• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 336
  • 14
  • 12
  • 3
  • Tagged with
  • 366
  • 366
  • 251
  • 211
  • 72
  • 56
  • 50
  • 48
  • 41
  • 38
  • 37
  • 35
  • 35
  • 34
  • 32
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
271

Análise das competências das lideranças em empresas projetizadas

Reis, Alexandre dos 17 July 2015 (has links)
Submitted by Joana Azevedo (joanad@id.uff.br) on 2017-06-29T15:34:35Z No. of bitstreams: 1 Dissert ALEXANDRE DOS REIS.pdf: 2988128 bytes, checksum: 0266eed184181696d96e521dc4a0986c (MD5) / Rejected by Biblioteca da Escola de Engenharia (bee@ndc.uff.br), reason: Item rejeitado, pois a ficha catalográfica está fora do padrão. Atenciosamente, Catarina Ribeiro Bibliotecária BEE - Ramal 5992/5993/5994 on 2017-07-07T12:33:07Z (GMT) / Submitted by Joana Azevedo (joanad@id.uff.br) on 2017-07-25T19:33:23Z No. of bitstreams: 1 Dissert ALEXANDRE DOS REIS.pdf: 1565359 bytes, checksum: 85611701dcdbab1d813431b8b9628a5f (MD5) / Rejected by Biblioteca da Escola de Engenharia (bee@ndc.uff.br), reason: Olá, Joana! Favor verificar a formatação da ficha catalográfica. Att, Catarina on 2017-07-28T15:24:44Z (GMT) / Submitted by Joana Azevedo (joanad@id.uff.br) on 2017-08-03T14:17:22Z No. of bitstreams: 1 Dissert Alexandre dos Reis.pdf: 1562711 bytes, checksum: 97c69b5ee554b491e325ccd39283850e (MD5) / Approved for entry into archive by Biblioteca da Escola de Engenharia (bee@ndc.uff.br) on 2017-08-24T13:13:49Z (GMT) No. of bitstreams: 1 Dissert Alexandre dos Reis.pdf: 1562711 bytes, checksum: 97c69b5ee554b491e325ccd39283850e (MD5) / Made available in DSpace on 2017-08-24T13:13:49Z (GMT). No. of bitstreams: 1 Dissert Alexandre dos Reis.pdf: 1562711 bytes, checksum: 97c69b5ee554b491e325ccd39283850e (MD5) Previous issue date: 2015-07-17 / O estudo que ora se apresenta busca investigar a relação entre as lideranças e as empresas, tendo como ponto de partida uma listagem com os maiores clientes/arrecadadores compulsórios do SFIRJAN. É universo da pesquisa, portanto, empresas localizadas no Estado do Rio de Janeiro, majoritariamente enquadradas por sua atividade econômica como indústria. Assim, dentro desse objetivo, busca-se qualificar e quantificar os valores, competências, perfis e expectativas das empresas sobre seus líderes, como elas formam essas lideranças, quem são os líderes atuais das companhias-alvo e, como esses enxergam a estrutura da mesma. A dissertação traz, portanto, uma pesquisa exploratória com executivos brasileiros das companhias foco do escopo, além da referência bibliográfica que traz conceitos de tipos de liderança, história da liderança, ambiente corporativo, governança corporativa e estruturas projetizadas. Assim, buscou-se aprofundar conceitos até então pouco explorados, ajudando a entender os impactos da liderança em empresas de estrutura projetizada. / The following study investigates the relationship between leaders and businesses, taking as its starting point a listing with the largest customers/compulsory collecting for SFIRJAN. It universe of research, therefore, companies located in the State of Rio de Janeiro, mostly governed by its economic activity as industry. Within this goal, we will qualify and quantify the values, skills, profiles and expectations of the companies on their leaders, how they form these leaders, who are the current leaders of the target companies, and how these leaders see the structure of his/her companies. This dissertation brings therefore an exploratory study of Brazilian executives from companies focus the scope, plus a bibliographic reference that brings concepts of types of leadership, history of leadership, corporate environment, corporate governance and projectized structures. Thus, we sought to deepen concepts little explored, helping to understand the impact of leadership in projectized structure companies.
272

Diretrizes para construção de uma metodologia de gerenciamento de projetos de pesquisa, desenvolvimento e inovação tecnológica – caso do escritório de gerenciamento de projetos do INT na EMBRAPII.

Fernandez, Gabriela de Rezende 24 November 2016 (has links)
Submitted by Joana Azevedo (joanad@id.uff.br) on 2017-08-07T19:38:01Z No. of bitstreams: 1 Dissert Gabriela de Rezende Fernandez.pdf: 2719120 bytes, checksum: a4e0277e6395cc9a69efd0a7c1d17e90 (MD5) / Approved for entry into archive by Biblioteca da Escola de Engenharia (bee@ndc.uff.br) on 2017-08-29T16:27:08Z (GMT) No. of bitstreams: 1 Dissert Gabriela de Rezende Fernandez.pdf: 2719120 bytes, checksum: a4e0277e6395cc9a69efd0a7c1d17e90 (MD5) / Made available in DSpace on 2017-08-29T16:27:08Z (GMT). No. of bitstreams: 1 Dissert Gabriela de Rezende Fernandez.pdf: 2719120 bytes, checksum: a4e0277e6395cc9a69efd0a7c1d17e90 (MD5) Previous issue date: 2016-11-24 / O presente trabalho tem como objetivo definir diretrizes para a construção de uma metodologia de gerenciamento de projetos que tenha como foco a execução no ambiente de Pesquisa, Desenvolvimento & Inovação Tecnológica, e que auxilie os pesquisadores na condução dos projetos pertencentes ao programa da Empresa Brasileira de Pesquisa e Inovação Tecnológica (EMBRAPII). Para isso, foram selecionas 11 características do modelo de negócio da EMBRAPII que foram confrontadas com as características dos projetos de Pesquisa, Desenvolvimento e Inovação (PD&I) a fim de verificar o alinhamento do modelo de negócio da EMBRAPII com a natureza da PD&I. Paralelamente, foram analisadas as formas de gerenciamento de projetos padrão PMBOK® Guide, as metodologias de desenvolvimento de produto Scrum e Front End Loading (FEL) e a metodologia de gerenciamento de projetos PRINCE2™, com o objetivo de extrair elementos que poderão contribuir na construção da metodologia de gerenciamento de projetos das Instituições Científicas e Tecnológicas (ICTs) credenciadas na EMBRAPII. Para tanto, foi utilizada a experiência da investigante na construção e implantação da metodologia de gerenciamento de projetos no Instituto Nacional de Tecnologia. O presente estudo teve como resultado um conjunto de 11 diretrizes relacionadas às 11 características da EMBRAPII, que podem influenciar a metodologia em questão. / The goal of this study is to define guidelines to design a project management methodology that focuses on the execution of Research, Development & Innovation’s projects, and to assist researchers in conducting the projects included on the Brazilian’s National Program of Research and Technological Innovation, using EMBRAPII. With that objective in mind and in order to check the alignment with EMBRAPII´s business model, 11 EMBRAPII’s features were selected and compared with the characteristics of Research, Development and Innovation´s projects (RD & I). In parallel, the study also analyzed the world standard methodologies for project management such as the PMBOK® Guide, the product development methodologies Scrum, Front End Loading (FEL) and PRINCE2 ™, with the objective of selecting elements that may contribute to the construction of the project management methodology for Scientific and Technological Institutions (ICT's) accredited by EMBRAPII. Additionally, it was applied also the researcher experience in the construction and implementation of project management methodology at the National Institute of Technology. This study resulted in a set of 11 guidelines related to 11 characteristics of EMBRAPII, which can positively influence the methodology in question.
273

Gestão do projeto e sua interface com o canteiro de obras sob a ótica da preparação da execução de obras (PEO) / Design management and its interactions with the construction field under the perspective of the construction preparation and execution (PEO)

Arrotéia, Aline Valverde 26 September 2013 (has links)
Submitted by Jaqueline Silva (jtas29@gmail.com) on 2014-10-06T20:56:54Z No. of bitstreams: 3 Dissertação - Aline Valverde Arrotéia - 2013 (1).pdf: 19845597 bytes, checksum: a0771de1e645df07c152873e59f534e2 (MD5) Dissertação - Aline Valverde Arrotéia - 2013 (2).pdf: 17441990 bytes, checksum: b1f22aee78d803aedac8b5d5827fa31b (MD5) license_rdf: 23148 bytes, checksum: 9da0b6dfac957114c6a7714714b86306 (MD5) / Approved for entry into archive by Jaqueline Silva (jtas29@gmail.com) on 2014-10-06T20:57:05Z (GMT) No. of bitstreams: 3 Dissertação - Aline Valverde Arrotéia - 2013 (1).pdf: 19845597 bytes, checksum: a0771de1e645df07c152873e59f534e2 (MD5) Dissertação - Aline Valverde Arrotéia - 2013 (2).pdf: 17441990 bytes, checksum: b1f22aee78d803aedac8b5d5827fa31b (MD5) license_rdf: 23148 bytes, checksum: 9da0b6dfac957114c6a7714714b86306 (MD5) / Made available in DSpace on 2014-10-06T20:57:05Z (GMT). No. of bitstreams: 3 Dissertação - Aline Valverde Arrotéia - 2013 (1).pdf: 19845597 bytes, checksum: a0771de1e645df07c152873e59f534e2 (MD5) Dissertação - Aline Valverde Arrotéia - 2013 (2).pdf: 17441990 bytes, checksum: b1f22aee78d803aedac8b5d5827fa31b (MD5) license_rdf: 23148 bytes, checksum: 9da0b6dfac957114c6a7714714b86306 (MD5) Previous issue date: 2013-09-26 / Coordenação de Aperfeiçoamento de Pessoal de Nível Superior - CAPES / During the last twenty years the construction field in Brazil has evolved significantly in response to its market growing and competitiveness. However this evolving path has faced many obstacles such as cultural barriers and the lack of efforts to achieve quality at the Brazilian construction site. As one of the causes of this facts the lack of integration between construction and the designing process generates waste, pathologies, work redone and improvised changes originated by incompatible projects which were taken by incapacitated personnel at an inconvenient moment. At the same time, the great amount of information generated on the designing or construction phases is lost due to the lack of an effective coordination of these activities. From this scenario Souza (2001), has developed two management methods in her doctorate thesis named Preparation for the Execution of Buildings (known as PEO) and the Pro-active Coordination (known as CPA), these methods are based on the application of the processes adopted by the French construction industry on Brazilian construction sites. These methodologies aim to establish the integration of the project phases by a set of actions and activities implemented by a system of meetings where the main objective is to discuss the projects and the planning of the construction site seeking to obtain a better quality and better outcome on the productive process. These methodologies aim to bring expressive improvements on the productivity, as well as on the lowering of waste, on the settlement of goals, on planning actions in accordance with all the agents involved and mainly on the reduction of costs allied to higher quality standards. Thus is an objective of this research to implement the Preparation on the Execution of Buildings (PEO) seeking to understand the management of the designing process and its interface with the construction site. The methodology applied on the development of the analysis is classified as qualitative and it will be carried by the practical application of the research and the evaluation of its results. Thus, the study was divided into two stages, one of them intended for a pilot study of PEO in Company A, and the other to the implementation of PEO on the company B. This way, the method was developed from a system meetings entitled structured in three different stages: the release of PEO; the development of PEO and the completion of the intensive phase of PEO, which were performed over a period from two to three months. The data analysis was structured upon five main aspects which were evaluated during the implementation of the method on the studied companies. These aspects were: the actions taken during the PEO phase, the development of the actions and the participation of the agents; the internal structure of the companies analyzed; The management and design coordination and the contract form of the contractors, architects and engineers. The results obtained demonstrated the PEO method's effectiveness and viability while a booster on the improvement of project management. Therefore, it can be concluded that the PEO is feasible to be applied in building construction companies, since this method can contribute to the integration of the design phases and construction, as well as to the improvement of the communication between the agents involved in the building construction field. / Nos últimos 20 anos, o setor da construção civil no Brasil evoluiu significativamente em resposta ao crescimento da competitividade no mercado. Entretanto, nesse processo de evolução ainda têm sido encontradas barreiras culturais e organizacionais, e, sobretudo, dificuldades nos esforços à qualidade nos canteiros de obras brasileiros. Aliada a este quadro, a falta de integração entre as atividades de construir e projetar provoca uma série de desperdícios, patologias, retrabalhos e alterações improvisadas decorrentes de projetos não compatibilizados, ora por ausência de detalhes nos projetos, ora por decisões tomadas por pessoas não capacitadas em momentos inadequados. A partir dessa realidade, Souza (2001) desenvolveu dois métodos de gestão nomeados Preparação da Execução de Obras (PEO) e Coordenação Pró-Ativa (CPA) em sua tese de doutoramento, por meio da transposição desses métodos adotados na gestão da interface projeto-execução de obras na França para a realidade dos canteiros de obras brasileiros. Esses métodos visam à integração das etapas de projeto e obra a partir de um conjunto de ações e atividades realizadas por meio de reuniões sistematizadas voltadas à discussão do projeto, ao planejamento e à organização do futuro canteiro de obras, a fim de obter melhor qualidade e desempenho no processo produtivo. Dessa forma, este trabalho tem como objetivo geral implementar o método da preparação da execução de obras (PEO) a fim de avaliar a interface entre a gestão do processo de projeto e a execução do canteiro de obras. A metodologia adotada para o desenvolvimento deste trabalho é classificada como qualitativa, a qual foi realizada por meio de uma pesquisa-ação, e dividida em duas etapas diferentes, sendo uma destinada ao estudo piloto da PEO na empresa A, e a outra à implementação da PEO na empresa B. Deste modo, a aplicação do método foi desenvolvida a partir de um sistema de reuniões em três fases intituladas: lançamento da PEO; desenvolvimento da PEO e finalização da fase intensiva de PEO, as quais foram realizadas em um período entre dois e três meses. A análise de dados foi estruturada a partir de cinco aspectos principais, os quais foram avaliados durante a aplicação do método nas empresas estudadas, sendo eles: quanto às ações desenvolvidas na fase de PEO, quanto ao desenvolvimento das reuniões e a participação dos agentes; quanto à estrutura organizacional e departamental das empresas; quanto à gestão e a coordenação de projetos; e quanto ao formato de contratação dos projetistas e subempreiteiros. Os resultados obtidos com a realização deste trabalho comprovaram a eficácia do método da PEO e a sua viabilidade enquanto potencializador na melhoria da gestão da interface projeto-execução de obras. Portanto, pode-se concluir que a PEO é viável de ser aplicada em empresas de construção e incorporação de edifícios, uma vez que este método pode contribuir para a integração das etapas de projeto e execução, bem como na melhoria da comunicação e na interação entre os agentes envolvidos na produção de edifícios.
274

Gerenciamento ágil de projetos: proposta e avaliação de método para gestão de escopo e tempo / Agile project management: proposal and evaluation of a method for scope and time management

Edivandro Carlos Conforto 22 June 2009 (has links)
A demanda crescente por produtos inovadores desafia as práticas e métodos consagrados de gerenciamento de projetos. Uma das respostas foi o surgimento da abordagem do gerenciamento ágil de projetos (GAP). Essa abordagem, inicialmente aplicada na área de software, está embasada em um conjunto de princípios que buscam simplificar o processo de gestão, tornando-o mais flexível e auto-gerido. Seu enfoque está no aprendizado contínuo por meio de iterações constantes e entregas em tempo reduzido, possibilitando assim, agregar valor em ambientes dinâmicos de negócio. No entanto, existe uma lacuna nessa teoria quanto à aplicação desses princípios no desenvolvimento de novos produtos, principalmente os que envolvem hardware. O tema do trabalho é investigar a aplicação prática desses princípios no desenvolvimento de novos produtos. Para tal, foi adotada a seguinte estratégia: desenvolver, implantar e avaliar um método para planejamento e controle de escopo e tempo utilizando como base um conjunto de princípios do gerenciamento ágil de projetos. O método desenvolvido foi intitulado IVPM2 (Iterative and Visual Project Management Method) e sua criação deu-se por meio do extensivo estudo da literatura sobre GAP combinado com uma pesquisa-ação pura realizada em duas empresas de base tecnológica da região de São Carlos, nomeadas Empresa A e Empresa B. O desenvolvimento e implantação do método ocorreu simultaneamente e contou com a participação dos profissionais dessas empresas, considerando dois cenários distintos. Na empresa A, o IVPM2 foi implantado em um único projeto piloto, de longa duração e com maior complexidade e grau de inovação. Na empresa B o método foi testado em um ambiente multiprojetos (7 projetos) com menor duração e complexidade. Para avaliação do IVPM2 foi utilizada estatística descritiva a partir da análise de dados qualitativos e quantitativos, coletados a partir da aplicação de questionários, entrevistas e análise de documentos. O objetivo foi responder ao problema central de pesquisa e as duas perguntas específicas que guiaram este estudo. O problema central dessa pesquisa foi descrito como: É possível aplicar os princípios do GAP para o planejamento e controle de projetos de produtos inovadores? E, consequentemente as questões específicas consideradas nesse estudo: Q1) O IVPM2 adere aos princípios da abordagem de gerenciamento ágil de projetos? Q2) O IVPM2 trouxe benefícios para a gestão de projetos das empresas? Os resultados apontaram evidências da presença de alguns princípios do GAP no IVPM2, classificando-o como um método ágil. Além disso, o IVPM2 foi capaz de proporcionar vários benefícios para a gestão de projetos de desenvolvimento de novos produtos em ambas as empresas estudadas. Contribuiu também, para a melhoria de outros aspectos da gestão de projetos não tratados diretamente nesse estudo. As evidências coletadas durante a pesquisa, portanto, indicaram diversos benefícios a partir da combinação de princípios do GAP com técnicas tradicionais de gestão de projetos e um software. São indícios de que é possível aplicar os princípios dessa teoria do GAP no planejamento e controle de projetos de desenvolvimento de produtos inovadores inseridos em ambientes dinâmicos de negócio. Por fim, o estudo aponta a necessidade de aprimorar as análises conduzidas e o próprio IVPM2 para aplicação e validação em outras empresas e ambientes de projeto. / The high demand for innovative products has been treated as a challenge for the adoption of traditional project management (PM) practices and methods, specially those ones developed in turbulent and complex business environments. Recently, an alternative approach to deal with these challenges emerged. This approach, entitled Agile Project Management (APM), firstly applied in the software development area, is based on a set of principles which has the purpose to keep the management process as simple as possible, becoming more flexible and self-manageable. By focusing on continuous learning using constant iterations and rapid value deliverable driven, APM aims to improve the results for clients in face of turbulent business environment. However, there is lack on the literature regarding APM principles application in new product development (NPD) projects. The aim of this research is to investigate this issue and the practical application of those principles to NPD projects, developed under turbulent and innovative business environments. To achieve this goal the following strategy was adopted: develop, implement and evaluate a method for planning and controlling scope and time. It was based on a set of principles extracted from the APM literature. The method developed was entitled IVPM2 (Iterative and Visual Project Management Method) and its creation comprised an extensive literature review combined with a pure action-research methodology carried out in two small technology-based companies from the São Carlos technological pole. The companies were called Company A and Company B, and the IVPM2 development, implementation and evaluation activities occurred simultaneously in both companies, considering two distinct scenarios. In the company A the IVPM2 was implemented in a single long term project, with a high level of complexity and innovation. In the company B the IVPM2 was implemented in more than one project (a total of 7 projects) with less complexity and innovation aspects. In order to evaluate the IVPM2 adherence and contribution to project management a statistic descriptive approach was applied using qualitative and quantitative data. The data was collected by questionnaire, interviews and document analysis. The main purpose of this evaluation was to respond the central research problem and the specific research questions. The central research problem was described as: Is it possible to apply APM principles for planning and controlling innovative product projects? Consequently, the specific research questions considered after the method implementation were: RQ1) Did IVPM2 adhere to APM principles? RQ2) Did IVPM2 contribute to enhance project management process in the companies under study? The results showed many evidences of the presence of APM principles in the IVPM2 as stated in the literature. Moreover, the IVPM2 was capable to enhance many aspects of project management process of new product development in both companies studied. It also contributed to improve other aspects not directly addressed in the current research. Finally, the evidences collected during the research have indicated many benefits by combining principles from APM approach with traditional PM techniques and a PM software to support project management. This result is important to consider the applicability and viability of APM principles application to NPD projects in turbulent, innovative and complex business environments. Finally, this study has presented many indications of the need to explore this theme and improve the analysis and the IVPM2 components in order to implement them in different companies and project contexts.
275

Proposta de método para modelagem de requisitos de clientes de empreendimentos habitacionais de interesse social usando BIM

Baldauf, Juliana Parise January 2013 (has links)
O gerenciamento de requisitos do cliente visa melhorar a geração de valor de empreendimentos da construção. Para isto é necessário um processo sistemático de captura de requisitos e processamento destas informações, tornando-as explícitas para a equipe de desenvolvimento do produto, bem como controlar se estas informações são devidamente equilibradas. Isto é particularmente importante quando os recursos são limitados, como em empreendimentos habitacionais de interesse social (EHIS). Este processo envolve uma grande quantidade de informações qualitativas, e é preciso considerar a diversidade de requisitos que normalmente existem entre os diferentes clientes envolvidos no processo. O principal objetivo desta pesquisa é propor um método para modelar os requisitos do cliente de empreendimentos de habitação de interesse social, com o apoio de Building Information Modeling (BIM). Este método foi concebido para apoiar os processos de tomada de decisão durante a fase de projeto, e também a avaliação de projetos que já foram concluídos. A pesquisa foi desenvolvida em três etapas. A primeira teve como objetivo a compreensão do programa habitacional Minha Casa Minha Vida (PMCMV), seleção e treinamento do software para modelagem de requisitos, bem como identificação de requisitos do PMCMV e elaboração de uma versão inicial da estrutura de requisitos. Na segunda etapa realizou-se o refinamento da estrutura de requisitos para que a mesma se adaptasse aos empreendimentos habitacionais de interesse social. Com os requisitos estruturados, os mesmo foram armazenados em um software BIM de gestão de requisitos e conectados com o modelo do produto EHIS B1. As principais contribuições do estudo referem-se à exploração de diferentes formas de modelagem de requisitos do cliente no contexto da construção civil, estruturação de requisitos genéricos que podem servir de base para o desenvolvimento de novos projetos de habitação de interesse social, identificação dos tipos de requisitos que podem ser verificados automaticamente através do uso do software BIM selecionado, e, por fim, a identificação das principais mudanças e benefícios para o gerenciamento de requisitos quando se automatiza as etapas de modelagem dessas informações. / Client requirements management aims to improve value generation of construction projects. This requires a systematic process of capturing requirements, processing this information, and making them explicit to the product development team, as well as controlling whether these are properly balanced. This is particular important when resources are limited, such as in low-income housing projects. This process involves a large amount of qualitative information, and need to consider the diversity of requirements that usually exist among different stakeholders. This paper aims to propose a method to model client requirements in low-income housing with the support of Building Information Modeling (BIM). This method was devised to support both the decision-making processes during design stages, and also the evaluation of designs that have already been finished. The research was conducted in three stages. The first one aimed to understand the Programa Minha Casa Minha Vida [My House My Life Program], selection and training of the requirements modeling software, as well as identification of the PMCMV requirements and elaboration of an initial version of the requirements structure. In the second stage the requirements structure was refined so that it could be adapted to low-income housing projects. Once the requirements were structured, they were stored in a requirements management BIM software, and connected with the product model. The main contributions of this study are concerned with the exploration different ways of modeling client requirements in the construction context, structuring of generic requirements that can be used as a basis for developing new low-income housing projects, identification of types of requirements that can be verified automatically through the use of a BIM software, and finally understanding main changes and benefits for managing requirements when the modeling process is automated.
276

Design da informação : requisitos de projeto para um sistema de gerenciamento no processo projetual do produto edificação / Information design: design requirements for a management system in the design process building product

Abbud, Paulo Roberto January 2009 (has links)
A evolução das ferramentas computacionais, aliada à tecnologia da informação (TI) e ao ambiente web possibilitam a realização de projetos colaborativos, com maior integração de procedimentos, visando à comunicação, à coordenação e à cooperação da equipe multidisciplinar. O estudo de caso, realizado para o projeto de produto edificação, foi desenvolvido com a aplicação de um questionário nos escritórios de projeto em Porto Alegre e apontou para uma situação diversa da efetiva utilização destas ferramentas. O desafio do trabalho está no fato de se estabelecer os requisitos das equipes de projeto, para o desenvolvimento de um sistema de gestão do conhecimento, com a utilização da estrutura de metadados para conceber um mecanismo de busca das informações. O desenvolvimento do processo de investigação apresentou a influência da TI no setor de projetos; a adoção de um modelo de referência para gerenciamento do processo de projeto integrado de edificações (GPPIE) e a possibilidade de integração eficaz com um SGBD. / The evolution of computational tools, along with information technology (IT) and the web environment allow for collaborative projects, with a greater integration of procedures for communication, coordination and cooperation of the multidisciplinary team. The case study was conducted for the building design product, was developed with a questionnaire in the design offices in Porto Alegre, and pointed to a situation different from the effective use of these tools. The challenge of the work is to establish the requirements of the design team, developing a management system of Knowledge, using the metadata structure designing a search engine information. The development of the research showed the influence of IT in the design, the adoption of a reference model for building integrated design process management (BIDPM) and the possibility of effective combination with a DBMS.
277

A gestão de projetos de desenvolvimento territorial frente aos desafios da localização e da sustentabilidade

Pasini, Sandro André January 2006 (has links)
p. 1-127 / Submitted by Santiago Fabio (fabio.ssantiago@hotmail.com) on 2013-02-26T17:18:56Z No. of bitstreams: 1 666.pdf: 12363039 bytes, checksum: 458e5a1b1d632ea3d1eda66278af79f5 (MD5) / Approved for entry into archive by Tatiana Lima(tatianasl@ufba.br) on 2013-03-13T20:22:07Z (GMT) No. of bitstreams: 1 666.pdf: 12363039 bytes, checksum: 458e5a1b1d632ea3d1eda66278af79f5 (MD5) / Made available in DSpace on 2013-03-13T20:22:07Z (GMT). No. of bitstreams: 1 666.pdf: 12363039 bytes, checksum: 458e5a1b1d632ea3d1eda66278af79f5 (MD5) Previous issue date: 2006 / A gestão de projetos de desenvolvimento territorial está sendo, de forma crescente, confrontada com os desafios da localização e da sustentabilidade. Neste contexto, se questiona se os tradicionais modelos de gestão de projetos, fundamentados ainda no pensamento mecanicista e reducionista, podem fazer frente a estes desafios. Esta pesquisa procura, de forma indutiva, buscar respostas para esta questão, partindo da sistematização do caso do “Programa de Apoio ao Desenvolvimento Sustentado da Costa dos Coqueiros”, analisando discursos da academia e das agências de assistência técnica ao desenvolvimento, bem como estudando dois modelos de referência em gestão de projetos, o Logical Framework Approach e o Project Management Body of Knowledge. Resulta destas análises a conclusão de que a concepção e a administração de projetos de desenvolvimento territorial, além de serem fortemente influenciadas pelo contexto local, requerem uma nova forma de abordagem, de caráter mais endógeno, que promova a capacitação, a participação e o empoderamento efetivo dos beneficiários e dos demais atores locais envolvidos. / Salvador
278

Prática de gestão de projetos: um estudo de caso da aderência e dissonância da sistemática de uma empresa brasileira de PMBOK

Munk, Rafael 21 December 2015 (has links)
Submitted by Rafael Munk (rafamunk@hotmail.com) on 2016-03-23T16:51:54Z No. of bitstreams: 1 RafaelMunk_dissertacao - ENTREGA.pdf: 2011366 bytes, checksum: fb33c10d7dedc7500b1f95bb5fc9204b (MD5) / Approved for entry into archive by Janete de Oliveira Feitosa (janete.feitosa@fgv.br) on 2016-03-28T17:05:52Z (GMT) No. of bitstreams: 1 RafaelMunk_dissertacao - ENTREGA.pdf: 2011366 bytes, checksum: fb33c10d7dedc7500b1f95bb5fc9204b (MD5) / Approved for entry into archive by Maria Almeida (maria.socorro@fgv.br) on 2016-03-30T19:23:51Z (GMT) No. of bitstreams: 1 RafaelMunk_dissertacao - ENTREGA.pdf: 2011366 bytes, checksum: fb33c10d7dedc7500b1f95bb5fc9204b (MD5) / Made available in DSpace on 2016-03-30T19:24:07Z (GMT). No. of bitstreams: 1 RafaelMunk_dissertacao - ENTREGA.pdf: 2011366 bytes, checksum: fb33c10d7dedc7500b1f95bb5fc9204b (MD5) Previous issue date: 2015-12-21 / This thesis aims to evaluate the attractiveness to the small Brazilian investor, from a financial point of view, of a new form of investment, based on characteristics of the Brazilian crowdfunding model and of traditional investment tools, to be called crowdinvesting. Supported by the detailed understanding of the existing crowdfunding model in the country and the identification and mapping of the characteristics of traditional investment instruments, this study seeks to define how the new form of investment would work and examine whether, in comparison with traditional tools, in terms of risk and return, the crowdinvesting model would be competitive in the Brazilian market. / Os projetos são frequentemente utilizados como um meio de direta ou indiretamente alcançar os objetivos do plano estratégico de uma organização e está em curso um movimento de valorização desta prática. Esta valorização da gestão por projeto é perceptível no crescente número de instituições preocupadas em disseminar a disciplina de gerenciamento de projetos, no movimento por parte dos executivos em promover a profissão do gerente de projetos e no volume de investimento financeiro dedicado a esta prática. A atual confiança neste modelo de gestão traz consigo uma alta expectativa quanto a seus resultados, que, por sua vez, exigem uma metodologia de gestão eficiente. Uma das maiores empresas brasileira é reconhecida mundialmente pela excelência em sua implantação de projetos de grande a porte financeiro. Por trás deste sucesso está uma sistemática desenvolvida internamente para a gestão de projetos. Tendo em vista a inexistência de uma instituição brasileira de práticas de projeto, qual será a aderência da sistemática da empresa a prática internacional de gestão de projetos? Este estudo de caso busca apontar os principais pontos de aderência e a dissonância entre a sistemática proposta pela empresa e a metodologia de gestão de projetos do Project Management Institute, o PMBOK.
279

A dinâmica de gestão de projetos em redes horizontais

Silva, Karen Menger da January 2008 (has links)
A dinâmica de gestão de projetos em redes horizontais, com seus elementos específicos de gestão, é o tema abordado nesta tese. Primeiramente são discutidos os líderes de projeto, responsáveis pela coordenação direta dos projetos conduzidos em rede. A seguir, são discutidas as ações de comunicação, responsáveis pela realização da conectividade, ou seja, pela interligação da rede como um todo. Por fim, são discutidos os times de projetos, responsáveis pela concretização da complementaridade, isto é, pelo arranjo de competências na rede. A partir das discussões teóricas a respeito dos elementos de gestão de projetos em redes, foi elaborado um modelo de análise. Esse modelo foi então aplicado a dois casos de redes horizontais do Estado do Rio Grande do Sul. Uma das principais contribuições da pesquisa de aplicação do modelo de análise foi a constatação da importância, nas redes pesquisadas, da fase de implementação dos projetos desenvolvidos pelos times. Observou-se que trata-se de uma fase particularmente crítica para um projeto conduzido por uma rede horizontal. A partir dessa constatação, cada um dos elementos de gestão de projetos do modelo de análise proposto foi reconfigurado. Como conclusão do trabalho, é possível afirmar que os líderes de projeto devem ser capazes de exercer a coordenação direta das atividades e comunicar, a todos os associados, os objetivos estratégicos a serem alcançados com a realização de um projeto coletivamente. Para tanto, faz-se necessária a escolha de um líder reconhecido por todos e com experiência no escopo do projeto. O líder de projeto deve ser capaz de desenvolver uma dinâmica de trabalho a partir da delimitação da contribuição de cada um dos membros do time. O líder também deve observar a sistemática comunicação dos resultados do time aos demais associados, visando à etapa futura de implementação de cada um dos projetos conduzidos em rede. Ao esforço de coordenação dos líderes soma-se a necessidade de formalização dos fluxos de informação por meio das ações de comunicação. Por meio destas, a rede é conectada, oportunizando a divulgação, a discussão dos projetos em execução e a sua futura implementação para todas as empresas. Por fim, devem ser formados times de projeto com atores oriundos de diferentes empresas. Com o suporte do trabalho de coordenação dos líderes de projeto e de conexão da rede, por meio das ações de comunicação, o arranjo de complementaridade de informações viabilizado pela própria existência da rede ganha dinamismo. Os atores que compõem os times podem ser coordenados dentro de uma lógica de interação e aprendizado contínuo, que permita vencer o desafio de se alinharem atores oriundos de empresas diferentes. / Dynamics of project management in horizontal networks and their specific management elements is the topic approached in this thesis. Firstly, project leaders, in charge of direct coordination of projects carried out in networks, are discussed. Next, communication actions in charge of connectivity are discussed: interconnection of the network as a whole. Finally, project teams in charge of carrying out complementarity are discussed: by arranging competences in the network. Analysis model was applied to two horizontal networks of the Rio Grande do Sul State. One of research s main contribution was the perception of how important implementing stage of projects developed by teams is. It has been observed that it is a very critical part of a project carried out by a horizontal network. From this perception, each one of the elements of proposed analysis model for project management has been reconfigured. As a conclusion, it is possible to affirm that the project leaders must be able to practice the straight coordination of the activities and to communicate the strategic objectives to be reached through carrying out a project collectively. Thus, it is necessary to choose a leader who is recognized by all people involved and who is also experienced at project s field. Project leader must be able to develop a working dynamics based on the contribution of each one of the members of the team. The leader will also have to point out systematic communication of the results of the team to the associates, aiming at the future stage of implementation of projects developed in the network. To the effort of leaders coordination, formalization of the information flows through the communication actions adds up. Through this, the network is connected, the projects being carried out and their future implementation are disclosed for all the companies involved. Finally, project teams must be set with agents from different companies. With the support of coordination job from project and network connections leaders, and the formalization of the information flows, through communication actions, the arrangement of information complementing in the network gets more dynamic. Agents that make up team can be coordinated through an interaction and continuous learning logics, which allows to overcome the challenge of aligning actors coming from different companies.
280

Proposta de método para modelagem de requisitos de clientes de empreendimentos habitacionais de interesse social usando BIM

Baldauf, Juliana Parise January 2013 (has links)
O gerenciamento de requisitos do cliente visa melhorar a geração de valor de empreendimentos da construção. Para isto é necessário um processo sistemático de captura de requisitos e processamento destas informações, tornando-as explícitas para a equipe de desenvolvimento do produto, bem como controlar se estas informações são devidamente equilibradas. Isto é particularmente importante quando os recursos são limitados, como em empreendimentos habitacionais de interesse social (EHIS). Este processo envolve uma grande quantidade de informações qualitativas, e é preciso considerar a diversidade de requisitos que normalmente existem entre os diferentes clientes envolvidos no processo. O principal objetivo desta pesquisa é propor um método para modelar os requisitos do cliente de empreendimentos de habitação de interesse social, com o apoio de Building Information Modeling (BIM). Este método foi concebido para apoiar os processos de tomada de decisão durante a fase de projeto, e também a avaliação de projetos que já foram concluídos. A pesquisa foi desenvolvida em três etapas. A primeira teve como objetivo a compreensão do programa habitacional Minha Casa Minha Vida (PMCMV), seleção e treinamento do software para modelagem de requisitos, bem como identificação de requisitos do PMCMV e elaboração de uma versão inicial da estrutura de requisitos. Na segunda etapa realizou-se o refinamento da estrutura de requisitos para que a mesma se adaptasse aos empreendimentos habitacionais de interesse social. Com os requisitos estruturados, os mesmo foram armazenados em um software BIM de gestão de requisitos e conectados com o modelo do produto EHIS B1. As principais contribuições do estudo referem-se à exploração de diferentes formas de modelagem de requisitos do cliente no contexto da construção civil, estruturação de requisitos genéricos que podem servir de base para o desenvolvimento de novos projetos de habitação de interesse social, identificação dos tipos de requisitos que podem ser verificados automaticamente através do uso do software BIM selecionado, e, por fim, a identificação das principais mudanças e benefícios para o gerenciamento de requisitos quando se automatiza as etapas de modelagem dessas informações. / Client requirements management aims to improve value generation of construction projects. This requires a systematic process of capturing requirements, processing this information, and making them explicit to the product development team, as well as controlling whether these are properly balanced. This is particular important when resources are limited, such as in low-income housing projects. This process involves a large amount of qualitative information, and need to consider the diversity of requirements that usually exist among different stakeholders. This paper aims to propose a method to model client requirements in low-income housing with the support of Building Information Modeling (BIM). This method was devised to support both the decision-making processes during design stages, and also the evaluation of designs that have already been finished. The research was conducted in three stages. The first one aimed to understand the Programa Minha Casa Minha Vida [My House My Life Program], selection and training of the requirements modeling software, as well as identification of the PMCMV requirements and elaboration of an initial version of the requirements structure. In the second stage the requirements structure was refined so that it could be adapted to low-income housing projects. Once the requirements were structured, they were stored in a requirements management BIM software, and connected with the product model. The main contributions of this study are concerned with the exploration different ways of modeling client requirements in the construction context, structuring of generic requirements that can be used as a basis for developing new low-income housing projects, identification of types of requirements that can be verified automatically through the use of a BIM software, and finally understanding main changes and benefits for managing requirements when the modeling process is automated.

Page generated in 0.074 seconds