• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 97
  • 15
  • 1
  • Tagged with
  • 113
  • 49
  • 36
  • 30
  • 29
  • 29
  • 13
  • 12
  • 11
  • 10
  • 10
  • 9
  • 9
  • 9
  • 9
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Energieffektivisering av modern tillbyggnad till äldre skola : fallstudie från Österbyskolan i Österbybruk / Efficient energy use in a modern extension to an old school

Rolfhamre, Jonas January 2014 (has links)
The Swedish government has introduced a goal to reduce the energy intensity by 20% to the year 2020. To reach this goal actions need to be taken throughout the energy sector which includes residential and commercial buildings. This thesis considers the possibility to reduce the energy usage in a building located close to Uppsala. The analyzed building is a combined office, cafeteria and entrance and was completed about half a year before this project started. Therefore the measures presented for a more energy efficient building are presented as measures for future constructions. Simulations have been made in VIP-Energy, a dynamic energy calculation program. The measures that have been evaluated are added insulation to roof and walls and change of windows to those with a better U-value. The results showed that the added insulation is not recommended because of the small savings compared to the investments. The use of better windows, on the other hand, would be economically viable according to the results. The better windows reduced the energy consumption by 4 MWh/year which gave a pay-back time of 16 years. Alternative energy supply systems for the studied building are also presented. The analyzed systems are pellet boiler, solar heating and two types of pre-heating/pre-cooling of ventilation air with ground heat. The most viable of these alternatives were the pre-heating/pre-cooling of the ventilation air with underground ducts which had a pay-back time of 21 years.
2

Atomens byggnad – modell eller sanning? En textanalys av tre läroböcker inom ämnet kemi för grundskolans senare år

Ek, Louise January 2009 (has links)
<p>Det har länge varit känt att de naturvetenskapliga ämnena i skolan traditionellt betraktas som svåra. Detta kan bero på att den vetenskapliga diskursen är fylld av särdrag som gör språket i läroböckerna mer otillgängligt för läsaren, men även att samtliga naturvetenskapliga falanger innehåller många komplexa begrepp och snårig terminologi. Denna studie har för avsikt att belysa vissa språkliga drag i läroböcker, i synnerhet avsnitt ur sammanlagt tre läroböcker inom kemi för grundskolans senare del som behandlar atomens byggnad. Analysen behandlar vilken typ av språk som används i läroböcker, vilka strategier författarna använder för att förmedla kunskapen kring atomens byggnad samt om olika läromedel uppvisar någon skillnad i hur atomen framställs. </p><p>I studien redovisas resultet av textanalysen utförd på de tre läromedlen och man kan konstatera att samtliga läroböcker visar många gemensamma drag utifrån innehåll och språk – men även skillnader i hur atomens byggnad framställs. Endast en av läroböckerna kopplar tydligt samman begreppet modell med dess beskrivning av hur elektronerna förhåller sig till atomkärnan. Likaså framkommer i studien i vilken utsträckning de olika läroboksförfattarna använder sig av språkliga strategier för att öka läsarvänligheten hos texterna.</p>
3

Atomens byggnad – modell eller sanning? En textanalys av tre läroböcker inom ämnet kemi för grundskolans senare år

Ek, Louise January 2009 (has links)
Det har länge varit känt att de naturvetenskapliga ämnena i skolan traditionellt betraktas som svåra. Detta kan bero på att den vetenskapliga diskursen är fylld av särdrag som gör språket i läroböckerna mer otillgängligt för läsaren, men även att samtliga naturvetenskapliga falanger innehåller många komplexa begrepp och snårig terminologi. Denna studie har för avsikt att belysa vissa språkliga drag i läroböcker, i synnerhet avsnitt ur sammanlagt tre läroböcker inom kemi för grundskolans senare del som behandlar atomens byggnad. Analysen behandlar vilken typ av språk som används i läroböcker, vilka strategier författarna använder för att förmedla kunskapen kring atomens byggnad samt om olika läromedel uppvisar någon skillnad i hur atomen framställs. I studien redovisas resultet av textanalysen utförd på de tre läromedlen och man kan konstatera att samtliga läroböcker visar många gemensamma drag utifrån innehåll och språk – men även skillnader i hur atomens byggnad framställs. Endast en av läroböckerna kopplar tydligt samman begreppet modell med dess beskrivning av hur elektronerna förhåller sig till atomkärnan. Likaså framkommer i studien i vilken utsträckning de olika läroboksförfattarna använder sig av språkliga strategier för att öka läsarvänligheten hos texterna.
4

Avvikelser mellan beräknad och faktisk energianvändning i byggnader : Fallstudie av en fastighet byggd 2012

Wellholm, Jill January 2015 (has links)
The Swedish legislation for energy efficiency in buildings established in 2006 presents maximum limits for annual energy use in new buildings. To fulfill these goals the property developer is required to perform an energy calculation beforehand. The regulations also include an independent follow-up of energy use within two years after commissioning of the building. Significant discrepancies between calculated and actual results appear and need to be reduced. In this case study the energy consumption inoperation has been compared to the energy simulations in VIP Energy from the planning phase for a property consisting of four apartment buildings located in Uppsala, Sweden. The property uses a combination of geothermal heating and district heating. A wide approach to identify possible causes was applied, ranging from review of input parameters in the simulation files to evaluation of impact from deviating operation parameters and residential behavior. Furthermore, the thesis highlights the possible impact of the working process with energy calculations and follow-up of energy use in operation. The process was compared to a Swedish industry standard called Sveby, which defines a work plan for energy management in building projects. In the case study the energy use in operation exceeds the simulated results with approximately 63 % for two of the buildings and 44 % for the remaining two. The property uses more district heating than predicted. Possible causes have been identified, for example poor functioning of the heat pump and excluded heat losses in the simulation, but more detailed onsite measuring is needed to confirm the causes. An industry wide systematic approach to extend the monitoring of energy usage inoperation may reduce the deviations in future projects.
5

Energieffektivisering av en äldre byggnad : Fallstudie på Andra Magasinsgatan i Gävle

Olsson, Sofia, Karlsson, Ingela January 2016 (has links)
Syftet med denna rapport är att ta fram ett kostnadseffektivt sätt att energieffektivisera en äldre byggnad i Gävle utifrån Gävle kommuns restriktioner avseende fysisk och estetisk ändring. Detta då miljöproblemen på senare tid har blivit ett stort hot mot vår värld och det arbetas dagligen med att stoppa dessa och den växthuseffekt som dessa problem bidrar till. Bostadssektorn står för nästan en tredjedel av all energianvändning, vilket är en stor del av växthusutsläppen. För att minska energianvändningen och därmed bidra till att dämpa växthuseffekten går det att energieffektivisera byggnader. I den här fallstudien har litteraturstudier, besiktningar, mätningar, undersökningar, beräkningar och simuleringar gjorts för att få fram ett resultat. Byggnadens historia har även undersökts och detaljplanen för Gävle stad är granskad för att kontrollera om det finns begränsningar avseende fysisk eller estetisk ändring på grund av speciella bevarandekrav. Det finns dock inga begränsningar enligt detaljplanen eller kommunens bevarandekrav, så därför har Boverkets Byggregler med varsamhetskravet följts under framtagandet av resultatet. Den åtgärd som är mest kostnadseffektiv och mest energieffektiv i denna fallstudie är att kombinera tre sätt; att tilläggsisolera ytterväggarna invändigt, att tilläggsisolera vindsbjälklaget samt att byta de befintliga ytterdörrarna till nya dörrar som både är tätare och har bättre U-värden. / The purpose of this report is to propose a cost-effective way of improving energy efficiency in an old building in Gävle based on Gävle municipality's restrictions on physical and aesthetic changes. This is due to the fact that environmental problems in recent times have become a major threat to our world, and there are daily efforts aiming at curbing these and the greenhouse effect they contribute to. The housing sector stands for almost a third of all energy consumption, which is a large part of greenhouse gas emissions. To reduce energy consumption and thereby help to mitigate the greenhouse effect, energy efficiency can be improved in buildings. In this case study, literature reviews, inspections, surveys, studies, calculations and simulations have been executed in order to reach a result. The history of the building has also been investigated and the zoning of Gävle city has been studied to determine whether or not there exists restrictions regarding physical or aesthetic alterations due to special preservation requirements. However, since no restrictions existed according to the zoning or the preservation requirements of the municipality, the building regulations of the National Board of Housing, Building and Planning with the caution requirement have been followed carefully during the development of the study. The most cost effective and energy effective measure to take in this case study is to combine three types; to provide additional insulation to the inside of the exterior walls, to provide additional insulation to the attic as well as to replace the external doors with new doors that are both tighter and have better U-values.
6

Säkerhetsöverlåtelseborgenärens kreditsäkerhet i byggnad på annans mark / Creditor's benefit in transfer of full ownership of building on non-freehold property as collateral security

Ehrling, Sara, Ye, Yejie Hans January 2010 (has links)
Institutet säkerhetsöverlåtelse är en pantform som bland annat används vid kreditgivning för byggnad på annans mark. Säkerhetsöverlåtelse är inte lagreglerat men  erkänt genom praxis. Högsta domstolen fastställde genom NJA 1952 s. 407 den huvudprincip att borgenären uppnår sakrättsligt skydd redan genom ingående av säkerhetsöverlåtelseavtalet. Rättsläget gällande säkerhetsöverlåtelseborgenärens utmätningsrätt är emellertid oklart. Inte minst vid säkerhetsöverlåtelsegäldenärens dubbelöverlåtelse visar det sig att säkerhetsöverlåtelseborgenärens möjligheter till utmätning är begränsade. Författarna visar i denna uppsats att begränsningen torde kunna lösas genom bland annat tvångsförsäljning tack vare säkerhetsöverlåtelseborgenärens sakrättsliga skydd till byggnad på annans mark. Uppsatsen behandlar kortfattat hur tolkningen av pantavtalet av byggnad på annans mark bör gå till vid säkerhetsöverlåtelseborgenärens konkurs. Det är författarnas åsikt att en teleologisk tolkning borde vara det mest optimala. Uppsatsen behandlar två problem som kan uppstå för säkerhetsöverlåtelseborgenären vid andra borgenärers utmätningsanspråk i byggnaden. Antingen har säkerhetsöverlåtelsen ingåtts före det att andra borgenärer begärt utmätning i byggnaden, eller så har den ingåtts efter. Rättsföljderna i det första fallet har genom NJA 954 A 5 besvarats såtillvida att en säkerhetsöverlåtelse inte utgör något hinder för att utmätning skall kunna ske. Säkerhetsöverlåtelseborgenären har dock genom sitt sakrättsliga skydd rätt att få full betalning för sin fordran före övriga borgenärer. I det andra fallet menar författarna att det sakrättsliga skyddet som fastställts genom 1952 års dom inte kan anses vara tillämpbart. Säkerhetsöverlåtelseborgenären får därmed finna sig i att vara  oprioriterad borgenär, trots säkerhetsöverlåtelseavtalet. Åtskilliga utredningar har lagts fram om instiftande av ett registersystem för panträtt i registrerad nyttjanderätt. Emellertid har ingen lagstiftning kommit till stånd främst på grund av ekonomiska skäl. Författarna visar att stora delar av de utredningar som gjorts främst varit inriktade på att ta hänsyn till kredittagarens ställning vid pantsättning av byggnad på annans mark. Detta beror troligtvis, enligt författarna, på att regeringen velat skydda den svagare parten. Det är författarnas uppfattning att de juridiska spörsmål som framläggs genom denna uppsats inte behandlats i utredningen om panträtt i registrerad nyttjanderätt.
7

Energieffektivisering av Valhalla : Åtgärdsförslag för minskad energianvändning med hänsyn till en byggnads kulturvärde

Eriksson, Olle January 2014 (has links)
No description available.
8

Urban Building vid Hornsbruksgatan / Kommunikation och tillgänglighet

Carnero, Jorge January 2012 (has links)
Kommunikation och tillgänglighet som mål Mitt program består av fem hus,630 kv var,studentsbostäder 541 kv och ett kontors komplex,komplexet är i samma byggnad som t-bana hus. Alla hus är på parken, på grund av ljusförhållande,eftersom programmet är orienterad mot söder.För att komma till bostäder går man genom trappor,det finns fem nya trappor från gatan till bostäderna som har som funktion,förutom att nå bostäder,att göra möjligt till alla grannar att gå till parken från gatan själv.Programmet har också för mål att skapa ett mera dynamiskt urban liv med sitt multifunktionella grannskap,väl dimensionerad hus och anslutna ytor,varierande boende av alla åldrar,och utveckla ett mera aktiv förhållande till parken och med de nya bosättare
9

Koncept - detalj - byggnad / Concept-Detail-Building

Nilzén, Henrik January 2014 (has links)
Concept - detail - building Stockholm International Fairs, new main entrance   I studied at the KTH School of Architecture from 1995 to 2000. After completing my studies I wanted to work in an office that had a structural way of thinking and that knew the building process; I therefore chose to work for Rosenberg Architects. I have worked on a number of projects, among them several for the Stockholm International Fairs, from the Rica Talk Hotel and Hall AE, to the new main entrance. In the projects we undertook at the School of Architecture we had to identify and draw details that were central to our concepts. I have here identified some key details that we considered to be essential for the concept in a built project; the new main entrance of the Stockholm International Fairs completed in 2013. The entrance has complex logistics with multiple intersecting flows: exhibitors, employees, journalists, VIPs and others. The main entrance is not a solitary object but woven into the structure and consisting of new and refurbished parts. Above the flows we placed a large "flying" roof, a wing, with a long cantilever. The details are described below; I have also evaluated their actual importance to the concept after completion of the construction.   1 To give the roof a light expression, we wanted a thin finish that must be experienced completely even when seen in perspective. During the project its diameter grew but still felt slender in the overall context.   2 We wanted to visually separate the ceiling and wall using a horizontal niche. This was not implemented and weakened the concept of the built outcome.   3 To reinforce the impression of a flying roof, we wanted the glass facade to meet the ceiling without a visible horizontal post; it was to be recessed in the ceiling. This could not be implemented but ultimately proved unimportant in relationship to the finished entity.   Henrik Nilzén / Koncept – detalj – byggnad Stockholmsmässan, ny huvudentré   Jag studerade vid KTH:s arkitekturskola mellan 1995 och 2000. Efter skolan ville jag arbeta på ett kontor som tänker strukturellt, som kan byggprocessen och sökte mig därför till Rosenbergs arkitekter. Jag har där arbetat med en rad projekt för stockholmsmässan, från Rica Talk Hotel och Hall AE, till huvudentrén i roller alltifrån medverkande till medansvarig. I projekten på arkitekturskolan ingick att identifiera och rita detaljer som var centrala för koncepten. Jag har här identifierat några centrala detaljer som vi ansett vara avgörande för att bibehålla konceptet i ett konkret byggprojekt, Stockholmsmässans nya huvudentré, färdigställd 2013. Entrén har en komplicerad logistik med flera korsande flöden: utställare, anställda, journalister, VIP-gäster m fl. Huvudentrén är ingen solitär utan invävd i mässtrukturen bestående av nya och ombyggda delar. Ovan flödena placeras ett stort, “svävande” tak, en vinge, med lång utkragning. Detaljerna beskrivs nedan, jag utvärderar också kort erfarenheterna efter genomfört bygge.   1. För att ge taket ett lätt uttryck ville vi ha en tunn avslutning som måste upplevas helt jämn sedd i perspektiv. Under projekteringen växte dess diameter men upplevdes ändå smäcker i sammanhanget. ­­ 2. Vi ville visuellt separera tak och vägg med hjälp av ett skuggspår. Detta utfördes inte och försvagade konceptet i det byggda resultatet.   3. För att förstärka intrycket av svävande tak ville vi att glaspartierna skulle möta taket utan synlig horisontell post, att den skulle fällas in i undertaket. Detta kunde inte genomföras men visade sig inte vara viktigt sett i relation till helheten.   Henrik Nilzén
10

På andra sidan vattnet / Beyond the water

Mierse, Emma January 2015 (has links)
PÅ ANDRA SIDAN VATTNET Byggnaden är formad för att ge barn och ungdomar utrymme att bearbeta och utforska komplexa frågor. En plats där det är möjligt att ta både trevande och våghalsiga steg utan att bli betraktad utifrån. Rummen är organiserade kring ett atrium där verksamheterna har visuell kontakt med varandra, från utsidan är endast kommunikationsytorna synliga. Passagerna, som bär på en historia av både snabb och långsam förflyttning, upphäver tiden och låter besökarna gå in i sin egen värld. Det långsmala atriet ger ljus åt olika rum. Där inne växer låga ormbunkar och det går endast att nå från insidan. Närmast entrén ligger en yta fylld med vatten. Vattenspegeln är synlig från alla tre våningsplan där det nedre planet befinner sig under ytan. Stilla och i rörelse bryter den ljuset på olika sätt. / BEYOND THE WATER The building is designed to give children space to process complex issues. A place formed to encourage new ways of expression, a possibility to explore without being seen from the outside. The rooms are organized around an atrium where studios have visual contact with each other, from the outside only the area for communication is visible. The passages carry a history of both fast and slow movement, where time cease to exist, and let the visitors enter their own world. The long, narrow atrium brings light into different rooms and can be reached from the inside. Near the entrance is an area filled with water. The water mirror is visible from all three floors where the bottom floor exists below the surface. Still and in motion the light breaks in different ways.

Page generated in 0.0218 seconds