• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 143
  • 142
  • 17
  • 15
  • 15
  • 10
  • 9
  • 7
  • 6
  • 6
  • 2
  • 2
  • 2
  • 1
  • 1
  • Tagged with
  • 408
  • 408
  • 141
  • 137
  • 113
  • 80
  • 67
  • 67
  • 65
  • 63
  • 61
  • 60
  • 56
  • 50
  • 49
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
291

Arquitetura de sistema de planejamento e controle da produção no contexto de empresa virtual. / Production planning and control system architecture in virtual enterprise context.

Pessoa, Marcosiris Amorim de Oliveira 24 April 2015 (has links)
Em um mercado global, tem sido observada a tendência para a dispersão geográfica das fabricas. Esta dispersão e motivada pela oportunidade de explorar as vantagens locais, sob diferentes pontos de vista. Essa estrutura também permite a interação mais intensa entre plantas de diferentes empresas produtivas. Neste sentido, o conceito de Empresa Virtual (EV) e fundamental para explorar novas estratégias de negócios, tais como foco nas competências essenciais, orientação máxima para o cliente e produção distribuída. No entanto, nesta nova estrutura produtiva, há novos requisitos para o planejamento e para o estabelecimento da data de entrega dos pedidos. Um sistema de Planejamento e Controle da Produção (PCP) convencional utiliza uma arquitetura hierárquica, o que não atende o requisito de autonomia das empresas parceiras. Para atender a essas novas exigências, este trabalho apresenta uma arquitetura de sistemas de planejamento e controle da produção no contexto de EV. Na proposta são utilizados os conceitos de janelas de tempo em conjunto com propagação de restrições para atender os requisitos de prazo de entrega de produtos. Estes dois conceitos tem sido amplamente utilizados na literatura relacionada a sistemas de planejamento convencionais, no entanto, não no contexto de EV. Nesta abordagem, as janelas de tempo delimitam o intervalo de alocação das tarefas nos sistemas de produção envolvidos, enquanto as restrição de capacidade identificam janelas de tempo factíveis considerando a importância da data de vencimento do pedido. E apresentado um exemplo da utilização da arquitetura e um exemplo de implementação. Este trabalho engloba EVs com empresas parceiras de diversos tipos de produção (produção em lotes e produção discreta). E utilizado o Production Flow Schema (PFS) para modelagem dos processos produtivos segundo uma abordagem hierárquica, com base em sucessivos renamentos para construir o modelo de forma progressiva e estruturada onde as propriedades do modelo ficam asseguradas por construção. Este refinamento gera sub-grafos em Rede de Petri, que são utilizados para a analise e o controle do processo produtivo. / In a global market, the trend for geographical dispersion of manufacturing plants has been observed. This dispersion is motivated by the opportunity to exploit local advantages under dierent viewpoints. This structure also allows for more intense interaction between plants of dierent productive enterprises. In this sense, the concept of Virtual Enterprise (VE) is fundamental to explore new business strategies such asfocus on core competencies,maximal customer orientationanddistributed production. However, in this new productive structure, there are new requirements for planning and for establishing the delivery date of the orders. A conventional Production Planning and Control system (PPC) uses a hierarchical architecture, which does not meet the requirement of autonomy of the partners companies. To address these new requirements, this work introduces a Production Planning and Control System Architecture in EV context. In the proposal are used the concepts oftime windowsandconstraint propagationto meet the deadline requirements of product delivery. These two concepts have been widely used in the literature relating to conventional planning systems, however, not in the EV context. In this approach, thetime windowsdelimit the allocation range of tasks in production systems involved, while the capacity constraint identify the feasible time window considering the importance of the ordes due date. An example of using the architecture and an implementation is presented. This work includes EVs with partner companies of various types of production (production batch and discrete manufacturing). Production Flow Schema (PFS) is used for modeling the processes according to a hierarchical approach based on successive renements to construct progressive and structured model where the properties of model are ensured by construction. This renement generates sub-graphs in Petri Net, which are used for the analysis and control of the production process.
292

Planejamento e controle da produção com a utilização de células de trabalho: estudo de caso em construções com vedações verticais em concreto armado moldadas in loco / Planning and control of production using work cells: a case study in constructions with cast-in-place concrete vertical panels

Bezerra, Larissa Marinho Coelho de Medeiros 10 June 2010 (has links)
A indústria da construção civil vem assumindo um papel determinante no desenvolvimento econômico do país e vivenciado um crescimento exponencial que exige das empresas uma dedicação crescente na busca por novas tecnologias construtivas e ferramentas que auxiliem na gestão de empreendimentos. Sistemas construtivos racionalizados que repercutam na melhoria dos produtos com a redução de custos são essenciais para manter a competitividade no setor. O sistema construtivo de vedações verticais em concreto armado moldadas in loco confere uma alternativa na produção de habitações em larga escala caracterizada pela redução de custos e alta produtividade originando uma cadeia produtiva que auxilia no planejamento e controle da produção em obras. O presente trabalho tem como objetivo contribuir para o planejamento e o controle da produção de edificações que utilizam em seu processo o sistema construtivo anteriormente citado, propondo um modelo de organização da produção baseado na redução da variabilidade dos processos produtivos por meio do fluxo contínuo da produção, que proporcione o trabalho ininterrupto no canteiro de obras. A proposta associa os princípios que sustentam a filosofia produtiva da Lean Constrution, e recomenda um modelo para o planejamento operacional de curto prazo, que defina os fluxos produtivos pela aplicação de ritmos constantes nas atividades mediante o nivelamento dos recursos de mão-de-obra envolvidos no processo produtivo com a introdução de células produtivas que proporcionam lotes otimizados de trabalho, constituindo células de trabalho. / The construction industry has a decisive role in economic development of the country and experienced exponential growth requires dedication growing companies in the search for constructive new technologies and tools that will assist them in managing exposures. Constructive rationalized systems that reverberate in improvement of products with reducing costs is critical to remain competitive in the industry. The constructive system using cast-in-place concrete vertical panels confers an alternative in the production of large-scale housing characterized by reduced costs and high productivity that provides a productive chain which assists in the planning and production control in workplaces. This work aims to contribute to the planning and production control buildings that use its constructive system previously cited, proposing a model organization of production based on reducing variability in productive processes through streaming production, providing uninterrupted work on site. The proposal combines the principles supporting the production philosophy of Lean Constrution, and recommends a template for the short-term operational planning, defining workflows by applying patterns appearing in activities by the leveling of labour resources involved in the production process with the introduction of work cells that provide small batches of work.
293

A implantação de sistemas APS sob a perspectiva de redes de inovação auto-organizadas / The implementation of APS systems under self-organizing innovation networks perspective

Thales Botelho de Sousa 15 May 2015 (has links)
Esta dissertação tem como finalidade analisar a implantação de sistemas APS em empresas sob a perspectiva de redes de inovação auto-organizadas. Considera-se que a implantação do sistema APS representa uma inovação organizacional para a área de planejamento e controle da produção da empresa adquirente do software, pois comparado aos sistemas de planejamento e controle da produção predecessores, supre deficiências referentes às limitações de capacidade da empresa, flexibilidade na geração de estratégias de produção, disponibilização de prazos de entrega mais curtos e maior apoio aos processos de decisão. Considera-se também que o processo de implantação pode ser analisado sob a perspectiva de uma rede auto-organizada, formada pela empresa adquirente, implantadora e desenvolvedora do software, o que permite identificar os nós (empresas), ligações (relacionamentos), posições (atividades das empresas), fluxos tangíveis (recursos físicos) e fluxos intangíveis (troca de conhecimento e informações). A metodologia de pesquisa utilizada compreende um estudo bibliográfico para o embasamento teórico da temática proposta e de sete estudos de caso para a coleta de dados em campo. A análise e discussão do cruzamento entre as evidências teóricas e práticas visa identificar e sistematizar elementos para disponibilizar um modelo de referência para a implantação de sistemas APS. O desenvolvimento do modelo de referência foi orientado pela metodologia Enterprise Knowledge Development (EKD), e o mesmo foi avaliado por profissionais de empresas implantadoras e pesquisadores acadêmicos, a fim de verificar sua consistência e identificar possíveis melhorias. / This dissertation aims to analyze the APS systems implementation in companies under the selforganizing innovation networks perspective. It is considered that the APS systems implementation represents an organizational innovation in the area of production planning and control of the software\'s acquiring company, because compared to the predecessors production planning and control systems, supplies deficiencies relating to capacity constraints of the company, flexibility in the generation of production strategies and greater support to decisionmaking. It is also considered that the implementation process can be analyzed under the perspective of a self-organized network formed by the acquirer, implanter and developer companies of the software, which allows us to identify the nodes (companies), links (relationships), positions (activities of companies), tangible flows (physical resources) and intangible flows (exchange of knowledge and information). The research methodology used comprises a bibliographical study to the theoretical background of the proposed theme and seven case studies to data collection in the field. The analysis and discussion of the intersection between theoretical and practical evidences aims to identify and systematize elements for provide a reference model for the APS systems implementation. The development of the reference model was guided by the Enterprise Knowledge Development (EKD) methodology, and the model was assessed by implementing companies professionals and academic researchers in order to check its consistency and identify possible improvements.
294

Proposta de implantação do plano de gerenciamento de resíduos sólidos para uma rede de supermercados, de acordo com as diretrizes da lei nº 12.305/2010 / Implementation s proposal of the plan of solid waste management for a supermarket chain, according to the guidelines of the law nº 12.305/2010

Debastiani, Solange Maria 12 February 2016 (has links)
Made available in DSpace on 2017-07-10T16:04:59Z (GMT). No. of bitstreams: 1 sola _nge.pdf: 3534206 bytes, checksum: 590f66cca597aadcf92f7e0b79e9aa52 (MD5) Previous issue date: 2016-02-12 / The aim of this dissertation was characterize a Plan of Solid Waste Management (PGRS) for a supermarket chain, according to the guidelines of the Law nº 12.305/2010, including all steps for its implementation, in order to adapt the enterprise to the current legislation. It is a case study, configured as an applied research, which used the exploratory and descriptive methods, with qualitative approach. With regard to data collection procedures, were used, in addition to bibliographic search, raising the organization's records, semi-structured interviews with managers and coordinators of the sectors, direct observation and participatory action research. For data analysis, it was used the content analysis. So, is justified the present study because of business is part of the list of companies considered large waste generators, and according to the requirement of Law nº 12.305/2010, it has the obligation to develop and implement a PGRS. Thus, after the analysis of the data and the identification of improvement points, it can be presented as a contribution to the practice: the elaboration of the PGRS and the action s plans for the implementation of the suggested proposal, in addition to the action research approach. It is expected, with this proposal, which, when deploying the PGRS, the enterprise contemplates not only the legal requirements, but also the environmental, social and financial benefits for the organization, seeking, in this way, that the company becomes environmentally friendly / O objetivo desta dissertação foi caracterizar um Plano de Gerenciamento de Resíduos Sólidos (PGRS) para uma rede de supermercados, de acordo com as diretrizes da Lei nº 12.305/2010, contemplando todas as etapas para a sua implantação, com a finalidade de adequar o empreendimento à legislação vigente. Trata-se de um estudo de caso, configurando-se como uma pesquisa aplicada, que empregou os métodos exploratórios e descritivos, com abordagem qualitativa. No que se refere aos procedimentos de coleta de dados, foram empregados, além da pesquisa bibliográfica, levantamento nos registros da organização, entrevistas semiestruturadas com os gerentes e com os coordenadores dos setores, observação in loco e pesquisa-ação. Para a análise dos dados, empregou-se a análise de conteúdo. Assim, justifica-se o presente estudo pelo fato do empreendimento fazer parte do rol de empresas consideradas grandes geradoras de resíduos e de acordo com as exigências da Lei nº 12.305/2010, estas possuem a obrigatoriedade de elaborar e de implantar um PGRS. Dessa forma, após a análise dos dados levantados e a identificação dos pontos de melhoria, apresentou-se como contribuição prática: a elaboração do PGRS e dos planos de ação para a implantação da proposta sugerida, além da abordagem da pesquisa-ação. Espera-se com essa proposta, que, ao implantar o PGRS, o empreendimento contemple não somente os requisitos legais, como também os benefícios ambientais, sociais e financeiros para a organização, buscando, dessa forma, que a empresa se torne ambientalmente correta
295

A implantação de sistemas APS sob a perspectiva de redes de inovação auto-organizadas / The implementation of APS systems under self-organizing innovation networks perspective

Sousa, Thales Botelho de 15 May 2015 (has links)
Esta dissertação tem como finalidade analisar a implantação de sistemas APS em empresas sob a perspectiva de redes de inovação auto-organizadas. Considera-se que a implantação do sistema APS representa uma inovação organizacional para a área de planejamento e controle da produção da empresa adquirente do software, pois comparado aos sistemas de planejamento e controle da produção predecessores, supre deficiências referentes às limitações de capacidade da empresa, flexibilidade na geração de estratégias de produção, disponibilização de prazos de entrega mais curtos e maior apoio aos processos de decisão. Considera-se também que o processo de implantação pode ser analisado sob a perspectiva de uma rede auto-organizada, formada pela empresa adquirente, implantadora e desenvolvedora do software, o que permite identificar os nós (empresas), ligações (relacionamentos), posições (atividades das empresas), fluxos tangíveis (recursos físicos) e fluxos intangíveis (troca de conhecimento e informações). A metodologia de pesquisa utilizada compreende um estudo bibliográfico para o embasamento teórico da temática proposta e de sete estudos de caso para a coleta de dados em campo. A análise e discussão do cruzamento entre as evidências teóricas e práticas visa identificar e sistematizar elementos para disponibilizar um modelo de referência para a implantação de sistemas APS. O desenvolvimento do modelo de referência foi orientado pela metodologia Enterprise Knowledge Development (EKD), e o mesmo foi avaliado por profissionais de empresas implantadoras e pesquisadores acadêmicos, a fim de verificar sua consistência e identificar possíveis melhorias. / This dissertation aims to analyze the APS systems implementation in companies under the selforganizing innovation networks perspective. It is considered that the APS systems implementation represents an organizational innovation in the area of production planning and control of the software\'s acquiring company, because compared to the predecessors production planning and control systems, supplies deficiencies relating to capacity constraints of the company, flexibility in the generation of production strategies and greater support to decisionmaking. It is also considered that the implementation process can be analyzed under the perspective of a self-organized network formed by the acquirer, implanter and developer companies of the software, which allows us to identify the nodes (companies), links (relationships), positions (activities of companies), tangible flows (physical resources) and intangible flows (exchange of knowledge and information). The research methodology used comprises a bibliographical study to the theoretical background of the proposed theme and seven case studies to data collection in the field. The analysis and discussion of the intersection between theoretical and practical evidences aims to identify and systematize elements for provide a reference model for the APS systems implementation. The development of the reference model was guided by the Enterprise Knowledge Development (EKD) methodology, and the model was assessed by implementing companies professionals and academic researchers in order to check its consistency and identify possible improvements.
296

[pt] MINIMIZAÇÃO DE CUSTOS DE PRODUÇÃO VIA PROGRAMAÇÃO INTEIRA MISTA: ESTUDO DE CASO DE PLANEJAMENTO DE PRODUÇÃO DE LUMINÁRIAS / [en] MINIMIZING PRODUCTION COSTS VIA MIXED INTERGER PROGRAMMING: CASE STUDY OF PRODUCTION PLANNING OF LUMINARIES

FELIPE KAIUCA CASTELO BRANCO KHOURY 22 December 2011 (has links)
[pt] O presente trabalho representa um estudo realizado sobre a gestão da produção e operações, tendo em vista o planejamento da produção de um conjunto de itens independentes num horizonte de curto prazo de uma empresa de varejo do setor eletrônico, via minimização de custos. O estudo iniciou-se a partir da necessidade de uma interface entre o setor de produção e o de vendas, e é focado na otimização da produção de luminárias da empresa Energia, a qual abastece o mercado de emissoras de televisão e produtores cinematográficos, em sua maioria. Para o planejamento, é necessário conhecer a série histórica da demanda dos itens dos últimos períodos. Porém, somente os dados históricos disponíveis – os dados de vendas dos itens - foram manipulados no software de previsão Forecast Pro, com o intuito de simular a previsão de demanda desses produtos no horizonte de planejamento de curto prazo. Em seguida, a modelagem matemática do problema de planejamento da produção desagregado – o modelo MPS para itens acabados - foi realizada a partir de entrevistas com responsáveis por setores distintos na empresa estudada. Por fim, utilizou-se o software de otimização AIMMS 3.10, capaz de solucionar problemas difíceis, para encontrar o plano ótimo de produção desagregado. Os resultados obtidos pelo software para o planejamento de curto prazo são as quantidades de luminárias a serem produzidas e estocadas em cada período, assim como decisões de produzir ou não em cada período. Esses resultados foram usados como base para analisar novos cenários, gerando informações suficientes para auxiliar a tomada de decisão por parte dos gerentes da empresa, como por exemplo, expandir os recursos produtivos. / [en] This work represents a study on the production and operations management, in order to plan the production of a set of independent items in a short-term horizon of a retail company of the electronics industry, by minimizing costs. As a necessity of understanding between sales and production the study is focused on optimizing production of lamps of the company Energia, which supplies to mostly the market for television and film producers. For planning, it is necessary to know the historical series of product demands of the items in recent past periods. However, the only available data – the product sales data -were handled in prediction Forecast Pro software to simulate the demand sales of the items for the short-term planning horizon. Then, the mathematical modeling of disaggregate production planning problem - the MPS model for finished items - was built, from interviews with managers of different sectors of the studied company. Finally, the optimization software AIMMS 3.10, capable of solving complex problems, was used to find the optimal production plan. The obtained results for short-term planning are the quantities of items to be produced and to be stocked in each period, as well as the decision to produce or not in each period. These results were used as the basis to analyze new scenarios, generating sufficient information to assist decision makers of the company, as for example, expand the productive resources.
297

Um modelo de projeto de melhoria em planejamento e controle da produção para pequenas e médias empresas. / An improvement project model in production planning and control for small and medium-sized enterprises.

Cruz, Rogério Santos 04 July 2019 (has links)
Objetivos: responder às seguintes questões de pesquisa: (1) Como gerenciar um projeto de melhoria de processos na Pequena e Média Empresa? (2) Quais são os fatores críticos para a implantação bem-sucedida de um modelo de projeto de melhoria de processos? Fundamentação teórica: Ao analisar a literatura, foi possível mapear três principais características da gestão das Pequenas e Médias Empresas: (1) Planejamento e Controle da Produção deficientes, (2) informalidade na execução dos processos e (3) falta de mensuração de resultados. O modelo de projeto de melhoria de processos proposto neste trabalho parte de um entendimento de que as caraterísticas (2) e (3) explicam (1) em grande medida. Metodologia: Este trabalho utilizou a pesquisa-ação para validar um modelo de projeto de melhoria em Planejamento e Controle da Produção para Pequenas e Médias Empresas. O modelo baseia-se no método DMAIC e utiliza o BPM, um Sistema de Gerenciamento de Resultados e ferramentas da qualidade para formalizar os processos de Planejamento e Controle da Produção e mensurar os seus resultados. Resultados: Esta pesquisa mostra que é possível realizar melhorias nos processos de Planejamento e Controle da Produção de Pequenas e Médias Empresas através da utilização de um modelo de projeto de melhoria estruturado baseado no método DMAIC. Com a utilização do modelo proposto os processos de planejamento e controle puderam ser formalizados e os seus resultados mensurados na empresa estudada. Tanto a formalização de processos quanto a mensuração dos resultados impactaram positivamente os processos de Planejamento e Controle da Produção. A formalização do processo ajudou a disseminar o conhecimento das atividades entre os funcionários da Pequena e Média Empresa e diminuiu consideravelmente a improvisação nos processos. Além disso, a formalização dos processos possibilitou que as áreas envolvidas no gerenciamento dos pedidos da empresa se comunicassem melhor e com isso foi possível identificar uma série de deficiências no processo. Por fim, a mensuração de resultados permitiu identificar problemas que não eram conhecidos pelos agentes do processo da empresa estudada. Contribuições: São duas as contribuições principais desta pesquisa. A primeira contribuição é de origem prática e está relacionada à falta de detalhamento ou até mesmo de um roteiro sobre como implantar um modelo de projeto de melhoria de processos em uma Pequena e Média Empresa. Neste trabalho, apresenta-se um passo a passo para conduzir e implantar tal projeto no ambiente da Pequena e Média Empresa. A segunda contribuição é de origem teórica e diz respeito aos fatores que devem ser considerados na condução e implantação de um modelo de projeto de melhoria de processos para que a sua implantação seja bem-sucedida. / Objectives: answer the following research questions: (1) How to manage a process improvement project in Small and Medium-Sized Enterprises? (2) Which are the critical factors for the successful implementation of the proposed improvement project model? Theoretical background: In analyzing the literature, it was possible to map three main characteristics of SMEs management: (1) poor Production Planning and Control, (2) informality in the execution of process and (3) lack of measurement of results. The proposed improvement project model in this work starts with an understanding that the characteristics (2) and (3) explain (1) to a great extent. Methodology: This study used the action research to validate an improvement project model of Production Planning and Control in Small and Medium Enterprises. The model is based on the DMAIC method and uses BPM, a Performance Management System and quality tools to formalize the Production Planning and Control processes and measure their results. Results: This research shows that it is possible to carry out improvements in the Production Planning and Control processes of the Small and Medium-Sized Enterprises through the use of a structured improvement model based on the DMAIC method. With the use of the proposed model, the Production Planning and Control processes could be formalized and their results measured. Both the process formalization and the results measurement positively affected the Production Planning and Control of the company studied. The process formalization helped to disseminate the knowledge of the activities among the employees of the Small and Medium- Sized Enterprise and considerably reduced the need of improvisation in the processes. In addition, the process formalization allowed the different areas of the company to communicate better and with this it was possible to identify a series of problems in the order management process. Finally, the measurement of results allowed us to identify problems that were not known to the process users. Contributions: There are two main contributions in this research. The first, of a practical matter, is related to the lack of a roadmap on how to implement a process improvement model in a Small and Medium-Sized Enterprise. This study provide a step-by-step guide to implement a process improvement project in the Small and Medium-Sized enterprise environment. The second, of a theoretical matter, refers to the factors that must be considered for the successful implementation of an improvement project model.
298

Modelos matemáticos para planejamento da produção em indústrias de embalagens de vidro / Mathematical models for production planning in the glass container industry problems

Amorim, Flaviana Moreira de Souza 19 June 2019 (has links)
Esta tese de doutorado apresenta modelos matemáticos de problemas de dimensionamento de lotes para planejamento da produção na indústria de embalagens de vidro, que são essenciais em qualquer cadeia de produção, pois são responsáveis por proteger e conservar os produtos (alimentos e bebidas). Na literatura científica são raros os trabalhos que abordam estudos sobre problemas combinados de dimensionamento de lotes e planejamentos da produção em indústrias de embalagens de vidro. Com a finalidade de preencher esta lacuna, a presente tese tem por objetivo propor modelos inéditos e métodos de resolução aplicáveis em problemas nas indústrias de embalagens de vidro. Dessa forma, propõem-se dois modelos baseados em problemas reais para a construção ou reforma de forno(s), denominados de Problema de Instalação de um Novo Forno e Problema de Instalação de Múltiplos Fornos, que verificam a capacidade de fusão e as configurações das máquinas instaladas. Outros dois modelos são desenvolvidos a partir de estudos de casos referentes ao planejamento e ao controle da produção de ampolas de garrafas térmicas. No primeiro estudo, considera-se o máximo da produção líquida e no segundo, minimiza-se os set-up, sendo que em ambos os casos a realidade de uma fábrica é refletida. A complexidade desses modelos contribui para o uso de métodos heurísticos e meta-heurísticos como técnicas para resolução dos mesmos. No entanto, considera-se também a avaliação da associação desses métodos ao uso de programação matemática. Para isso, modelos matemáticos são propostos dentro do contexto das indústrias consideradas. Desta forma, uma heurística de Filtro Guloso e as meta-heurísticas como o Algoritmo Genético Simples, o Algoritmo Genético Multi-Populacional e o Algoritmo Genético Modificado são utilizados na determinação das variáveis inteiras presentes nos modelos matemáticos. Além disso, utiliza-se um método exato, por meio da ferramenta CPLEX, para determinar as variáveis contínuas. Os estudos são conduzidos a partir de dados fornecidos por indústrias localizadas no Brasil e em Portugal. Portanto, os resultados colaboram com o estado da arte nessa área de pesquisa e com o processo de fabricação industrial de embalagens de vidro. / This doctoral dissertation presents mathematical models of lot-sizing problems for production planning in the glass containers industry, which are essential in any production chain, as they are responsible for protecting and conserving products (food and beverages). In the scientific literature, studies addressing combined problems of batch sizing and production planning in glass containers industries are rare. In order to fill this gap, this thesis aims to propose novel models and resolution methods applicable to problems in the glass containers industry. Thus, we propose two models based on real problems for the construction or remodelling of the furnace (s), called New Furnace Installation Problem and Multiple Furnace Installation Problem, which verify fusibility and configurations of installed machines. We developed two other models from case studies regarding the planning and control of the production of thermos vials. In the first study, we consider the maximum net production; in the second, we minimize the set-up. Both cases reflect the reality of a factory. The complexity of these models contributes to the use of heuristic and metaheuristic methods as techniques for their resolution. However, we also consider the evaluation of the association of these methods with the use of mathematical programming. For this, we propose mathematical models within the context of the considered industries. Thus, a Greedy Filter heuristic and metaheuristics such as the Simple Genetic Algorithm, the Multi-Population Genetic Algorithm and the Modified Genetic Algorithm are used to determine the integer variables present in mathematical models. Besides, we use an exact method from CPLEX tool to determine continuous variables. The studies are conducted from data provided by industries located in Brazil and Portugal. Therefore, the results collaborate with state of the art in this research area and with the industrial glass containers manufacturing process.
299

Reducing internal lead times in MTO & job-shop production environments: a case study

Todeti, Vamsikrishna, Jally, Kalyanchakravarti January 2013 (has links)
This Master’s thesis has been carried out within the subject area of Production Development and Management and aims to reduce internal lead times in make-to-order (MTO) and job-shop production environments with the use of identified theoretical methods. The reason this particular production environment was chosen was the flexibility and satisfaction it provides its customers. Today, customers expect customised products, a situation which causes problems for manufacturers as they are unable to produce such products in large amounts. In order to investigate problems with these kinds of environments and the causes for long lead times, we have conducted a literature study where we identified the problems these particular kinds of production environments experience regarding production planning and control which are related to the immense amount of time consumed by changeovers because of high demand variance and high requirements for customisation. To affirm the theoretical findings, we opted to undertake a case study and chose Talent Plastics Gislaved AB as our case, because this company utilises an MTO and job-shop production environment for its production of highly customised products with high demand variance. In the analysis of our case, we found that the wastes in the organisation were similar to those identified in the theoretical findings. The current planning system and the current state of the manufacturing lead time system were evaluated and a theoretical framework using a combination of lean production, work load control and constant work-in-process theories was suggested. We claim that concentrating on the reduction of setup times can lead the job-shop towards drastically decreased lead times and a much more effective use of time throughout the organisation. Because the organisation will continue to face problems due to the ever-increasing demand variance and requirements for customisation, there are plenty of opportunities for further research in these kinds of production environments. Emerging theories, such as quick response manufacturing, may also be tested to construct an efficient framework.
300

Zustandsgeregelte dynamische Dimensionierung von Produktionssystemen im Kontext des Produktionsmanagements / Status controlled dynamic dimensioning of production systems in context of production management

Krauß, Andreas 30 January 2013 (has links) (PDF)
Das zu entwickelnde Konzept zielt darauf ab, ausgehend von definierten Produktionsverfahren, -prozessen und den dafür qualitativ bestimmten Maschinen und Anlagen Erkenntnisse zur notwendigen Anzahl und den resultierenden Kosten zu ermitteln. Mit der Entwicklung des Konzepts soll ein Beitrag zur Schaffung eines unternehmensziel- und strategiekonformen Wertschöpfungsprozesses über alle Bereiche des Produktionsmanagements produzierender Unternehmen geleistet werden. Den Kern des Konzepts bildet die dynamische Dimensionierung, die Belastungsänderungen des Produktionssystems über die Zeit berücksichtigt. Der Schwerpunkt liegt dabei auf der Gestaltung eines wirtschaftlich sinnvollen Maßes an Flexibilität und Wandlungsfähigkeit. Weiterhin wird eine Automatisierung des Planungsprozesses in Verbindung mit dem Einsatz von Optimierungstechniken und Kostensimulation angestrebt. Anhand unterschiedlicher Szenarien erfolgt eine Gegenüberstellung des neu entwickelten Konzepts mit bestehenden Verfahren. / The concept which has been developed is based on defined production methods and production processes which are necessary for quality machinery and equipment in order to identify specifically, the number of machines required and the resulting costs. The developed concept contributes to creating a business goal and strategy-driven value creation process in all areas of production management of the manufacturing company. Since the core concept is dynamic dimensioning, it is imperative to take into account the load of the production system and how it changes over time; and is therefore both flexible and adaptable. Furthermore, automation of the planning process in conjunction with the use of optimization techniques and simulation cost is sought. Different scenarios allow the comparison of newly developed concepts with a variety of procedures which already exist.

Page generated in 0.035 seconds