• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 17
  • Tagged with
  • 17
  • 8
  • 8
  • 7
  • 7
  • 6
  • 6
  • 6
  • 6
  • 5
  • 4
  • 4
  • 3
  • 3
  • 3
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Användning av förorenade massor som en resurs i urbana miljöer för att främja hållbar utveckling : En förstudie

Ullerhed, Madeleine January 2017 (has links)
Exploitation of soil increases in line with the urbanisation. Exploitation sometimes leads to surplus masses, generally handled as waste due to lack of a resource perspective. Many areas attractive for exploitation are more or less contaminated of pollutions and the most common alternative to handle such waste is landfilling. The context leads to extraction of virgin materials, extensive transportation and negative impact on ecosystem services. A measure of action is to utilize lightly polluted surplus masses in structures in society and at the same time applying an ecosystem service perspective, provided that the masses do not cause health risks. The study investigates if there is a need in urban areas of reuse lightly polluted soil and which parameters that generally governs reuse. Furthermore, opportunities for treating masses in a sustainable way in social planning are investigated and if there is a need of development projects on the subject. The study consists of qualitative interviews with key persons who work with soil in Kalmar, Linköping and Norrköping and a case study of a noise barrier. This is complemented by legislation. Reuse of lightly contaminated masses is today complicated and currently it seems like there is a need to increase reuse in the three cities. The need of reuse is most likely to increase in the future. There are opportunities to increase reuse of soil in social planning, especially in the detailed development plan. In order for reuse to increase, for example new guidelines will probably need to be taken regarding the assessment of pollution risk.
2

Hållbar hantering av schaktmassor i mindre kommuner / Sustainable management of excavated soil in smaller municipalities

Andersson, Henrik, Johansson, Filip January 2020 (has links)
Till följd av ökad exploatering och byggnation har uppkomsten av byggnads- och rivningsavfall ökat. Avfall från byggnation utgörs volymmässigt till stor del av schaktmassor, och endast gruvsektorn producerar i dagsläget mer avfall. När byggnadssektorn till 2020 förväntas återanvända 70 viktprocent av icke-farligt byggnads- och rivningsavfall är det rimligt att ställa sig frågan hur en mindre kommun ska arbeta för att uppnå detta. Syftet med denna studie är att undersöka vilka hinder och möjligheter som finns för att uppnå mer hållbar hantering av schaktmassor i mindre kommuner. För att undersöka detta har intervjuer genomförts med tre kommuner, dokument i form av respektive kommuns avfallsplan granskats samt en litteraturstudie genomförts för att samla in data. Det finns möjlighet att utveckla en mer hållbar schaktmassehantering i mindre kommuner. Tekniska lösningar finns tillgängliga och kan anses rimliga för en mindre kommun. Det finns möjligheter att styra både interna och externa aktörer mot en mer hållbar hantering. Några av de hinder som påträffats är; mängden schaktmassor som uppkommer kan vara för liten, kommunens budget ger inte utrymme för att lägga resurser på hållbar hantering samt krav på byggnadsmaterial kan vara för högt ställda för att möjliggöra återvinning av förädlade material. I dagsläget sker redan arbete mot en mer hållbar hantering, dock skulle flera aspekter av detta kunna utvecklas och utökas. Mindre kommuner bör ta ett helhetsperspektiv kring schaktmassor i kommuner, utöka befintlig förädlingsverksamhet och etablera ny sådan. Krav på byggnadsmaterial bör ses över samt hur avfallsplanen kan användas för att styra mot en mer hållbar hantering. Då studien genomförts inom ett begränsat geografiskt område kan detta ha påverkat studiens resultat. Studien omfattas inte av förorenade schaktmassor eller så kallade fall A massor, det vill säga massor som återanvänds inom respektive projekt.
3

Miljögeoteknisk 3D-modell för markexploatering / Environmental 3D Model for Land Development

Kalin, Cecilia January 2010 (has links)
<p>Vid exploatering av mark måste ofta stora volymer jordmassor schaktas bort för grundläggning av hus och anläggning av ledningar och vägar. Dessa jordmassor skickas många gånger till en deponi, vilket orsakar emissioner av miljö- och hälsofarliga gaser från transporter, förbrukning av naturmaterial och innebär även en ekonomisk kostnad.</p><p>I Johannelund i västra Stockholm har Stockholms stad planerat ett nytt bostadsområde, och stora mängder jordmassor kommer att behöva schaktas bort under exploateringen. Stockholms stad lät skapa en miljögeoteknisk 3D-modell för att få en översikt över markkvaliteten och bestämma vilka massor som kunde återanvändas för utfyllnad inom området. Med en miljögeoteknisk 3D-modell menas här en CAD-modell i 3D baserad på provtagningar, geotekniska undersökningar och planerad bebyggelse i området. Då detta examensarbete påbörjades var planeringen av Johannelundsprojektet klar och 3D-modellen skapad, men själva bygget hade ännu inte påbörjats.</p><p>Syftet med detta examensarbete var att avgöra om miljögeotekniska 3D-modeller bör användas i <em>framtida</em> exploateringsprojekt, och målet var att utvärdera och ge råd om framtida användning av modellen samt att undersöka möjligheterna med att återanvända schaktmassor. En fallstudie gjordes av Johannelundsprojektet där de miljömässiga och ekonomiska konsekvenserna av masshanteringen utvärderades och åsikter om problematiken undersöktes genom intervjuer med myndigheter och intressenter. Vidare bestämdes det underlag som behövs till modellen och en lämplig arbetsordning togs fram. Denna information baserades på beräkningar, eget arbete i 3D-modellen samt intervjuer med involverade i Johannelundsprojektet.</p><p>Utvärderingen av Johannelundsprojektet visade att återanvändningen av schaktmassor reducerade kostnader för masshantering med 67 % och emissioner från transporter med 85 % jämfört med om den totala volymen schaktmassor skulle ha skickats på deponi. Vidare visade intervjuerna att myndigheter och intressenter har vitt skilda åsikter vad gäller riktvärden, hantering av schaktmassor och miljögeotekniska 3D-modeller. Studien visade även att om arbetet med 3D-modellen ska bli lyckat krävs bland annat ett fullgott dataunderlag och investering i viss kunskapsutveckling hos personalen.</p><p>3D-modeller används allt mer inom samhällsbyggnad, och stora ekonomiska och miljömässiga vinster kan göras genom verktygets möjlighet till effektiv planering och kommunikation. Användning av en miljögeoteknisk 3D-modell rekommenderas i framtida byggprojekt där det förekommer ställvis förhöjda halter av markföroreningar och en omfattande volym schaktmassor beräknas uppkomma.</p> / <p>Land development can cause a great deal of excessive soil masses due to shafting. The total volume of excessive soil is many times transported to a landfill, causing gas emissions, use of natural resources and a significant economical cost.</p><p>In a land development project in the area of Johannelund in Stockholm much of the soil masses were planned to be reused instead. To overview the soil quality and decide on what soil masses to reuse and where an Environmental 3D Model for Land Development was used by the City of Stockholm. This means a 3D Model based on soil samples, geotechnical investigations and planned shafting. When the work with this thesis begun the Project Johannelund was already planned and the 3D Model had been created, but the land development had yet not been started.</p><p>The aim of this thesis was to decide if Environmental 3D Models should be used in <em>future</em> land development projects, and the goals were to evaluate the model, give advice on future use and to investigate the possibilities to reuse soil masses. A case study of the environmental and economical effects of reusing soil masses in the Project Johannelund was done. Public authorities and stakeholders were interviewed and advices on how to use Environmental 3D Models were given, this includes the data needed to create a model as well as a suggested way of work. The information is based on calculations, personal experience with the 3D Model and interviews with people involved in the Project Johannelund.</p><p>The evaluation of the Project Johannelund showed that the reuse of soil masses reduced the costs of transports and land fill fees with 67 %, and the gas emissions from transports with 85 %. The opinions of public authorities and stakeholders vary greatly. Advices on how to use the Environmental 3D Model includes a thorough database and that the staff will need support in order to use the 3D Model properly.</p><p>3D Models are used to a larger and larger extent in Urban Management. There are economical and environmental benefits with using the Environmental 3D Model for a more efficient project planning and communication. The City of Stockholm is recommended to use the 3D Model in future land development projects with heterogeneous soil contamination and a large volume of expected excessive soil masses.</p>
4

Miljögeoteknisk 3D-modell för markexploatering / Environmental 3D Model for Land Development

Kalin, Cecilia January 2010 (has links)
Vid exploatering av mark måste ofta stora volymer jordmassor schaktas bort för grundläggning av hus och anläggning av ledningar och vägar. Dessa jordmassor skickas många gånger till en deponi, vilket orsakar emissioner av miljö- och hälsofarliga gaser från transporter, förbrukning av naturmaterial och innebär även en ekonomisk kostnad. I Johannelund i västra Stockholm har Stockholms stad planerat ett nytt bostadsområde, och stora mängder jordmassor kommer att behöva schaktas bort under exploateringen. Stockholms stad lät skapa en miljögeoteknisk 3D-modell för att få en översikt över markkvaliteten och bestämma vilka massor som kunde återanvändas för utfyllnad inom området. Med en miljögeoteknisk 3D-modell menas här en CAD-modell i 3D baserad på provtagningar, geotekniska undersökningar och planerad bebyggelse i området. Då detta examensarbete påbörjades var planeringen av Johannelundsprojektet klar och 3D-modellen skapad, men själva bygget hade ännu inte påbörjats. Syftet med detta examensarbete var att avgöra om miljögeotekniska 3D-modeller bör användas i framtida exploateringsprojekt, och målet var att utvärdera och ge råd om framtida användning av modellen samt att undersöka möjligheterna med att återanvända schaktmassor. En fallstudie gjordes av Johannelundsprojektet där de miljömässiga och ekonomiska konsekvenserna av masshanteringen utvärderades och åsikter om problematiken undersöktes genom intervjuer med myndigheter och intressenter. Vidare bestämdes det underlag som behövs till modellen och en lämplig arbetsordning togs fram. Denna information baserades på beräkningar, eget arbete i 3D-modellen samt intervjuer med involverade i Johannelundsprojektet. Utvärderingen av Johannelundsprojektet visade att återanvändningen av schaktmassor reducerade kostnader för masshantering med 67 % och emissioner från transporter med 85 % jämfört med om den totala volymen schaktmassor skulle ha skickats på deponi. Vidare visade intervjuerna att myndigheter och intressenter har vitt skilda åsikter vad gäller riktvärden, hantering av schaktmassor och miljögeotekniska 3D-modeller. Studien visade även att om arbetet med 3D-modellen ska bli lyckat krävs bland annat ett fullgott dataunderlag och investering i viss kunskapsutveckling hos personalen. 3D-modeller används allt mer inom samhällsbyggnad, och stora ekonomiska och miljömässiga vinster kan göras genom verktygets möjlighet till effektiv planering och kommunikation. Användning av en miljögeoteknisk 3D-modell rekommenderas i framtida byggprojekt där det förekommer ställvis förhöjda halter av markföroreningar och en omfattande volym schaktmassor beräknas uppkomma. / Land development can cause a great deal of excessive soil masses due to shafting. The total volume of excessive soil is many times transported to a landfill, causing gas emissions, use of natural resources and a significant economical cost. In a land development project in the area of Johannelund in Stockholm much of the soil masses were planned to be reused instead. To overview the soil quality and decide on what soil masses to reuse and where an Environmental 3D Model for Land Development was used by the City of Stockholm. This means a 3D Model based on soil samples, geotechnical investigations and planned shafting. When the work with this thesis begun the Project Johannelund was already planned and the 3D Model had been created, but the land development had yet not been started. The aim of this thesis was to decide if Environmental 3D Models should be used in future land development projects, and the goals were to evaluate the model, give advice on future use and to investigate the possibilities to reuse soil masses. A case study of the environmental and economical effects of reusing soil masses in the Project Johannelund was done. Public authorities and stakeholders were interviewed and advices on how to use Environmental 3D Models were given, this includes the data needed to create a model as well as a suggested way of work. The information is based on calculations, personal experience with the 3D Model and interviews with people involved in the Project Johannelund. The evaluation of the Project Johannelund showed that the reuse of soil masses reduced the costs of transports and land fill fees with 67 %, and the gas emissions from transports with 85 %. The opinions of public authorities and stakeholders vary greatly. Advices on how to use the Environmental 3D Model includes a thorough database and that the staff will need support in order to use the 3D Model properly. 3D Models are used to a larger and larger extent in Urban Management. There are economical and environmental benefits with using the Environmental 3D Model for a more efficient project planning and communication. The City of Stockholm is recommended to use the 3D Model in future land development projects with heterogeneous soil contamination and a large volume of expected excessive soil masses.
5

Från schaktmassa till ballastprodukt : Om möjligheten att uppgradera schaktmassor med våtsiktning

Afzelius, Alissa January 2020 (has links)
Byggsektorn är den bransch (exklusive gruvnäringen) som står för störst andel uppkommen avfall i Sverige, framförallt i form av schaktmassor. Marknaden för återvunna schaktmassor är idag begränsat, dels på grund av otydlig lagstiftning kring återvinning, dels på grund av massornas varierande innehåll. Uppgrävda överskottsmassor från gamla industrimarker kan innebära förhöjda föroreningshalter vilket leder till dyra behandlingar för köpare. Det är heller inte lika lätt att styra den geotekniska kvaliteten hos produkten när råvaran varierar i sammansättning. Vidare kommer produkter av återvunnet ursprung troligtvis vara utsatta för hårdare kontroller än produkter framtagna av jungfruligt material. Den större risken, tillsammans med få incitament att prioritera återvunna material i byggen försvårar säljbarheten. Syftet med det här examensarbetet har varit att undersöka ifall schaktmassor kan uppgraderas till högkvalitativa konstruktions- eller anläggningsprodukter som efterfrågas av marknaden. Swerocks våtsiktsanläggning i Malmö användes som studieobjekt och undersökningen begränsades till två fraktioner, sand i storlek 0–4 mm och grus i storlek 4–16 mm. Arbetet har utförts genom litteraturstudie, intervjuer samt analysering av provresultat, där tre forskningsfrågor kring användning, kravbild och kvalitet har legat som grund för undersökningarna. Resultatet visar att flera aktörer ställer sig positiva till ökad användning av återvunna ballastprodukter så länge dess kvalitet kan säkerställas, främst med avseende på innehållet av föroreningar. Ett stort hinder är den befintliga avfallslagstiftningen och dess avsaknad av tydliga kriterier för när avfallet kan omklassas till produkt. Det finns användningsområden som lämpar sig bättre för ett schaktmaterial av varierande ursprung, där de geotekniska materialkraven är färre. Studien visade att uppgraderat material kan uppfylla krav för utvalda applikationer inom fyllning och dränering enligt AMA Anläggning 17. Främsta krav där är på kornstorleksfördelning och sortering, vilket våtsikten klarar bra. Däremot gör AMA:s nuvarande materialtypsindelning att återvunna material förbises. Detta trots att de kan ha motsvarande egenskaper likt de efterfrågade materialtyperna. Vidare omfattas både fyllnad- och dränerandematerial av ballaststandard SS-EN 132 42 vilket gör att produkterna måste prestandadeklareras och CE-märkas enligt lag. Trots byggproduktskravet är detta något som ofta förbises hos både köpare och producenter. Gällande de kemiska innehållet hos det våtsiktade materialet visade den här studien på stor spridning samt föroreningshalter överstigande haltnivåer för MRR för PAH, koppar, bly och oljor i både sand och grus. En trend av ökande föroreningshalter i produkter i samband med att mer förorenat material togs in för behandling kunde även anas. Sammantaget innebär det en minskad säljbarhet av materialet trots att det uppfyllde krav enligt AMA 17. Antingen behöver fler behandlingssteg tilläggas, med ökade produktionskostnader som följd, eller mer restriktivt urval av vilka massor som tas in för behandling / Cirkulär masshantering med uppgraderade jord- och schaktmassor
6

Hantering av schaktmassor ianläggningsprojekt- Eftersträvan att uppnå massbalans i projekteringsskedet / Handling of Excavated Masses in Construction Projects- The pursuit of achieving mass balance in the projecting stage

Erhardsson, David, Götvall, Stina January 2021 (has links)
Anläggningsbranschen står för stora utsläpp av växthusgaser och att uppnå klimatmål är enutmaning. Genom massbalans, som innebär att återanvända schaktmassor till den fyllningsom är aktuell i största möjliga mån, kan anläggningsbranschen ta sitt ansvar för minskadklimatpåverkan. Massbalans är något som eftersträvas inom anläggningsprojekt för att få enlägre kostnad och tidsbesparing i projektet. Idag klassificeras inte vägbyggnation juridisktsom produktionsprocess vilket skapar ett problem. Produktion ger restprodukter som i sin turkan användas till andra ändamål men denna möjlighet finns inte i anläggningsbranschen ominte syftet för återanvändandet av schaktmassorna fastslagits från början.Rapportens syfte är att tydliggöra vad som gäller vid hantering av schaktmassor, utifrån deförordningar som finns, för att leda fram till hur schaktmassor som avfall ska hanteras vidprojektering inom anläggning. Rapporten avgränsar till projektering med inriktning mot vägoch järnväg och kommer inte att hantera problemen under produktionen efterprojekteringsstadiet. Genom litteraturstudier och intervjuer hämtas information till arbetet.Naturvårdsverket säger att schaktmassor inte behöver bli betraktat som ett avfall om det gåratt hitta ett användningsområde inom samma projekt i tidigt skede med rimlig förutsättningoch tid. Om syfte för återanvändandet av schaktmassorna i tidigt skede saknas bedöms desom avfall och då blir all hantering av schaktmassorna under någon form av anmälnings- ochtillståndsplikt. Det råder stor ovisshet kring tillämpning av lagstiftning vilket leder tillsvårigheter i att förutse vilket beslut tillsynsmyndigheten fastställer kring hur schaktmassornafår hanteras.Länsstyrelsen har nyligen slagit fast att byggnation av en väg inte är en produktionsprocess,vilket gör att schaktmassor inte kan klassificeras som en biprodukt och återanvändning avschaktmassor försvåras. Därmed blir även massbalans svårt att uppnå på grund avlagstiftning och definitioner kring uppschaktade jord- och bergmassor.Slutsatsen är att det juridiska försvårar möjligheten att uppnå massbalans. Somlagstiftningen tillämpas och tolkas i dagsläget försvåras och i vissa fall omöjliggörs arbetet förprojektörer och entreprenörer att uppnå massbalans i samtliga projekt. Enklare ocheffektivare tillvägagångssätt kring syftet med schaktmassorna i anläggningsprojekt skulle gestörre möjligheter för återanvändning. / The construction industry is responsible for major greenhouse gas emissions and to achievethe climate goals is a challenge. By working with a balance of masses, which means reusingexcavated masses for the filling that is relevant as far as possible, the construction industrycan take their responsibility of minimizing the climate impact. Balance of masses issomething that is sought within construction projects to get a lower cost and time saving inthe project. Today, road construction is not legally classified as production which creates aproblem. Production produces residual products which in turn can be used for otherpurposes, but this possibility does not exist in the construction industry unless the purposefor the reuse of the excavated masses has been established from the beginning.The purpose of the report is to clarify what applies when handling excavated masses basedon the existing regulations, in order to guide how excavated masses as waste are to behandled when designing in the construction industry. The report is limited to projecting withfocus on roads and railways and will not deal with the problems in production after theprojecting stage. Information to the report is obtained through literature studies andinterviews.The Swedish Environmental Protection Agency tells that excavated masses do not need tobe considered as waste, if it is possible to find an area of use within the same project at anearly stage with a reasonable condition and time. If there is no purpose for the reuse of theexcavated masses at an early stage, excavated masses are assessed as waste and then allhandling of the excavated masses becomes subject to some condition of notification andpermit requirement. There is large uncertainty about the application of legislation, whichleads to difficulties in predicting which decision the supervisory authority determinesregarding how the excavated masses may be handled.The County Administrative Board has recently stated that the construction of a road is not aproduction process, which means that excavated masses cannot be classified as a byproductwhich makes reuse of excavated masses more difficult. Which makes balance ofmasses difficult to achieve due to definitions and regulations regarding excavated soil androck masses.The conclusion is that the legal makes it difficult to achieve mass balance. As the legislationis applied and interpreted at present, it is made more difficult and in some cases impossiblefor project designers and contractors to achieve mass balance in all projects. Simpler andmore efficient approaches to the purpose of the excavated masses in construction projectswould provide greater opportunities for reuse.
7

Återanvändning av schaktmassor ur ett hållbarhetsperspektiv för entreprenadföretag / Recycling of excavated soil in a sustainability perspective for construction companies

Fransson, Theodor, Callenryd, Jakob January 2022 (has links)
Regardless of the project within the construction industry there is a high probability that the soil needs preparation, this is often done through excavation. The outcome will likely be a large amount of soil, if these masses can’t be used within the project, they will in most cases be transported to a landfill and be classified as waste. The more transports to landfills and the longer the trip the more greenhouse gases will be produced. Instead, the transport of lower quality masses could go to a recycling facility for treatment as the landfill is not environmentally sustainable. The study is based on a qualitative method, where data is collected using semi-structured interviews. In order to obtain a high content validity and concept validity, the questions in the interviews must be designed from the questions and concepts used in the questions are correctly defining and operationalized. Reliability is obtained by having both authors participate in interviews and that the interviews are recorded audio. Bureaucratic obstacles, uncertainty, untested methods, unclear guidance, laws and requirements mean that many trample on the same place even though the will to work more sustainably exists, these are conclusions made by the collected empirical data. The study resulted in all actors interviewed in this report wanting the recycling and reuse of excavated masses to increase to benefit the environment. The path to that goal looks different for those involved, which is also often the reason why there is not more recycling than what is being recycled today. The implication of the result is that many solutions to these problems lie with the authorities that need to create an economic advantage to recycle compared to driving excavated soil to landfills, that is not sustainable in the long run. Another solution is to reduce processing times for permits and increase permitted storage times. The limitation of work in the interviews is that only one person from each party has been interviewed except for Holst Entreprenad AB, this does not give the entire organization a broad point of view. / Oavsett byggnation inom byggbranschen kommer marken med stor sannolikhet förberedas, detta sker oftast genom schaktning. Resultatet av schaktningen blir en större mängd massor, om dessa inte återanvänds direkt i projektet transporteras de i vissa fall till deponi där de tippas på hög och kommer att klassas som avfall. Desto fler transporter som går till deponi och desto längre sträckan är desto mer ökar koldioxidutsläppen. I stället för att köra sämre massor till deponi skulle transporterna gå till en återvinningsanläggning för behandling då deponi inte är miljömässigt hållbart i längden. Studien baseras på kvalitativ metod, där data samlas in med hjälp av semistrukturerade intervjuer. För att få en hög innehållsvaliditet samt begreppsvaliditet ska frågorna i intervjuerna utformas från frågeställningarna och begrepp som används i frågorna är korrekt definierande samt operationaliserade. Reliabilitet erhålls då båda författarna deltar i intervjuer samt att intervjuerna spelas in. Byråkratiska hinder, osäkerhet, obeprövade metoder, otydlig vägledning samt lagar och krav gör att många trampar på samma ställe även fast viljan att jobba mer hållbart finns. Studien resulterade i att samtliga aktörer som intervjuades i denna rapport vill att återvinningen och återanvändningen av schaktmassor ska öka för att gynna miljön. Vägen till det målet ser olika ut för de inblandade vilket också ofta är anledningen till att det inte återvinns mer än vad det görs idag. Innebörden av resultatet är att många av lösningarna på dessa problem ligger hos myndigheter som behöver skapa en ekonomisk fördel att återvinna jämfört med att köra uppgrävda massor till deponi som inte är hållbart i längden. Det som också skulle öka återanvändningen av schaktmassor är om handläggningstider för tillstånd förkortades och tillåtna upplagstider förlängdes. Arbetes begränsning i intervjuerna är att endast en person från respektive part har intervjuats med undantag från Holst Entreprenad AB, detta ger inte hela organisationens breda synpunkt.
8

Vägen mot cirkulär masshantering / The way towards circular mass management

Ramadan, Leila, Esfandiari, Nima January 2022 (has links)
Inledning: Återanvändningsgraden av schaktmassor är väldig låg i Sverige. Det har lett till ett ökat klimatutsläpp och överutnyttjande av naturresurser. Ökad återanvändning av schaktmassor skulle gynna miljön och ekonomin på många olika sätt. Syftet med studien är således att undersöka förutsättningarna för recirkulering av schaktmassor och att ta reda på varför schaktmassor inte återanvänds mer genom intervjuer med aktörer i värdekedjan. Syftet uppnås genom att ta reda på vilka hinder som har lett till att en cirkulär masshantering inte fungerar fullt ut inom anläggningsindustrin samt att ta reda på vilka incitament som krävs för att marknaden för återvunna schaktmassor ska förbättras. Metod: En litteratur- och intervjustudie användes som metod för att besvara studiens frågeställningar. Litteraturstudien bidrog till kunskapsuppbyggnaden i början av arbetet och fortgick löpande under hela arbetets gång. Intervjustudien bestod av semistrukturerade kvalitativa intervjuer som utgick ifrån en intervjumall. Intervjuerna möjliggjorde möten med verksamhetsutövare och myndighetspersoner som är verksamma i Västra Götaland, vilket bidrog till att aktuell information kunde erhållas. Resultat: Studien påvisar tydliga tecken på brister i hanteringen av schaktmassor inom anlägg-ningsindustrin. Avfallslagstiftningen anses vara komplicerad och resultatet visar på att det finns brister i samarbetet mellan myndighetspersoner och verksamhetsutövare. Dessa problem leder bland annat till att oseriösa aktörer lättare kan ta sig in i marknaden. Ett annat problem är de långa handläggningstiderna som leder till att användbart material körs till deponi, vilket i sin tur leder till ökad utvinning av jungfruligt (nyproducerat) material samt ökad belastning på kli-matet. Diskussion: Respondenternas syn på ovannämnda brister är snarlika men kan i vissa fall skilja sig åt beroende på om respondenten är en myndighetsperson eller en verksamhetsutövare. Vid intervju med en av myndighetspersonerna nämns ofullständig information från entreprenörer som en av anledningarna till de långa handläggningstiderna för recirkulering. Tvärtemot nämner verksamhetsutövarna att den svårtolkade avfallslagstiftningen försvårar myndighetspersonernas arbete, vilket leder till långa handläggningstider och att användningsbara schaktmassor följaktligen hamnar på deponi. Respondenterna uppfattas ändå vara positiva inför framtiden. Detta kan bland annat bero på de initiativ som har tagits inom branschen. Aktörer inom branschen har blivit mer medvetna och jobbar mot en omställning till cirkulär masshantering. Exempelvis sker samarbetsförsök i en större skala för att skapa en bättre marknad för schaktmassor i Göteborg. På Regeringsnivå har Naturvårdsverket fått i uppdrag att undersöka hanteringen av jord- och schaktmassor i syfte att underlätta tillsynsarbetet. Naturvårdsverket arbetar för tillfället med att uppdatera sin handbok för hantering av schaktmassor. / Introduction: Reuse of excavated soil is very low in Sweden. This has led to increased climate emissions and overexploitation of natural resources. Increased reuse of excavated masses would benefit the environment and economy in many ways. The purpose of the study is therefore to look over the conditions in the market for reused soil and find out why exca-vated soil is not more reused through an interview of the stakeholders in the value chain. The purpose of the study is achieved by finding out what obstacles have led to a circular mass management not working fully in the construction industry and to find out what incentives are needed to improve the market for recycled excavated masses. Method: A literature- and interview study were used as a method to answer the study's questions. The literature study contributed to the knowledge building at the beginning of the work and continued continuously throughout the work. The interview study consisted of semi-structured interviews based on an interview guide. The interviews enabled meetings with entrepreneurs and government authority employees active in Västra Götaland, which contributed to obtaining current information. Result: The study shows a clear sign of shortcomings in the handling of excavated masses in the construction industry. The waste legislation is considered to be complicated, and the results show that there are shortcomings in the cooperation between authority employees and entrepreneurs. These problems make it easier for illegal activities within the excavated masses market. Another problem is the long waiting period to get permission to recycle the excavated soil, this makes useful masses getting to the landfill, which in turn leads to increased extraction of virgin material and increased load on the climate. Discussion: The respondents' views on the above-mentioned shortcomings are similar but may in some cases differ depending on whether the respondent is an authority employee or an entrepreneur. In an interview with one of the authority employees, incomplete information from entrepreneurs is mentioned as one of the reasons for the long waiting periods to get per-mission to recycle. On the contrary, the entrepreneurs mention that the difficult waste legislation puts the authority employees in a difficult position, which leads to long waiting periods and that usable excavated masses consequently end up in landfills. Although there are major shortcomings in the handling of excavated masses in the construction industry, the respondents have a positive attitude towards the future. This may be due to the initiatives that have been taken in the industry. The entrepreneurs and authority employees have become more aware and are working towards a transition towards circular mass management. In many municipalities, such as in Gothenburg they have joined forces and tried to cooperate on a larger scale, to create a better market for excavated masses. On the governmental level the Swedish Environmental Protection Agency has been commissioned to investigate the handling of soil and excavated masses in order to facilitate the administration. The Swedish Environ-mental Protection Agency is currently working to update its handbook on excavated masses.
9

Återanvändning av schaktmassor ur ett hållbarhetsperspektiv i tre mindre kommuner / Reuse of excavated masses from a sustainability perspectivein three small municipalities

Nadhem, Umnia, Porsbo, Elsa January 2021 (has links)
I dagsläget transporteras stora mängder schaktmassor till deponier istället för att återanvändas för ändamål i projekt. Detta är på grund av att det är svårt att avgöra vilka massor som är godtagbara för återanvändning enligt lagsstiftningen. Lagstiftningen och kraven är juridiskt komplexa och leder i många fall till missförstånd. Syftet med denna rapport är att få en inblick i hur det arbetas med återanvändningen av schaktmassor ur ett hållbarhetsperspektiv i olika kommuner samt hur lagstiftningen påverkar återanvändningen av schaktmassor. För att undersöka detta har intervjuer med tre mindre kommuner samt en litteraturstudie genomförts och bidragit till att få en djupare inblick i problematiken. Byggledningssidan upplever att lagstiftningen är komplex vilket leder till att många projektledare/ byggledare väljer att inte återanvända schaktmassor. Byggledningssidan får oftast stöd och hjälp av miljöenheterna på kommunerna när det gäller frågor som berör återanvändning av schaktmassor men även när det gäller de olika kraven som finns i miljöbalken. Miljöenheten i samtliga kommuner är mer insatta i lagstiftningen men flera av dem upplever problem med tillgång till information och kommunikation mellan olika avdelningar och projekt inom kommunerna. Samtliga respondenter anser att en tydligare lagstiftning hade möjliggjort en ökning av återanvändningen av schaktmassor. De huvudsakliga slutsatserna som rapporten presenterar är att bristen på kommunikation är en bidragande faktor till att schaktmassor inte återanvänds samt att lagstiftningen försvårar arbetet med återanvändningen av schaktmassor. En begräsning i arbetet är att enbart tre mindre kommuner har undersökts. / At present, large quantities of excavated masses are transported to landfills instead of being reused for purposes in projects. This is because it is difficult to determine which masses are acceptable for reuse under the legislation. The legislation and requirements are legally complex and, in many cases, lead to misunderstandings. The purpose of this report is to gain an insight into how the reuse of excavated masses is worked on from a sustainability perspective in different municipalities and how the legislation affects the reuse of excavated masses. To investigate this, interviews with three smaller municipalities and a literature review were conducted and contributed to gaining a deeper insight into the problem. The construction management side feels that the legislation is complex, which leads to many project managers and construction managers choosing not to reuse excavated masses. The construction management department usually receives support and help from the environmental units with regards to issues concerning the reuse of excavated masses. Additionally, they acquire assistance with regard to the various requirements contained in the Environmental Code. The environmental unit in all communities is more familiar with the legislation, but several of them have experienced problems.These include access to information, communication between different departments as well as differences within projects of the community. All respondents believe that clearer legislation would have made it possible to increase the reuse of excavated masses.The main conclusions presented by the report are, that the lack of communication is a contributing factor to the fact that, excavated masses are not reused and that the legislation complicates the work with the reuse of excavated masses. A limitation in the work is that only three smaller municipalities have been examined.
10

Modell för att beräkna driftkostnader vid ett Masslogistikcenter : Modellering och fallstudie på jord- &amp; bergflöden i norra Norrköping / Model for calculating operating costs at a rock and soil consolidation center : Modelling and case study of rock and soil flows in northern parts of Norrköping

Moberg, Adam, Runefors, Simon January 2021 (has links)
I samband med byggprojekt uppstår det berg- och jordmassor som måste hanteras. De senaste årens ökade bostadsbyggande och stora infrastrukturprojekt i kombination med en ökad miljömedvetenhet har lett till att olika effektiviseringar av massahantering hamnat i fokus. En sådan effektivisering är  en samordnad återvinning av massa centralt mellan olika byggprojekt och som enligt studier kan minska både antalet transporter och total miljöpåverkan, en sådan plats kallas för masslogistikcenter (MLC). Kostnadsstrukturen hos ett MLC är dock outforskat vilket försvårar skapandet av hållbara affärsmodeller. Med detta som motivering är studiens syfte följande: Syftet är att skapa en modell för att beräkna kostnaden av att driva ett MLC Modellbyggnadens struktur och dess viktiga komponenter belästes i en inledande litteraturstudie tillsammans med fakta om masshantering och centraliserad materialhantering. En metod för modellutförande utvecklades med tre större steg: utformande av en konceptuell modell, kvantifierande av modellen till en datamodell och slutligen ett test av modellen för att förbättra den. Litteratur om masshantering belyste det komplexa ämnet där massa beroende på omständigheter och sort kan variera från avfall till handelsvara. Slutligen belystes den teoretiska bakgrund som finns till centraliserad materialhantering med fokus på bygglogistikcenter som visar sig kunna minska kostnader vid byggprojekt. Modellen utvecklades sedan i tre större faser utifrån den valda metoden för modellutförande och modellens utveckling överensstämmer med rapportens tre huvudfrågor. I första fasen anlades en konceptuell modell med stöd av den gjorda litteraturstudien och semistrukturerade intervjuer av personer kunniga inom masshantering och erfarna av aktiviteter i och runt ett MLC. I modellbyggandets andra fas kvantifierades den konceptuella modellen. En aktivitetsbaserad kalkyl passade den konceptuella modellens utformning bäst. Den tredje fasen testade sedan modellen på framtida byggprojekt i norra Norrköping, utifrån detta experiment förbättrades modellen ytterligare. Resultatet sammanfattar aktiviteter i det studerade systemet och resurser som används av dessa aktiviteter. Det kan sammanfattas som att mängden massa, massans typ samt dess föroreningsgrad driver flera kostnader. Allra mest kostsam är den massa som sorteras ut i MLC för kvittblivning. Systemet blir alltså kostnadseffektivt om man så tidigt som möjligt i processen kan sortera ut det material som i så hög grad som möjligt kan återvinnas. Resultatet visar vidare att ett MCL:s kostnadsstruktur påverkas av dess geografiska placering som blir en vägning mellan närhet till projekt och markpris. Närhet till projekt minskar transportkostnader medan billig mark möjliggör i sin tur antingen lägre kostnad för mark eller större möjligheter till lagring som ökar återvinning och minskar deponikostnader. På detta sätt är flera större kostnadsposter också direkt beroende av MCL:s placering. Ett annan vägning mellan kostnader är när krossning ska genomföras, varje krossning innebär en startkostnad samtidigt som behövd lageryta ökar när krossningar görs mer sällan. Slutligen innebär ett MLC en viss planering av såväl transporter som lager, detta driver kostnader för administrativt arbete vars kostnad måste bäras av den minskade deponeringen och transporten som ett MLC kan möjliggöra. Kvantifieringen av modellens massflöden gjordes enligt en tolkning av en ABC-kalkyl med minsta tidsenhet en vecka. Testet av modellen, med data från Optimass, på ett antal projekt i Norrköping gav en rad förbättringar av modellen. Dessutom grundlade testet tillsammans med ett enkelt referensscenario att ca 30 % av driftkostnaderna kunde sparas med ett MLC. Genom att modellen skapats, testats och förbättras har studiens syfte uppfyllts. Denna studie är ett steg i att analysera möjligheterna med ett MLC. Vidare forskning behövs bland annat inom områdena: marknaden för återvunna massor, andra användningsområden för lera och investeringskostnader för ett MLC. / In connection with construction projects, large quantities of rock and soil are excavated and need to be handled. In recent years, increased housing construction and large infrastructure projects in combination with an increased environmental awareness has contributed to an increased interest in rock and soil management. A rock and soil consolidation centre (from now on SCC) is a location where recycling of rock and soil can be coordinated between different construction projects in the area. A centre like this can, according to studies, lower both number of transports needed and the total environmental impact. However, the cost structure of a rock and soil consolidation centre lacks research, which makes it difficult to create sustainable business models. The structure of model building and its important components, together with facts regarding rock and soil management and centralized material handling were studied with a literature study. A method for creating a model was developed using three steps: firstly, designing a conceptual model; secondly, quantifying the model into a computer model and lastly test and improve the model. Literature regarding rock and soil management highlighted the complicated matter of the different uses of rock and soil, where, on one hand, when excavated by a construction/excavation company, it is considered waste and may not be dumped haphazardly. On the other hand, if the rock and soil were collected and deposited into an SCC, it may be sold for reuse and hence becomes a commercial product. The literature also showed how in theory a centralized construction logistic can lower costs during construction projects. The model was developed in three phases, each corresponding to the three main questions of the study. The first phase focuses on the creation of a conceptual model, which was made possible with sources in the literature and the semi-structured interviews with respondents working in the rock and soil management field. The second phase moved the conceptual model into a computer model. An activity-based calculation was chosen to represent calculation regarding costs in the model, while the last phase focused on testing the model in Norrköping and finding improvements. The result presents activities within the studied system, as well as which resources were used to make these activities happen. The results can be summarized by saying that the volume of rock and soil, what types of rock and soil used and the levels of contamination are the main drivers of a higher total cost. The costliest part is connected to the fee for taking rock and soil waste to landfills. Since this cost can be reduced if a product is recycled, a lot of the cost can be lowered if rock and soil that can be reused is sorted out early. The result also shows that an SCC’s cost structure is affected by its geographical location, which becomes a balance between proximity to projects and cheaper, more accessible land further away from a city. Another crossroad is when to conduct crushing of rocks and soil, since there is a high start-up cost and at the same time more storage is needed if the crushing of rock and soil is carried out less frequently. Lastly an SCC requires some planning regarding its operations and transports which in hand also contributes to increased administrative costs, costs which all need to be lower than the option of driving the rock and soil to a landfill. To quantify the module was done according to an interpretation of an activity-based calculation with a time unit of a week. The test of the model, with data from Optimass on several development projects in Norrköping, resulted in some improvements of the model. The test also could also be compared to a simple reference scenario where approximately 30% of the total cost could be saved with an SCC. It also showed a pay-off time of around a year. By creating, testing, and improving the model the purpose of the study has been accomplished. This study is a step in analysing the possibilities with an SCC. Further research is needed to determine the market for recycled rock and soil products, other usable areas for products such as clay and more accurate calculations regarding the investment costs of an SCC.

Page generated in 0.1582 seconds