• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 13
  • 1
  • Tagged with
  • 14
  • 8
  • 7
  • 7
  • 5
  • 5
  • 5
  • 5
  • 5
  • 4
  • 4
  • 4
  • 4
  • 4
  • 3
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
11

Samverkansentreprenad : En studie om olika parters påverkan / Partnering : A study on the influence of different parties

Nilsson, Sofie, Unger, Anna January 2023 (has links)
I denna studie utreds definitionen av samverkan, vad det egentligen innebär och hur detupphandlas, samt vilka för- och nackdelar som finns med samarbetsformen. Äveninvolveringen av strategiskt viktiga underentreprenörernas har studerats. För att undersökadetta har både en litteraturstudie och en kvalitativ intervjustudie utförts.Studiens utgångspunkt är upplevelsen och erfarenheten av att arbeta med samverkan och föratt få ett så brett perspektiv som möjligt intervjuades beställare, huvudentreprenör ochunderentreprenör.Litteraturstudien ger en överblick av byggbranschens problem som bland annat innefattarbristfällig projektering, otillräcklig kompetens och tidsbrist. I denna rapport beskrivs hursamverkansentreprenad växt fram som en motreaktion till dessa problem. Det redogörs ävenför vad som kännetecknar en lyckad samverkan och när det är som mest lämpat att använda.Resultatet visar att definitionen av samverkan är projektspecifikt och det är beställarensengagemang som är avgörande för att samverkan faktiskt genomsyrar projektet. Vidare visarstudien att upphandlingen till stor del sker på mjuka parametrar och att lagen om offentligupphandling, LOU, inte egentligen är något hinder.Sammanfattningsvis är det av stor vikt att en samverkansentreprenad består av gemensammamål, förtroende och transparens för att lyckas. / In this study, the definition of partnering is looked into, what it actually means and how it isprocured, as well as the advantages and disadvantages of partnering. The involvement ofstrategically important subcontractors has also been studied. To examine this, both a literaturereview and a qualitative interview study have been conducted.The starting point of this study is the experience of working with partnering, and to gain asbroad a perspective as possible, clients, main contractor, and subcontractor were interviewed.The literature study gives an overview of the construction industry's problems, includinginadequate planning, insufficient competence, and time constraints. This report describes howpartnering has emerged as a reaction to these problems. It also explains the characteristics ofsuccessful partnering and when it is most suited.The results show that the definition of partnering is project-specific, and it is the involvementof the client that is crucial for partnering to permeate the project. Furthermore, the studyshows that procurement largely relies on soft parameters and that the Public Procurement Actis not actually an obstacle.In summary, it is crucial for partnering to consist of shared goals, trust, and transparency inorder to succeed.
12

Huvudentreprenörens övertagande av underentreprenörers materialansvar : Effekter och förutsättningar / The change of material responsibility from subcontractor to main contractor : Effects and prerequisites

Säfström, Olivia, Söderbaum, Karl January 2018 (has links)
Det finns stora förbättringsmöjligheter inom logistiken i byggbranschen då den idag är väldigt kostsam och innebär många störningar i produktionen. Den logistik som sköts av underentreprenörerna i ett byggprojekt är ofta ej synkroniserad med huvudentreprenörens logistik vilket innebär ytterligare svårigheter. Dålig kommunikationen mellan aktörerna och en relation som karaktäriseras av misstro försvårar en mer integrerad logistik. Denna studie syftar därmed till att undersöka en alternativ lösning där huvudentreprenören övertar underentreprenörens materialansvar. En sådan lösning innebär att huvudentreprenören är ansvarig för all logistik och att underentreprenören utför monteringen. Genom intervjuer med en huvudentreprenör samt flera underentreprenörer och leverantörer har denna studie försökt besvara både hur bygglogistiken och relationen mellan huvudentreprenör och underentreprenör påverkas. I och med ett övertagande av materialansvaret får huvudentreprenören ökad kontroll över logistiken vilket innebär ett större ansvar men även möjligheter att förbättra leveranssäkerheten och att huvudtidplanen följs. Då de hanterar all logistik kan de i högre grad nyttja resurser som t.ex. samlastning via mellanlager och en intern tredjepartlogistiker. Huvudentreprenören kan även ha en tidigare och tydligare kommunikation med leverantören. Underentreprenören får ett minskat ansvar i och med övertagandet och även en minskad kontroll över logistiken vilket leder till att de blir mer beroende av huvudentreprenören. Detta innebär ett ökat samarbete mellan aktörerna och därmed krävs en förbättrad kommunikation. Ett övertagande innebär vidare att huvudentreprenören blir mindre beroende av underentreprenören vilket ökar risken för att underentreprenören ersätts. Den främsta fördelen med ett förändrat materialansvar är enligt studien att byggplatslogistiken förbättras. Svårigheter i övertagandet ligger dels i kulturella normer då det innebär en förändring av underentreprenörens roll i bygglogistiken men även i huvudentreprenörens brist på kunskap om underentreprenörens material. Vidare visar studien att det finns en oro bland aktörerna kring vem som är ansvarig vid problem med materialet och att omorganiseringen kräver en utredningsprocess som avgör om byggnationsfel orsakats av materialfel eller monteringsfel. Sammanfattningsvis visar studien att det finns en stor potential i att huvudentreprenören övertar underentreprenörens materialansvar men för att en sådan omorganisering ska bli lyckad så bör underentreprenören vara involverad i utformandet. Vidare krävs en tydlig ansvarsfördelning, en förbättrad kommunikation och en förståelse för andra aktörers perspektiv. Lyckas aktörerna med detta kan omorganiseringen innebära en effektivare produktion. / In the area of building logistics there are great possibilities for improvement since it is today very costly and entails many disruptions in the production. The logistics handled by the subcontractors are often not synchronized with the logistics of the main contractor which leads to more difficulties. Bad communication between the actors and a relationship characterized by mistrust hinders more integrated logistics. The purpose of this study is to examine an alternative solution where the material responsibility is changed from the subcontractor to the main contractor. Such a solution entails that the main contractor is responsible for all the logistics and that the subcontractor will perform the assembly. Through interviews with a main contractor and several subcontractors and suppliers this study aims to answer both how the building logistics and the relationship between main contractor and subcontractor will be affected. As an effect of the change of material responsibility the main contractor will get a higher level of control over the logistics which results in a bigger responsibility but also the possibility to improve deliverance certainty and that the main time schedule is followed. As a consequence of them handling all the logistics they can to a greater extent utilize resources such as joint loading via storage facilities or an internal third-party logistics provider. The main contractor can have an earlier and more direct communication with the supplier. The subcontractor will have less responsibility as a result of the change but also a lowered control over the logistics which leads to a stronger dependence on the main contractor. This implies an increased cooperation between the actors and thus a demand for an improved communication. The main contractor will become less dependent on the subcontractor and therefore the risk for the subcontractor to be replaced will increase. The main benefit with the change of material responsibility is according to the study that the on-site logistics will improve. Difficulties with the reorganization are partly in cultural norms as it will change the subcontractor’s role in the construction logistics and partly in the main contractor’s lack of knowledge about the subcontractor’s material. The study also shows that there is a worry among the actors about who is responsible when a material problem occurs and the change demands an investigation process to determine whether a construction error is caused by a material or assembly error.  To conclude; this study shows a big potential in the material responsibility changing from the subcontractor to the main contractor but for such a reorganization to be successful the subcontractor should be included in the process of developing the reorganization. Furthermore, this demand a clear division of responsibilities, an improved communication and an understanding for the other actors’ perspective. If the actors succeed with this change of material responsibility it can lead to a more effective production.
13

Partnering according to whom? : Different stakeholder perspectives on how to facilitate project partnering / Samverkan enligt vem? : Olika aktörers perspektiv på hur man främjar projektsamverkan

Audish, Benil January 2024 (has links)
The construction industry faces challenges with efficiency and communication due to the interdependence of stakeholders and the transition between distinct phases of projects. Traditional project delivery methods often result in adversarial relationships, poor communication, higher costs, and schedule overruns. Partnering, introduced in the 1980s, aims to address these issues by promoting cooperative relationships and collaborative project management. However, the concept of partnering lacks a universal definition, making its implementation difficult. This leads to a lack of understanding about the dynamics between various stakeholders beyond just the client and contractor. Current literature mainly focuses on these two parties, neglecting the broader range of stakeholders involved in construction projects and failing to recognize the interdependency of stakeholders in a larger supply chain. To address this gap of partnering relationships, the thesis adopted Eriksson's (2015) theoretical framework, which includes four dimensions—strength, scope, duration, and depth—to identify the obstacles and opportunities that exists in the implementation of partnering. The thesis aims to increase the understanding of clients', main contractors’ and subcontractors’ views on partnering in relation to one another to facilitate the implementation of partnering. The aim of the thesis was achieved by answering the following questions: 1. What are the obstacles and opportunities for implementing project partnering from the perspective of each stakeholder in relation to one another? 2. What do clients, main contractors, and subcontractors respectively require in relation to one another to foster project partnering? Data was collected by conducting semi-structured interviews in collaboration with a company with individuals across the three stakeholder groups: client, main contractor and subcontractors. The results show that while stakeholders have minor differences in defining partnering, they agree on three key factors that influence the implementation: trust, openness and high engagement. Therefore, the main conclusions of the thesis are that in order to facilitate project partnering, stakeholders need to collectively define partnering to unify their understanding and address differing views. Awareness of the benefits can increase openness. Establishing trust and openness early should be done through a mix of formal and informal activities to develop relationships on both a personal and professional level. Initially, both types of activities should be frequent, with informal activities maintained during the production phase while the frequency of formal activities is lowered. Early broad stakeholder involvement ensures shared expectations and vision. The scope should be narrowed from the client side towards the production phase to improve communication. Key subcontractors should coordinate their work with each other from the start, and the client should stay engaged and show their presence during the production phase to promote collaboration. Choosing naturally cooperative individuals who can influence others is essential. Maintaining the partnering attitude throughout the project requires involving the same individuals in all phases. / Byggbranschen står inför utmaningar med effektivitet och kommunikation på grund av beroendeförhållandet mellan aktörer och övergången mellan de olika faserna av projekt. Traditionella projektleveransmetoder resulterar ofta i konfliktfyllda relationer, dålig kommunikation, högre kostnader och förseningar. Samverkan, som introducerades på 1980-talet, syftar till att lösa dessa problem genom att främja samarbetsrelationer och kollaborativ projektledning. Begreppet samverkan saknar dock en universell definition, vilket gör implementeringen svår. Detta leder till bristande förståelse för dynamiken mellan olika aktörer, utöver endast beställaren och huvudentreprenören. Nuvarande litteratur fokuserar mest på dessa två parter och försummar det bredare spektrumet av aktörer som är involverade i byggprojekt. Vidare misslyckas de med att erkänna beroendet mellan aktörer i en större försörjningskedja. Klyftan i litteraturen om samverkans relationer bemöttes genom att anta Erikssons (2015) teoretiska ramverk, som inkluderar fyra dimensioner–intensitet, bredd, varaktighet och djup–för att identifiera hinder och möjligheter vid implementeringen av samverkan. Studien syftar till att öka förståelsen för beställares, huvudentreprenörers och underentreprenörers syn på samverkan i förhållande till varandra för att underlätta implementeringen av samverkan. Syftet med studien uppnåddes genom att besvara följande frågor: 1. Vilka är hindren och möjligheterna för att implementera projektsamverkan ur varje aktörs perspektiv i förhållande till varandra?2. Vad kräver beställare, huvudentreprenörer respektive underentreprenörer i förhållande till varandra för att främja projektsamverkan? Data samlades in genom att genomföra semistrukturerade intervjuer i samarbete med ett företag med individer från de tre intressentgrupperna: beställare, huvudentreprenör och underentreprenörer. Slutsatserna visar att även om aktörerna har mindre skillnader i hur de definierar samverkan, är de överens om tre nyckelfaktorer som påverkar implementeringen: tillit, öppenhet och högt engagemang.Således visar de huvudsakliga slutsatserna av avhandlingen att för att främja projektsamverkan i byggbranschen krävs det att aktörer gemensamt definierar samverkan för att enas om en förståelse och hantera olika synsätt. Medvetenhet om fördelarna kan öka öppenheten. Att etablera tillit och öppenhet tidigt bör göras genom en blandning av formella och informella aktiviteter för att utveckla relationer både på en professionell och personlig nivå. Inledningsvis bör båda typerna av aktiviteter vara frekventa, med informella aktiviteter bibehållna under produktionsfasen medan frekvensen av formella aktiviteter minskas.  Tidig bred aktör medverkan säkerställer gemensamma förväntningar och vision. Omfattningen bör smalnas av från beställarens sida mot produktionsfasen för att förbättra kommunikationen. Viktiga underentreprenörer bör samordna sitt arbete med varandra från början, och beställaren bör förbli engagerad och visa sin närvaro under produktionsfasen för att främja samarbete. Att välja naturligt samarbetsvilliga individer som kan påverka andra är avgörande. För att bibehålla samverkansattityden genom hela projektet krävs att samma individer är involverade i alla faser.
14

Delaktighet och förtroende i partneringprojekt : – En fallstudie som belyser underentreprenörernas roll

Bonat, Ida, Mellåker, Emelie January 2015 (has links)
Problem:                      What role do sub-contractors have in a partnering project? Purpose:                       The purpose of the case study is to describe, explain and understand the sub-contractor’s role in a partnering project. The study will complement existing partnering research that is one-dimensional. Method:                       The study had an abductive approach and was based on a literature study, which collected secondary data and created the theoretical framework, and a qualitative case study, where semi-structured interviews collected primary data and created the empirical chapter. The empirical study is based on interviews with six respondents, all participants in the same project, three sub-contractors, one main contractor and one project manager. To ensure that the empirical study answered the issue and is relevant in relation to the theoretical framework, an operationalization scheme was used in the development of the interview guide. The interviews were transcribed, commented, categorized and coded. The empirical study was built around the themes presented in the theoretical framework. The analysis was done by systematically testing the empirical material against the theories. The study has limited generalization possibilities since it only highlights one project but the study is not meant for generalization. Conclusion:                  The case study complements existing knowledge through the factors participation and trust where the sub-contractors role is explained, described and understood in the Swedish construction industry. Organisations and individuals who want to understand the role of the sub-contractor in a partnering project can use the case study. It can also be used in a more general meaning to raise knowledge about partnering. The study shows that formal means are not as crucial as earlier research states; instead the informal means are the important ones. / Frågeställning:            Vilken roll har underentreprenörerna i ett partneringprojekt? Metod:                          Studien genomfördes med en abduktiv ansats och baseras på en litteraturstudie, som samlade in sekundärdata och skapade den teoretiska referensramen, och en kvalitativ fallstudie, där semistrukturerade intervjuer genomfördes som samlade in primärdata och ligger till grund för empiri-kapitlet. Den empiriska studien baseras på ett urval av sex respondenter, alla aktörer i samma projekt, tre underentreprenörer, en huvudentreprenör och en projektledare. För att säkerställa att den empiriska studien besvarade frågeställningen och var relevant i förhållande till litteraturstudien gjordes ett operationaliseringsschema som användes vid utvecklandet av intervjuguiden. Intervjuerna transkriberades, kommenterades, kategoriserades och kodades. Empirin byggdes upp kring de teman som presenterades i den teoretiska referensramen. Analysarbetet skedde genom att systematiskt testa empiri mot teori. Studien har begränsade generaliseringsmöjligheter eftersom den endast utgår ifrån ett projekt. Den är dock inte menad att användas för att generalisera. Slutsats:                        Studien kompletterar befintlig kunskap genom faktorerna delaktighet och förtroende som beskriver, förklarar och förstår underentreprenörers roll i den svenska byggindustrin. Studien kan användas av organisationer och individer som vill förstå underentreprenörens roll i ett partneringprojekt. Den kan också användas för att få en mer generell förståelse för partnering. Studien visar att formella medel inte är lika avgörande som tidigare forskning menar utan det är de informella medlen som har betydelse.

Page generated in 0.0764 seconds