• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 3183
  • 58
  • 55
  • 55
  • 55
  • 53
  • 52
  • 29
  • 26
  • 11
  • 11
  • 11
  • 6
  • 6
  • 5
  • Tagged with
  • 3353
  • 788
  • 724
  • 703
  • 624
  • 602
  • 557
  • 390
  • 365
  • 347
  • 330
  • 324
  • 311
  • 308
  • 297
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
591

O impacto da implantação de escritório de gerenciamento de projetos (EGP) nas organizações públicas: o caso da Polícia Federal

Scafutto, Stefenson Marcus Pinto 18 December 2013 (has links)
Submitted by Stefenson Marcus Pinto Scafutto Scafutto (stefensonscafutto@yahoo.com.br) on 2014-09-23T16:37:15Z No. of bitstreams: 1 STEFENSON_SCAFUTTO_DISSERTACAO_APRESENTADA_EBAPE_OBTENCAO_GRAU_MESTRE .pdf: 1125868 bytes, checksum: 59152f790654bfa7e7909fba1d92414c (MD5) / Approved for entry into archive by Janete de Oliveira Feitosa (janete.feitosa@fgv.br) on 2014-09-26T12:57:03Z (GMT) No. of bitstreams: 1 STEFENSON_SCAFUTTO_DISSERTACAO_APRESENTADA_EBAPE_OBTENCAO_GRAU_MESTRE .pdf: 1125868 bytes, checksum: 59152f790654bfa7e7909fba1d92414c (MD5) / Approved for entry into archive by Marcia Bacha (marcia.bacha@fgv.br) on 2014-10-01T11:55:15Z (GMT) No. of bitstreams: 1 STEFENSON_SCAFUTTO_DISSERTACAO_APRESENTADA_EBAPE_OBTENCAO_GRAU_MESTRE .pdf: 1125868 bytes, checksum: 59152f790654bfa7e7909fba1d92414c (MD5) / Made available in DSpace on 2014-10-01T11:55:36Z (GMT). No. of bitstreams: 1 STEFENSON_SCAFUTTO_DISSERTACAO_APRESENTADA_EBAPE_OBTENCAO_GRAU_MESTRE .pdf: 1125868 bytes, checksum: 59152f790654bfa7e7909fba1d92414c (MD5) Previous issue date: 2013-12-18 / In this research, to investigate the positive and negative effects perceived by project managers, members of the management offices and project sponsors after implantation of PMO of the Federal Police in Brazil. Argues that the implementation of EGP has been shown to be a critical success factor for public organizations because projects are structural changes aimed at organizational innovations. The research project employed qualitative methods in four study cases (Headquarters of the Federal Police in Brazil, Federal Police of Rio de Janeiro, Federal Police of São Paulo, Federal Police of Minas Gerais) using semi-structured interviews with the PMOs managers, sponsors and project managers. The foundings showed the positive and negative impacts, the difficulties as challenges of the PMO, as well as the traditional and basic services like the methodology development, trainning and reports distribuition to the high administration. / Este estudo teve por objetivo investigar os efeitos positivos e negativos percebidos pelos gerentes de projetos, membros dos escritórios de gerenciamento de projetos e patrocinadores após implantação do EGP na Polícia Federal do Brasil. Argumenta que a implantação de EGP tem se evidenciado como um fator crítico para o sucesso para as organizações públicas, pois os projetos são mudanças estruturantes que visam inovações organizacionais. Metodologicamente, trata-se de uma pesquisa de natureza qualitativa onde foram aplicadas entrevistas semi-estruturadas com os membros dos EGP’s, gerentes de projetos e patrocinadores dos EGP´s do Órgão central da Polícia Federal e das Superintendências da Polícia Federal do Estado do Rio de Janeiro, São Paulo e Minas Gerais, totalizando quatros estudos de caso. Os resultados indicam o tipo de influência que o EGP exerce na organização. As descobertas apontam os impactos positivos, negativos, dificuldades e desafios dos EGP´s, além dos serviços básicos e tradicionais executados pelos EGP´s como desenvolvimento de metodologias, capacitação e treinamento e distribuição de relatórios para alta administração.
592

Os principais desafios da implantação e maturação de escritórios de projetos em organizações do governo brasileiro

Silva, Marcus Vinicius de Miranda 27 November 2014 (has links)
Submitted by Marcus Vinicius de Miranda da Silva (adm.miranda@icloud.com) on 2015-01-07T02:54:12Z No. of bitstreams: 1 Dissertacao_VersaoFinal.pdf: 1717914 bytes, checksum: 437e9b26e1fd6496cb04fc226703a981 (MD5) / Approved for entry into archive by Janete de Oliveira Feitosa (janete.feitosa@fgv.br) on 2015-01-08T11:50:58Z (GMT) No. of bitstreams: 1 Dissertacao_VersaoFinal.pdf: 1717914 bytes, checksum: 437e9b26e1fd6496cb04fc226703a981 (MD5) / Approved for entry into archive by Marcia Bacha (marcia.bacha@fgv.br) on 2015-01-16T17:22:10Z (GMT) No. of bitstreams: 1 Dissertacao_VersaoFinal.pdf: 1717914 bytes, checksum: 437e9b26e1fd6496cb04fc226703a981 (MD5) / Made available in DSpace on 2015-01-16T17:23:35Z (GMT). No. of bitstreams: 1 Dissertacao_VersaoFinal.pdf: 1717914 bytes, checksum: 437e9b26e1fd6496cb04fc226703a981 (MD5) Previous issue date: 2014-11-27 / Os Escritórios de Gerenciamento de Projetos (EGPs) têm um papel cada vez mais relevante nas organizações, contribuindo para o sucesso dos projetos, no interesse dos objetivos organizacionais. A atuação dos EGPs, entrementes, transcorre repleta de percalços e desafios, que ocorrem desde a sua implantação nas organizações, percorrendo todo o seu ciclo de vida. Nas organizações públicas, alguns projetos apresentam uma complexa rede relacional, que afeta um grande número de stakeholders, em razão de sua exposição ao escrutínio público, tornando bastante difícil a coordenação e gestão de todos esses atores, o que pode afetar o sucesso dos projetos. Dessa forma, este estudo se propõe a responder ao seguinte problema de pesquisa: quais os principais desafios da implantação e maturação de escritórios de projetos em organizações do governo brasileiro? Para esse fim, foi realizada uma pesquisa qualitativa, com estudos de casos múltiplos, aplicada a dez representantes de oito organizações do governo brasileiro, por meio de entrevistas semiestruturadas. A partir dos resultados encontrados na pesquisa, foram identificados os códigos Burocracia, Capacitação, Comunicação, Cultura da Organização, Dedicação Parcial aos Projetos, Estrutura da Organização, Ferramentas de Gerenciamento de Projetos, Legislação e Política, que representam os principais desafios enfrentados pelos escritórios de gerenciamento de projetos estudados. O entendimento da dinâmica relacional desses códigos contribuiu para uma melhor compreensão dos EGPs das organizações do setor público brasileiro e seus desafios.
593

A representação social dos gerentes de projeto de TI sob a ótica dos profissionais da área

Viana, Vinicius Jorge 19 July 2016 (has links)
Submitted by Vinicius Viana (vdviana@gmail.com) on 2016-08-30T13:36:02Z No. of bitstreams: 1 Dissertação MEX - V3.2 - FINAL.pdf: 1853576 bytes, checksum: 227b477f9d9df03ae3a5a27ffb365ca2 (MD5) / Approved for entry into archive by Maria Almeida (maria.socorro@fgv.br) on 2016-09-02T12:42:25Z (GMT) No. of bitstreams: 1 Dissertação MEX - V3.2 - FINAL.pdf: 1853576 bytes, checksum: 227b477f9d9df03ae3a5a27ffb365ca2 (MD5) / Approved for entry into archive by Maria Almeida (maria.socorro@fgv.br) on 2016-09-02T12:43:09Z (GMT) No. of bitstreams: 1 Dissertação MEX - V3.2 - FINAL.pdf: 1853576 bytes, checksum: 227b477f9d9df03ae3a5a27ffb365ca2 (MD5) / Made available in DSpace on 2016-09-02T12:44:06Z (GMT). No. of bitstreams: 1 Dissertação MEX - V3.2 - FINAL.pdf: 1853576 bytes, checksum: 227b477f9d9df03ae3a5a27ffb365ca2 (MD5) Previous issue date: 2016-07-19 / É indiscutível a importância de projetos em qualquer organização estabelecida, principalmente por eles representarem mudanças e suas consequências. A TI tem sido cada vez mais tratada como estratégia nas organizações vencedoras, e vem assumindo um papel decisivo na obtenção de vantagens competitivas. Estudar e entender o profissional de Projetos, o profissional de TI e principalmente o profissional de Projetos de TI é fundamental diante da miríade de oportunidades aí encontrada. O objetivo deste trabalho é entender como esse profissional é percebido pelo universo de profissionais de TI, analisar as metodologias e suas aplicações e recomendar processos e métodos de atuação para esse profissional. A Teoria das Representações Sociais foi a metodologia adotada para a condução desse trabalho, tendo como instrumento a evocação livre de palavras e a análise do seu núcleo central e sistemas periféricos. Dessa forma, foi possível identificar o núcleo central desse profissional, assim como o sistema periférico, embasados na literatura científica. A pesquisa bibliográfica já mostra a distinção nos papéis do gerente de projetos de TI, especialmente aqueles relacionados ao resultado e gestão de mudança, especialmente relacionados a pressão e sobrecarga existentes durante o ciclo de vida dos projetos de TI. A realização e a tabulação da pesquisa de campo, tendo o embasamento teórico como referencial, possibilitaram a identificação dos elementos Oportunidade, Pressão, Resultado e Flexibilidade como sendo os componentes do núcleo central, ou seja, aquilo que define a percepção do gerente de projetos de TI na ótica dos profissionais da área.
594

A importância da simetria de informações para o sucesso dos projetos de tecnologia da informação, por meio das ações de cooperação

Oliveira, Henrique Pontes Gonçalves de 24 February 2017 (has links)
Submitted by Henrique Pontes (henrique.pontes@uol.com.br) on 2017-03-21T00:46:25Z No. of bitstreams: 1 Dissertação - Henrique Pontes.pdf: 3935453 bytes, checksum: 7700a20560f29b2b18636236872fa621 (MD5) / Approved for entry into archive by Pamela Beltran Tonsa (pamela.tonsa@fgv.br) on 2017-03-21T15:06:29Z (GMT) No. of bitstreams: 1 Dissertação - Henrique Pontes.pdf: 3935453 bytes, checksum: 7700a20560f29b2b18636236872fa621 (MD5) / Made available in DSpace on 2017-03-21T15:50:23Z (GMT). No. of bitstreams: 1 Dissertação - Henrique Pontes.pdf: 3935453 bytes, checksum: 7700a20560f29b2b18636236872fa621 (MD5) Previous issue date: 2017-02-24 / With the advancement of technological solutions and a business environment increasingly agile and competitive, the Information Technology area has, growingly, assumed an essential part in organizations. As a result, the number of IT demands has increased significantly, making the usage of project management practices a fundamental component in meeting these demands. In Information Technology projects the generation and flow of information, as well the interaction between the areas associated with the projects, is significantly high, requiring adequate communication procedures, which are the most sensitive and extremely associated to the success or failure of the project. This research explored, through a multiple case study, the influence of information symmetry, that is, the adequate distribution of project information among its stakeholders through cooperation actions in the projects’ success. After an extensive review of the literature on IT projects, project management, information symmetry and cooperation, three propositions were developed in order to answer the research question. The first proposes that the symmetry of information in IT projects facilitates cooperation actions; the second, that cooperation actions influence the success of IT projects, and the third, that efficient communication and symmetry of information, referring to IT projects, through cooperation actions, are essential factors for the success of the project. The research data collection stage was carried out in two large multinational companies, in the retail sector, in the food and garments segments and, in each of them, qualitatively analyzed a strategic project for the company. In the two analyzed projects, it was verified that did not obtain satisfactory results, although their products were delivered. The main factors pointed out were problems in the communication process, mainly the information symmetry. It was still verified that the inefficiency in the communication directly harms the cooperation actions and proved that the inadequate distribution of information is a preponderant factor for the generation of conflicts and, consequently, the failure of the project. However, it was pointed out by all interviewees, in both projects, that information symmetry influences cooperation actions between teams and, it is essential to achieve the success of IT projects. / Com o avanço das soluções tecnológicas e um contexto de negócios cada vez mais ágil e competitivo, a área de Tecnologia da Informação vem assumindo um papel essencial nas organizações. Com isso, a quantidade de demandas junto à área de TI aumentou significativamente, tornando a utilização de práticas de gerenciamento de projetos um componente fundamental no atendimento dessas demandas. Em projetos de Tecnologia da Informação a geração e o fluxo de informação, bem como a interação entre as áreas associadas aos projetos, é significativamente elevada, exigindo procedimentos adequados de comunicação, mais sensíveis e extremamente associados ao sucesso ou fracasso do projeto. Este trabalho pesquisou, a partir de um estudo de caso múltiplo, a influência da simetria da informação, ou seja, a adequada distribuição das informações do projeto entre seus envolvidos por meio das ações de cooperação no sucesso dos projetos. Após extensa revisão bibliográfica sobre projetos de TI, gerenciamento de projetos, simetria de informação e cooperação, três proposições foram elaboradas a fim de responder à questão de pesquisa. A primeira propõe que a simetria das informações em projetos de TI facilita as ações de cooperação; a segunda, que as ações de cooperação influenciam no sucesso de projetos de TI, e a terceira, que a comunicação eficiente e a simetria de informações referentes aos projetos de TI, por meio das ações de cooperação, são fatores essenciais para o sucesso do projeto. A etapa de coleta de dados da pesquisa foi realizada em duas empresas multinacionais de grande porte, no ramo do varejo, nos segmentos de alimentação e vestuário e, em cada uma delas, analisados qualitativamente um projeto estratégico para a empresa. Nos dois projetos analisados, foi constatado que não obtiveram resultados satisfatórios, apesar de seus produtos terem sido entregues. Os principais causadores da insatisfação foram problemas no processo de comunicação, principalmente a simetria da informação. Foi verificado ainda que a ineficiência na comunicação prejudica diretamente as ações de cooperação e comprovado que a inadequada distribuição de informações é fator preponderante para a geração de conflitos e, consequentemente, o fracasso do projeto. Por outro lado, todos os entrevistados apontaram, nos dois projetos, que a simetria de informação influencia as ações de cooperação entre as equipes e, é essencial para atingir o sucesso dos projetos de TI.
595

[en] A MODEL FOR PROJECT SELECTION AND EVALUATION IN A SOCIAL SERVICE ORGANIZATION / [pt] MODELO PARA SELEÇÃO E AVALIAÇÃO DE PROJETOS EM UMA ORGANIZAÇÃO DE SERVIÇO SOCIAL

VICTOR DA SILVA TARDIN FIGUEIREDO 28 September 2012 (has links)
[pt] Esta dissertação propõe uma ferramenta de apoio aos tomadores de decisão das instituições sociais, no processo de seleção e avaliação de seus projetos. O modelo foi construído a partir da necessidade mapeada, no processo de planejamento estratégico de uma organização de cunho social, de se obter indicadores de avaliação objetivos, alinhados com sua Missão e Visão, com vistas a iniciar um processo de gestão estratégica institucional. O modelo proposto, inspirado no Balanced Scorecard, respeita as características de uma instituição de cunho social, que não visa lucro e apresenta outras especificidades se comparada às empresas privadas. Foram utilizados métodos qualitativos e quantitativos para mapear os principais indicadores de avaliação dos projetos da organização, obtendo-se um modelo aderente às necessidades da instituição estudada. Como resultado, foi criada a Matriz de Avaliação de Projetos, que busca alinhar os projetos desenvolvidos à estratégia do negócio, possibilitando a priorização de projetos e o descarte daqueles não alinhados com os objetivos estratégicos da organização. O modelo propicia a padronização da análise de projetos, viabilizando a avaliação dos projetos realizados ou propostos em função do seu desempenho em relação aos indicadores estabelecidos, a realocação de investimentos e a remodelagem dos projetos de acordo com as estratégias corporativas. Os resultados preliminares sugerem que a Matriz proposta se configura útil como instrumento de seleção e avaliação de projetos sócio-culturais, bem como se mostra uma ferramenta apropriada de feedback, de aprendizado organizacional e de alinhamento estratégico. / [en] This paper proposes a tool to support decision-makers of social institutions in the process of selection and evaluation of their projects. The proposed model was created out of necessity mapped in the organization s strategic planning process, to obtain indicators for evaluating objectives aligned with its mission and vision and with aims of starting a institutional strategic management process. The proposed model, inspired by the Balanced Scorecard, respects the characteristics of a social institution, is not-profit and presents other special features when compared to private companies. Qualitative and quantitative methods were used to map the key indicators for evaluating the organization s projects, thereby obtaining a model adhering to the needs of the institution studied. As a result, the Matrix Assessment Project was created, which seeks to align developed projects to the business strategy, enabling the prioritization of projects and discarding those not aligned with the organization s strategic goals. The model provides standardization of project analysis, enabling the assessment of projects carried out or proposed on the basis of their performance in relation to the established indicators, the reallocation of investments and redevelopment of projects in accordance with corporate strategies. Preliminary results suggest that the proposed matrix is configured as a useful tool for selection and evaluation of socio-cultural projects, as well as an appropriate feedback tool, organizational learning and strategic alignment.
596

Sustentabilidade em gestão de projetos e sua relação com sucesso em projetos: proposição de um modelo teórico e empírico. / Sustainability in project management and its relationship with sucess in projects: proposal of a theoretical and empirical model.

Martens, Mauro Luiz 22 May 2015 (has links)
Este trabalho trata dos temas sustentabilidade, gestão de projetos e sucesso em projetos. Por abordá-los de forma conjunta, preenche uma lacuna de pesquisa que trata da conexão entre os três temas. O objetivo da tese, desenvolvida por artigos, é propor um modelo teórico e empírico de sustentabilidade aplicável no contexto de gestão de projetos e orientado para o sucesso em projetos. Como metodologia fez-se uso da abordagem combinada, envolvendo pesquisa qualitativa e quantitativa com aplicação de multi métodos. A pesquisa qualitativa foi utilizada para a sistematização da literatura dos temas chaves e para o desenvolvimento de estudos de casos múltiplos com aplicação de entrevistas com gestores de projetos e de sustentabilidade, bem como aplicação de questionário aos membros de equipes de projetos. A pesquisa quantitativa foi utilizada para a realização de levantamento survey, com 143 gestores de projetos em empresas brasileiras, e análise estatística por meio da modelagem de equações estruturais, bem como foi aplicado o método de análise fatorial exploratória. Os constructos e variáveis do modelo teórico proposto, bem como os protocolos de pesquisa survey, foram validados por meio de um fórum com 11 especialistas oriundos de 10 universidades, localizadas em seis países diferentes. Como contribuições deste estudo pode-se destacar a estruturação do referencial teórico de sustentabilidade em gestão de projetos e de sucesso em projetos; a apresentação e validação da estrutura de um modelo teórico e empírico de constructos e variáveis de sustentabilidade com enfoque Triple-Bottom Line - TBL (econômica, ambiental e social) em gestão de projetos orientado ao sucesso em projetos; e, a validação estatística do relacionamento entre sustentabilidade em gestão de projetos e sucesso em projetos. Esta última relação foi confirmada pela alta significância da relação causal entre os constructos, pois sustentabilidade em gestão de projetos contribui positivamente para o sucesso em projetos, explicando 43% dos efeitos sobre sucesso em projetos. Em decorrência, foram desenvolvidos seis artigos científicos, alguns publicados e outros submetidos para periódicos internacionais. / This research looks to study sustainability, Project management and project success. Merging these themes, this thesis works on a gap of research related to approaching both topics. For that matter, this study, developed by articles model, aims to propose a theoretical and empirical framework of sustainability, applicable into project management context and oriented to project success. The combined approach was used as methodology, engaging qualitative and quantitative research by applying multi methods. Qualitative research was used to systematize the literature of key themes and to develop multiple case studies by applying semi-structured interviews with people responsible for projects and sustainability areas and questionnaire application to projects team members. Quantitative research was used to develop a survey involving 143 project managers in Brazilian companies. Statistics analysis was carried out in order to treat the data through structural equation modeling. Exploratory factor analysis was also used. Constructs and variables of the conceptual framework proposed, as well as the survey research protocols, were validated by experts through and expert panel of eleven experts from ten universities and six different countries. Contributions of this study may highlight the development of the bibliographic review of sustainability in project management and project success topics; the presentation and validation of the conceptual and empirical model of constructs and variables of sustainability (with triple-bottom line perspective) in project management oriented to project success; and the statistical validation of the relationship between sustainability in project management and project success. This relationship was confirmed by the high significance of the casual relation between both constructs, explaining that the constructs of sustainability in project management contributes positively to obtain project success. It was found that 43% of these constructs affect project success. At the end, six scientific articles were developed, and some of them were already published and others submitted to international journals.
597

Gerenciamento de projetos: análise dos fatores de risco que influenciam o sucesso de projetos de sistemas de informação / Management projects: analysis of risk factors that influence the success of projects in information systems

Pinto, Sergio Augusto Orfão 18 July 2002 (has links)
Este trabalho é sobre gerenciamento de projetos no contexto da área de sistemas de informação, onde há características específicas e relacionamentos entre elementos tais como : tecnologia, processos de negócio, gerenciamento de mudança, comportamento humano e especificação subjetiva do produto . A taxa de fracassos em projetos de sistemas de informação permanece alta em comparação com outros projetos de tecnologia. O principal objetivo desta pesquisa é contribuir para o conhecimento na área de gerenciamento de projetos de sistemas de informação, focando na investigação dos fatores de risco que podem influenciar no sucesso percebido de um projeto. Um dos desafios deste trabalho foi definir conceitos e medidas objetivas para avaliar os eventos associados com gerenciamento do risco e com o sucesso de projetos. Apoiado na revisão da literatura sobre o tema e em outras pesquisas similares, foi construído um instrumento com o qual diversas dimensões de risco e sucesso foram avaliadas em uma amostra de 180 projetos de sistemas de informação. Cada dimensão foi dividida em classes e cada classe foi detalhada em variáveis métricas em sua maioria. Depois da coleta e validação dos dados da amostra, foram aplicadas algumas técnicas estatísticas para analisar o comportamento das dependências entre fatores de risco e fatores de sucesso. A análise da direção e intensidade de influência de cada fator de risco para cada fator de sucesso reproduziu grande parte do conhecimento obtido da revisão da literatura, mas o nível de detalhe proporcionado pelo uso das técnicas estatísticas permitiu desvendar alguns aspectos que não eram facilmente perceptíveis. As conclusões apresentadas neste trabalho podem ser consideradas por gerentes de projeto que trabalham com produtos de tecnologia de informação, mais especificamente aqueles envolvidos com implantação e/ou desenvolvimento e sistemas de informação. Além disso, os resultados obtidos podem ajudar na elaboração de procedimentos práticos para metodologias de gerenciamento de risco, pois a lista de influências e dependências entre risco e sucesso é agora melhor conhecida, permitindo melhorias em políticas de gerenciamento de risco. / This research is about project management, especially in the context of information systems area, where there are specific characteristics and relationships among elements like : technology , business processes, change management, human behavior and subjective product specification. The rate of information system project failure remains high in comparison with other high-tech projects. The main objective of this research is to contribute to the knowledge in the area of project management, focusing in the investigation of risk factors that can influence on the perceived success of the project. One of the challenges was to define concepts and to conceive objective measures to assess the events associated with risk management and project success. Sustained in the literature and other similar researches, it was built a instrument with which several dimensions of risk and success were assessed in a sample of 180 information system projects. Each dimension was divided into classes and each class was detailed by variables composed by metric indicators in its majority. After the gathering and validation of the data sample, some statistical techniques were applied to talk over the behavior of dependencies between risk and success factors. The analysis of direction and intensity of the influence of each risk factor over each success factor has reproduced some knowledge from the literature and other researches, but the level of details that was able to get by the statistical techniques shed some light over some aspects that were unrevealed. The conclusions presented in this research can be considered by project managers who work with information technology products, more specifically those who work with systems information development or deployment . Besides, the analysis achieved in this work can help to create practical procedures for risk management methodologies, since the list of influences and dependencies of risk factor over success factors are better known, allowing improvements in a active risk management policy.
598

Early termination of R&D projects / Terminação precoce de projetos de P&D

Gonçalves, Leandro Rodrigues 27 October 2015 (has links)
Early project termination is one of the most difficult decisions to be made by Research and Development managers. While there is the risk of terminating good projects, there is also the opposite risk of not terminating bad projects and overspend resources in unproductive research. Criteria used for identifying these projects are common subject of research in Business Administration. In addition, companies might take important lessons from its interrupted projects that could improve their overall portfolio technical and commercial success. Finally, the set and weight of criteria, as well as the procedures companies use for achieve learning from cancelled projects may vary depending on the project type. This research intends to contribute to the understanding of policies applied to projects that were once considered attractive, but by some reason is not appreciated anymore. The research addressed the question: How companies deal with projects that become unattractive? More specifically, this research tried to answer the following questions: (1) Are projects killed or (otherwise) they die naturally by lack of resources? (2) What criteria are used to terminate projects during development? (3) How companies learn from the terminated projects to improve the overall portfolio performance? (4) Are the criteria and learning procedures different for different types of projects? In order to answer these questions, we performed a multiple case study with four companies that are reference in business administration and innovation: (1) Oxiteno, considered the base case, (2) Natura, the literal replication, (3) Mahle and (4) AES, the theoretical replications. The case studies were performed using a semi-structured protocol for interviews, which were recorded and analyzed for comparison. We found that the criteria companies use for selecting projects for termination are very similar to those anticipated by the literature, except for a criteria related to compliance. We have evidences to confirm that the set of criteria is not altered when dealing with different project types, however the weight they are applied indeed varies. We also found that learning with cancelled projects is yet very incipient, with very few structured formal procedures being described for capturing learning with early-terminated projects. However, we could observe that these procedures are more common when dealing with projects labeled as innovative, risky, big and costly, while those smaller and cheaper derivative projects aren\'t subject of a complete investigation on the learning they brought to the company. For these, the most common learning route is the informal, where the project team learns and passes the knowledge though interpersonal information exchange. We explain that as a matter of cost versus benefit of spending time to deeply investigate projects with little potential to bring new knowledge to the project team and the organization / Terminação precoce de projetos é uma das decisões mais difíceis a serem tomadas pelos gerentes de pesquisa e desenvolvimento. Enquanto há o risco de terminar bons projetos, há também o risco oposto de não encerrar maus projetos e ter recursos alocados em pesquisa improdutiva. Os critérios utilizados para a identificação destes projetos são objeto comum de investigação em Administração de Empresas. Além disso, as empresas podem tirar lições importantes com seus projetos interrompidos que poderiam melhorar o desempenho técnico e comercial da sua carteira. Finalmente, o conjunto de critérios e respectivos pesos, bem como os procedimentos usados pelas empresas para reter aprendizado a partir da interrupção de projetos, podem variar dependendo do tipo de projeto. Esta pesquisa pretende contribuir para a compreensão das políticas aplicadas a projetos que já foram considerados atraentes, mas por alguma razão não são mais apreciados. A pesquisa abordou a questão: Como as empresas lidam com projetos que se tornam pouco atraentes? Mais especificamente, esta pesquisa procurou responder às seguintes questões: (1) São os projetos encerrados ou (caso contrário) eles morrem naturalmente por falta de recursos? (2) Que critérios são usados para encerrar projetos durante o desenvolvimento? (3) Como as empresas aprendem com os projetos terminados de modo a melhorar o desempenho geral da carteira? (4) Os critérios e procedimentos de aprendizagem são diferentes para diferentes tipos de projetos? A fim de responder a essas perguntas, foi realizado um estudo de caso múltiplo com quatro empresas que são referência em administração de empresas e inovação: (1) Oxiteno, considerado o caso base, (2) Natura, a replicação literal, (3) Mahle e (4) AES, as replicações teóricas. Os estudos de caso foram realizados utilizando um protocolo semiestruturado para as entrevistas, que foram gravadas e analisadas para comparação. Descobrimos que os critérios usados pelas empresas para identificação dos projetos candidatos ao cancelamento são muito semelhantes àqueles antecipados pela literatura, com exceção de um critério relacionado com a existência de indícios de corrupção. A pesquisa gerou evidências que corroboram a ideia de que o conjunto de critérios não é alterado quando se lida com diferentes tipos de projeto, no entanto, varia o peso atribuído a cada um na sua aplicação. Também descobrimos que a aprendizagem com projetos cancelados é ainda muito incipiente. As empresas descreveram muito poucos procedimentos formais estruturados para a captura de aprendizagem com projetos terminados precocemente. No entanto, pode-se observar que estes procedimentos são mais comuns quando se trata de projetos rotulados como inovadores, arriscados, grandes e caros. Os projetos derivados, menores e mais baratos, não são objeto de uma investigação completa sobre o aprendizado que eles trouxeram para a empresa. Para estes, a rota de aprendizagem mais comum é a informal, onde a equipe do projeto aprende e passa o conhecimento à frente por meio de intercâmbio de informações entre as pessoas. Nós explicamos este achado como uma questão de custo versus benefício de pessoal de P&D para investigar profundamente projetos com pouco potencial de trazer conhecimentos valiosos para a organização.
599

Reflexões sobre o Projeto Inclusão Social Urbana: cuidados na gestão e na implementação de novos projetos sociais / Reflections on the experience of the Project Inclusão Social Urbana: carefulness in the management and implementation of new social projects

Machado, Antonio Augusto Telles 28 April 2016 (has links)
Submitted by Filipe dos Santos (fsantos@pucsp.br) on 2016-08-02T13:13:08Z No. of bitstreams: 1 Antonio Augusto Telles Machado.pdf: 1412006 bytes, checksum: 6e01f092934ca24e5643dc3e840924e9 (MD5) / Made available in DSpace on 2016-08-02T13:13:08Z (GMT). No. of bitstreams: 1 Antonio Augusto Telles Machado.pdf: 1412006 bytes, checksum: 6e01f092934ca24e5643dc3e840924e9 (MD5) Previous issue date: 2016-04-28 / Coordenação de Aperfeiçoamento de Pessoal de Nível Superior / This dissertation lists the carefulness in the management and implementation of social projects based on researcher´s considerations and experience in the Projeto Inclusão Social Urbana, implemented in São Paulo downtown between 2006 and 2010, by Prefeitura Municipal de São Paulo (PMSP) and European Commision (C.E.). Considering the historical data of the Projeto Inclusão Social Urbana, main aspects of the implementation were identified: the conception of social inclusion; the dynamics of an affective-cognitive management; intersectoriality; territorialization; physical spaces and reception; interdisciplinary; care with professionals and the monitoring of the social project; social participation; flexibility; interruptions based on administrative topics; political circumstances and personal management aspects; bureaucracy. These categories were discussed and intertwined with the theoretical field of Social Psychology, bringing to cautions to the development of new social projects, focusing on carefulness to target population, team members of the implementation, subjective aspects of management and the management model / Este trabalho relaciona cuidados na gestão e na implementação de projetos sociais, tendo como base reflexões do pesquisador sobre a experiência do Projeto Inclusão Social Urbana, implementado no centro da cidade de São Paulo, entre os anos de 2006 e 2010, pela Prefeitura Municipal de São Paulo (PMSP) e pela Comissão Europeia (CE). A partir do histórico do Projeto, foram identificados diferentes aspectos da sua implementação: a concepção de inclusão social do Projeto; a dinâmica afetivo-cognitiva da gestão e seu impacto no Projeto; a intersetorialidade; a territorialização; o acolhimento e os espaços físicos do Projeto; a interdisciplinaridade; os cuidados com os profissionais e o monitoramento do Projeto; a participação social; a flexibilidade; as continuidades/descontinuidades administrativas; as circunstâncias políticas e os aspectos pessoais da gestão; a burocracia. Após a análise, discussão e interligação dessas categorias com o campo teórico da Psicologia Social, formulamos cuidados na implementação de novos projetos sociais, tendo como foco a população-alvo, os profissionais de um projeto social, os aspectos subjetivos da gestão e o modelo de gestão
600

Modelos de maturidade, um caminho para as organizações alcançarem maturidade em gerenciamento de projetos como diferencial estratégico

Kanup, Wélerson Robaina 26 May 2009 (has links)
Made available in DSpace on 2016-04-25T16:45:16Z (GMT). No. of bitstreams: 1 Welerson Robaina Kanup.pdf: 1168428 bytes, checksum: f9c894dbce62ea48c931fdf5d62dc650 (MD5) Previous issue date: 2009-05-26 / Pandata Informatica / The projects management maturity is bound on the ability of an organization in managing its projects This dissertation has as objective to show to a way them organizations to reach project management maturity as strategical distinguishing. For this we evaluate the theoretical beddings and concepts of the models of management maturity and analyze the application of a model in a non-profit organization of the area of projects management. The bibliographical revision, divides in two parts, introduced the beddings of the projects management and in the second part the beddings of project management maturity. The methodology of research adopted in this dissertation was the application of OPM3 (Organizational Project Management Maturity Model), of PMI (Project Management Institute), in an organization and its analysis. The application of the model was carried through in the directions of the company (vice-presidency, studies technician, administrative, support to the associate, financier and events) and presents in detail the application of the model in the administrative direction. As instrument of collection of data we carry through interviews with the directors of the company and fulfilling of the questionnaire of the tool of the OPM3 Self-Assessment for execution of the evaluation. For analysis of data we also use the tool that after fulfilling of the questions produced a vision in high level or executive - including the list of Better Practical that currently they exist in the organization, and those that do not exist in relation to the Standard Model. The list of Better Practical that they do not exist currently in the organization was referenced as Target Best Practices . The program also generated four graphs, established in the answers: 1) the organization s overall position on a continuum of organizational project management maturity, 2) the organization s maturity in terms of each domain, 3) the organization s maturity in terms of each process improvement stage, and 4) a composed view of graphs 2 and 3. The conclusion showed that projects management maturity is a strategical differential and will be reached with strategical planning directed toward management of projects in the organizations / A maturidade em gerenciamento de projetos está ligada à habilidade de uma organização em gerenciar seus projetos. Esta dissertação tem como objetivo mostrar um caminho para as organizações alcançarem maturidade em gerenciamento de projetos como diferencial estratégico. Para isso avaliamos os fundamentos teóricos e conceitos dos modelos de maturidade de gestão e analisamos a aplicação de um modelo em uma organização sem fins lucrativos da área de gerenciamento de projetos. A revisão bibliográfica, divida em duas partes, introduziu os fundamentos do gerenciamento de projetos e na segunda parte os fundamentos de maturidade em gerenciamento de projetos. A metodologia de pesquisa adotada nesta dissertação foi a aplicação do OPM3 (Organizational Project Management Maturity Model), do PMI (Project Management Institute), em uma organização e sua análise. A aplicação do modelo foi realizada nas diretorias da empresa (vice-presidência, estudos técnicos, administrativa, apoio ao associado, financeira e eventos) e apresentamos em detalhe a aplicação do modelo na diretoria administrativa. Como instrumento de coleta de dados realizamos entrevistas com os diretores da empresa e preenchimento do questionário da ferramenta do OPM3 Self-Assessment para execução da avaliação. Para análise de dados utilizamos também a ferramenta que após preenchimento das questões produziu uma visão em alto nível ou executiva - incluindo a lista de Melhores Práticas que correntemente existem na organização, e aquelas que não existem em relação ao Modelo Padrão. A lista de Melhores Práticas que não existem atualmente na organização foi referenciada como Melhores Práticas Alvo . O programa também gerou quatro gráficos, baseados nas respostas: 1) Posição como um todo da organização em uma série contínua da maturidade de gerenciamento de projeto organizacional, 2) a maturidade da organização em termos de cada domínio, 3) a maturidade da organização em termos de cada estágio de melhoria, e 4) uma visão composta dos gráficos 2 e 3. A conclusão mostrou que maturidade no gerenciamento de projetos é um diferencial estratégico e será alcançada com planejamento estratégico voltado para gerenciamento de projetos nas organizações

Page generated in 0.033 seconds