Estudo do sistema de planejamento e controle de materiais no Laboratório de Hematologia do Hospital das Clínicas de Ribeirão Preto / Study of materials planning and control system on the Haematology Laboratory of the Clinical Hospital of Ribeirão PretoDuarte, Nathalia Campos Moura 20 October 2015 (has links)
Diante do atual contexto econômico enfrentado pelas organizações, ações que visam a redução de custos e desperdícios são cada vez mais evidentes. No setor de saúde, em especial no ramo da medicina diagnóstica, a pressão financeira exercida tanto no âmbito público como privado, o aumento da demanda por exames, o avanço da tecnologia, e consequentemente, o aumento do investimento associado ao seu uso fizeram com que os custos aumentassem de forma crescente. Dessa forma, um dos maiores custos dos laboratórios se refere a materiais (insumos), inclusive equipamentos, sendo assim, os estoques representam importante quesito a ser administrado uma vez que a gestão de materiais tem o objetivo de conciliar os interesses entre as necessidades de suprimentos e a otimização dos recursos financeiros e operacionais das empresas. Nesse sentido o presente estudo objetivou o estudo e análise do sistema de planejamento e controle de materiais (mais especificamente os reagentes utilizados na realização dos e hemogramas e contagem de reticulócitos) do Laboratório de Hematologia do Hospital das Clínicas da Faculdade de Medicina de Ribeirão Preto. A pesquisa caracterizou-se por ser uma pesquisa aplicada, qualitativa e quantitativa, bem como exploratória. Para tanto foram utilizadas como técnicas de coleta de dados observação in locco, entrevistas e análise documental de dados secundários. Os dados coletados foram relacionados ao processo de realização dos exames e da gestão e controle dos reagentes, além da gestão do contrato. Para realização das análises quantitativas foram levantadas informações sobre a quantidade de reagentes adquiridos bem como demanda de exames realizados ao longo dos anos de 2013 e 2014, período das análises compreendido durante o estudo. Os resultados analisados permitiram concluir que a forma de estruturação do contrato com fornecedor dificulta a gestão eficiente dos recursos. / According to the actual economic context faced by organizations, pressures for cost and waste reduction are increasingly evident. In the healthcare sector, especially in diagnostic medicine, the financial pressure, the increased demand for test, the advance of technology and the high investment associated to it use induced to an incrementally increase of the costs. Thus, one of the biggest costs of laboratories refers to materials (inputs), including equipment. Therefore, stocks represent an important issue to consider, once materials management aims to reconcile the interests of the supply needs and the optimization of financial and operational resources of the companies. In this sense, the present research aimed the study and analysis the materials and control system (specifically the reagents used in clinical blood count tests and reticulocyte count) on the Hematology Laboratory of the Ribeirão Preto School of Medicine Clinical Hospital. The study was considered an applied, exploratory, qualitative and quantitative research. It was used as data collection techniques in loco observation, interviews and document analysis of secondary data. The collected data were related to the process of the examinations and the management and control of reagents, as well as contract management. To perform the quantitative analyzes information about the amount of reagents purchased and demand for tests performed over the years 2013 and 2014 have been raised. Therefore, it was concluded that the form of contract suppliers structuring does not allow an efficient management of resources.
|
182 |
Planejamento e controle da produção com a utilização de células de trabalho: estudo de caso em construções com vedações verticais em concreto armado moldadas in loco / Planning and control of production using work cells: a case study in constructions with cast-in-place concrete vertical panelsBezerra, Larissa Marinho Coelho de Medeiros 10 June 2010 (has links)
A indústria da construção civil vem assumindo um papel determinante no desenvolvimento econômico do país e vivenciado um crescimento exponencial que exige das empresas uma dedicação crescente na busca por novas tecnologias construtivas e ferramentas que auxiliem na gestão de empreendimentos. Sistemas construtivos racionalizados que repercutam na melhoria dos produtos com a redução de custos são essenciais para manter a competitividade no setor. O sistema construtivo de vedações verticais em concreto armado moldadas in loco confere uma alternativa na produção de habitações em larga escala caracterizada pela redução de custos e alta produtividade originando uma cadeia produtiva que auxilia no planejamento e controle da produção em obras. O presente trabalho tem como objetivo contribuir para o planejamento e o controle da produção de edificações que utilizam em seu processo o sistema construtivo anteriormente citado, propondo um modelo de organização da produção baseado na redução da variabilidade dos processos produtivos por meio do fluxo contínuo da produção, que proporcione o trabalho ininterrupto no canteiro de obras. A proposta associa os princípios que sustentam a filosofia produtiva da Lean Constrution, e recomenda um modelo para o planejamento operacional de curto prazo, que defina os fluxos produtivos pela aplicação de ritmos constantes nas atividades mediante o nivelamento dos recursos de mão-de-obra envolvidos no processo produtivo com a introdução de células produtivas que proporcionam lotes otimizados de trabalho, constituindo células de trabalho. / The construction industry has a decisive role in economic development of the country and experienced exponential growth requires dedication growing companies in the search for constructive new technologies and tools that will assist them in managing exposures. Constructive rationalized systems that reverberate in improvement of products with reducing costs is critical to remain competitive in the industry. The constructive system using cast-in-place concrete vertical panels confers an alternative in the production of large-scale housing characterized by reduced costs and high productivity that provides a productive chain which assists in the planning and production control in workplaces. This work aims to contribute to the planning and production control buildings that use its constructive system previously cited, proposing a model organization of production based on reducing variability in productive processes through streaming production, providing uninterrupted work on site. The proposal combines the principles supporting the production philosophy of Lean Constrution, and recommends a template for the short-term operational planning, defining workflows by applying patterns appearing in activities by the leveling of labour resources involved in the production process with the introduction of work cells that provide small batches of work.
|
183 |
A implantação de sistemas APS sob a perspectiva de redes de inovação auto-organizadas / The implementation of APS systems under self-organizing innovation networks perspectiveThales Botelho de Sousa 15 May 2015 (has links)
Esta dissertação tem como finalidade analisar a implantação de sistemas APS em empresas sob a perspectiva de redes de inovação auto-organizadas. Considera-se que a implantação do sistema APS representa uma inovação organizacional para a área de planejamento e controle da produção da empresa adquirente do software, pois comparado aos sistemas de planejamento e controle da produção predecessores, supre deficiências referentes às limitações de capacidade da empresa, flexibilidade na geração de estratégias de produção, disponibilização de prazos de entrega mais curtos e maior apoio aos processos de decisão. Considera-se também que o processo de implantação pode ser analisado sob a perspectiva de uma rede auto-organizada, formada pela empresa adquirente, implantadora e desenvolvedora do software, o que permite identificar os nós (empresas), ligações (relacionamentos), posições (atividades das empresas), fluxos tangíveis (recursos físicos) e fluxos intangíveis (troca de conhecimento e informações). A metodologia de pesquisa utilizada compreende um estudo bibliográfico para o embasamento teórico da temática proposta e de sete estudos de caso para a coleta de dados em campo. A análise e discussão do cruzamento entre as evidências teóricas e práticas visa identificar e sistematizar elementos para disponibilizar um modelo de referência para a implantação de sistemas APS. O desenvolvimento do modelo de referência foi orientado pela metodologia Enterprise Knowledge Development (EKD), e o mesmo foi avaliado por profissionais de empresas implantadoras e pesquisadores acadêmicos, a fim de verificar sua consistência e identificar possíveis melhorias. / This dissertation aims to analyze the APS systems implementation in companies under the selforganizing innovation networks perspective. It is considered that the APS systems implementation represents an organizational innovation in the area of production planning and control of the software\'s acquiring company, because compared to the predecessors production planning and control systems, supplies deficiencies relating to capacity constraints of the company, flexibility in the generation of production strategies and greater support to decisionmaking. It is also considered that the implementation process can be analyzed under the perspective of a self-organized network formed by the acquirer, implanter and developer companies of the software, which allows us to identify the nodes (companies), links (relationships), positions (activities of companies), tangible flows (physical resources) and intangible flows (exchange of knowledge and information). The research methodology used comprises a bibliographical study to the theoretical background of the proposed theme and seven case studies to data collection in the field. The analysis and discussion of the intersection between theoretical and practical evidences aims to identify and systematize elements for provide a reference model for the APS systems implementation. The development of the reference model was guided by the Enterprise Knowledge Development (EKD) methodology, and the model was assessed by implementing companies professionals and academic researchers in order to check its consistency and identify possible improvements.
|
184 |
A implantação de sistemas APS sob a perspectiva de redes de inovação auto-organizadas / The implementation of APS systems under self-organizing innovation networks perspectiveSousa, Thales Botelho de 15 May 2015 (has links)
Esta dissertação tem como finalidade analisar a implantação de sistemas APS em empresas sob a perspectiva de redes de inovação auto-organizadas. Considera-se que a implantação do sistema APS representa uma inovação organizacional para a área de planejamento e controle da produção da empresa adquirente do software, pois comparado aos sistemas de planejamento e controle da produção predecessores, supre deficiências referentes às limitações de capacidade da empresa, flexibilidade na geração de estratégias de produção, disponibilização de prazos de entrega mais curtos e maior apoio aos processos de decisão. Considera-se também que o processo de implantação pode ser analisado sob a perspectiva de uma rede auto-organizada, formada pela empresa adquirente, implantadora e desenvolvedora do software, o que permite identificar os nós (empresas), ligações (relacionamentos), posições (atividades das empresas), fluxos tangíveis (recursos físicos) e fluxos intangíveis (troca de conhecimento e informações). A metodologia de pesquisa utilizada compreende um estudo bibliográfico para o embasamento teórico da temática proposta e de sete estudos de caso para a coleta de dados em campo. A análise e discussão do cruzamento entre as evidências teóricas e práticas visa identificar e sistematizar elementos para disponibilizar um modelo de referência para a implantação de sistemas APS. O desenvolvimento do modelo de referência foi orientado pela metodologia Enterprise Knowledge Development (EKD), e o mesmo foi avaliado por profissionais de empresas implantadoras e pesquisadores acadêmicos, a fim de verificar sua consistência e identificar possíveis melhorias. / This dissertation aims to analyze the APS systems implementation in companies under the selforganizing innovation networks perspective. It is considered that the APS systems implementation represents an organizational innovation in the area of production planning and control of the software\'s acquiring company, because compared to the predecessors production planning and control systems, supplies deficiencies relating to capacity constraints of the company, flexibility in the generation of production strategies and greater support to decisionmaking. It is also considered that the implementation process can be analyzed under the perspective of a self-organized network formed by the acquirer, implanter and developer companies of the software, which allows us to identify the nodes (companies), links (relationships), positions (activities of companies), tangible flows (physical resources) and intangible flows (exchange of knowledge and information). The research methodology used comprises a bibliographical study to the theoretical background of the proposed theme and seven case studies to data collection in the field. The analysis and discussion of the intersection between theoretical and practical evidences aims to identify and systematize elements for provide a reference model for the APS systems implementation. The development of the reference model was guided by the Enterprise Knowledge Development (EKD) methodology, and the model was assessed by implementing companies professionals and academic researchers in order to check its consistency and identify possible improvements.
|
185 |
Proposição de um sistema de planejamento da produção olerícola nas unidades de produção familiarLima, José Donizetti de January 2010 (has links)
No Brasil, as hortaliças são produzidas, em diferentes épocas do ano, por milhares de agricultores familiares, distribuídos por todo o país. Por ser uma atividade que admite maior complexidade que as demais atividades agrícolas, esta tese propõe um sistema de planejamento da produção olerícola (SPPO) para as unidades de produção familiar (UPFs). Para o desenvolvimento do SPPO utilizou-se uma metodologia, dividida em quatro fases. A primeira fase consistiu no levantamento de fatores e variáveis intervenientes no processo decisório (para quem, o que, quando e quanto produzir) utilizando-se a análise de conteúdo. Os resultados encontrados foram submetidos ao crivo dos especialistas em olericultura e olericultores familiares, por meio de entrevistas individuais, para definir quais elementos incorporar ao SPPO. Na segunda fase estruturou-se o banco de dados do SPPO de acordo com os resultados da primeira fase. A terceira fase, denominada processo de filtragem, além de contemplar a experiência do olericultor na escolha dos canais de distribuição, hortaliças e confrontar as recomendações agrotécnicas com as condições edafoclimáticas da localidade, busca reduzir a dimensão do problema de planejamento do sequenciamento de produção. A quarta fase consistiu na modelagem matemática para a definição da combinação de produção que será recomendado para a UPF em estudo. Ainda, nesta fase é proposta uma metodologia multiíndice para analisar a viabilidade econômica da produção recomendada pelo SPPO. Entre as vantagens do SPPO, destacam-se: (i) consideração dos fatores mercadológicos, agroecológicos, agrotécnicos, agrotecnológicos, capacidade (área, recursos humanos, hídricos e financeiros) e de base ecológico-sustentável que são incorporados em função das escolhas do olericultor; (ii) maior entendimento da complexidade que envolve o desenvolvimento da atividade; (iii) levantamento das despesas e receitas semanais durante o horizonte de planejamento; e (iv) visualização das atividades (tarefas) que devem ser realizadas para o desenvolvimento do planejado. Foram realizados estudos de caso, utilizando dados reais adaptados de UPFs do município de Pato Branco/PR, para mostrar a viabilidade do SPPO como ferramenta auxiliar no planejamento da produção de hortaliças nas UPFs. / In Brazil, vegetables are produced in different year seasons by thousands of family farms distributed throughout the country. Being an activity that allows bigger complexity than other agricultural activities, this thesis proposes a olericultural production planning system (SPPO) for the family production units (UPFs). For the development of the SPPO it was applied a methodology divided into four phases. The first phase consisted in collecting the factors and variables intervenient in the decisive process (to whom, what, when, and how much to produce) using the content analysis. The results found were submitted to the appreciation of olericulture specialists and family olericulturists, by means of individual interviews, to define which elements to incorporate to the SPPO. In the second phase the SPPO data bank was structured according to the first phase results. The third phase, denominated filtration process, besides contemplating the olericulturist´s experience in the choice of the distribution canals, vegetables, and in confronting the agrotechnical recommendations with the edafoclimatical conditions of the place aims at reducing the dimension of the problem of production sequencing planning. The fourth phase consisted in the mathematical modeling to the definition of production combination which will be recommended to the UPF being studied. In this phase it is still proposed a multiindex methodology to analyze the economical viability of the production recommended by the SPPO. Among the SPPO advantages can be mentioned: (i) consideration of market agroecological, agrotechnical, agrotechnological factors, capacity (area; human, hydric, and financial resources), and of ecological-sustainable basis that are incorporated according to the olericulturist´s choices; (ii) greater understanding of the complexity that involves the activity development; (iii) calculating the weekly expenses and revenue during the planning horizon; and (iv) visualization of the activities (tasks) that must be performed to the development of what has been planned. Case studies were performed, using actual data adapted to the UPFs in the city of Pato Branco/PR to show the viability of the SPPO as an auxiliary tool in planning vegetables production in the UPFs.
|
186 |
Planejamento financeiro: levantamento de casos na indústria cinematográficaRocha, Fernanda Amorim Poggi da 12 1900 (has links)
Submitted by fernanda amorim poggi da rocha (fepoggi@gmail.com) on 2016-01-20T22:50:55Z
No. of bitstreams: 1
Dissertação_v. final_Fernanda Poggi_20.01.2016.pdf: 1324736 bytes, checksum: dfe76e09e1e20caf8d7b9f61ca73d9c6 (MD5) / Approved for entry into archive by Marcia Bacha (marcia.bacha@fgv.br) on 2016-02-29T12:03:32Z (GMT) No. of bitstreams: 1
Dissertação_v. final_Fernanda Poggi_20.01.2016.pdf: 1324736 bytes, checksum: dfe76e09e1e20caf8d7b9f61ca73d9c6 (MD5) / Approved for entry into archive by Marcia Bacha (marcia.bacha@fgv.br) on 2016-02-29T12:04:54Z (GMT) No. of bitstreams: 1
Dissertação_v. final_Fernanda Poggi_20.01.2016.pdf: 1324736 bytes, checksum: dfe76e09e1e20caf8d7b9f61ca73d9c6 (MD5) / Made available in DSpace on 2016-02-29T12:05:08Z (GMT). No. of bitstreams: 1
Dissertação_v. final_Fernanda Poggi_20.01.2016.pdf: 1324736 bytes, checksum: dfe76e09e1e20caf8d7b9f61ca73d9c6 (MD5)
Previous issue date: 2015-12 / This exploratory research aimed to investigate the main mechanisms used in the planning process by the film industry. At this extent, it was realized a multiple case study with four film producers companies, of which three of them are located in Rio de Janeiro, and one in São Paulo. The data was collected through interviews with professionals from those four companies. The cases were analyzed in light of planning and control theories facing both environmental uncertainty and cultural industries. The results indicate that the budgetary process and control of a film are made in a rigorous way. All the four companies use continuous budgets during the production. The main uncertainty perceived by all four cases was revenue projection and for that two companies indicated the use of scenario analyses. Furthermore, two film companies elaborate a portfolio of projects in order to reduce production risks among the projects. Finally, only one case brought a new element in comparison to the other cases: including a partner with equity share of the production. This business model results in lower budgets if compared to the other cases. / Este estudo exploratório teve como objetivo investigar os principais mecanismos de gestão utilizados no planejamento na indústria cinematográfica. Para tanto, foi realizado um estudo de casos múltiplos, envolvendo quatro produtoras cinematográficas, das quais três estão localizadas no estado do Rio de Janeiro e uma em São Paulo. Os dados foram obtidos a partir de entrevistas focalizadas com profissionais dessas quatro empresas. Os casos foram analisados sob à luz de teorias sobre planejamento e controle em ambientes incertos e nas indústrias culturais. Os resultados indicam que o orçamento e controle dos filmes é feito de forma rigorosa. Todas as produtoras efetuam revisões orçamentárias durante a produção dos filmes. A maior incerteza relatada por todas as empresas foi a estimativa da receita e para isso, duas produtoras indicaram o uso de cenários para auxiliá-los nesta tarefa. Além disso, duas produtoras relataram a elaboração de carteiras de projetos a fim de reduzir o risco das produções. Por fim, um caso especificamente trouxe um elemento novo em relação aos demais casos ao incluir sócio em busca de investimento de risco na composição acionária do filme. Este modelo de negócio acarretou orçamentos em patamares menores do que nos demais casos.
|
187 |
Planejamento e controle do processo de projeto de sistemas pré-fabricados em ambientes de engineer-to-order / Design planning and control for engineer-to-order prefabricated building systemsWesz, Josana Gabriele Bolzan January 2013 (has links)
O processo de projeto tem importante papel na geração de valor, pois define o produto de forma que este atenda às necessidades do cliente. No entanto, o planejamento e controle deste processo na indústria da construção são, em geral, informais e ineficazes. Estes problemas tendem a ser mais graves em empreendimentos rápidos e complexos, quando envolvem sistemas pré-fabricados, normalmente caracterizados como sistemas do tipo engineer-to-order (ETO). Visando a aprimorar o processo de projeto, muitas empresas tem implementado conceitos e princípios da produção enxuta, podendo ser destacado o uso do Sistema Last Planner (SLP), que contribui para proteger a produção da variabilidade do processo, assim como para eliminá-la. O presente estudo tem como objetivo propor um modelo de planejamento e controle de projetos em empresas que projetam, fabricam e montam sistemas pré-fabricados, com características de sistema de produção do tipo ETO. Foi realizado um estudo empírico no setor de projetos de empresa de sistemas construtivos metálicos, com sede na Região Sul do Brasil. Inicialmente, o SLP foi implementado em duas equipes de projeto, sendo refinado e adaptado ao contexto da empresa. Depois, o SLP refinado foi implementado em outras quatro equipes. Como principais contribuições destacam-se o papel do modelo proposto no aumento da transparência de processos e na melhoria da confiabilidade deste processo, possibilitando o planejamento integrado entre as equipes de projeto. O modelo pode ser aplicado a sistemas pré-fabricados do tipo ETO, não somente no contexto de sistemas construtivos metálicos, mas em equipes de projetos que desenvolvem múltiplos projetos simultaneamente. / The design process plays an important role in value generation, since it defines the products that must meet customer needs. However, design planning and control in the construction industry are often informal and ineffective. This problem tends to bring serious consequences, especially in fast and complex projects that involve prefabricated building systems, normally defined as engineer-to-order (ETO) environments. In order to improve the design process, several companies have implemented lean production concepts and principles, and especially the Last Planner System (LPS) for production control, which shields production from upstream variability as well as contributes for reducing it. The aim of this study is to propose a model for planning and controlling the design process in companies that design, manufacture and assemble prefabricated ETO building systems. An empirical study was carried out is the design department of a steel fabricator based in Southern Brazil. Initially, LPS was implemented in two design teams, being refined and adapted to the context of the company. Then, the existing LPS was implemented in four other design teams. The main contributions of this investigation is the role of the proposed model in increasing process transparency and improving the reliability of the design process, making it possible to produce an integrated plan for the whole design department. This model is not limited to steel fabricators, but is applicable to any ETO prefabricated building systems, in which design teams carry out multiple design projects simultaneously.
|
188 |
Modelo para planejamento e controle logístico de obras de sistemas pré-fabricados do tipo engineer-to-order com o uso de BIM 4DBortolini, Rafaela January 2015 (has links)
O planejamento e controle logístico cumpre um importante papel no processo de montagem de sistemas construtivos pré-fabricados, e pode ter um impacto substancial nas metas do empreendimento em termos de prazo, custo, qualidade e segurança. A falta de planejamento logístico na construção pode causar congestionamento em postos de trabalho e resultar em baixa produtividade. Building Information Modeling (BIM) tem sido apontado como uma grande oportunidade para a melhoria do desempenho da logística de canteiros, principalmente pelo uso de modelos 4D para analisar planos de construção, assim como reduzir conflitos espaciais em canteiros de obras. Entretanto, modelos 4D têm sido frequentemente utilizados simplesmente para representar a sequencia de execução definida em uma rede CPM, sem considerar atividades que não agregam valor, tais como estoques e transporte. Visando a preencher esta lacuna, esta pesquisa propõe um modelo para o planejamento e controle logístico para sistemas construtivos pré-fabricados do tipo engineer-to-order, utilizando BIM 4D. Pesquisa construtiva foi a abordagem metodológica adotada nesta pesquisa. Quatro estudos empíricos foram realizados em diferentes canteiros de obras de uma empresa de estrutura metálica, nos quais processos logísticos foram planejados e controlados. O estudo também propôs diretrizes para integrar o planejamento logístico ao planejamento e controle da produção e para o uso de gestão visual para apoiar o controle logístico. O modelo proposto sugere que o desenvolvimento e uso de modelos 4D para controle e planejamento logístico deve ter uma ampla participação de diferentes intervenientes. / Logistics planning and control plays a key role in the process of assembling prefabricated building systems, and can have a major impact in project goals in terms of schedule, cost, quality and safety. The lack of construction logistics planning may cause congestion in workspaces and result in low productivity. Building Information Modeling (BIM) has been pointed out as a major opportunity for the improving the performance of site logistics, especially by using 4D models to analyze construction plans as well as to reduce spatial conflicts in construction sites. However, 4D models have been often used simply for representing the installation sequence defined in a CPM network, without considering non value-adding activities, such as inventories and transportation. In order to fill this gap, this research work proposes a logistics planning and control model for engineer-to-order prefabricated building systems using BIM 4D. Constructive research was the methodological approach adopted in this investigation. Four empirical studies were carried in different construction sites of a steel fabricator company, in which logistic processes were planned and controlled. This study also proposes guidelines for integrating logistics planning and control with production planning and control, and for the use of visual management to support logistics control. The proposed model suggests that the development and use of 4D models for logistics planning and control should have a broad participation of different stakeholders.
|
189 |
Avaliação do Sistema Simplified Drum-Buffer-Rope em ambientes de produção para estoque / Evaluation of Simplified Drum-Buffer-Rope System in make to stock enviromentsCastro, Robson Flávio [UNESP] 29 March 2016 (has links)
Submitted by ROBSON FLÁVIO CASTRO null (robson.afl@gmail.com) on 2016-05-04T14:03:14Z
No. of bitstreams: 1
ROBSON_CASTRO_AUTOARQUIVAMENTO.pdf: 19394323 bytes, checksum: 7e472e92d451cc588e98cedecc565eba (MD5) / Approved for entry into archive by Juliano Benedito Ferreira (julianoferreira@reitoria.unesp.br) on 2016-05-06T14:50:11Z (GMT) No. of bitstreams: 1
castro_rf_me_bauru.pdf: 19394323 bytes, checksum: 7e472e92d451cc588e98cedecc565eba (MD5) / Made available in DSpace on 2016-05-06T14:50:11Z (GMT). No. of bitstreams: 1
castro_rf_me_bauru.pdf: 19394323 bytes, checksum: 7e472e92d451cc588e98cedecc565eba (MD5)
Previous issue date: 2016-03-29 / Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES) / Por meio de experimentos baseados em simulação computacional, este trabalho tem como objetivo avaliar o desempenho do Sistema de Coordenação de Ordens (SCO) Simplified Drum-Buffer-Rope (S-DBR) aplicado a ambientes de produção para estoque, denominado Make-to-Availability (MTA). Composto por um conjunto de técnicas, o MTA visa maximizar o nível de serviço a partir da garantia de estoques de produtos acabados para pronta entrega. Nesta pesquisa, são criadas derivações do MTA com as retiradas das técnicas Gerenciamento do Pulmão, Priorização pelo Status do Pulmão e Carga Planejada. O desempenho das derivações é comparado com o MTA em sua forma completa. Para tanto, quatro indicadores de desempenho são utilizados: fill rate, estoque em processo, estoque de produtos acabados e tempo de reposição. Quatro cenários foram simulados, variando as taxas médias de demanda e o coeficiente de variação dos tempos de processamento. O MTA não obteve o melhor desempenho em nenhum dos indicadores, nos quatro cenários, porém a retirada das técnicas não trouxe melhoras significativas na disponibilidade dos produtos, e em alguns casos aumentou extremamente os níveis de estoque e o tempo de reposição. Ao final as técnicas se mostraram importantes para manter a disponibilidade dos produtos com menores níveis de estoque e menor tempo de reposição. / Through experiments with computer simulation, this work aims to evaluate the performance of an Ordering System Coordinator (OSC), Simplified Drum-Buffer-Rope applied to a make to stock environment, called Make-To-Availability (MTA). Composed of a set of techniques, the MTA aims to maximize the level of service from the supply guarantee for immediate delivery. In this research, MTA derivations are created pulling out the techniques Buffer Management, Status of Buffer Prioritization and Planned Load. The performance of derivations was compared with MTA in its complete form. For this purpose, four performance indicators were utilized: fill rate, work in process, finished goods inventory and reposition time. Four scenarios were simulated, with different median demand rates and the coefficient of variation of the process time. The MTA does not obtain the best performance in any indicator, at the four scenarios, however the pulling out of techniques does not bring significant improvement on product availability, and in some cases, stocks and reposition time greatly increased. In the end, the techniques have shown important to keep the availability of products with lower stocks and smaller reposition time.
|
190 |
Estudo das reuniões de coordenação da produção em obras.Haka, Osmar Roberto 23 August 2007 (has links)
Made available in DSpace on 2016-06-02T20:09:07Z (GMT). No. of bitstreams: 1
DissORH.pdf: 1389760 bytes, checksum: bf2c8f6cce9e62b72986dddae19744a7 (MD5)
Previous issue date: 2007-08-23 / This work presents an exploratory study on the coordinating meetings, in the stage of
production of the Civil Engineering in the subsector constructions, classifying the different
forms of management, raising the ways of communication and identifying which are the
fiscalized elements. Also will be treated the questions to the relations between the participants
of the meetings, conditions for the establishment of partnerships between them and how its
activities are made compatible. The planning meetings belong to the operational level, where
the directions of the Production Projects and the Projects to Production, will be had, will be
transmitted, if necessary adapted, made compatible and executed, propitiating a formal
occasion, in which tools and techniques of management can be transmitted and be evaluated.
Amongst main participants of the planning meetings, we can cite representatives of the
constructors and the specialists subcontractors. The parameters raised will evidence which are
the better ways of leading such meetings, in the diverse stages of production, in accordance
with the constructive culture and with the technological resources of the company. / Este trabalho tem como objetivo apresentar estudo exploratório sobre as reuniões de
coordenação de serviços na etapa de produção da construção civil no subsetor edificações,
classificando as diferentes formas de gestão, levantando os meios de comunicação e
identificando quais são os elementos fiscalizados. Também serão tratadas as questões das
relações entre os participantes das reuniões, as condições para o estabelecimento de parcerias
entre eles e de como suas atividades são compatibilizadas. As reuniões de planejamento
pertencem ao nível operacional, onde as diretrizes dos Projetos da Produção e dos Projetos
para Produção, se houverem, serão transmitidas, se necessário adaptadas, compatibilizadas e
executadas, propiciando uma ocasião formal, na qual as ferramentas e técnicas de gestão
podem ser transmitidas e avaliadas. Dentre os principais participantes das reuniões de
planejamento, podemos citar representantes das construtoras e dos subempreiteiros. Os
parâmetros levantados poderão evidenciar quais são as maneiras mais adequadas de se
conduzir tais reuniões, nas diversas etapas de produção, de acordo com a cultura construtiva e
com os recursos tecnológicos da empresa construtora.
|