• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 9
  • 1
  • Tagged with
  • 10
  • 8
  • 8
  • 7
  • 5
  • 5
  • 4
  • 4
  • 4
  • 4
  • 4
  • 4
  • 3
  • 3
  • 3
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Dimensionering och utformning av dagvattendammar

Forsberg, Kajsa January 2019 (has links)
Storm water runoff in urban areas will be collected in storm water systems and one typeof solution to receive a flow and pollution reduction is storm water ponds. This studyincludes a literature study that compiles knowledge and literature about storm water andtreatment of storm water by ponds. Compiled information and equations describingrunoff and processes in storm water ponds have been used as base for creating an Excelbased calculation tool specific for storm water ponds. By entering information about astorm water pond as input to the tool step by step it provides an estimated resultregarding the pollution reduction efficiency of the incoming storm water. The toolestimates the reduction efficiency for suspended soils (SS), phosphorus, (P), copper(Cu) and zinc (Zn). The reduction efficiency of SS is determined in the tool by usingtwo different methods that includes input data of the pond hydraulics depending on itsdesign, incoming concentration of SS and the pond volume relative to runoff area. Thetool also estimates the reduction efficiency of SS by particle fraction. Reduction of P,Cu and Zn is estimated in two methods by using the particle bound and the reductionefficiency of SS. The created tool has thereafter been applied on six well documentedponds located in Sweden. The estimated results by the tool is thereafter compeered tothe documented results regarding incoming flow, pollution concertation and reductionefficacy. The estimated tool is also compared with results from StormTac, which is aprogram for design of storm water facilities. The result indicates that the tool estimatesthe incoming flow and concentration relatively well but that it is complicated toestimates the big variations in storm water. Both the tool and StormTac generallyestimates lower reduction efficacy of SS than the actual for all selected ponds. Thereduction efficiency of P, Cu and Zn is also underestimated by the tool compared to theactual values. However, it can be observed that the estimated result follow the sametrend as the actual values and result from StormTac.
2

Simulering och känslighetsanalys av ett pumpkraft-dagvattendammsystem : En utvärdering av potential för småskalig energilagring av solelsöverskott eller arbitrage / Simulation and sensitivity analysis of a PHES-stormwater pond system : An evaluation of potential as small-scale energy storage used for solar energy or arbitrage

Abrams, Philip January 2020 (has links)
The global move to more sustainable and renewable energy sources causes increased fluctuations in theelectric market. That fact combined with the Swedish regulations on micro producers make high levels ofself-use critical and have increased the interest in energy storage of energy from intermittent sources.Cooperation with Eksta AB have provided the opportunity to evaluate an innovative energy storage conceptfor a future exploitation area of around 17,2 hectares planned residential and urban area. This bachelorthesis studies the potential of using stormwater management ponds for small-scale energy storage in theform of pumped hydro energy storage (PHES). The focus is on storage of surplus energy from a solarenergy system designed for micro production and local energy supply. However, it also evaluates thepotential of using the equivalent dimensions for energy storage which storage level only change whenbuying or selling electricity at market prices for arbitrage purposes.Potential in the form of financial benefit and increased self-use of solar energy are studied through aquantitative methodology that, in the case of storing surplus energy from a solar system, use a simulationmodel developed for this thesis that takes Eksta´s contractual electric specifications into account. Toevaluate the case of energy storage for arbitrage a simulation model is used in the form of an algorithmbaseddrive strategy named “Optimal”, which has been recreated from research in the field of energy storageand drive strategies. The level of innovation is high on account of including such as energy additions to thestorage from rain water management, energy losses from dispersion of stored stormwater to surroundingground layers, it´s novel focus on a stormwater pond for energy storage, the rarely studied combination ofPHES and small scale solar systems and finally that the dimensions of the pump and turbine that is neededin PHES is based on PaT (pump as turbine) technology, allowing the reverse drive of a centrifugal pumpto operate as a turbine.Sensitivity analysis is included to increase the understanding of PHES-stormwater systems in the case of Eksta and as a concept for energy storage. The work also includes a brief examination of relevant regulationsin order to supply a wider perspective.The result shows that the implementation of a PHES-stormwater system during the years 2018 and 2019increased the self-use of generated solar energy by 28,59 % and provide the joint financial benefit of 5989SEK. The simulation model of energy storage for arbitrage during the years 2018 and 2019 resulted in thecombined financial benefit of 699 SEK when “Optimal” operation strategy is used and 678 SEK with apractically applicable operation strategy.The main conclusion is that PHES-stormwater systems as an energy storage for small-scale solar surplushas high potential to increase the self-use of solar energy but relatively low potential to increase the financialbenefits of small-scale solar systems. From the sensitivity analysis it can be concluded that the simulatedPHES-stormwater system is sensitive to small and medium ranged changes in storage capacity, efficiency,rate of dispersion, set electrical buying price and selectivity of which hours to empty the storage. This whilebeing generally insensitive to small and medium ranged variations in installed peak effect of the solar system,filling/emptying time and the relative size of the turbine compared to the pump.The conclusion from the simulation of arbitrage application is that the potential for financial benefit inthese circumstances is extremely low. The sensitivity analysis lead to the conclusion that the system issensitive to small and medium ranged variations in storage capacity, efficiency, filling/emptying time andmarginal operation costs.Besides the limited financial benefit, other potential hindrances may be the legality of connecting the systemelectrically, lack of financial benefits given to larger but still small-scale solar systems and the eventuality ofdisrupting the main function of the stormwater pond, which is purifying stormwater.
3

Dagvattenutredning för Rännilslunden, Östertälje : Utredning av flödesbelastning, föroreningsbelastning och framtagande av åtgärdsförslag / Stormwater investigation at Rännilslunden in Östertälje : Investigating the stormwater runoff and pollutant load owing to build specific measures of stormwater management for improving chemical and ecological status of the stream

Razzak, Md Abdur January 2020 (has links)
I dialog med Telge Nät har det framkommit området Rännilslunden i Östertälje kunde fungera som en fallstudie för denna utredning eftersom det finns behov av att utveckla dagvattenhanteringen med fokus på förbättring av dagvattenkvalitet. Detta arbete har utförts med syftet att utreda föroreningsstatus och flödesbelastning för området och utarbeta ett ekonomiskt rimligt och hållbart åtgärdsförslag till förbättring av befintlig dagvattenkvalitet för att uppnå god kemisk och ekologisk status. Beräkning av fördröjningsmagasin och flödesbelastning baseras på Svenskt vattens publikationer (P110, P90, P104 och P105). Föroreningsbelastning, reningseffekt och utformning av föreslagen reningsanläggning utfördes med hjälp av den Excelbaserade dagvatten- och recipientmodellering webprogrammet StormTac version 20.2.2.   Resultatet av beräkningen visade att utredningsområdets tillkortakommanden beträffande kapacitet inte var det största problemet. Ett fördröjningsmagasin med volymen 509 m3 räcker till för att lösa kapacitetsproblemen, men för att förbättra dagvattenkvaliteten behövs längre uppehållstider, vilket resulterar i ett betydligt större magasin (1800 m3). Modelleringen gjord i StormTac visade att befintligt dagvattensystem överskrider föreslagna riktvärden för Igelstaviken. Med avseende att förbättra renheten på dagvattnet från området har tre åtgärdsförslag tagits fram, vilket kompletterats med en kostnadsberäkning. Föroreningsreduktion och utformning av anläggningen samt reningseffekten modellerades i StormTac. Åtgärdsförslagen inkluderar anläggning av en damm med omhändertagande av 20,15 och 10 millimeter nederbörd med en rening av vatten på 90%, 86% respektive 76%. Dessa åtgärdsförslag uppnådde målen för rening enligt rådande miljökvalitetsnorm och Södertälje kommuns VA-policy. Åtgärdsförslagen skilde sig marginellt gällande reducering av föroreningshalter och kostnadseffektivitet.   En nedströmslösning i form av en fördröjning/reningsdamm dimensionerad för att kunna hantera 20 millimeter nederbörd kan vara optimal för Rännilslunden om den utformas med en reglervolym för fördröjning av flödet från ett 30-årsregn och maximalt regndjup om 30 millimeter. Denna fördröjning/reningsdamm bidrar till ett dagvatten som uppfyller miljökvalitetsnormerna.   Den planerade dammens reningseffekt för näringsämnen ligger kring 50% för fosfor och 25% för kväve, upp till 50–70% för tungmetaller (lägre värdet för kvicksilver) och cirka 60 % för suspenderat material (StormTac databas v.20.2.2). Denna typ av lösning förbättrar dagvattnets kvalitet avsevärt ur ett kemiskt och ekologiskt perspektiv. Fördröjning/reningsdamm är en bra lösning, både ur hållbarhetsperspektiv och kostnadseffektivitet, men också ur en estetisk synvinkel. En fördröjnings-/reningsdamm reducerar effektivt flödet, föroreningshalter samt föroreningsmängder, vilket gör att miljökvalitetsnormerna uppfylls i Södertälje kommun, men bidrar också till det estetiska och ekologiska värdet.
4

Förslag på generell arbetsprocess för utredningar av befintliga dagvattendammar ur ett funktionellt perspektiv / Suggested general work process for investigations of existing stormwater ponds from a functional perspective

Blekic, Demir, Fritz, Adam January 2016 (has links)
Syfte: I dagens läge byggs nya dagvattendammar för att magasinera dagvatten som överbelastar dagvattenledningssystemen och de befintliga dagvattendammarna förblir utan översyn. Eftersom klimatförändringar bidrar till att femårsregn kommer i en högre frekvens ökar flödet av dagvatten och orsakar att allt fler dagvattendammar kommer att bli underdimensionerade. För att bevara samhällsfunktioner utreds en generell arbetsprocess hur kommuner kan undersöka och bevara befintliga dagvattendammar. Metod: Metoderna som används är intervju, fallstudie och litteraturstudie. Intervju bidrar till att lösningar och förslag av undersökningsmetoder och åtgärdsförslag samlas in. Fallstudien utfördes på tre olika dagvattendammar och undersöker vilka undersökningsmetoder som kan användas. Att samla empiri i ett praktiskt fall bör bidra till att utredningens trovärdighet förstärks. De metoderna som användes i fallstudien är beräkningar, sedimentprovtagning och dokumentanalys från underlag av befintliga dagvattendammar. Med hjälp av litteraturstudie analyseras utredningens empiri med andra källor för att kontrollera empirins tillförlitlighet. Resultat: Ett flertal undersökningsmetoder och åtgärdsförslag analyserades. Tre undersökningsmetoder som passade en generell arbetsprocess var: flödesproportionell provtagning, sedimentprovtagning och dagvattenberäkningar med dagvattenmodellen Stormtac. Åtgärdsförslag som passade var: byggnation av en vall runt dammen för att utöka magasineringen, plantering av växter som tar upp näringsämnen och tungmetaller bundna i dagvattnet, utnyttja dagvattendammens form där dagvattendammens hydrauliska effektivitet utnyttjas maximalt samt anlägga fördamm med en makadamvall med vattenlevande växter. Konsekvenser: Flödesproportionell provtagning var tillförlitlig undersökningsmetod enligt intervju och litteraturstudie. Sedimentprovtagning av sediment i botten av inoch utlopp går att nyttjas i en generell arbetsprocess, men vissa föroreningshalter kan vara missvisande beroende på hur detaljerat sedimentprovtagningen görs. Dagvattenmodellen Stormtac och dess beräkningar kan nyttjas i en generell arbetsprocess eftersom Svenskt Vatten P110 (2016) bekräftar modellens beräkningar. Åtgärdsförslagen testades inte i verkliga fall, men effekten bekräftades i intervjun och litteraturstudien. Ett förslag på generell arbetsprocess kunde sammanställas. Stickprovstagning passar sämre in i en generell arbetsprocess. Begränsningar: Fallstudien har begränsats genom att utreda två metoder, varav den ena är dagvattenmodellen Stormtac och den andra är sedimentprovtagning. Utvalda föroreningar som tungmetaller, olja, kväve och fosfor analyseras. Studien avgränsas från att analysera hur recipienter påverkas av de befintliga dagvattendammar som studerats. / Purpose: At present are new stormwater ponds constructed to store stormwater which overloads stormwater pipe systems while existing stormwater ponds remains without overhaul. Since climate changes contributes to five-year rain in a higher frequency, which increases the flow of stormwater and causing more stormwater ponds to be undersized. In order to preserve social functions, are a general work process investigated of how municipalities can investigate and preserve their existing stormwater ponds. Method: The methods that are used are interviews, case study and literature study. The interviews contribute to solutions and proposals of investigation methods and proposals for action. The case study were performed in three stormwater ponds and examines the investigation methods that can be used. Collecting empirical data in a practical case, should increase the investigation’s credibility. The methods used in the case study are calculations, sediment sampling and document analysis of the basis of existing stormwater. Using literature study are the empirical data of the investigation analyzed with other sources to check the reliability of the empirical data. Findings: Several methods of investigations and action proposals were analyzed. Three investigation methods which fit a general work process were: flow proportional sampling, sediment sampling and stormwater calculations through the stormwater model Stormtac. The proposals for action which suited a general work process were: construction of a trench around the pond to expand the storage area, planting plants that take up nutrients and heavy metals tied up in stormwater, exploit the stormwater ponds shape where the hydraulic efficiency are exploited flat out by placing the inlet and outlet on opposite ends, and building trenches with a gravel embankment with aquatic plants. Implications: Flow proportional sampling were a reliable investigation method according to interview and literature study. Sediment sampling of sediment in bottom of in- and outlet can be used in a general work process, but certain contamination levels can be misleading depending on how detailed sediment samplings are done. Stormwater model Stormtac and its calculations can be used in a general workprocess because publication Svenskt Vatten P110 (2016) are confirming the models calculations. The proposals for action were not tested in real cases, but the effect was confirmed in the interview and literature study. Limitations: The case study was limited by investigating two methods, one of which is stormwater model Stormtac and sediment sampling. Selected contaminants such as heavy metals, oil, nitrogen and phosphorus are analysed. The study is delimitated by analyzing how recipients are affected by the studied existing stormwater ponds.
5

Uppföljning av reningsfunktionen i Steningedalens våtmark / Follow-Up of the Water Purification Function at Wetland of Steningedalen

Girleviciute, Aiste January 2018 (has links)
Dagvattnet från Märsta är belastat med bland annat tungmetaller och näringsämnen. Vattnet hamnar i Märstaån och transporteras vidare ut till Mälaren. Steningedalens våtmark är ett dammsystem som renar och fördröjer en del av Märstaåns flöde före transport ut mot Mälaren.   Syftet med detta självständiga arbete på kandidatnivå har varit att undersöka anläggningens reningsfunktion med hjälp av sedimentprovtagning. Sedimentprover har tagits vid in- och utloppet och en kemisk analys av dessa har utförts i ett ackrediterat laboratorium. Resultaten från in- och utloppet har jämförts för att se om det sker en minskning av föroreningar genom systemet. Fem sedimentfällor har placerats ut i delar av dammsystemet för att undersöka sedimentfördelningen och muddringsbehovet i anläggningen. Resultatet av studien visade att dammsystemet har en god vattenreningsfunktion med avseende på tungmetallerna bly, nickel, kadmium, krom, koppar och zink samt näringsämnet fosfor. Anläggningen har bedömts att vara i behov av muddring. / In Märsta, the storm water is contaminated with heavy metals and nutrients (nitrogen and phosphorus) among other pollutants. The water emits to the river Märstaån and further to the lake Mälaren. The wetland of Steningedalen is a pond system that delays part of the stream in Märstaån and purifies the water on its way through the system. This independent project is based on investigation of the purification functioning at Steningedalen wetland. The investigation has been done by sediment sampling and analysis. The samples were taken from the inlet and the outlet of the pond system. Chemical analysis has been made on these samples in an accredited laboratory. The results were compared in order to see if there is a trend through the system. Five sediment traps were placed in parts of the system to study the distribution of the sediment and the need of dredging. The results of the study have concluded that the stormwater pond system has a good water purification function with regard to heavy metals lead, nickel, cadmium, chromium, copper and and zinc aswell as the nutrient phosphorous. The study has also shown that the system is in need of dredging.
6

Assessment of the Potential Environmental Impacts of Stormwater Management from a Life cycle perspective : A case study of stormwater treatment alternatives in Finspång Municipality / Analys av de potentiella miljöeffekterna av dagvattenhantering ur ett livscykelperspektiv : En fallstudie av dagvattenreningsalternativ i Finspångs kommun

Nieminen, Neea January 2021 (has links)
Finspång Municipality suspects that the stormwater discharge has a negative impact on the quality of lake Skutbosjön due to its poor quality. Therefore, Tyréns is currently working together with the municipality to introduce new stormwater measures that would help to improve the state of the lake. This study will provide supporting evidence for decision-making by analysing and comparing the potential environmental impacts of a detention pond, an underground detention chamber system (UDCS) and a biofiltration system by utilising life cycle assessment (LCA) methodology. Metrics used in this study include 18 mid-point impact categories that are quantified for each system’s life cycle. The modelled pond had significantly lower adverse environmental impact in 12 impact categories than other systems, and UDCS had the highest environmental impacts in 13 impact categories. For pond, majority of the impacts where attributed to the transport of bulky materials during the decommissioning phase while for UDCS and biofilters, the material production in the construction phase dominated the life cycle impacts. Overall, applying LCA in a context of stormwater management can help in gaining a better understanding of the system’s life cycle and identifying areas of improvement. / Finspångs kommun misstänker att dagvattenutsläppet till Skutbosjön har en negativ påverkan på vattenkvalitet i sjön. Därför arbetar Tyréns tillsammans med kommunen för att införa nya dagvattenåtgärder som ska bidra till att förbättra sjöns tillstånd. Denna studie kommer att ge underlag för beslutsfattande genom att analysera och jämföra den potentiella miljöpåverkan av en dagvattendamm, ett underjordiskt avsättningsmagasin och dagvattenbiofilter genom en livscykelanalys (LCA). Mätvärden som används i denna studie inkluderar 18 effektkategorier som är kvantifierade för varje systems livscykel. Den modellerade dammen hade betydligt lägre negativ miljöpåverkan i 12 effektkategorier än andra system, och avsättningsmagasinen hade den högsta miljöpåverkan i 13 effektkategorier. För dammen tillskrevs merparten av påverkan transporten av skrymmande material under byggfasen, medan för avsättningsmagasinen och dagvattenbiofilter dominerade materialproduktionen i byggfasen. Att tillämpa LCA i ett sammanhang med dagvattenhantering kan hjälpa till att få en bättre förståelse av systemets livscykel och identifiera förbättringsområden.
7

Sedimentprovtagning av dagvattendammar som ett alternativ till flödesproportionell vattenprovtagning / Sediment sampling in stormwater ponds as an alternative to flow-weighted water sampling

Persson, Annika January 2010 (has links)
<p>Stormwater run-off from surfaces such as roads or rooftops is often polluted with heavy metals and nutrients. Many of these substances can cause great damage in biota if they end up in the recipient. In Sweden constructed wetlands and ponds for treatment of stormwater are frequently used, since research has shown that these treatment ponds are reducing stormwater pollution considerably to a low cost. The knowledge of these pollutant removal mechanisms and how follow-up and assessment of the ponds should be performed is still limited.</p><p>To determine the pollutant removal efficiency of the stormwater ponds it is recommended that flow-weighted water samples are collected from both the inflow and the outflow of the pond. This method demands considerable resources of time and money for installations and analysis. Alternative methods for assessing pollutant removal are requested, methods with lower costs but relevant results. This thesis is investigating whether sediment sampling could be such an alternative.</p><p>Sediment core samples were taken in four stormwater ponds where flow-weighted water sampling has been performed as well. This makes it possible to compare the two methods. A method of sampling recently sedimented material was also tried out by constructing and placing sediment traps on the pond floor. Analysis of concentration of six heavy metals (Cd, Cr, Cu, Ni, Pb and Zn) and phosphorus were carried out.</p><p>The results show i.e. that the concentrations of heavy metals and phosphorus in the pond sediments decrease as the distance from the pond inlet increase. Comparing the two methods shows that the results from the sediment sampling are in the same order of magnitude as the results from the water sampling. Consequently, the conclusion states that a well executed sediment sampling may be an alternative to flow-weighted water sampling.</p> / NOS dagvatten
8

Sedimentprovtagning av dagvattendammar som ett alternativ till flödesproportionell vattenprovtagning / Sediment sampling in stormwater ponds as an alternative to flow-weighted water sampling

Persson, Annika January 2010 (has links)
Stormwater run-off from surfaces such as roads or rooftops is often polluted with heavy metals and nutrients. Many of these substances can cause great damage in biota if they end up in the recipient. In Sweden constructed wetlands and ponds for treatment of stormwater are frequently used, since research has shown that these treatment ponds are reducing stormwater pollution considerably to a low cost. The knowledge of these pollutant removal mechanisms and how follow-up and assessment of the ponds should be performed is still limited. To determine the pollutant removal efficiency of the stormwater ponds it is recommended that flow-weighted water samples are collected from both the inflow and the outflow of the pond. This method demands considerable resources of time and money for installations and analysis. Alternative methods for assessing pollutant removal are requested, methods with lower costs but relevant results. This thesis is investigating whether sediment sampling could be such an alternative. Sediment core samples were taken in four stormwater ponds where flow-weighted water sampling has been performed as well. This makes it possible to compare the two methods. A method of sampling recently sedimented material was also tried out by constructing and placing sediment traps on the pond floor. Analysis of concentration of six heavy metals (Cd, Cr, Cu, Ni, Pb and Zn) and phosphorus were carried out. The results show i.e. that the concentrations of heavy metals and phosphorus in the pond sediments decrease as the distance from the pond inlet increase. Comparing the two methods shows that the results from the sediment sampling are in the same order of magnitude as the results from the water sampling. Consequently, the conclusion states that a well executed sediment sampling may be an alternative to flow-weighted water sampling. / NOS dagvatten
9

Dagvattenutredning för Hamrebäcken : Utredning av föroreningsbelastning och framtagande av åtgärdsförslag för att förbättra vattenkvaliteten / Stormwater pollution of the Hamrebäcken stream : Investigating the pollutant load in order to develop measures to increase the ecological and chemical status of the stream

Feltelius, Vilhelm January 2015 (has links)
Hamrebäcken rinner genom östra delen av Västerås och har Mälaren som recipient. Under bäckens flödesväg tillkommer dagvatten och föroreningar i form av näringsämnen och tungmetaller från dess avrinningsområde. Bäcken utgör ett av de mest prioriterade vattendragen i Västerås gällande utsläpp av dagvatten. Detta examensarbete har utförts med syftet att utreda föroreningssituationen för Hamrebäcken och hur dess recipient Mälaren påverkas. Examensarbetet syftade även till att undersöka reningseffekten för en befintlig dagvattendamm samt att utifrån ett kostnads- och reningsperspektiv beskriva ett antal åtgärdsförslag för att uppnå en förbättring av bäckens ekologiska och kemiska status. Utvärdering av Hamrebäckens föroreningsbelastning samt reningseffekt för befintlig dagvattendamm och åtgärdsförslag utfördes med hjälp av den Excelbaserade dagvatten- och recipientmodellen StormTac.   Resultatet från studien visade att den modellerade belastningen från flera av bäckens delavrinningsområden överskrider föreslagna riktvärden för mindre vattendrag. Den totala belastningen från Hamrebäckens avrinningsområde överskrider i fallet för föroreningarna bly och suspenderat material även föreslagna riktvärden för Mälaren. Modellering av den befintliga dammen indikerar att anläggningen är underdimensionerad i förhållande till dess belastningsyta. Dammens reningseffekt uppnår inte heller effektmålen i Västerås stads handlingsplan för dagvatten. Ett förslag om utbyggnation av dammen har tagits fram utifrån litteraturstudie och tillgänglig yta för åtgärden. Den simulerade ombyggnationen uppnådde inte uppsatta effektmål men gav en betydande ökning i reningseffekt. Åtgärder som syftar till att öka dammens avskiljningsförmåga bör därför utredas ytterligare.   Fyra ytterligare åtgärdsförslag togs fram och reningseffekten av dessa modellerades i StormTac. Detta inkluderade två olika placeringar av dagvattendammar, en skärmbassäng med flytande våtmark, samt en konstruerad våtmark. Från genomförd modellering rekommenderas vidare utredning av åtgärdsförslagen inkluderande ett anläggande av en skärmbassäng med flytande våtmark, alternativt en konstruerad våtmark. Detta då dessa åtgärdsförslag uppnådde effektmålen för rening enligt Västerås stads handlingsplan för dagvatten. Åtgärdsförslagen skilde sig något åt gällande kostnadseffektivitet. Detta ansågs dock inte ensamt vara argument nog för att motivera anläggning av något åtgärdsförslag till följd av osäkerheter i det beräknade resultatet. Att en skärmbassäng kan utföras i närtid och inte kräver några ingrepp i avrinningsområdet kan anses som ytterligare argument för installation av anläggningen. En konstruerad våtmark kan i sin tur motiveras med att anläggningen bidrar till att höja det estetiska och ekologiska värdet av området. Dessa argument bör beaktas i valet av metod och det fortsatta arbetet med att minska områdets föroreningsbelastning och förbättra bäckens ekologiska och kemiska status. / Hamrebäcken is a small stream in Västerås, which flows through the eastern part of the city. Along it’s course to Lake Mälaren, the stream receives polluted stormwater containing such as heavy metals and nutrients. The primary objective of this master thesis was to investigate the level of pollutants in Hamrebäcken. A secondary objective was to study the reduction efficiency of an existing wet stormwater treatment pond in the area, and propose ways in which to achieve a higher ecological and chemical status for the stream. The stormwater and recipient software model StormTac was used to estimate the level of pollutants and to investigate the reduction efficiencies of different stormwater treatment facilities.   The study revealed that pollutant levels were too high for several of the subwatersheds, based on the recommended guidance for small streams. The pollutant load for the total watershed exceeded the guidance levels for Lake Mälaren for lead and suspended solids. Modelling the reduction efficiency of the existing wet pond indicated that the pond’s size was inadequate to cater for the quantity of incoming stormwater in need of treatment. Subsequently, the pollution reduction efficiency of the pond was not meeting those objectives set out in the Stormwater Action Plan developed by Västerås municipality. A proposal for rebuilding the pond was therefore developed, taking into account the existing conditions of the area and using recommendations from literature. When modeled in StormTac, the modified pond showed a substantial increase in reduction efficiency compared to that of the existing pond. Despite not reaching the objectives of the Action Plan, this suggested that it would be beneficial to investigate measures that increase the reduction efficiency of the existing wet pond further. As a result, an additional four alternatives for reducing the pollutant load of Hamrebäcken were developed using StormTac. These consisted of two wet stormwater treatment ponds at different locations within the watershed, a screen basin with floating treatment wetlands, and a constructed wetland.   The modeling revealed that the most feasible of the investigated measures was an installation of either a screen basin with floating treatment wetlands or a constructed wetland, both measures adjacent to the outlet of Hamrebäcken. This was mainly due to the modeled reduction capacity of these measures where the reduction objectives of the Action Plan were reached. A difference in cost effectiveness was found between the different measures. This was however not considered to solely be argument to justify the implementation of a certain measure due to uncertainties in the modelled result. The fact that a screen basin can be installed in the near future and without occupying space in the watershed are additional arguments for the use of this measure. A constructed wetland can in return be motivated by a potential increase in esthetic and ecological value of the area. These arguments should be considered in the continued investigation of choosing a measure for reducing the pollutant load of Hamrebäcken and to achieve a higher ecological and chemical status for the stream.
10

Utredning av reningsfunktionen hos Kungsängens dagvattendamm : en studie med flödesproportionell provtagning / Investigation of the treatment function of Kungsängens stormwater pond : A study with flow proportional sampling

Arnlund, Jonathan January 2014 (has links)
Dagvatten kallas det regn- och smältvatten som rinner av från hårdgjorda ytor i stadsmiljön. Detta vatten för ofta med sig stora mängder av föroreningar som tungmetaller, näringsämnen och oljerelaterade ämnen, vilka kan göra stor skada om de når recipienter. För att rena dagvattnet och därmed minska föroreningsbelastningen byggs det allt fler öppna dagvattensystem som t.ex. våtmarker och dammar. Studier har visat att dessa system har hög reningseffekt och dessutom är de kostnadseffektiva. Kunskapen om hur avskiljningen i dessa system fungerar och om hur de bäst utvärderas är dock begränsad. Kungsängsdammen utanför Uppsala är en nybyggd dagvattenanläggning som är avsedd att rena och fördröja dagvattnet från industri- och handelsområdet Boländerna. Detta examensarbete syftar till att utreda reningsfunktionen av anläggningen. Framför allt genomfördes flödesproportionell provtagning vid inlopp och utlopp under 8 veckor. Ämnen som analyserades var näringsämnena P och N, suspenderat material, tungmetallerna As, Cd, Co, Cr, Cu, Mo, Ni, Pb, V, Zn och oljekolväten. Vid några tillfällen analyserades också de oljerelaterade organiska föreningarna PAH:er, oktyl- och nonylfenoler samt tributyltenn. Flödesproportionell provtagning rekommenderas för att säkert avgöra avskiljningseffektiviteten av en damm, men nackdelen är att den tar mycket tid och stora resurser i anspråk. Utöver denna metod genomfördes kompletterande mätningar med sedimentfällor samt en beräkning av föroreningsbelastning vid inloppet med programmet StormTac. Den flödesproportionella provtagningen visade att Kungsängsdammen fungerar väl som avskiljningsanläggning för föroreningar. Suspenderat material, näringsämnen och tungmetaller avskiljs effektivt och utloppshalterna understiger föreslagna riktvärden för dagvatten. Detta trots att både zink, koppar, kväve och suspenderat material hade inloppshalter som låg över riktvärdena. Flödesberäkningar visade att andelen av flödet som bräddas i bypass-diket förbi dammen är viktig vid bedömning av avskiljningseffektiviteten. För organiska föreningar uppmättes tributyltenn i halter över miljökvalitetsnormen för ytvatten både vid inlopp och vid utlopp. Inloppskoncentrationer framräknade i StormTac gav överensstämmande resultat med den flödesproportionella provtagningen för tungmetaller och näringsämnen. Vidare visade undersökningen av sediment att sedimentationen sker främst i fördiket och i inloppet till dammen. Fördiket är i stort behov av rensning, då sediment riskerar att spolas bort vid höga flöden. / Stormwater is the name for rainwater and snowmelt runoff from impervious surfaces in the urban environment. This water often carries large amounts of pollutants such as heavy metals, nutrients, and oil-related substances, which can cause great damage if they reach the receiving waters. To clean the storm water and thus reduce the pollution load, more and more open storm water systems are being built, such as wetlands and ponds. Studies have shown that these systems have high pollutant removal efficiency and are cost effective. Knowledge of how these systems work and how they best are evaluated is limited. “Kungsängsdammen” near Uppsala is a newly constructed stormwater facility that is designed to clean and retard stormwater from the industrial and commercial area Boländerna. This thesis aims to investigate the purification function of the facility. Flow proportional sampling was carried out at the inlet and outlet for 8 weeks. Substances that were analyzed were nutrients P and N, suspended solids, heavy metals As, Cd, Co, Cr, Cu, Mo, Ni, Pb, V, Zn and petroleum hydrocarbons. On some occasions, the petroleum-related organic parameters PAHs, octyl and nonylphenols and tributyltin were analyzed. Flow proportional sampling is recommended to determine the efficiency of a stormwater pond, but the problem is that it takes much time and considerable resources. In addition to this method, additional measurements were carried out with sediment traps, and a calculation of pollution load at the inlet with the program StormTac. The flow proportional sampling showed that the “Kungsängsdammen” pond-, functions well as a treatment facility for pollutions. Suspended solids, nutrients and heavy metals are separated effectively and the outlet concentrations for these substances were below proposed guideline values. This is observed, despite the fact that zinc, copper, nitrogen and suspended solids had intake concentrations above the guideline values. Flow calculations showed that the bypass flow is important when estimating the pollutant removal efficiency. For organic compounds, tributyltin was measured at concentrations above the Environmental Quality Standards (EQS) for surface water both at the inlet and outlet. The inlet concentrations that were calculated in StormTac were consistent with the results of the flow proportional sampling for heavy metals and nutrients. Moreover, the investigation of sediments showed that sedimentation occurs mainly in the ditch before the pond and at the inlet to the pond. The ditch is in need of cleansing, because of the risk of sediment being washed away during high flows. The flow proportional sampling showed that the “Kungsängsdammen” pond-, functions wellas a treatment facility for pollutions. Suspended solids, nutrients and heavy metals are separated effectively and the outlet concentrations for these substances were below proposedguideline values. This is observed, despite the fact that zinc, copper, nitrogen and suspended solids had intake concentrations above the guideline values. Flow calculations showed that the bypass flow is important when estimating the pollutant removal efficiency. For organiccompounds, tributyltin was measured at concentrations above the Environmental Quality Standards (EQS) for surface water both at the inlet and outlet. The inlet concentrations that were calculated in StormTac were consistent with the results of the flow proportional sampling for heavy metals and nutrients. Moreover, the investigation of sediments showedthat sedimentation occurs mainly in the ditch before the pond and at the inlet to the pond. The ditch is in need of cleansing, because of the risk of sediment being washed away during high flows.

Page generated in 0.2605 seconds