• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 283
  • 5
  • 4
  • Tagged with
  • 295
  • 154
  • 88
  • 85
  • 71
  • 60
  • 50
  • 49
  • 45
  • 45
  • 43
  • 42
  • 37
  • 37
  • 35
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
91

AVALIAÇÃO DA VEGETAÇÃO RIBEIRINHA EM RESPOSTA À REDUÇÃO DA VAZÃO À JUSANTE DA UHE PASSO SÃO JOÃO / EVALUATION OF RIPARIAN VEGETATION IN RESPONSE TO THE REDUCTION OF THE DOWNSTREAM FLOW OF THE HEP PASSO SÃO JOÃO

Balestrin, Diego 31 July 2014 (has links)
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior / In front of the current and growing demand for natural resources, especially of the water resources, it seeks to find a way to minimize the impacts caused by the anthropic interference in areas of riparian vegetation. These environments have an important functionality to the ecosystems belonging and surrounding due to the fact of this vegetation possesses intrinsic characteristics and adapted to the hydro and ecological environment. The rivers barring for water use as an energy source (study subject of this work) cause various impacts to the environment, one of the major is the alteration of the natural regime of pulses and often, the reducing the downstream flow of the works. The flow reduction in certain stretches of the waterway, besides requiring an in-depth study about the impacts caused by the reduction of the downstream water level of the utilization section, it becomes essential to the vegetation analysis, soil and local geology. These related factors to the morphophysiological characteristics of the different species found in these locations will determine if the current ecosystem, observed in natural altimetric quotes previously found in the area of riparian vegetation, will be able to adapt to the lower quotes checked after implementation of the barring, in other words, in the stretch of reduced flow (SRF). For determination and differentiation of the vegetation it was necessary the study and development of a methodology of analysis by quotes. This analysis was performed using the points method that consisted of a classification and identification by functional character of the existing plants in three sampling units (SU's) located in the SRF of the hydroelectric unit Passo São João town of Roque Gonzales-RS. Furthermore, were performed the gathering of soil samples in the different quotes of the three SU's for physical and chemical analysis. Thus, it was possible to determine that the soil variable (physical and chemical characteristics), has no significant variation by quotes gap and therefore, are not considered necessary for studies of adaptive variations of the vegetation established there. However, in front of this fact and of the generated results, one can strengthen the hypothesis that the hydrological variable is directly responsible for the adaptive variation of the vegetal species in these areas. / Diante da atual e crescente demanda por recursos naturais, em especial dos recursos hídricos, busca-se uma forma de minimizar os impactos causados pela interferência antrópica em áreas de vegetação ribeirinha. Estes ambientes possuem uma importante funcionalidade aos ecossistemas pertencentes e circundantes devido ao fato desta vegetação possuir características intrínsecas e adaptadas ao meio hidro ecológico. O barramento de rios para utilização da água como fonte energética (objeto de estudo deste trabalho) causa vários impactos ao meio ambiente, um dos principais é a alteração do regime natural de pulsos e, muitas vezes, a redução da vazão a jusante das obras. A redução da vazão em determinados trechos do curso d´agua, além de necessitar um estudo aprofundado a respeito dos impactos causados pela redução do nível de água a jusante da seção de aproveitamento, torna-se indispensável a análise da vegetação, solo e geologia local. Estes fatores relacionados com as características morfofisiológicas das diferentes espécies encontradas nestes locais determinarão se o ecossistema atual, observado nas cotas altimétricas naturais anteriormente encontradas na área de vegetação ribeirinha, terá condições de se adaptar às cotas inferiores verificadas após a implantação do barramento, ou seja, no trecho de vazão reduzida (TVR). Para determinação e diferenciação da vegetação foi necessário o estudo e desenvolvimento de uma metodologia de análise por cotas. Esta análise foi realizada pelo método de pontos que consistiu em uma classificação e identificação por caracteres funcionais das plantas existentes em três unidades amostrais (UA‟s) locadas no TVR da UHE Passo São João, município de Roque Gonzales-RS. Além disso, foram realizadas coletas de amostras de solo nas diferentes cotas das três UA‟s para análise física e química. Desta forma, foi possível determinar que a variável solo (características físicas e químicas), não possuem variação significativa por intervalo de cotas e, portanto, não são consideradas necessárias para estudos de variações adaptativas da vegetação ali estabelecida. Contudo, diante deste fato e dos resultados gerados, pode-se fortalecer a hipótese de que a variável hidrológica é, de forma direta, responsável pela variação adaptativa das espécies vegetais destas áreas.
92

ANÁLISE DA EFETIVAÇÃO DAS MEDIDAS PROGNOSTICADAS NO EIA/RIMA DA USINA HIDRELÉTRICA DONA FRANCISCA, RIO GRANDE DO SUL / ANALYSIS OF PROGNOSTICATED MEASURES EFFECTUATION EIA/RIMA FROM DONA FRANCISCA HYDROELECTRIC PLANT, RIO GRANDE DO SUL

Noal, Tatiana Nardon 06 July 2012 (has links)
The society lives in dynamic pursuit of improved quality of life. The need for the supply of electricity, in increasing amounts, boosts the pressure over the environment. Thus, procedures as the environmental licensing, the environmental impact study have their importance and necessity recognized, especially in ensuring entrepreneurial actions that respect the principles of sustainability. This study aimed to identify problems in the effectiveness of mitigation measures of Dona Francisca Hydroelectric plant collaborating to methodological improvement of the planning process and environmental licensing in hydroelectric projects, aiming to better legislation compliance. This work is characterized as a case study, consisting of extensive research, drawing on multiple sources of evidence. The case choice for Dona Francisca Hydroelectric Plant was taken due to the development being located near the city of Santa Maria, with greater accessibility, facilitating the planning and execution of research activities. Data collection was performed in 4 phases; the first phase was characterized as exploratory, through literature review, followed by diagnosis and problem identification through obtained data, and on-site visit in the surroundings of Dona Francisca HPP and Conservation Unit. In the third phase, we performed a planning study setting, where ideas were structured according to the proposed goals, and finally in the fourth phase an assessment of the briefings was done. Based on the Basic Environmental Project were analyzed 5 programs relating to the physical environment, 7 programs related to the biotic environment and 4 programs for the socioeconomic and cultural conditions of the population. After the analysis it was concluded that even with some adjustments, all environmental programs produced were implanted. The identified deficiencies were in meeting deadlines, deficiencies in technical projects, superficial presentation and data exploration, besides the bureaucracy generated during the process. The importance of increased support from the government is revealed, faced with environmental projects, either in improving operationalizator institutions and supervisory bodies of environmental issues or investing in environmental studies, with the goal of forming an independent database, as well as in creating less bureaucratic procedures in order to facilitate the work of everyone involved in the licensing process. It is recommended the standardization and creation of document templates and procedures as a viable alternative to improve the licensing processes, and the use of multicriteria methodologies for carrying out the Environmental Impact Assessment. / A sociedade vive em dinâmica busca pela melhoria na qualidade de vida. A necessidade do abastecimento de energia elétrica, em quantidades cada vez maiores, impulsiona a pressão sobre o meio ambiente. Assim, procedimentos como o licenciamento ambiental, o estudo de impacto ambiental tem sua importância e necessidade reconhecida, especialmente na garantia de ações empreendedoras que respeitem os princípios de sustentabilidade. O presente estudo teve como objetivo identificar os problemas na efetivação das medidas mitigadoras da Usina Hidrelétrica Dona Francisca colaborando para o aperfeiçoamento metodológico do processo de planejamento e licenciamento ambiental em projetos hidrelétricos, visando o melhor cumprimento às legislações pertinentes. Este trabalho caracteriza-se como um estudo de caso, consistindo em uma pesquisa abrangente, valendo-se de múltiplas fontes de evidência. A escolha do Caso da Usina Hidrelétrica Dona Francisca deu-se em função do empreendimento localizar-se próximo ao Município de Santa Maria, apresentando maior acessibilidade, facilitando o planejamento e execução das atividades de pesquisa. A coleta de dados foi executada em 4 fases, a primeira foi caracterizada como fase exploratória, através da revisão bibliográfica, seguida pelo diagnóstico, e identificação do problema através de dados obtidos, além de visita in loco no entorno da UHE Dona Francisca e na Unidade de Conservação. Na terceira fase, foi realizada a configuração do planejamento do estudo, onde foram estruturadas as idéias de acordo com os objetivos propostos e, por fim na quarta fase foi realizada uma avaliação das informações apuradas. Com base no Projeto Básico Ambiental, foram analisados 5 programas referentes ao meio físico, 7 programas referentes ao meio biótico e 4 programas referentes as condições socioeconômicas e culturais da população. Após a análise concluiu-se que mesmo com algumas adaptações, todos os programas ambientais elaborados foram implantados. As deficiências identificadas foram quanto ao cumprimento de prazos, deficiências em projetos técnicos, apresentação e exploração superficial de dados, além da burocracia gerada no decorrer do processo. Revela-se a importância de um maior apoio por parte do governo, frente a projetos ambientais, seja na melhoria das instituições operacionalizadoras e fiscalizadoras das questões ambientais ou no investimento em estudos ambientais, com objetivo de formar um banco de dados independente, assim como na criação de procedimentos menos burocráticos com vistas a facilitar a atuação de todos envolvidos nos processos de licenciamento. Recomenda-se a uniformização e criação de modelos de documentos e procedimentos como uma alternativa viável para melhoria nos processos de licenciamento, bem como a utilização de metodologias multicritério para a realização da Avaliação de Impactos Ambientais.
93

PARTIDA DE UM REATOR ANAERÓBIO DE FLUXO ASCENDENTE COM MANTA DE LODO (UASB) NO TRATAMENTO DE EFLUENTES PROVENIENTES DE UMA INDÚSTRIA DE LATICÍNIOS / STARTING A UPFLOW ANAEROBIC SLUGDE BLANKET REACTOR (UASB) IN THE TREATMENT OF EFFLUENT FROM A DAIRY INDUSTRY

Hamerski, Fernando 17 October 2012 (has links)
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior / Surface Waters are generally used as support for disposal of waste generated by man. The effluents from dairy industries are characterized by high volume presents, but mainly because of its high concentration of organic load. The evolution of agro-industrial systems wastewater treatment offers the application of eficiente technologies of the environmental impact is kept to a maximum. The UASB (upflow anaerobib sludge blanket) reactor is considered one of the most representative anaerobic systems, due to its high biomass concentration and a rich microbial diversity. This study aimed to initiate and control their operation in the anaerobic digestion process to the treat wastewater from a dairy plant evaluating the removal of control parameters (temperature, pH, COD, BOD5, TKN, TS and VST) beside the design parameters (HRT, HLR and VOL). The reactor was operated with the HRT of 0,085 d-1, and VOLs ranging from 12,58 to 29,2 kg.m-3.d-1, which influenced the high HLR value. To start, the inoculum used was from a septic tank. The temperature oscillations due to the presented experimental period. As for the control parameters, the system showed a significant difference in the removal of organic matter. The removal of BOD5 by the system obtained a removal efficiency of 42,7%. For COD, removal was 58,6%. The removal efficiency was related by large sludge production, indicating the time of withdrawal of excess. The concentration of excess sludge was analyzed, which showed significant 17.538 mg.L-1, being the explicit need for disposal of the sludge during operation. / As águas superficiais geralmente são utilizadas como suporte para eliminação de resíduos produzidos pelo homem. Os efluentes das indústrias de laticínios são caracterizados por apresentarem elevados volumes, mas principalmente por sua elevada concentração de carga orgânica. A evolução dos sistemas de tratamento de efluentes agroindustriais disponibiliza a aplicação de tecnologias eficientes para que o impacto ambiental seja reduzido ao máximo. O reator UASB (upflow anaerobic sludge blanket) é considerado um dos mais representativos sistemas anaeróbios, devido a sua alta concentração de biomassa e uma rica diversidade microbiana. Este trabalho objetivou dar início ao processo bem como controlar sua operação no processo de digestão anaeróbia para o tratamento de efluentes de uma usina de laticínios avaliando a remoção dos parâmetros de controle (temperatura, pH, DQO, DBO5, NTK, ST e SVT), além dos parâmetros de projeto (TDH, TCH e COV). O reator foi operado com um TDH de 0,085 d-1, e COV variando de 12, 58 a 29,2 kg.m-3.d-1, os quais influenciaram no alto valor da TCH. Para a partida, o inóculo utilizado foi proveniente de uma fossa séptica. A temperatura apresentou oscilações devido ao tempo experimental. Quanto aos parâmetros de controle, o sistema apresentou diferença significativa na remoção da matéria orgânica. A remoção de DBO5 pelo sistema obteve-se uma eficiência de remoção de 42,7%. Para a DQO, a remoção foi de 58,6%. A eficiência de remoção foi relacionada pela grande produção de lodo, indicando o momento da retirada do excesso. A concentração do excesso de lodo foi analisada, onde apresentou expressivos 17.538 mg.L-1, ficando explícita a necessidade de descarte do lodo durante a sua operação.
94

O Projeto Educacional da Itaipu Binacional (1974-1985) : uma educação para cada vila e para cada fração da classe trabalhadora / The educational project of the Binacional Itaipu : an education for each village and each fraction of the working class

Sbardelotto, Denise Kloeckner, 1983- 26 August 2018 (has links)
Orientador: Sérgio Eduardo Montes Castanho / Tese (doutorado) - Universidade Estadual de Campinas, Faculdade de Educação / Made available in DSpace on 2018-08-26T16:36:53Z (GMT). No. of bitstreams: 1 Sbardelotto_DeniseKloeckner_D.pdf: 10961869 bytes, checksum: 12b6e42597dfba467d2601e7ecf3a127 (MD5) Previous issue date: 2014 / Resumo: A presente tese analisa o Projeto Educacional da Itaipu Binacional, viabilizado nas três Vilas Habitacionais e no Canteiro de Obras da margem esquerda brasileira da Usina Hidrelétrica Binacional de Itaipu, entre 1974 e 1985. Fez parte deste projeto toda a estrutura ideológica implementada pela entidade, através da União de Construtoras - UNICON, responsável pelas obras civis de Itaipu. São analisadas as iniciativas de educação formal, efetivadas através do ensino regular do Anglo-Americano, técnico-profissionalizante do SENAI e Centro de Treinamento e Desenvolvimento da UNICON no Canteiro de Obras, e de alfabetização funcional e supletiva pela Escola do Canteiro; e não-formal, através das atividades culturais e desportivas realizadas pelos Centros Comunitários das Vilas Habitacionais e Canteiro de Obras. Resultante de conflitos diplomáticos entre Brasil, Paraguai e Argentina, a Usina Hidrelétrica de Itaipu foi construída em Foz do Iguaçu, região Oeste do Paraná, concretizando um dos grandes projetos dos governos militares no Brasil. O aumento da capacidade energética significava a infraestrutura necessária ao crescimento do parque industrial brasileiro, com o fortalecimento de indústrias nacionais dependentes de tecnologia externa e instalação de multinacionais e associadas. Porém, a construção da hidrelétrica gerou inúmeros impactos econômicos, ambientais, sociais e educacionais para Foz do Iguaçu e região Oeste do Paraná, devido ao alagamento de grandes áreas rurais e urbanas e inchaço populacional da cidade sede. Sob pressupostos do materialismo histórico-dialético, utilizei fontes bibliográficas, documentais e orais. O recorte histórico definido tem por justificativa a data de início e término da construção civil da Usina Hidrelétrica de Itaipu (1974-1985). A pesquisa me permitiu constatar que a educação formal e não-formal ofertada para os trabalhadores e seus dependentes na região do Projeto Itaipu foi diferenciada de acordo com a fração da classe trabalhadora a que eram destinadas, aprofundando a estratificação de classe que já era visível pelas diferenças qualitativas entre as Vilas Habitacionais A, B e C e alojamentos do Canteiro de Obras. Foram utilizadas estratégias para destinar educação de qualidade e voltada à "formação" generalista aos dependentes de trabalhadores dos altos níveis funcionais/fração de classe, enquanto aos trabalhadores e seus dependentes dos baixos níveis funcionais/fração de classe era oferta educação qualitativamente inferior, limitada ao "cuidado" e técnica-profissionalizante. Através da educação formal e não-formal o Projeto Educacional de Itaipu consolidou uma estrutura ideológica eficiente em disseminar valores éticos e morais de racionalidade, produtividade, disciplina, cooperação, respeito à hierarquia, civismo e meritocracia, adequados à manutenção da ordem nas Vilas Habitacionais e Canteiro de Obras e à formação da força de trabalho para as necessidades da obra, prioridade absoluta dos governos militares do Brasil e Paraguai / Abstract: This thesis analyzes the Educational Project of Itaipu , conducted in the three Villages Housing and Construction Works of the Brazilian left bank of the Itaipu Binational hydroelectric plant between 1974 and 1985. He was part of this project all the ideological structure implemented by the entity through the Builders Union - UNICON , responsible for the civil works of Itaipu. Formal education initiatives are analyzed , carried through the regular teaching of Anglo -American, technical and professional SENAI and Training and Development Center of UNICON Jobsite , and functional literacy and supplementary by the School of Construction ; and non- formal, through cultural and sporting activities carried out by Community Centers of VillagesHousing and Construction Site . Resulting diplomatic conflicts between Brazil , Paraguay and Argentina , Itaipu Hydroelectric Power Plant was built in Foz do Iguaçu , western Paraná , fulfilling one of the great projects of the military governments in Brazil. The power capacity meant the infrastructure necessary for growth of Brazilian industry , with the strengthening of national industries dependent on foreign technology and installation of multinational and associates. However, dam construction has generated numerous economic, environmental , social and educational impacts to Foz do Iguaçu and western Paraná , due to flooding of large rural and urban population and swelling of the host city . Under assumptions of historical and dialectical materialism , I used bibliographical, documentary and oral sources . The historical approach is justification set the start date and completion of construction of the Itaipu Hydroelectric Power Plant ( 1974-1985 ) . The research allowed me to see that the formal and non- formal education offered to employees and their dependents in the Itaipu project area was differentiated according to the fraction of the working class to which they were intended , deepening class stratification that was already visible by qualitative differences between the Villages Housing a, B and C and Construction Site lodges . Strategies were used to assign quality education and focused on " training " generalist to dependents of employees of high functional levels / class fraction , while the workers and their dependents of low functional levels / class fraction was offering qualitatively inferior education, limited to "care" and technical - vocational . Through formal and non - formal educational project of the Itaipu consolidated an effective ideological framework in spreading ethical and moral values of rationality , productivity , discipline, cooperation , respect for hierarchy , civility and meritocracy , necessary to maintain the order in the Housing and Villages Construction Works and training of the workforce to the needs of the work , absolute priority of the military governments of Brazil and Paraguay / Doutorado / Filosofia e História da Educação / Doutora em Educação
95

INFRA-ESTRUTURAS DE APOIO A GRANDES EMPREENDIMENTOS EAS ALTERACOES NO MEIO AMBIENTE / LARGE PROJECTS SUPPORT INFRASTRUCTURES AND THE ENVIRONMENTAL MODIFICATIONS

Ione Novoa Jezler Muller 23 January 1995 (has links)
O estudo pretende subsidiar o processo de tomada de decisão na concepção e planejamento de infraestruturas de apoio a grandes empreendimentos por parte dos empreendedores, dentro de uma política que considere as possibilidades de promover o desenvolvimento regional a partir deste marco, representado pela introdução maciça de investimentos. O trabalho enfoca principalmente o caso de usinas hidrelétricas, fazendo um paralelo com infraestruturas de apoio a minerações. Pretende-se tornar mais claras as consequencias da política adotada pelo setor no planejamento e implantação de vilas residenciais e alojamentos sobre o meio socioeconomico no qual se inserem. / The study aims to contribute to the decision making process on the conception and planning of support infrastructures of large projects, adopting a policy that considers the possibilities of promoting regional development induced by the massive introduction of investiments. The main focus is on hydroelectric power plants compared to mining projects. It is aimed to clarify the consequences of each different policy on the socioeconomic environment.
96

Desempenho de desenvolvimento humano dos municípios brasileiros afetados por usinas hidrelétricas e suas relações com a trajetória da avaliação de impacto ambiental / Human development performance of municipalities affected by hydroelectric plants and its relation with the environmental impact assessment trajectory

Nádia Lúcia Zuca 17 October 2016 (has links)
As usinas hidrelétricas são fundamentais na produção energética brasileira, sendo também responsáveis pela geração de importantes impactos ambientais negativos na escala local, os quais acabam tendo efeito no próprio desempenho dos municípios afetados. Com o objetivo de equacionar estes impactos de natureza física, biótica e socioeconômica, instituiu-se a Avaliação de Impacto Ambiental (AIA) por meio da Política Nacional de Meio Ambiente em 1981. A partir de então, este instrumento tem passado por alterações temporais no campo político, legal, institucional e técnico, as quais podem refletir-se na forma como o instrumento equaciona os impactos ambientais e, neste caso, nos próprios desempenhos de desenvolvimento dos locais afetados por hidrelétricas. O presente trabalho teve como objetivo analisar a relação entre o desempenho de desenvolvimento nos municípios brasileiros afetados por hidrelétricas e a trajetória da Avaliação de Impacto Ambiental. Nesse sentido, o resultado obtido neste trabalho, é um indicativo de que a AIA quando bem executada pode ser um meio eficaz para gestão de impactos e planejamento ambiental. / Brazilian hydropower plants are fundamental in Brazil\'s energy production, although they are also responsible for generating significant environmental impacts at the local scale, which having an effect on their own municipal development performances. Aiming to solve these physical, biotic and socio-economic impacts, was created the Environmental Impact Assessment (EIA) by the National Environmental Policy in 1981. Since then, this instrument was temporal changed by political, legal, institutional and technical contexts, which may be reflected in how the instrument solves environmental impacts and, in this case, the municipal development performances affected by hydropower plants. This project aimed to analysis the relationships between municipal development performances and the temporal course of Environmental Impact Assessment. In this sense, the result obtained in this project is an indication that the EIA when well executed can be an effective means for impact management and environmental planning.
97

Desajustes identificados em relatórios de estudos de impactos ambientais em empreendimentos hidrelétricos focando os grupos de aves e mamíferos silvestres / Discrepancies identified in environmental impact assessment reports for hydropower projects focused on analyses of wild birds and mammals

Adriana Akemi Kuniy Kamogawa 19 March 2013 (has links)
Os Estudos de Impacto Ambiental (EIA) foram legalmente institucionalizados no Brasil durante a década de 1980. Estes são balizados a partir do Termo de Referência (TR) que define as diretrizes que o EIAs deverão seguir, mas não determina qual grupo faunístico e metodologias devem ser adotadas, o que fica a critério dos empreendedores e consultores contratados. Visando verificar se esse procedimento resulta ou não em ausência de padronização entre os TRs e os relatórios de EIAs, bem como em outros possíveis desajustes que resultem na menor eficácia dos relatórios de EIA, foram compararados nove relatórios de empreendimentos hidrelétricos das décadas de 1980, 1990 e dos anos 2000. Para tanto, foram utilizadas informações como atendimento às exigências contidas nos TRs e metodologias utilizadas, no que diz respeito aos métodos de coleta, esforço amostral, levantamento de grupos de aves e mamíferos dependentes de hábitats específicos relacionados, solidez das listas de faunas e análise dos dados. Além disso, foi avaliada a aplicabilidade do delineamento RAPELD na avaliação de impacto de empreendimentos hidrelétricos. Os resultados indicaram que há discrepância quanto aos esforços amostrais e às metodologias utilizadas nos estudos, além da ausência de informações requeridas pelos Termos de Referência e a escassez de dados relacionados aos grupos de fauna associada aos ambientes que serão afetados e a aves e mamíferos dependentes de ambientes aluviais. O delineamento RAPELD muitas vezes não é aplicável em regiões com alterações antrogênicas, mas deve-se levar em consideração que a recomendação de sua utilização pelo órgão ambiental para um casos analisados indica uma sutil evolução recente no delineamento amostral. As análises realizadas neste trabalho podem servir como indicadores sobre o estado geral da efetividade dos EIA como ferramentas a serem utilizadas pela sociedade no que se refere às intervenções ambientais. / Environmental Impact Assessment (EIA) studies were legally institutionalised in Brazil in the 1980s, and their elaboration is based on guidelines established by Terms of Reference (TR) which define the main directives to be followed by each project\'s EIA, but often do not determine the faunal groups to include and the methods to be employed choices which are then left at the discretion of the company proposing the project and their hired consultants. In order to analyse whether this procedure does or does not result in an absence of standardisation among Terms of Reference and EIA studies, as well as in other disparities which may impair the effectiveness of EIA reports, this work compared 9 EIA reports for hydro-power projects from the 1980s, 1990s and 2000s. The reports were compared with regard to such information as compliance with the requirements set by the TRs and methodology used (including sampling methods, sampling effort, study of bird and mammal groups dependent on specific habit types, reliability of the fauna lists provided and data analysis). The appropriateness of the RAPELD sampling design for Hydro-power environmental impact assessments was also analysed. The results indicated incongruities as to the sampling effort and the methodologies employed for the studies, as well as an absence of information required according to the Terms of Reference and a paucity of data specifically dealing with fauna groups associated with environments to be directly affected by the projects and with mammals and birds dependent on alluvial environments. The RAPELD sampling design is often considered inappropriate for highly human-modified regions, but it is noted that its recommendation by environmental agencies for some of the cases analysed indicates a recent improvement in sampling designs. This work\'s findings may serve as indicators of the overall state of the effectiveness of EIA studies as tools for the society to assess the effects of interventions in the environment.
98

[pt] ADEQUAÇÃO ESTRATÉGICA DE PROJETOS: ESTUDO DE CASO DA ELETRONUCLEAR / [en] PROJECT STRATEGIC FIT: A CASE STUDY OF ELETRONUCLEAR

EDCLER FELIX MAYRINK 03 September 2008 (has links)
[pt] Os princípios de gerenciamento de projetos têm alcançado nos últimos anos um grande interesse por parte das organizações, com objetivos de foco operacional em realizações eficazes dentro do custo, prazo e qualidade planejadas. No entanto, muito pouco se fez para reconhecer a disciplina gerenciamento de projetos como uma das core competencies para a composição do diferencial competitivo na estratégia empresarial selecionada. Esta pesquisa tem como objetivo principal o desenvolvimento de um estudo para averiguar se existe adequação entre os processos da disciplina gerenciamento de projetos e a estratégia da empresa pesquisada. A pesquisa foi desenvolvida por meio de estudo de caso único, para o qual foi selecionada como unidade de análise uma empresa governamental: a Eletrobrás Termonuclear S.A. - Eletronuclear. A coleta de dados foi realizada de acordo com o princípio de triangulação de diferentes métodos (YIN, 2003), e: 1) investigação documental (impressa, telematizada, eletrônica); 2) levantamento de percepções com auxílio de questionário estruturado de pesquisa; 3) levantamento de percepções complementares por meio de entrevistas. As interpretações e análises efetuadas dos dados coletados foram fundamentadas no referencial teórico utilizando-se o modelo genérico-integrativo de Macedo-Soares (2001b). Os resultados evidenciaram algumas inconsistências entre os processos da disciplina gerenciamento de projetos e a estratégia da empresa. Permitiram identificar fatores organizacionais que contribuem e outros que não contribuem para a adequação estratégica de projetos. Na conclusão do trabalho, são compartilhadas lições que a pesquisa focada na Eletronuclear trouxe para outras empresas. / [en] In recent years, organizations have become increasingly interested in the principles of project management in order to enhance the operational effectiveness of their undertakings in terms of planned cost, schedule and quality. However, little has been done in the way of recognizing the discipline of project management as one of the core competencies constituting the competitive differential of the business strategy selected. The main objective of this study is to ascertain whether the processes of the project management discipline fit the strategy of the firm at issue. The study adopted the single case study method, focusing on the government firm Eletrobrás Termonuclear S.A. - Eletronuclear. Data collection was performed in accordance with the method triangulation principle (YIN, 2003), together with 1) documental investigation (printed, telematic, electronic); 2) a perceptions survey using a structured research questionnaire; 3) a complementary perceptions survey through interviews. The data collected was analyzed and interpreted using Macedo-Soares` (2001b) generic integrative model. The results evidenced some inconsistencies between the processes of the project management discipline and the firm´s strategy. They permitted the identification of organizational factors that did or did not contribute to projects´ strategic fit. The study concludes by sharing the lessons for other firms that could be drawn from the Electronuclear case.
99

[en] ANALYSIS OF DYNAMIC BEHAVIOR OF A PWR UTILIZING THE COMPUTER PROGRAM SARDAN 2 / [pt] ANÁLISE DO COMPORTAMENTO DINÂMICO DE UM PWR UTILIZANDO O PROGRAMA SARDAN DOIS

JORGE ALEXANDRE ONODA PESSANHA 09 April 2018 (has links)
[pt] No projeto de uma usina nuclear PWR, é necessário verificar se os limites de projeto dos seus componentes são respeitados mesmo em condições de operação anormal. O presente trabalho representa uma evolução do programa Sardan, desenvolvido para simulação de transitórios em PWR s. Os novos aspectos incorporados na versão Sardan 2, são: análise da vareta de combustível ou diferenças finitas, modelo de canal aberto para o subcanal crítico e implantação de um modelo simplificado para o sistema de controle automático. O programa foi testado em acidentes condição II, em particular, retirada descontrolada de um conjunto de barras de controle, queda de um conjunto de barras de controle, diluição descontrolada de boro, e os resultados obtidos considerados satisfatórios. / [en] In the design of a PWR nuclear plant it is necessary to verify if the design limits are respected, even under abnormal operation condition. The present work represents an evolution of SARDAN code, developed to simulate transients in PWR, the new aspects incorporeted in SARDAN 2 are: the fuel ROD analysis in finite- diference, an open channel model for the critic subchannel analysis and the introduction of a simplified model for the automatic control system. The program has been tested in accident condition II, in special, uncontrolled ROD cluster assembly bank withoraw, dropped full-length assembly group, uncontrolled Boron dilution, and the results obtained were considered satisfactory.
100

[en] KNOWLEDGE BASED FOR HYDROELECTRIC MACHINES DIAGNOSIS / [pt] SISTEMA DE CONHECIMENTO PARA DIAGNÓSTICO DE MÁQUINAS HIDROGERADORAS

LUCIANO R CHAGAS COSTA JUNIOR 18 September 2006 (has links)
[pt] O Sistema elétrico brasileiro é baseado quase que integralmente em energia produzida por Usinas Hidroelétricas. Estas Máquinas Hidroelétricas possuem um comportamento diferenciado das máquinas turbo geradoras, cujo comportamento já foi identificado e classificado em pesquisas anteriores. Este trabalho investiga o uso de um Sistema baseado em Conhecimento para o diagnóstico precoce de falhas em Máquinas Hidrogeradoras, visando redução de custos advindos principalmente de paradas operacionais não necessárias na máquina para manutenção. O sistema foi criado com informação obtida a partir dos seguintes meios: sistemática de manutenção executada nas Usinas Hidroelétricas, através de entrevistas à equipe responsável pela manutenção da usina de Furnas (MG); da identificação do comportamento eletromecânico da máquina; e do estudo de casos. O Sistema é capaz de identificar, a partir dos sensores localizados nas máquinas, eventuais falhas, permitindo executar paradas programadas de maneira otimizada. Foi criado um protótipo de um sistema computacional baseado em Conhecimento implementando tal modelo de forma bem flexível. A modelagem criada, a implementação do protótipo computacional e, principalmente, a explicação do raciocínio empregado, agregado com a possibilidade da modificação do conhecimento através da aquisição automática, são contribuições inovadoras deste trabalho. É descrito o Domínio do Problema de diagnosticar falhas em Máquinas Hidrogeradoras, identificado durante análise das informações coletadas da equipe de manutenção na usina de Furnas e de especialistas no comportamento eletromecânico das máquinas. É descrito também o modelo simbólico criado, representativo do domínio, utilizando interface projetada, visando a implementação prática nas usinas. É apresentado uma solução de desacoplamento das informações advindas dos sensores eletromecânicos da máquina e o sistema, através de módulo baseado em Lógica Nebulosa (Fuzzy Logic) que converte as informações numéricas em informações simbólicas compreendidas pelo sistema de diagnóstico, permitindo o uso do sistema, sem alteração em máquinas que possuam características diversas. Finalmente, é apresentada a metodologia de testes adotada para validação do modelo implementado através da simulação de dados de vibração e oscilação, cujo relacionamento com eventuais falhas é parcialmente conhecido, assim como uma conclusão sobre a viabilidade e praticidade de um modelo simbólico na solução do diagnóstico das máquinas hidrogeradoras. Durante o desenvolvimento da tese verificou-se que o conhecimento sobre falhas em Máquinas Hidrogeradoras ainda não está consolidado e que então, um Sistema baseado em Conhecimento com aquisição de conhecimento automático mostra-se uma excelente ferramenta de modelagem para os especialistas. / [en] The Brazilian Electrical Energy supply is almost entirely based on the energy produced by the Hydroeletric Power Station Machines. These Hydroeletric Machines own particular behavior in comparison to the turbogenerator behavior. This work investigates the use of Knowledge based system Hydroeletric Machines fault diagnosis. The system was modeled using information obtained by: the maintenance s systematic executed Hydroeletric Power Stations, though Furnas (Minas Gerais) maintenance team interviews; the Machine electromechanical behavior; and a Case Based study. The system is able to identify, from machine located sensors data analysis, eventual faults, allowing the execution of programmed operational interrupts in the machine in a optimized manner. A computational prototype and, mainly, the interface explain engine in addition to the knowledge modification through acquisition, are the innovative contributions of this work. The machine fault diagnosis problem domain is described, identified in the information, collected from the maintenance team and the electromechanical behavior experts, analysis. It is also described the projected symbolic model, the domain representation, using graphical and friendly interface, aiming its practical implementation in real Power Stations. It is shown a sensor information detach solution, through a Fuzzy Logic based module which converts the numerical data in a symbolic one, known by the diagnosis system, allowing its use, without any modification, in a sort of different machines. Finally, it is shown the test methodology adopted for the prototype validation through oscillation data simulation, which relationship with machine faults is partially known, and the symbolic model praticality and feasibility in the Hidrogenerator Diagnosis solution. Through the thesis development, it was verified that the Hydrogenerator fault knowledge wasn t still consolidated. So, the Knowledge Based system with knowledge acquisition became an excelent modeling tool for the domain experts.

Page generated in 0.0357 seconds