• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 3
  • 1
  • Tagged with
  • 4
  • 4
  • 3
  • 3
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Modell för att beräkna driftkostnader vid ett Masslogistikcenter : Modellering och fallstudie på jord- & bergflöden i norra Norrköping / Model for calculating operating costs at a rock and soil consolidation center : Modelling and case study of rock and soil flows in northern parts of Norrköping

Moberg, Adam, Runefors, Simon January 2021 (has links)
I samband med byggprojekt uppstår det berg- och jordmassor som måste hanteras. De senaste årens ökade bostadsbyggande och stora infrastrukturprojekt i kombination med en ökad miljömedvetenhet har lett till att olika effektiviseringar av massahantering hamnat i fokus. En sådan effektivisering är  en samordnad återvinning av massa centralt mellan olika byggprojekt och som enligt studier kan minska både antalet transporter och total miljöpåverkan, en sådan plats kallas för masslogistikcenter (MLC). Kostnadsstrukturen hos ett MLC är dock outforskat vilket försvårar skapandet av hållbara affärsmodeller. Med detta som motivering är studiens syfte följande: Syftet är att skapa en modell för att beräkna kostnaden av att driva ett MLC Modellbyggnadens struktur och dess viktiga komponenter belästes i en inledande litteraturstudie tillsammans med fakta om masshantering och centraliserad materialhantering. En metod för modellutförande utvecklades med tre större steg: utformande av en konceptuell modell, kvantifierande av modellen till en datamodell och slutligen ett test av modellen för att förbättra den. Litteratur om masshantering belyste det komplexa ämnet där massa beroende på omständigheter och sort kan variera från avfall till handelsvara. Slutligen belystes den teoretiska bakgrund som finns till centraliserad materialhantering med fokus på bygglogistikcenter som visar sig kunna minska kostnader vid byggprojekt. Modellen utvecklades sedan i tre större faser utifrån den valda metoden för modellutförande och modellens utveckling överensstämmer med rapportens tre huvudfrågor. I första fasen anlades en konceptuell modell med stöd av den gjorda litteraturstudien och semistrukturerade intervjuer av personer kunniga inom masshantering och erfarna av aktiviteter i och runt ett MLC. I modellbyggandets andra fas kvantifierades den konceptuella modellen. En aktivitetsbaserad kalkyl passade den konceptuella modellens utformning bäst. Den tredje fasen testade sedan modellen på framtida byggprojekt i norra Norrköping, utifrån detta experiment förbättrades modellen ytterligare. Resultatet sammanfattar aktiviteter i det studerade systemet och resurser som används av dessa aktiviteter. Det kan sammanfattas som att mängden massa, massans typ samt dess föroreningsgrad driver flera kostnader. Allra mest kostsam är den massa som sorteras ut i MLC för kvittblivning. Systemet blir alltså kostnadseffektivt om man så tidigt som möjligt i processen kan sortera ut det material som i så hög grad som möjligt kan återvinnas. Resultatet visar vidare att ett MCL:s kostnadsstruktur påverkas av dess geografiska placering som blir en vägning mellan närhet till projekt och markpris. Närhet till projekt minskar transportkostnader medan billig mark möjliggör i sin tur antingen lägre kostnad för mark eller större möjligheter till lagring som ökar återvinning och minskar deponikostnader. På detta sätt är flera större kostnadsposter också direkt beroende av MCL:s placering. Ett annan vägning mellan kostnader är när krossning ska genomföras, varje krossning innebär en startkostnad samtidigt som behövd lageryta ökar när krossningar görs mer sällan. Slutligen innebär ett MLC en viss planering av såväl transporter som lager, detta driver kostnader för administrativt arbete vars kostnad måste bäras av den minskade deponeringen och transporten som ett MLC kan möjliggöra. Kvantifieringen av modellens massflöden gjordes enligt en tolkning av en ABC-kalkyl med minsta tidsenhet en vecka. Testet av modellen, med data från Optimass, på ett antal projekt i Norrköping gav en rad förbättringar av modellen. Dessutom grundlade testet tillsammans med ett enkelt referensscenario att ca 30 % av driftkostnaderna kunde sparas med ett MLC. Genom att modellen skapats, testats och förbättras har studiens syfte uppfyllts. Denna studie är ett steg i att analysera möjligheterna med ett MLC. Vidare forskning behövs bland annat inom områdena: marknaden för återvunna massor, andra användningsområden för lera och investeringskostnader för ett MLC. / In connection with construction projects, large quantities of rock and soil are excavated and need to be handled. In recent years, increased housing construction and large infrastructure projects in combination with an increased environmental awareness has contributed to an increased interest in rock and soil management. A rock and soil consolidation centre (from now on SCC) is a location where recycling of rock and soil can be coordinated between different construction projects in the area. A centre like this can, according to studies, lower both number of transports needed and the total environmental impact. However, the cost structure of a rock and soil consolidation centre lacks research, which makes it difficult to create sustainable business models. The structure of model building and its important components, together with facts regarding rock and soil management and centralized material handling were studied with a literature study. A method for creating a model was developed using three steps: firstly, designing a conceptual model; secondly, quantifying the model into a computer model and lastly test and improve the model. Literature regarding rock and soil management highlighted the complicated matter of the different uses of rock and soil, where, on one hand, when excavated by a construction/excavation company, it is considered waste and may not be dumped haphazardly. On the other hand, if the rock and soil were collected and deposited into an SCC, it may be sold for reuse and hence becomes a commercial product. The literature also showed how in theory a centralized construction logistic can lower costs during construction projects. The model was developed in three phases, each corresponding to the three main questions of the study. The first phase focuses on the creation of a conceptual model, which was made possible with sources in the literature and the semi-structured interviews with respondents working in the rock and soil management field. The second phase moved the conceptual model into a computer model. An activity-based calculation was chosen to represent calculation regarding costs in the model, while the last phase focused on testing the model in Norrköping and finding improvements. The result presents activities within the studied system, as well as which resources were used to make these activities happen. The results can be summarized by saying that the volume of rock and soil, what types of rock and soil used and the levels of contamination are the main drivers of a higher total cost. The costliest part is connected to the fee for taking rock and soil waste to landfills. Since this cost can be reduced if a product is recycled, a lot of the cost can be lowered if rock and soil that can be reused is sorted out early. The result also shows that an SCC’s cost structure is affected by its geographical location, which becomes a balance between proximity to projects and cheaper, more accessible land further away from a city. Another crossroad is when to conduct crushing of rocks and soil, since there is a high start-up cost and at the same time more storage is needed if the crushing of rock and soil is carried out less frequently. Lastly an SCC requires some planning regarding its operations and transports which in hand also contributes to increased administrative costs, costs which all need to be lower than the option of driving the rock and soil to a landfill. To quantify the module was done according to an interpretation of an activity-based calculation with a time unit of a week. The test of the model, with data from Optimass on several development projects in Norrköping, resulted in some improvements of the model. The test also could also be compared to a simple reference scenario where approximately 30% of the total cost could be saved with an SCC. It also showed a pay-off time of around a year. By creating, testing, and improving the model the purpose of the study has been accomplished. This study is a step in analysing the possibilities with an SCC. Further research is needed to determine the market for recycled rock and soil products, other usable areas for products such as clay and more accurate calculations regarding the investment costs of an SCC.
2

Avfall inom byggsektorn : En jämförelse mellan gemensam och traditionell avfallshantering / Waste in the Construction Industry : A comparison between common and traditional waste management

Wikström, Camilla, Sandberg Borell, Ludwig January 2015 (has links)
Idag är miljö och hållbarhet en mycket aktuell fråga, inte minst i byggbranschen. Branschen står för en stor del av all energianvändning och det avfall som genereras. I strävan mot ett hållbart samhälle finns ett stort utrymme för utveckling och förbättring. Rapporten behandlar hur en gemensam och traditionell avfallshantering skiljer sig utifrån flera aspekter. En jämförelse av totalt uppkommet avfall, fraktionsfördelning, medeltömning och behandlingskostnader har genomförts. Från produktionsdata har det konstaterats att den gemensamma avfallshanteringen genererat mindre avfallsmängder, både totalt och per BTA. Störst procentuell minskning har skett i fraktionerna blandat avfall och deponi, vilka båda är relaterade till stora kostnader och miljöpåverkan. Behandlingskostnaden per BTA har minskat med 39 % i den gemensamma avfallshanteringen. Oavsett avfallshanteringsmetod utgör brännbart den största avfallsmängden och högsta behandlingskostnaden. Här finns utrymme för förbättringar och vidare sortering. Den gemensamma avfallshanteringen använder främst små avfallsbehållare vilket uppfattats vara en av orsakerna till bättre sortering och minskad total avfallsmängd. En annan orsak är antalet fraktioner som nyttjats i projekten, där en tydlig minskning av mängden blandat avfall påvisats i samband med ett ökat antal fraktioner. Kundnyttor och mervärden har varit svåra att styrka annat än från diskussioner med personer i branschen samt från egna observationer. Exempel på mervärde är flexibiliteten att anpassa avfallshanteringen efter behoven som uppstår på plats. Fortsättningsvis bör man tidigt i byggprocessen utreda om en gemensam avfallshantering är möjlig eller inte. Om möjligheten finns bör denna nyttjas för att minska avfallsmängder och behandlingskostnader. En gemensam avfallshantering kan till exempel användas av bolag med flera projekt inom samma område. / Sustainability and the environment are current issues in today’s world, especially in the construction industry. The industry stands for a big part of the energy consumption and the waste that is generated. There are considerable scopes for development and improvement to pursuit a sustainable community. The report describes, from many perspectives how common and traditional waste management are different from each other and a comparison has been done of total waste, fraction distribution, average voiding and treatment cost. Production data has shown that common waste management is producing less waste, both totally and per gross floor area. The fractions mixed waste and waste dump have the biggest percentage reduction. Both are related to large cost and environmental impact. Treatment costs per gross floor area have been reduced by 39 % in the common waste management. The fraction combustible has the largest amount of waste and the biggest treatment cost regardless of the waste management method. Here is room for improvement and further sorting.                                                                                                                              The common waste management uses mostly small containers which are perceived to be one reason for better sorting and less waste produced. Another reason is the amount of fractions used in the projects. A distinct reduction of mixed waste has been detected with higher amount of fractions. Costumer benefits and other values are hard to justify other than from discussions with people in the business and from our own observations. An example of benefits is the flexibility to adjust the waste management by needs arising on site. Further should an investigation be done early in the building process to see if a common waste management is possible or not. If it is a possibility, it should be used to lower the amount of waste and cost. Common waste management could for example be used when many companies have projects in the same area.
3

A public clients’ opportunity to create motivations in the procurement strategy to obtain an effective project performance / En offentlig beställares möjligheter att skapa drivkrafter vid upphandling för att uppnå ett effektivt projektgenomförande

Pietrewicz, Natalie, Rörström, Elin January 2016 (has links)
The purpose of this study is to develop knowledge about collaborative procurement strategies and how these strategies can contribute with motivation for an effective project performance in smaller municipal infrastructure projects. The study also aims to develop an understanding about how a construction logistics centre is applicable to an infrastructure project. Also, how the procurement strategies can create motivation to obtain an effective utilization of a construction logistic centre. To achieve the purpose with the study, a case study of Stockholm Royal Seaport (Norra Djurgårdsstaden) with focus on two infrastructure projects with a mandatory utilization of a construction logistic centre, has been examined. By an abductive method, in terms of literature studies and semi- structured interviews, this study results in that partnering and the payment form cost reimbursement have been a considerable important strategy for the project success. The main conclusion in this study is that collaborative procurement strategies and its components are applicable to a smaller municipal infrastructure project. Significant components to obtain an effective project performance has also been found. Furthermore, the study has shown that a construction logistics centre, designed as in Stockholm Royal Seaport, is not fully adapted to infrastructure projects with similar conditions as the two studied projects. This makes it difficult to draw general conclusions about how procurement strategies should be formed to create motivations for an effective utilization of a construction logistic centre. However, suggestions are given about how procurement can create motivation to obtain an effective utilization of a construction logistic centre by using literature studies. Conclusions can be drawn that partnering and a focus on long term relationships has created motivations for the actors to work effective. / Studiens syfte är att skapa kunskap kring samarbetsinriktade upphandlingsstrategier och hur dessa kan skapa drivkrafter mot ett effektivt projektgenomförande i mindre kommunala anläggningsprojekt. Studien syftar även till att skapa en förståelse om hur ett bygglogistikcenter förhåller sig till anläggningsprojekt samt hur upphandlingsstrategin kan skapa drivkrafter mot ett effektivt nyttjande av ett bygglogistikcenter. För att uppnå syftet med studien har en fallstudie av Norra Djurgårdsstaden med fokus på två anläggningsprojekt, med ett obligatoriskt nyttjande av ett bygglogistikcenter, undersökts. Genom en abduktiv forskningsmetod, i form av litteraturstudier och semi- strukturerade intervjuer, resulterar denna studie i att samverkan och ersättningsformen löpande räkning har varit en betydande strategi för projektens framgång. En huvudsaklig slutsats i studien är att samarbetsinriktade upphandlingsstrategier passar i mindre kommunala anläggningsprojekt. Betydelsefulla komponenter för att uppnå ett effektivt projektgenomförande har även påträffats. Dessutom har studien visat att ett bygglogistikcenter, utformat som i Norra Djurgårdsstaden, inte är helt anpassat till ett anläggningsprojekt. Detta gör det svårt att dra slutsatser från resultatet kring hur upphandlingsstrategier bör formas för ett effektivt nyttjande av ett bygglogistikcenter. Däremot ger studien förslag på hur entreprenadupphandlingen kan skapa drivkrafter för ett effektivt nyttjande av ett bygglogistikcenter med hjälp av litteraturstudier. Avslutningsvis kan slutsatser dras om att samverkansentreprenader, och ett fokus på långsiktiga relationer, skapar drivkrafter till aktörer att utföra ett effektivt projektgenomförande.
4

Energi- och miljövinster med ett bygglogistikcenter i Norra Djurgårdsstaden : Förslag på metod för utvärdering / Energy efficiency and environmental benefits of the construction consolidation center at Stockholm Royal Seaport : A proposed method of evaluation

Fröjd, Anna January 2015 (has links)
I Norra Djurgårdsstaden i Stockholm pågår ett stort stadsutvecklingsprojekt där det planerats för ungefär 12 000 nya bostäder, 35 000 arbetsplatser och 600 000 kvadratmeter kommersiell yta. För att koordinera alla transporter av byggmaterial in till området, samt hantera avfallstransporter ut ur området, har Stockholms stad etablerat ett bygglogistikcenter vars mål bland annat är att reducera antalet transporter. Syftet med detta examensarbete har varit att ta fram en metod för utvärdering av potentiella miljöeffekter med bygglogistikcentret i Norra Djurgårdsstaden. Examensarbetet har tittat på byggtransportlogistik ur ett livscykelperspektiv för jämförelse mellan två olika scenarion, då ett bygglogistikcenter finns (scenario 1) respektive då ett sådant inte finns (scenario 2). De parametrar som ingått är partiklar och energianvändning samt CO2, NOx och SO2. Två olika beräkningsverktyg har jämförts och valet föll på ett verktyg från NTM, Nätverket för Transporter och Miljön. En genomgång av vilken information som erfordras för att göra beräkningar har gjorts och för att undersöka tillgången till dessa data har ett antal intervjuer samt en workshop genomförts med olika aktörer, både inom Norra Djurgårdsstaden men också utifrån. Andra saker som diskuterades var aktörernas syn på bygglogistikcentret, vad som kan förbättras med det samt hur själva utfallet av en utvärdering skulle kunna förbättras, exempelvis genom styrning i upphandlingsprocessen. Intervjuer och workshop har också varit viktiga i syfte att förankra den föreslagna utvärderingsmetoden hos aktörerna själva. Under intervjuer och workshop har det bland annat framkommit en del konstateranden och några förslag till förbättringar. Exempelvis sades att logistikfrågor lyfts upp enbart genom att bygglogistikcentret finns och att den största förbättringen med bygglogistikcentret anses vara att framkomligheten är mycket bättre än vad den annars hade varit. En annan sak som de flesta var eniga om var att krav i upphandling bör ställas så tidigt som möjligt för att de ska kunna få så stor effekt som möjligt. För att göra en utvärdering krävs data om alla olika transporter och för varje transporttyp behövs information inom tre olika kategorier: fordonet, lasten samt själva körvägen. Eftersom alla data inte finns tillgängliga idag kommer en del antaganden att behöva göras, hur många beror på när i tiden utvärderingen ska göras och hur noggrann den ska vara. Om en utvärdering ska göras snarast rekommenderas att ett antal manuella mätningar genomförs men för att utvärderingar ska kunna göras kontinuerligt föreslås att en del åtgärder vidtas för att automatisera insamlingen av data. Det rekommenderas också att en känslighetsanalys av erhållna mätvärden görs för bedömning av vilka data som är i störst behov av ökad noggrannhet för att utvärderingens tillförlitlighet ska öka. Beroende på vad en sådan analys visar ges förslag på några olika åtgärder som kan vidtas, såsom att montera kameror vid grindpassager för information om passerande fordon eller att installera datorer i vissa fordon för att få information om körbeteende. / In the eastern part of Stockholm a major urban development project is taking place. It is called Stockholm Royal Seaport and until the year 2030 approximately 12,000 new homes, 35,000 workplaces and 600,000 square meters of commercial areas will be added to the area. The project has been given a very ambitious environmental action program and as a part of that the City of Stockholm has established a logistics center in the area. The logistics center is supposed to coordinate all transports of building material and handle the waste during the construction phase. One objective with the logistics center is to reduce the amount of transports and thereby also the generated emissions and the use of energy. The aim of this thesis has been to develop a methodology for evaluating the potential environmental impacts related to the logistics center in the Stockholm Royal Seaport. The evaluation method is able to compare the effect, from a life cycle perspective, from construction transports in two different scenarios, scenario 1 where there is a logistics center and scenario 2 where there is not. The chosen parameters are CO2, NOx, SO2, particulate matter and energy usage. Two different tools for computing values for the chosen parameters have been compared and the selected one is developed by NTM, the Network for Transport Measures. After the selection an investigation of input data required to use the tool was performed. A number of interviews were conducted and a workshop was organized with various representatives, mainly people working with construction or transportation in the Stockholm Royal Seaport. The things discussed during the interviews and the workshop were, among other things, the availability of required data, the interviewees opinions about the logistics center and their suggestions for improvements that can be done, both at the center itself, but also for example in the procurement process. Another purpose for the interviews and the workshop was to anchor the methodology with the various representatives. A direct result from the interviews and the workshop has been some proposals for improvement, for example that requirements in the procurement process should be presented at an early stage to be able to be as effective as possible. Some of the interviewees pointed out that logistic issues are highlighted simply by the existence of the logistics center. There are a couple of different transport routes within the area, as some deliveries are allowed directly into the construction sites, whereas some have to pass the logistics center to unload the freight, all depending on the amount of freight to a specific site. Staff at the logistics center will then consolidate the deliveries to the construction sites into one vehicle. They also collect the generated waste, which they handle at the center before it is transported to an external retrieval plant. The logistics center also utilizes a vehicle used for inspections of the traffic and deliveries within the area. All of the above mentioned types of transportations are included in the thesis. An evaluation of the effects of the logistics center requires data about all types of transportation, within three different categories: the vehicle, the load and the actual route. Since all required data is not available today some assumptions have to be made, how many and which depends on the requested accuracy of the evaluation and when it is to be performed. If an evaluation is to be performed given the current conditions it is recommended that a number of manual measurements are carried out to collect data which was not available at the time being, however, if evaluations are to be done continuously it is suggested that the retrieval of data is as automated as possible. It is also recommended to do a sensitivity analysis of the data retrieved from the measurements to assess the impact from certain data on the chosen parameters. The amount of impact helps determine which data to refine in order to increase the accuracy of the evaluation. Depending on what the analysis shows the thesis gives suggestions for actions such as installing cameras at gates to the construction sites and/or the logistics center or to install computers in vehicles to obtain data on driving behavior.

Page generated in 0.094 seconds