• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 266
  • 3
  • Tagged with
  • 271
  • 143
  • 143
  • 143
  • 143
  • 143
  • 138
  • 93
  • 90
  • 88
  • 77
  • 71
  • 69
  • 68
  • 49
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
221

Mejora de la gestión del plazo mediante la implementación de last planner system en pequeña empresa constructora caso de estudio obra: mejoramiento de transitabilidad vehicular av. Martinelly, Andahuaylas Apurimac 2018 / Improvement of term management through the implementation of the lps in a small construction company case study: improvement of vehicular transitability av. Martinelly, Andahuaylas Apurimac 2018

Chávez Reynaga, Wilfredo Ronald, Dalmiro Ramos, Enciso 17 November 2018 (has links)
El propósito del presente estudio de investigación nace por la necesidad de gestionar de manera eficiente el plazo en la ejecución de obras por parte de pequeñas empresas del rubro, mediante la aplicación de un sistema de protección eficiente y efectivo como el Sistema del Último Planificador, herramienta que forma parte de la filosofía “Construcción sin perdidas” o “Lean Construction que surgió en la década de 1990 y provenía de la adaptación de “Lean Production” y de los fundamentos para la dirección de proyectos. La aplicación del Sistema del Ultimo Planificador, se realizó en una obra de pavimentación ejecutada por una pequeña empresa con organigrama organizacional y de recursos, básica. Para ello se hizo primero una revisión de las bases teóricas de los conceptos como planificación maestra, planificación intermedia y planificación semanal y de los métodos, técnicas, herramientas y metodologías que se utilizan en el desarrollo de un proyecto de construcción y de la herramienta principal en la que centra este trabajo de investigación. La dinámica del estudio de investigación se basó en la determinación de indicadores de la herramienta del Ultimo Planificador y su medición durante las 6 semanas de estudio, de las cuales 2 se tomaron como medición de los indicadores sin la aplicación de la herramienta del Sistema del Ultimo Planificador para la creación de línea base de medición y de 4 semanas de medición de los indicadores con la aplicación de la herramienta del Sistema del Ultimo Planificador. En el proceso de aplicación se siguió los pasos establecidos por la herramienta de acuerdo a esta teoría. Durante el tiempo de estudio de la investigación se observaron las dificultades y las fortalezas de la empresa durante la aplicación de la herramienta del Ultimo Planificador y se realizó algunas recomendaciones para su aplicación e eliminación de las causas de no cumplimiento y así crear un círculo virtuoso de mejora continua. Producto de la aplicación se observaron mejoras en el cumplimiento de las tareas programadas y por ende de los plazos contractuales en un porcentaje razonable, esta mejora reforzó nuestra hipótesis y que esta se refleja en el ahorro de un monto económico que ayudaría a la empresa a mejorar sus utilidades, reducir el riesgo de incurrir en mayores gastos generales y tener mayores costos de oportunidad. También debemos indicar que a pesar de las dificultades producto de la implementación de un Sistema del Último Planificador como la resistencia al cambio, esta debería ser utilizada e implementada en las pequeñas y medianas empresas como algo cotidiano, pues los beneficios en costos son mayores a los gastos incurridos en su implementación. Finalmente el material y el proceso de implementación reflejado en el presente trabajo de investigación pueden servir como punto de partida para la aplicación de la herramienta de Sistema del Último Planificador en otros proyectos de construcción y otras empresas similares del rubro. / The purpose of this research study was born from the need to efficiently manage the term in the execution of works by small companies in the sector, through the application of an efficient and effective protection system such as the Last Planner System, a tool which is part of the philosophy "Construction without losses" or "Lean Construction" that emerged in the 1990s and came from the adaptation of "Lean Production" and the Project Management Body of Knowledge. The application of the Last Planner System was carried out in a paving work executed by a small company with an organizational and resource organization chart, basic. To this end, a review was first made of the theoretical bases of the concepts of methods, techniques, tools and methodologies used in the development of a construction project and of the main tool on which this research work is centered. The dynamics of the research study was based on the determination of indicators of the tool of the Last Planner and its measurement during the 6 weeks of study, of which 2 were taken as measurement of the indicators without the application of the Ultimate System tool Planner for the creation of baseline measurement and 4 weeks of measurement of the indicators with the application of the tool of the Ultimate Planner System. In the application process, the steps established by the tool were followed according to this theory. During the time of study of the research the difficulties and strengths of the company were observed during the application of the tool of the Last Planner and some recommendations were made for its application and elimination of the causes of non-compliance and thus create a virtuous circle of continuous improvement.       Product of the application improvements were observed in the fulfillment of the programmed tasks and therefore of the contractual terms in a reasonable percentage, this improvement reinforced our hypothesis and that this is reflected in the saving of an economic amount that would help the company to improve its profits, reduce the risk of incurring higher overhead costs and have higher opportunity costs. We must also indicate that despite the difficulties resulting from the implementation of a Last Planner System such as resistance to change, this should be used and implemented in small and medium-sized companies as an everyday matter, since the cost benefits are greater than expenses incurred in its implementation.      Finally, the material and the implementation process reflected in this research work can serve as a starting point for the application of the Last Planner System tool in other construction projects and other similar companies in the field. / Tesis
222

Modelo matemático para determinar el índice de inestabilidad de suelos arcillosos en laderas aprovechables para transporte carrozable – carretera de acceso a El Pinar – tramo 0+840 a 0+980, localidad de Huaraz – Áncash

Tarazona Rincón, Claudia Sofía January 2017 (has links)
Plantea obtener valores cuantitativos del índice de inestabilidad de laderas en suelos arcillosos mediante un modelo matemático basado en la regresión lineal múltiple que finalmente determine el desplazamiento de la ladera en estudio. El ámbito de investigación o muestra correspondió al tramo 0+840 a 0+980 de la carretera de acceso a la urbanización El Pinar en la localidad de Huaraz, Áncash, cuya información recolectada durante el periodo enero y diciembre 2015, generó 47 datos, de los cuales 15 datos finales correspondieron a la etapa experimental o de comprobación mediante el grupo control establecido. El modelo matemático se generó mediante aplicación del software Eviews 7, ecuación experimental resultante de ajuste lineal múltiple definida a través de la siguiente relación: I = -0.080227 + 0.002389(w) + 0.0580063(1/p) - 1.02x10-05(SC), Obteniéndose mediante aplicación de la fórmula, un desplazamiento de la ladera en estudio, interpretada como desplazamiento lento. / Tesis
223

Nueva metodología para la obtención de distancias de visibilidad disponibles en carreteras existentes basada en datos LiDAR terrestre

Campoy Ungria, Jose Manuel 21 December 2015 (has links)
[EN] The existence of a visibility that is appropriate to the actual operating conditions is a sine qua non to achieve a safe geometric design. The sight distances required in driving tasks, such as decision-making, stopping, overtaking or crossing, represent an essential parameter in the geometric design of new roads; and they play a key role in all international design guidelines. Nevertheless, once the road has been built and operating, many other surrounding circumstances do determine the actual sight distance available over time. Moreover, since geometric design guidelines encompass visibility measurements based on the observer and the obstacle located on the roadway, systematic and periodic measurements prove difficult and tedious as well as risky and traffic-disruptive. In engineering practice, it is common to use elevation digital models and geometric design specific programs to establish the visibility conditions on roads; however, the development of new remote sensing technologies expand the possibilities to better estimate the visibility actually available. LiDAR technology has been enjoying a boost internationally in recent years. It is an important source of information that consists of millions of georeferenced points belonging to all kinds of objects, which represent not only the geometry of the road itself, but also its more immediate surroundings. It is precisely this ability to include all sorts of potential obstacles to vision in the analysis that raised our interest. This PhD thesis presents a newly developed and tested methodology for the systematic assessment of visibility available on roads that deploys visuals directly drawn against the LiDAR point cloud. To this purpose the concepts of Visual Prism (VP) and Rectangular Prismatic Unit (RPU) have been defined as key elements in this new way of thinking about vision. They represent an alternative to the traditional straight line drawn between the observer and the object. During the research, the impact on the results of the point cloud density has been analyzed; and this methodology has been compared to the visibility results yielded by known techniques based upon digital terrain models, digital surface models and project profiles in two existing road sections. In general, conventional methods overestimate sight distance compared to the new methodology based on LiDAR data, and in many cases the overestimation is significant.. The development, that displays both visuals and three dimensional point cloud results, also enables to spot the reason for the obstruction of vision. This improvement is practice-ready and could be used while assessing the road and improving the conditions of sight distance and road safety. / [ES] La existencia de una visibilidad adecuada a las condiciones reales de operación, es condición indispensable para alcanzar un diseño geométrico seguro. Las distancias de visibilidad requeridas para tareas inherentes a la conducción, tales como la decisión, la parada, el adelantamiento o el cruce, constituyen un parámetro esencial en el diseño geométrico de nuevas carreteras, formando parte importante de todas las guías de diseño a nivel internacional. Sin embargo, una vez construida la carretera y durante el tiempo en que esta se encuentra en servicio, muchas otras circunstancias de su entorno condicionan la visibilidad realmente disponible a lo largo del tiempo. Por otro lado, dado que las guías de diseño geométrico contemplan las mediciones de visibilidad disponible con el observador y el obstáculo situados sobre la calzada, su medición sistemática y periódica es una complicada y tediosa labor no exenta de riesgos y de perturbaciones al tráfico. En la práctica ingenieril, es habitual el empleo de modelos digitales de elevaciones y de programas específicos de diseño geométrico para establecer las condiciones de visibilidad en carreteras; no obstante, el desarrollo de nuevas tecnologías de teledetección amplían las posibilidades a una mejor estimación de la visibilidad realmente disponible. La tecnología LiDAR está gozando de un importante impulso a nivel internacional en los últimos años y constituye una importante fuente de información consistente en millones de puntos georreferenciados pertenecientes a todo tipo de objetos que representan no solo la geometría de la propia carretera, sino también su entorno más inmediato. Precisamente por su capacidad de incluir en el análisis todo tipo de obstáculos potenciales a la visión, en la presente Tesis Doctoral se ha desarrollado y analizado una nueva metodología de evaluación sistemática de visibilidades disponibles en carreteras a partir de visuales trazadas directamente contra la nube de puntos LiDAR. Para ello se han definido por primera vez los conceptos de Prisma Visual (PV) y de Unidad Prismática Rectangular (UPR) como elementos básicos constitutivos de esta nueva forma de concebir la visión, alternativos a la tradicional línea recta visual trazada entre el observador y el objetivo. Durante la investigación se ha analizado el efecto de la densidad de la nube de puntos en los resultados y se ha sometido esta metodología a comparación con los resultados de visibilidad obtenidos por técnicas conocidas a partir de modelos digitales del terreno, modelos digitales de superficies y perfiles de proyecto en dos tramos de carretera existentes. En general, se obtiene una sobreestimación generalizada y en muchos casos significativa de las visibilidades realmente disponibles si se emplean metodologías convencionales en comparación con las obtenidas a partir de la nueva metodología basada en datos LiDAR. El desarrollo, preparado para la visualización conjunta de resultados de visuales y nube de puntos en tres dimensiones, permite asimismo interpretar el motivo de la obstrucción a la visión, lo que constituye un avance puesto al servicio de los ingenieros en la evaluación de la carretera y en la mejora de sus condiciones de visibilidad y de seguridad vial. / [CAT] L'existència d'una visibilitat adequada a les condicions reials d'operació, es condició indispensable per a aconseguir un disseny geomètric segur. Les distàncies de visibilitat requerides per a tasques inherents a la conducció, tals com la decisió, la parada, l'avançament, o l'encreuament, constitueixen un paràmetre essencial en el disseny geomètric de noves carreteres, formant part important de totes les guies de disseny a nivell internacional. No obstant, una volta construïda la carretera i durant el temps en què es troba en servici, moltes altres circumstancies del seu entorn condicionen la visibilitat realment disponible. D'altra banda, donat que les guies de disseny geomètric contemplen les mesures de visibilitat disponible en l'observador i el obstacle situats sobre la calçada, la seua medició es una complicada i tediosa llavor no exempta de riscs i de molèsties al trànsit. En la practica, es habitual l'ús de models digitals d'elevacions i de programes específics de disseny geomètric per a establir les condicions de visibilitat en carreteres; no obstant, el desenvolupament de noves tecnologies de tele-detecció amplien les possibilitats a una millor estima de la visibilitat realment disponible. La tecnologia LIDAR està gojant d'un important impuls a nivell internacional en els ultims anys i constitueix una important font d'informació consistent en milions de punts geo-referenciats de tot tipus d'objectes que representen no nomes la geometria de la pròpia carretera, sinó també el seu entorn mes immediat. Precisament per la seua capacitat d'incloure en l'analisis tot tipus d'obstacles potencials a la visió, en el present tesis doctoral s'ha analitzat una nova metodologia d'avaluació sistemàtica de visibilitats disponibles en carreteres a partir de visuals traçades directament contra el núvol de punts LIDAR. Per tal motiu s'han definit per primera vegada els conceptes de Prisma Visual (PV) i d'Unitat Prismàtica Rectangular (UPR) com a elements bàsics constitutius d'aquesta nova forma de concebre la visió, alternatius a la tradicional línia recta visual traçada entre l'observador i el objectiu. Durant la investigació s'ha analitzat l'efecte de la densitat del núvol de punts en els resultats i s'ha sotmès aquesta metodologia a comparació amb els resultats de visibilitat obtinguts per tècniques conegudes a partir de models digitals del terreny, models digitals de superfícies i perfils de projecte en dos trams de carretera existents. En general, s'obté una sobreestimació generalitzada i en molts casos significativa de les visibilitats realment disponibles si s'empren metodologies convencionals en comparació amb les obtingudes a partir de la nova metodologia basada en dades LiDAR. El desenvolupament, preparat per a la visualització conjunta de resultats de visuals i núvol de punts en tres dimensions, permet així mateix interpretar el motiu de l'obstrucció a la visió, el que constitueix un avanç posat al servei dels enginyers en l'avaluació de la carretera i en la millora de les seves condicions de visibilitat i de seguretat viària. / Campoy Ungria, JM. (2015). Nueva metodología para la obtención de distancias de visibilidad disponibles en carreteras existentes basada en datos LiDAR terrestre [Tesis doctoral no publicada]. Universitat Politècnica de València. https://doi.org/10.4995/Thesis/10251/59062 / TESIS
224

Establecimiento de parámetros de riesgo para la seguridad de los ciclistas durante las maniobras de adelantamiento en carreteras convencionales

Ferrer Pérez, Vicente Melchor 01 September 2017 (has links)
Concerning road safety, overtaking to cyclists is one of the most dangerous maneuvers that appear in two-lane rural roads, for both motor vehicles and cyclists. The underlying cause is that vehicles must partially invade the opposite lane, while driving parallel to them. Cyclists are very vulnerable users, thus being under a situation of clear inferiority with the rest of vehicles. In addition, the maneuver entirely depends on drivers, involving many variables in a complex decision process to be carried out in a very short period of time. The present thesis focuses on the analysis of the phenomenon of overtaking of motor vehicles to cyclists on two-lane rural roads in order to deepen the determination of the associated risk levels. A detailed review of the existing literature about overtaking maneuvers has been performed, especially focusing on the data collection methodologies. This has allowed the author to an in-depth determination of what variables do intervene in the process. As a result, it has been concluded that the most appropriate system is based on the use of an instrumented bicycle. Likewise, studies on aerodynamic effects during overtaking have been reviewed, given their impact on the stability and safety of the rider. From this point onwards, a road and mountain bike have been instrumented and in-situ data have been collected from overtaking maneuvers along several two-lane rural roads in the regions of Valencia and Castellón. The data collection process involves lateral distance, relative and absolute speeds, trajectories, etc., by means of naturalistic observations. The data collected have been analyzed, obtaining different risk parameters associated with the overtaking maneuvers and proposing a series of design and operational recommendations for two-lane rural roads to improve the safety of cyclists. Likewise, the accident data of both the roads in which the tests were carried out and other additional ones of the Valencian Community have been compiled, allowing to establish correlations between the parameters of risk and the predicted accident rate, developing a model for estimating road crashes. / A nivel de siniestralidad, la maniobra de adelantamiento a ciclistas es una de las más peligrosas que se presentan en carreteras convencionales, tanto para los vehículos que circulan por la carretera como para los propios ciclistas. Ello se debe a que, para adelantar a los ciclistas, el vehículo adelantante debe colocarse en paralelo a éstos y, en muchos casos, invadir el carril destinado al tráfico opuesto durante un cierto periodo de tiempo. El ciclista se presenta como un usuario muy vulnerable y con una situación de clara inferioridad en su interacción con el resto de vehículos. En última instancia, la maniobra depende totalmente de los conductores, en un proceso de decisión complejo a llevar a cabo en muy breve espacio de tiempo y en el que interviene un gran número de variables. La presente tesis doctoral se ha centrado en el análisis de este fenómeno del adelantamiento de vehículos a ciclistas en carreteras convencionales con el fin de profundizar en la determinación de los niveles de riesgo asociados. Se ha revisado la situación en la que se encuentran las investigaciones en relación con las maniobras de adelantamiento de vehículos sobre ciclistas, con especial orientación hacia las metodologías de toma de datos in situ por entenderse que es, a través de dichas metodologías, el camino correcto para conocer con mayor profundidad las variables que intervienen y condicionan este fenómeno. Fruto de este análisis se ha llegado a la conclusión de que el sistema más adecuado es el basado en la utilización de una bicicleta instrumentada. Igualmente, se han revisado los estudios sobre los efectos aerodinámicos durante el adelantamiento dada su incidencia en la estabilidad y seguridad del ciclista. A partir de ahí, se ha procedido a la instrumentación de una bicicleta de carretera y otra de montaña y se han recopilado datos in situ de adelantamientos a lo largo de varias carreteras convencionales de las provincias de Valencia y Castellón, tomándose datos sobre separaciones, velocidades, trayectorias, etc., a través de observaciones naturalistas. Los datos recopilados han sido analizados y a partir de ellos se han establecido diferentes parámetros de riesgo asociados a la maniobra de adelantamiento y se han propuesto una serie de recomendaciones para el diseño y explotación de carreteras convencionales que permitan mejorar la seguridad de los ciclistas. Igualmente, se han recopilado los datos de accidentalidad tanto de las carreteras en las que se han realizado las pruebas como de otras adicionales de la Comunidad Valenciana, permitiendo establecer correlaciones entre los parámetros de riesgo y la accidentalidad previsible, desarrollándose un modelo para la estimación de accidentes. / A nivell de sinistralitat, la maniobra d'avançament a ciclistes és una de les més perilloses que es presenten en carreteres convencionals, tant per als vehicles que circulen per la carretera com per als propis ciclistes. Això se deu al fet que, per a avançar als ciclistes, el vehicle avancen-te ha de col·locar-se en paral·lel a estos i, en molts casos, invadir el carril destinat al tràfic oposat durant un cert període de temps. El ciclista es presenta com un usuari molt vulnerable i amb una situació de clara inferioritat en la seua interacció amb la resta de vehicles. En última instància, la maniobra depén totalment dels conductors, en un procés de decisió complex a dur a terme en molt breu espai de temps i en el que intervé un gran nombre de variables. La present tesi doctoral s'ha centrat en l'anàlisi d'este fenomen de l'avançament de vehicles a ciclistes en carreteres convencionals a fi d'aprofundir en la determinació dels nivells de risc associats. S'ha revisat la situació en què es troben les investigacions en relació amb les maniobres d'avançament de vehicles sobre ciclistes, amb especial orientació cap a les metodologies de presa de dades in situ per entendre's que és, a través de les dites metodologies, el camí correcte per a conéixer amb més profunditat les variables que intervenen i condicionen este fenomen. Fruit d'esta anàlisi s'ha arribat a la conclusió que el sistema més adequat és el basat en la utilització d'una bicicleta instrumentada. Igualment, s'han revisat els estudis sobre els efectes aerodinàmics durant l'avançament donada la seua incidència en l'estabilitat i seguretat del ciclista. A partir d'ací, s'ha procedit a la instrumentació d'una bicicleta de carretera i una altra de muntanya i s'han recopilat dades in situ d'avançaments al llarg d'unes quantes carreteres convencionals de les províncies de València i Castelló, prenent-se dades sobre separacions, velocitats, trajectòries, etc., a través d'observacions naturalistes. Les dades recopilats han sigut analitzats i a partir d'ells s'han establit diferents paràmetres de risc associats a la maniobra d'avançament i s'han proposat una sèrie de recomanacions per al disseny i explotació de carreteres convencionals que permeten millorar la seguretat dels ciclistes. Igualment, s'han recopilat les dades d'accidentalitat tant de les carreteres en què s'han realitzat les proves com d'altres addicionals de la Comunitat Valenciana, permetent establir correlacions entre els paràmetres de risc i l'accidentalitat previsible, desenrotllant-se un model per a l'estimació d'accidents. / Ferrer Pérez, VM. (2017). Establecimiento de parámetros de riesgo para la seguridad de los ciclistas durante las maniobras de adelantamiento en carreteras convencionales [Tesis doctoral no publicada]. Universitat Politècnica de València. https://doi.org/10.4995/Thesis/10251/86188 / TESIS
225

Convergencia económica en el Perú y el rol de la infraestructura vial: 2001-2019

Zapana Solorzano, John Manuel 25 September 2021 (has links)
Utilizando los datos del PBI y el gasto público en transporte terrestre desagregados por región, el presente estudio tiene como objetivo analizar el impacto de la infraestructura vial sobre el proceso de convergencia económica entre las regiones del Perú durante el periodo 2001-2019. Para tal efecto, sobre la base de un panel de datos y dentro del marco de la Teoría del Crecimiento exógeno, se emplea un modelo de β-convergencia condicional donde la infraestructura vial es una de las variables determinantes a estudiar. En general, para el periodo 2001-2019 los resultados se muestran a favor de la hipótesis de convergencia condicional regional con velocidades cercanas al 2% anual. Donde las únicas variables que resultaron significativas fueron las líneas telefónicas per cápita y los créditos privados per cápita. No obstante, al realizar regresiones mediante el uso de variables instrumentales y efectos fijos para los subperiodos anuales: 2001-2015, 2006- 2010, 2006-2014, 2006-2015; se encontró convergencia económica regional condicionada a la infraestructura vial. En ese escenario, la variable de infraestructura vial per cápita resultó ser significativa, pero en términos de magnitud resultó ser pequeño. Así, un aumento del 1 % en la inversión de infraestructura vial per cápita de una determinada región se traducirá en un incremento aproximado de 0.010 % en el crecimiento económico de dicha región hacia su propio estado estacionario. Así también, las velocidades de convergencia resultaron estar por encima del 10 %. Los resultados obtenidos sugieren que las políticas económicas respecto al gasto público en infraestructura vial deberían buscar centrarse en un incremento general a nivel nacional. No obstante, en un contexto de restricción presupuestaria del sector público, debería priorizarse en regiones específicas como las denominadas regiones con efecto impulso. Así, se incrementaría el producto per cápita en estas regiones de manera directa, estimulándose el proceso de convergencia económica condicional en el Perú.
226

Diseño de la carretera La Palma a Nueva Libertad, del distrito de Chirinos, provincia San Ignacio, región Cajamarca, 2015

Ocupa Aguilar, Yaiser January 2020 (has links)
El proyecto consiste en la elaboración del diseño de la carretera la Palma a Nueva Libertad, del distrito de Chirinos, provincia San Ignacio, 2015, logrando así la comunicación de los pueblos y anexos de la zona del proyecto, mejorando el nivel de servicio de demanda de la producción agrícola en las zonas existentes, reduciendo los costos excesivos de trasporte generados por acémilas. Como también contribuyendo al ordenamiento territorial y desarrollo de los pueblo, La Palma, Nueva Libertad, anexos y Chirinos, son pueblos en crecimiento, comercial, agrícola, ganadera, turística, etc. aumentando así la calidad de vida de los pobladores. Beneficiando directamente a los pueblos en mención. Por ello es tal la importancia del proyecto que contamos con la información y apoyo necesario de instituciones públicas y privadas involucrados en el tema.
227

Prevención y control de riesgos en la construcción del Corredor Vial Interoceánico Sur Perú-Brasil 2009

Palmer Montenegro, Jaime January 2010 (has links)
La presente investigación se desarrolla en base a la aplicación del programa de empresas competitivas (PEC) para el consorcio CONIRSA, encargada de la construcción del corredor vial interoceánico sur. El PEC fue adoptado y aplicado por CONIRSA en diciembre del 2008 por la Gerencia de Seguridad y Salud, como parte de un nuevo enfoque en seguridad, en donde el aspecto de la seguridad de los trabajadores pasa a ser el elemento principal dentro de los lineamientos operacionales de la misma. Conforme a este nuevo enfoque, implementado corporativamente, el proyecto podría ser paralizado temporalmente en tanto los indicadores de gestión de seguridad no se encuentren dentro de los límites corporativos establecidos. La reanudación del mismo está en función a las medidas correctivas que se adopten y con conocimiento y participación de todos los niveles de decisión involucrados, desde las altas gerencias, personal de mando medio y personal de piso. CONIRSA se crea con la finalidad de realizar la construcción y mantenimiento de los Tramos 2 y 3 del corredor vial Interoceánica sur Perú-Brasil, es por esto que se juntan 4 empresas importantes en el ámbito de la construcción: Odebrecht (Brasil), Corporación Graña y Montero (Perú), JJC Contratistas Generales (Perú) y la empresa ICCGSA (Perú). / Tesis
228

Diseño definitivo de la carretera puente El Suro-La Flor, del distrito de San Andrés de Cutervo, Cutervo, Cajamarca

Delgado Perez, Jhames Franks, Cruz Linares, Abel Hipolito January 2019 (has links)
El presente proyecto de tesis, tiene como finalidad el Diseño Definitivo de la Carretera Puente El Suro-La Flor del distrito de San Andrés de Cutervo, provincia de Cutervo, región Cajamarca, ya que ésta zona carece de una vía que permita la intercomunicación entre los distintos lugares aledaños y así poder tener mejores oportunidades para el desarrollo. Con el Diseño Geométrico, Afirmado y de las diferentes Obras de Arte, aumentaran las posibilidades de desarrollo reduciendo la pobreza debido a la falta de integración por carencia de carreteras. Con dicho proyecto se buscará contribuir con el desarrollo Social, Salud, Educación, Economía, Comercial, Etc. La aplicación de este proyecto, incrementará de manera significativa la calidad de vida. La tesis en mención será realizada en cuatro fases programadas: FASE I: Visita a la zona del proyecto, recolección de información. FASE II: Estudios Básicos. FASE III: Diseño de la carretera. FASE IV: Diseño de cada componente del proyecto.
229

Medición de parámetros fundamentales para determinar la longitud máxima de cola en intersecciones de la ciudad de Lima

Delgadillo Anco, Valeria Alessandra 18 August 2020 (has links)
El incremento de la demanda vehicular durante los últimos años ha generado la saturación de las vías y, por lo tanto, se genera mayor tráfico. En Lima, es usual que entre las 7:00 am - 8:00 am o entre las 6:00 pm – 7 pm no se quiera transitar por las vías principales debido a la cantidad de vehículos que las utilizan. Por lo que, los conductores eligen vías secundarias como parte de sus rutas para dirigirse a su destino. La capacidad de las vías secundarias es menor y, por lo tanto, se saturan más rápido. Por ello, considero su estudio igual de importante. Las colas generadas en las intersecciones son definidas como parámetros de eficiencia de las vías. Por lo tanto, deben ser analizadas para poder identificar las causas de su origen y brindar soluciones a la problemática. El presente estudio evalúa la cantidad de vehículos que forman parte de la cola obtenidos en el campo con los obtenidos mediante la función transformada de Whiting. Durante la etapa de marco teórico se definen todos los conceptos que son utilizados como parte de la investigación. Definiciones como capacidad, demanda, flujo de saturación, grado de saturación y la metodología del High Capacity Manual (2010) son necesarios para la correcta comprensión. Se utiliza una metodología cuantitativa para la comparación de resultados y se evalúa la semejanza entre los resultados de campo y los resultados obtenidos mediante la función transformada de Whiting. La toma de datos se desarrolló por medio de filmaciones durante cuatro horas en las que existía presencia de tráfico y en una intersección con vías que no son consideradas principales. Finalmente, el estudio concluye que no es posible poder describir el comportamiento de la longitud máxima de cola mediante la función transformada de Whiting.
230

Diagnóstico organizacional bajo modelo de gestión propuesto para empresa PYME de consultoría en infraestructura vial: Caso VM

Zafra Lapatnikova, Anna Luisa 10 October 2023 (has links)
El presente estudio plantea la necesidad de realizar un diagnóstico organizacional interno basado en un modelo de la Excelencia en la Gestión de una organización pyme del rubro de consultoría en infraestructura vial en Lima. Este trabajo aportará como acción inicial o insumo a partir del cual se podrá construir una estrategia con visión sistémica. La aproximación de la investigación se realizó mediante el estudio de caso de una empresa peruana pyme perteneciente al sector de ingeniería, específicamente de consultoría en infraestructura vial. Esta empresa tiene más de cincuenta años en el mercado nacional, y al encontrarse en un entorno altamente competitivo necesita una estrategia clara de diferenciación frente a su competencia, para lo que primero tiene que conocer sus fortalezas y debilidades. En consecuencia, la presente investigación analizó la situación actual de la empresa como caso de estudio, y realizó un diagnóstico interno basado en las variables del modelo de Excelencia de Gestión. En base a este modelo se logró identificar las fortalezas y debilidades de la organización, así como la vista interna, externa y futura de la organización, la cual podrá servir como insumo para construir un plan estratégico para la empresa. Como resultado de este estudio, primero se analizaron los hallazgos los cuales se clasificaron en fortalezas y debilidades. Después de la clasificación, se realizó un análisis de estas, el cual desembocó en recomendaciones que contribuyeron a comprender la situación actual y posteriormente poder gestionar a la organización de manera sistémica, a mejorar el desempeño de los resultados de la organización y por último a facilitar la comparación y el intercambio de mejores prácticas. Todos los resultados se podrán utilizar para realizar un plan estratégico detallado para la empresa caso de estudio.

Page generated in 0.0556 seconds