• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 24
  • 13
  • 7
  • 3
  • 2
  • Tagged with
  • 55
  • 55
  • 25
  • 25
  • 20
  • 20
  • 20
  • 20
  • 20
  • 20
  • 17
  • 15
  • 9
  • 9
  • 9
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
31

Performance improvement in South African construction

Emuze, Fidelis Abumere January 2011 (has links)
In general, dreams are conceived, ideas are conceptualised, and initiatives are embarked upon in order to alter the state of realities. Dreams change realities; when mechanisms are put in place to realise them, dreams succeed. However, anecdotal evidence as well as empirical findings has continued to reiterate the difficulties associated with realising dreams related to construction projects. Extending the „dream‟ analogy to the South African construction industry context therefore paints an uninspiring picture. Dreams associated with construction do not have a 100% chance of becoming realities as evident in reported poor project performance in the industry. Shattered dreams in the form of poor performing projects, poorly implemented construction processes, or worst, projects delivered at the expense of unexpected cost to the client as a direct result of poor H&S or time overruns, negate the intent of dreams. This thesis is primarily concerned with project performance related bottlenecks in South African construction. After an extensive review of related literature that entails the analysis of publications related to non-value adding activities (NVAAs), supply chain management (SCM), and system dynamics (SD) in the construction project management realm, an exhaustive mixed-mode quantitative survey was conducted among key participants in the South African infrastructure sector. Public sector clients, consulting engineers and contractors that were involved in civil engineering projects were surveyed repeatedly with approximately five survey instruments at convenient intervals. Results arising from the study, inter-alia, indicate that: an appreciable amount of NVAAs occur in South African construction; these NVAAs become further compounded when propagated into other value adding activities (VAAs) in the construction process; the identified NVAAs equally perpetrate the menace associated with poor performance to the detriment of the achievement of cost, H&S, quality, and time project targets, and the root cause of these NVAAs that often contribute to poor performance is not far from the much reported „shortage of skills‟ in South Africa. Notable contributions to the body of knowledge include SD models are extendable regardless of the source of their empirical data as evident in the qualitative models proposed in this study; within the SD domain, it is advisable to consider the „competence‟ of individuals assigned to tasks especially in a developing country as this study revealed that human resources issues predominate among the sources of NVAAs that eventuate in a range of poor project performance; the NVAAs that occur, and their causes on projects are perceived to be due to lapses and / or inadequacies that involved the entire construction supply chain; there is no single construction process / task that is immune from being affected by NVAAs; and within the South African, and by implication construction context generally iii in developing countries, the adequacy of required knowledge among project stakeholders is the most crucial determinant of project performance. As opposed to what is obtainable in developed countries, the construction industry in developing countries, particularly in South Africa, should take advantage of knowledge management (KM) techniques such as brainstorming, communities of practices, and face-to-face interactions. These techniques can be driven through appropriate mentorship programmes, industry focused built environment education, and other human resources driven avenues that do not necessarily require substantial investment in technologies, so that to a large extent organisations in the industry can prioritise KM, and thereafter, continually engage in it for future performance improvement. Using inferential statistical methods for hypotheses testing, and SD concepts for creating qualitative models led to a range of recommendations which, inter-alia, propose that halting the tide of NVAAs and poor performance requires the management of both tacit and explicit knowledge gained in construction; and most importantly, it requires the assurance that „competence‟ is the overriding criteria for selecting project partners, and also, for assigning either design or construction related activities to responsible parties involved in project realisation in South Africa. In effect, in order to engender a culture of continuous improvement in South African construction, other considerations should be subservient to „competence‟ in the construction supply chain. Competence must be located among everyone involved in project realisation, that is, enhancing the competence of all involved in project realisation is as good as ensuring performance improvement, which in turn, equates to the acceleration of project delivery in South Africa.
32

Guía de implementación del LPS (Last Planner System) para la etapa de acabados de un proyecto multifamiliar dirigido a los sectores económicos A y B ubicado en la ciudad de Lima / LPS (Last Planner System) implementation guide for the finishing phase of a multifamily project for economic sectors A and B located in Lima

Corilla Usquiano, Shirley Lizzeth, Pereda Torres, Andrea Natividad 01 December 2020 (has links)
El presente proyecto de investigación tiene por finalidad plantear una guía de implementación del Last Planner System, herramienta del Lean Construction, para la etapa de acabados de proyectos multifamiliares, el objetivo es que las empresas que deseen utilizar esta herramienta en sus proyectos de construcción puedan seguir los pasos sugeridos para garantizar una implementación exitosa. El proceso de construcción está marcado por un alto índice de variabilidad, el cual aumenta a medida que los interesados incrementan en número dentro de un solo proyecto. Esto nos lleva a concluir que, de todas las etapas de la construcción la que tendría el mayor índice de variabilidad sería la etapa de acabados. Actualmente, aproximadamente solo 25 empresas constructoras son miembros corporativos del Lean Construction Institute Perú; es decir, se encuentran alineadas con este sistema de gestión, esto a pesar de que el porcentaje de desperdicios que se originan en los proyectos de construcción es de aproximadamente 30% del monto total de la inversión. Para poder realizar el planteamiento de nuestra propuesta, primero desarrollamos los conceptos generales referidos al Lean Construction, Last Planner y los casos de éxito de proyectos que implementaron esta herramienta a nivel mundial y en nuestro país. Posteriormente, evaluamos las métricas y lecciones aprendidas de la fase de casco de dos proyectos ejecutados con sistemas de gestión distintos: tradicional y mediante el uso del Last Planner System. A partir de los resultados obtenidos, se planteó la guía de implementación del Last Planner System para la etapa de acabados. / The objective of this research project is to propose an implementation guide of the Last Planner System, a Lean Construction tool, for the finishing phase of multi-family projects, the objective is that companies that need to use this tool in their construction projects can follow suggested steps to ensure a successful implementation. The construction process is marked by a high rate of variability, which increases as the stakeholders increase in number within a single project. This leads us to conclude that, of all the construction stages, the one that would have the highest variability would be the finishing phase. Currently, only 25 construction companies are members of the Lean Construction Institute Peru; it is mean, they are aligned with this management system, even though the percentage of waste originating from construction projects is approximately 30% of the total investment amount. In order to carry out our proposal, we first develop the general concepts related to Lean Construction, Last Planner and the success stories of projects that implemented this tool worldwide and in our country. Subsequently, we evaluate the metrics and lessons learned from the structural phase of two projects executed with different management systems: traditional and using the Last Planner System. From the results obtained, we proposed the implementation guide of the Last Planner System for the finishing phase. / Trabajo de investigación
33

Propuesta de diseño de una Oficina de Gestión de Proyectos para la empresa VF Consulting S.A.C. / Design proposal for a Project Management Office for the company VF Consulting S.A.C.

Pérez Rojas, Johann Cristian Berny, Sarmiento Del Carmen, Alex Omar, Uechi López, Eduardo Akira 14 February 2021 (has links)
El presente documento enfoca la problemática de una pequeña empresa consultora de software que brinda servicios de desarrollo y testeo de aplicaciones a empresas de Telecomunicaciones en el Perú, siendo por esta razón considerado uno de los socios estratégicos para estas empresas, por lo que es constantemente evaluada y muchas veces penalizada económicamente al no cumplir en varios proyectos con la meta planificada. En los últimos años, los ingresos de esta empresa han crecido lentamente, y en paralelo, los costos por incumplimiento a los objetivos también se han incrementado. Se analizó la situación de su gestión de proyectos identificando las causas que originan las penalizaciones, y se determinó la necesidad de implementar una oficina de dirección de proyectos (PMO) que proponga y soporte procesos que redunden en mejoras a la gestión de proyectos y con esto, la calidad del servicio prestado, buscando reducir al mínimo posible los montos de las penalizaciones. Los procesos propuestos se definieron priorizando las necesidades evidenciadas en una encuesta realizada a los ejecutivos de la consultora, y están basados principalmente en los lineamientos sugeridos por la Guía del PMBOK® 6ta Edición, además de otros autores. Como parte de la propuesta se elaboró el análisis financiero de este proyecto evaluando 3 posibles escenarios, teniendo como variable de sensibilidad el porcentaje de penalización. / This document focuses on the problem of a small software consulting company that provides application development and testing services to Telecommunications companies in Peru, being for this reason considered one of the strategic partners for these companies, so it is constantly evaluated and many times financially penalized for not meeting the planned goal in several projects. In recent years, the income of this company has grown slowly, and in parallel, the costs for not complying with the deliverables in a timely manner have also increased. The situation of their project management was analyzed identifying the causes that originate the penalties, and the need to implement a project management office (PMO) that proposes and supports processes that result in improvements to project management was determined and with it, the quality of the service provided, seeking to reduce the amounts of penalties to the minimum possible. The proposed processes were defined prioritizing the needs evidenced in a survey carried out with the executives of the consultancy and are based mainly on the guidelines suggested by the PMBOK® Guide, 6th Edition, in addition to other authors. As part of the proposal, the financial analysis of this project was prepared, evaluating 3 possible scenarios, with the percentage of penalty as a sensitivity variable. / Trabajo de investigación
34

Marco de trabajo para el control de costo y cronograma en proyectos de construcción de pequeña y mediana envergadura / Framework for cost and schedule control in small and medium-sized construction projects

Paucar Peña, Khevin Oscar, Esquivel Achata, Edmond Andre, Monteras Wayta, Dante Dennis, Sánchez Palacios, Rodrigo, Durán Quispe, Giusepe Rolando 30 April 2021 (has links)
El presente trabajo de investigación, busca desarrollar un marco de trabajo para el control del costo y cronograma en proyectos de construcción de pequeña y mediana envergadura. Para el desarrollo del marco propuesto se aplican e integran diferentes métodos, técnicas, herramientas y buenas prácticas para la gestión de proyectos. El marco de trabajo propuesto define cuatro procesos: Definir Situación Actual del proyecto, Analizar las Causas, Planificar las Mejoras y Monitorear. La implementación apropiada y oportuna del presente marco, en proyectos de construcción de pequeña y mediana envergadura; tiene la capacidad de generar beneficios palpables importantes en las empresas de construcción Pymes que lo apliquen. Ello dado que, en su gran mayoría, dichas empresas no cuentan con sistemas de gestión de proyectos apropiados y/o correctamente definidos; generándose un salto cualitativo al aplicar el presente marco. Los beneficios podrían incluir: económicos al encontrar la rentabilidad planeada de los proyectos de construcción gracias al control de costo de los proyectos, respetar los plazos planeados gracias al control de plazo de los proyectos y mejora de los procesos de gestión. / This research work seeks to develop a framework for cost and schedule control in small and medium-sized construction projects. For the development of the proposed framework, different methods, techniques, tools and good practices for project management are applied and integrated. The proposed framework defines four processes: Define Current Project Situation, Analyze Causes, Plan Improvements, and Monitor. The appropriate and timely implementation of this framework in small and medium-sized construction projects; It has the ability to generate significant tangible benefits in SME construction companies that apply it. This is given that, for the most part, these companies do not have appropriate and / or properly defined project management systems; generating a qualitative leap when applying this framework. The benefits could include: economic by finding the planned profitability of the construction projects thanks to the cost control of the projects, respecting the planned deadlines thanks to the project term control and improvement of the management processes. / Trabajo de investigación
35

Propuesta de diseño e implementación de una VMO para los Proyectos de Tecnología en una Cadena de Restaurantes / Design and Implementation Proposal of a Value Management Office for Technology Projects in a Restaurant Franchise

Diban Escaffi, Jaime Alfredo, Pineda La Serna, Oscar Alejandro, Rodriguez Urbina, Oscar Guillermo 14 April 2021 (has links)
La industria del sector de restaurantes ha venido siendo una de las de mayor crecimiento en el Perú, incrementando también de forma continua la oferta y la competencia. Las estrategias diseñadas en el sector han estado basadas principalmente en la calidad del servicio, ofertas y productos; pero los procesos detrás de estas estrategias han resultado muchas veces operativamente ineficientes, afectando directamente los márgenes del negocio; algo que ha sido observado por cada una de las empresas activas. Durante los últimos años, y sobre todo en el 2020 debido a la coyuntura presentada por el COVID-19, esta industria también se ha visto afectada por la ralentización de la economía y paralización de los mercados, evidenciando las falencias operativas y resaltando los sobrecostos, acentuando aún más la necesidad de crear economías de escala como parte de sus estrategias. Con el objetivo de optimizar costos, los restaurantes han encontrado un aliado en la transformación digital de sus procesos, incrementando de forma natural el número de proyectos de tecnología requeridos, exigiendo mejores resultados y una gestión mas eficiente, lo cual ha generado diversas oportunidades de mejora en la ejecución, sobrecostos de la gestión y procesos que conviven de forma no estandarizada. El presente trabajo de investigación propone el diseño e implementación de una oficina de gestión de valor, alineada con los valores de la organización, basada en el uso de prácticas agiles y lean para la gestión de proyectos de tecnología, con procesos definidos y la generación de valor como prioridad. / The restaurant sector industry has been one of the fastest growing in Peru, leading to the continuous increase of the offer and competition. This sector's designed strategies have been based mainly on service quality, offers, and products, but the processes behind these strategies have often been operationally inefficient, directly affecting business margins, something that the active companies have perceived. Lately, especially in 2020, due to the COVID-19 situation, this industry has also been affected by the slowdown in the economy and the paralysis of the markets; showing the operational shortcomings and highlighting cost overruns, furthermore, accentuating the need to create economies of scale as part of their strategies. To optimize costs, restaurants have found an ally in the digital transformation of their processes, increasing the number of required technology projects naturally, demanding better results and more efficient management, which has generated various improvement opportunities in the execution, cost management, and processes that coexist in a non-standardized way. This research work proposes the design and implementation of a value management office aligned with the organization's values, based on the use of agile and lean practices for the management of technology projects, with defined processes and the generation of value as a priority. / Trabajo de investigación
36

Propuesta de implementación de la ISO/NTC-29110 en una empresa Mype consultora de software / Proposal for the implementation of iso / ntc-29110 in a software consulting mype company

Arias Moreno, Franklin Jhino, Meres Morales, Evelyn Rosalía, Sosa Suárez, Doris Elizabeth 12 October 2020 (has links)
El presente proyecto de investigación propone la implementación de la ISO/NTC-29110 en una empresa MYPE consultora de Software Vision-xtrema S.A. para mejorar sus procesos de gestión de proyectos e implementación de software y poder acceder a mercados nacionales e internacionales que exigen una certificación. Este proyecto se sustenta en la publicación “La implementación de la norma ISO/IEC 29110 Guías de Gestión e Ingeniería para las organizaciones pequeñas” de Claude Y. Laporte, Editor del proyecto de ISO/IEC 29110 Standards and Guides en ISO/IEC JTC1 SC7 Working Group 24 del SubComité 7 (SC7) del Comité Técnico Conjunto 1 (JCT1) de la Organización Internacional de Normalización (ISO) y la Comisión Electrónica Internacional (IEC), en el que se señalan los beneficios de la norma ISO/IEC 29110 para las organizaciones pequeñas: Trabajo estandarizado, con mejor calidad y resultados consistentes en todos los proyectos. Mejor administración y seguimiento del proyecto. Mejor comunicación dentro del equipo. Proporciona mayores posibilidades para acceder a mercados internacionales. Como objetivos específicos del presente proyecto, se busca: Determinar el perfil de implementación para la MYPE. Crear un plan para Implementar la Gestión de proyectos en base a la Norma ISO/NTC-29110. Crear un plan para Implementar Software en base a la Norma ISO/NTC-29110. En el presente trabajo de investigación se propone roles, un mapa de procesos, se describen y diagraman los procesos, y se sugieren un conjunto de artefactos los cuales van a evidenciar los requisitos que exige la ISO-29110. / This research project proposes the implementation of ISO/NTC-29110 in a MYPE consulting company of Software Vision-xtrema S.A. to improve your project management and software implementation processes and gain access to national and international markets that require certification. This project is based on the publication “The implementation of ISO / IEC 29110 Management and Engineering Guides for small organizations” by Claude Y. Laporte, Editor of the ISO / IEC 29110 Standards and Guides project in ISO / IEC JTC1 SC7 Working Group 24 of Subcommittee 7 (SC7) of Joint Technical Committee 1 (JCT1) of the International Organization for Standardization (ISO) and the International Electronic Commission (IEC), in which the benefits of ISO / IEC 29110 for small organizations: Standardized work, with better quality and consistent results in all projects. Better administration and monitoring of the project. Better communication within the team. Provides greater possibilities to access international markets. The specific objectives of this project are: Determine the implementation profile for the MYPE. Create a plan to implement project management based on the ISO / NTC-29110 standard. Create a plan to Implement Software based on the ISO / NTC-29110 Standard. In this research work, roles are proposed, a process map, the processes are described and diagrammed, and a set of artifacts are suggested which will demonstrate the requirements required by ISO-29110. / Tesis
37

Plan para la dirección del proyecto edificio multifamiliar jausbarranco de siete pisos y tres sótanos aplicando las buenas prácticas del PMI

Blanco Ruiz, Jorge Max, Chávez Guerrero, Ricardo Américo, Cuadros Alminagorta, Juan Carlos, Romo Millán, Javier Jorge, Torres Díaz, Víctor Elias 26 November 2021 (has links)
La actividad edificadora en Lima Metropolitana se ha visto afectada por el decrecimiento en su actividad, entre los años 2014 al 2017, teniendo en el año 2018 un crecimiento de 1.38 millones de m2 comparados al año 2017, pero siempre dentro de un proceso de incertidumbre que no brinda la seguridad y confianza a nuevos inversionistas. Siendo el mercado más competitivo, las empresas deben aplicar un sistema de gestión que estandarice el control de recursos y la mejora continua. Nuestra propuesta está orientado al uso y aplicación de las buenas prácticas que la Guía de los fundamentos para la dirección de proyecto (Guía del PMBOK®), 6ª ed., y Construction Extension to the PMBOK® Guide del 2016. El trabajo está basado en una obra adjudicada a A. Chávez Constructores E.I.R.L. en el distrito de Barranco cuya característica es un edificio multifamiliar de 6 pisos más azotea, con semisótano y tres sótanos de estacionamiento, el cual se está gestionado con un staff básico propuesto, con la finalidad de asegurar que el negocio sea sostenible en el tiempo y capaz de soportar las caídas del sector y sobre todo que su inversión tenga los resultados esperados, para ello proponemos un documento de gestión a la medida del proyecto. Estos procesos permitirán a la organización adquirir nuevos conocimientos y buenas prácticas para optimizar los recursos y lograr mejores resultados para el alcance de sus objetivos, y con ello alinearse con la misión y visión de la empresa y poder implementarlo en sus proyectos futuros. / Building activity in Metropolitan Lima has been affected by the decrease in its activity, between 2014 and 2017, with a growth of 1.38 million m2 in 2018 compared to 2017, but always within a process of uncertainty that it does not provide security and confidence to new investors. Being the most competitive market, companies must apply a management system that standardizes the control of resources and continuous improvement. Our proposal is oriented to the use and application of the good practices that the Guide of the fundamentals for project management (PMBOK® Guide), Sixth Edition, and Construction Extension to the PMBOK® Guide of 2016. The work is based on a work awarded to A. Chávez Constructores E.I.R.L. in the Barranco district whose characteristic is a 6-story multifamily building plus a roof terrace, with a semi-basement and three parking basements, which is being managed with a proposed basic staff, in order to ensure that the business is sustainable over time and capable of withstanding the downturns of the sector and above all that your investment has the expected results, for this we propose a management document tailored to the project. These processes will allow the organization to acquire new knowledge and good practices to optimize resources and achieve better results for the achievement of its objectives, and thereby align with the mission and vision of the company and be able to implement it in its future projects. / Trabajo de investigación
38

Propuesta de implementación de una PMO apoyándose en un framework Lean-Agile para una empresa de servicios compartidos / Design proposal for the implementation of a PMO based on a Lean-Agile framework for a shared services company

Calderón Pereda, Giancarlo Daniel, Chavez Rodriguez, Daymo Rodrigo, Leon Medina, Claudio Martin, Vasquez Rodríguez, Hilda Magally 15 July 2021 (has links)
En el siguiente trabajo de investigación tiene como objetivo elaborar una propuesta de implementación de una PMO apoyándose en un framework Lean - Agile para una empresa de servicios compartidos, el cual brinde el soporte en la Gestión de Proyectos en el área de TI de la empresa, debido a la cantidad de proyectos que se reciben en el área de TI; por lo cual esta propuesta permitirá mejorar el desempeño en la gestión de los proyectos en la empresa. Basado en los principios Ágiles, acompañado de las buenas prácticas Lean, el framework propuesto estará compuesto por los servicios que brindará la PMO, de acuerdo con el análisis de interesados que se realizó como parte del diagnóstico para la identificación de los mismos. Cada servicio contará con la organización necesaria a partir de entregables y lineamientos ágiles que permita a la empresa obtener una mejor planificación, desarrollo y ejecución para la realización de proyectos y lograr la concreción de los objetivos trazados y metas propuestas para cada uno de ellos. Todo esto de acuerdo a un plan de implementación de esta propuesta, así como también se realiza una evaluación financiera donde se indicará los beneficios financieros y no financieros, el cual mostrará la viabilidad de la propuesta. / The following research aims as main objective to develop a proposal for the implementation of a PMO based on a Lean - Agile framework for a shared services company, which will provide support in Project Management of the IT area of ​​the company, which is due to the several projects received by the IT area. This proposal will allow to improve performance in project management of the company. Based on Agile principles, followed by good Lean practices, the proposed framework will be composed of services that the PMO will provide, in accordance with the stakeholder analysis that was carried out as part of an identifying diagnosis. Each service will have the necessary organization, based on deliverables and agile guidelines that allow the company to obtain better planning, development and execution to carry out projects and achieve the objectives stated and goals proposed for each of them. All this according to an implementation plan for this proposal, as well as a financial evaluation is carried out indicating the financial and non-financial benefits, which will show the viability of the proposal. / Trabajo de investigación
39

Diseño de una PMO para la constructora JMO

Núñez Chipana, Jesús Teodoro, Gamarra Camacho, Milagros Giuliana, Valencia Reyes, Orlando José 11 May 2021 (has links)
El presente trabajo de investigación tiene como objetivo diseñar una PMO para la empresa constructora JMO, con la finalidad de retomar su crecimiento económico, a través de la optimización de sus proyectos de construcción. Esta caída en las metas económicas se está dando por la deficiente dirección de sus proyectos, que han generado sobrecostos en su ejecución y ha sacado a relucir la falta de experiencia en este campo de sus profesionales técnicos. Para lograr este objetivo, se ha decidido usar la metodología PMO Value Ring por su facilidad de adaptación a cualquier modelo de negocio. Cabe destacar que esta metodología define a la PMO como una entidad prestadora de servicios que centraliza todas las funciones que tengan relación referente a la dirección de proyectos, con el objetivo de atender las necesidades y expectativas de sus clientes para poder generar valor. El diseño de la PMO se establecerá mediante un proyecto usando la herramienta Project Canvas para plantear de manera visual los elementos a tomar en cuenta siguiendo los lineamientos de la Guía del PMBOK® Sexta Edición para la dirección de proyectos. Se propondrá un plan de trabajo para la Gestión del Cambio Organizacional basada en el ACMP® Standard for Change Management y el PMI® Managing Change in Organizations: A practice guide, con la finalidad de evitar conflictos con el personal ante la incertidumbre que esta pueda generar, y que afecte aún más el rendimiento de la empresa. Al finalizar el proyecto, JMO tendrá una PMO lista para iniciar operaciones. / The present research work aims to design a PMO for the construction company JMO, in order to resume its economic growth, through the optimization of its construction projects. This fall in economic goals is occurring due to the poor management of its projects, which have generated cost overruns in its execution and has brought to light the lack of experience in this field of its technical professionals. To achieve this objective, it has been decided to use the PMO Value Ring methodology due to its ease of adaptation to any business model. It should be noted that this methodology defines the PMO as a service provider entity that centralizes all functions related to project management, in order to meet the needs and expectations of its customers in order to generate value. The design of the PMO will be established through a project using the Project Canvas tool to visually present the elements to be taken into account following the guidelines of the PMBOK® Sixth Edition Guide for project management. A work plan for Organizational Change Management will be proposed based on the ACMP® Standard for Change Management and the PMI® Managing Change in Organizations: A practice guide, in order to avoid conflicts with staff in the face of the uncertainty that this may generate and that further affects the performance of the company. At the end of the project, JMO will have a PMO ready to start operations. / Trabajo de investigación
40

Propuesta para la implementación de una Oficina de Gestión de Proyectos en una Empresa Peruana Pesquera / Proposal for the implementation of a Project Management Office in a Peruvian Fishing Company

Ezcurra Silva, Ingrid Cristina, Valles Velásquez, Jorge Jonathan, Cavalcanti Garay, Antton Deyke 14 August 2019 (has links)
El presente trabajo de investigación se ha elaborado con la finalidad de minimizar las pérdidas de dinero en la implementación de proyectos, así como, maximizar el uso de recursos propios de la organización y el alineamiento estratégico de la empresa Peruana Pesquera. Nuestro trabajo de investigación está compuesto por cinco capítulos. En el primer capítulo se identifica las estrategias metodológicas y herramientas a implementar, así como el modelo de madurez necesario para la evaluación en gestión de proyectos de la empresa. En el capítulo dos, hacemos mención a la situación actual de la empresa y su situación dentro del rubro pesquero, también brindamos una introducción a su alineamiento estratégico y estructura organizacional. Por otro lado, se indica la situación problemática que aqueja actualmente la organización. En el capítulo tres, se provee de información para la propuesta de solución, así como los objetivos y alcances del proyecto planteado. Se muestran indicadores de éxito, riesgos identificados y planes de respuesta a los riesgos del proyecto. Debido a que la propuesta de solución nace desde el área de Tecnologías de Información, por ser un área involucrada en la elección de proyectos de la empresa de manera transversal, se tomará en consideración las herramientas que son usadas por esta área para la gestión de proyectos, así como estándares y bases de conocimiento, en los proyectos de toda la empresa como una primera fase, siendo esta nuestra propuesta de implementación para la Oficina de Dirección de Proyectos (PMO). En el capítulo cuatro nos brinda información referente a la justificación económica del proyecto, costos de implementación y análisis de inversión, así como los beneficios del proyecto y la propuesta de implementación para la Oficina de Dirección de Proyectos (PMO). Por último, el capítulo cinco nos brinda las conclusiones y recomendaciones del trabajo de investigación. / The present research work has been prepared with the purpose of minimizing the losses of money in the implementation of projects, as well as, maximizing the use of the organization's own resources and the strategic alignment of the Peruvian Fishing Company. Our research work consists of five chapters. In the first chapter, the methodological strategies and tools to be implemented are identified, as well as the maturity model necessary for the evaluation of the company's project management. In chapter two, we mention the current situation of the company and its situation within the fishing industry, we also provide an introduction to its strategic alignment and organizational structure. On the other hand, the problematic situation that the organization is currently suffering is indicated. In chapter three, information is provided for the proposed solution, as well as the objectives and scope of the proposed project, success indicators, identified risks and project risk response plans are shown. Because the solution proposal is born from the Information Technology area, as it is an area involved in the company's selection of projects in a transversal way, the tools that are used by this area for project management will be taken into consideration, as well as standards and knowledge bases, in the projects of the entire company as a first phase, this being our proposal for implementation for the Project Management Office (PMO). In chapter four, it gives us information regarding the economic justification of the project, costs of implementation and investment analysis, as well as the benefits of the project and the proposal of implementation for the Project Management Office (PMO). Finally, chapter five gives us the conclusions and recommendations of the research work. / Trabajo de investigación

Page generated in 0.4676 seconds