshold. / [ES] El objeto de la investigación es analizar y desarrollar un sistema que permita determinar la dinámica más general del movimiento de un edificio de gran altura, así como cuantificar su evolución en el tiempo. Dicho sistema se plantea mediante la revisión de los algoritmos gaussianos y la aplicación de metodologías y técnicas GNSS. En este trabajo se determina rigurosamente, mediante el método general de Ajustes Coordinados con adición de funciones de variables o parámetros, la situación de oscilación del cuadrilátero de control conformado por una red microgeodésica local y observado con técnicas VRS-RTK ubicado en la planta de coronación del edificio Torre Espacio de Madrid. Es precisamente el tratamiento de los datos, la metodología gaussiana de ajuste en función de un condicionado propio impuesto por la realidad física y el análisis de los resultados parciales y finales lo que nos permite alcanzar un alto nivel de fiabilidad que se traduce en una gestión eficaz del riesgo en tiempo real. Paralelamente se determina la precisión instantánea y simultánea de cada antena y en cada momento, esto es la superficie de error y la fiabilidad individual y simultánea de la posición de cada receptor GNSS. Previo a la evaluación de la dinámica de la estructura, se calcula el umbral de precisión o ``sensibilidad'', por debajo del cual nada puede afirmarse o negarse con respecto al desplazamiento producido en la estructura a controlar. Supone contrastar la precisión de la instrumentación GNSS y del modelo matemático inicial de ajuste gaussiano. El proyecto concluye con el desarrollo de un sistema de alerta que se activa en el momento en que el movimiento del edificio alcanza un umbral preestablecido. / [CA] L'objecte de la investigació és analitzar i desenvolupar un sistema que permeta determinar la dinàmica més general del moviment d'un edifici de gran alçada, així com quantificar la seua evoluvió en el temps. Aquest sistema es plantaja mitjançant la revisió dels algorismes Gaussians i l'aplicació de metodologies y tècniques GNSS. En aquest treball es determina rigorosament, mitjançant el mètode general d'Ajusts Coordinats amb adició de de funcions de variables o paràmetres, la situació d'oscilació del quadrilàter de control conformat per una xarxa microgeodèsica local i observant amb tècniques VRS-RTK localitzat a la planta de coronació de l'edifici TorreEspacio de Madrid. És precisament el tractament de les dades, la metodologia Gaussiana d'ajust en funció d'un condicionat propi imposat per la realitat física y l'anàlisi dels resultats parcials i finals el que ens permet arribar a un alt nivell de fiabilitat, que es tradieix en una gestió eficaç del risc en temps real. Paral·lelament es determina la precisió instantània i simultània de cada antena i en cada moment, es a dir la superfície d'error i la fiabilitat individual i simultània de la posició de cada receptor GNSS. Previament a l'evaluació de la dinàmica de l'estructura, es calcula l'umbral de precisió o ``sensibilitat'', per davall de la qual no es por afirmar o negar res respecte al desplaçament produït en l'estructura a controlar. Això suposa contrastar la precisió de la instrumentació GNSS i del model matemàtic inicial d'ajust Gaussià. El projecte conclou amb el desenvolupament d'un sistema d'alerta que s'activa en el moment en que el moviment de l'edifici arriba a un umbral preestablert. / Quesada Olmo, MN. (2015). Desarrollo y análisis de un sistema para la determinación de la dinámica del movimiento más general de la azotea de un edificio de gran altura y su evolución en el tiempo [Tesis doctoral]. Universitat Politècnica de València. https://doi.org/10.4995/Thesis/10251/58993

Page generated in 0.0553 seconds