• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 6
  • 1
  • Tagged with
  • 7
  • 4
  • 4
  • 4
  • 3
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Entreprenörens risker vid övergången från utförandeentreprenader till totalentreprenader! : En nulägesanalys som skildrar entreprenörens perspektiv i väg och anläggningsprojekt.

Persson, Sebastian January 2016 (has links)
When clients more often choose to transfer from” traditional” design-bid-build contracts to design-build contracts it creates consequences of risks and possibilities for all involved parties. In collaboration with Skanska as a case company and their division “Väg och Anläggning i Väst”, this thesis was conducted as a qualitative study with the intention to examine what consequences it have on the contractor when an increased amount of contracts transfer from design-bid-build to design-build. This thesis shows that the contractor agrees that there are some difficulties with design-build contracts, and that the transition from design-bid-build to design-build takes place in a relatively short time, also that the contractor and the client lack the experience and skills required to perform a good project without major complications. Many of the problems that occur today can be derived to individuals and their communication skills, by increasing cooperation and open up for a better dialogue between the parties, which creates opportunity for both the client and the contractor to gently adjust to the changes that the transition to design-build contracts means. An Increased cooperation and a more open communication, will result in better working conditions and a better end product.
2

ÄTA-arbeten – Om ofullständighet i entreprenadavtal

Hakansson, Amanda, Kampe, Philippa January 2019 (has links)
Varje entreprenad är unik på så sätt att den i något eller i några avseenden skiljer sig från andra entreprenader. Det kan handla om att uppföra en byggnad snarlik en annan, det som skiljer entreprenaderna åt är att inblandade parter, avtal, utförande av arbetsuppdraget samt tillkommande ÄTA-arbeten kommer att, på ett eller annat sätt skilja sig åt mellan varandra. Då entreprenadrätten inte är lagstadgad i Sverige ges möjligheter att under ett kontrakterat arbete föreskriva förändringar i det ursprungliga avtalet, för att ett så tillfredsställande slutresultat som möjligt ska kunna uppnås. I nästan alla entreprenader uppkommer ÄTA-arbeten, som kan beskrivas som arbeten som utförs i anknytning till och är av samma natur som det ursprungliga kontrakterade arbetet. ÄTA-systematiken regleras i AB 04, som i allmänhet tolkas som branschpraxis och utges av byggandets kontraktskommitté. ÄTA-arbeten står för ändrings-, tilläggs- och avgående arbeten och utgör således en för beställaren, ändringsbefogenhet där rätten att beställa nödvändiga tilläggsarbeten, eller avbeställa ännu inte utförda kontraktsarbeten föreligger. Entreprenören blir med hänsyn till detta, både bunden och berättigad att utföra de ÄTA-arbeten som uppfyller formaliteterna. För att ett beställt ÄTA-arbete ska föreligga krävs en skrivelse angående detta av beställaren, samt att arbetet är av samma natur som det kontrakterade arbetet. Likställda ÄTA-arbeten har inget skriftlighetskrav, men då svårigheter att bevisa muntliga avtal föreligger borde entreprenören för att säkra rätten till betalning, ändå vänta med att påbörja ett likställt ÄTA-arbete till dess att en skrivelse om arbetet finns att tillgå. Denna utredning har visat att ändringsbefogenheten är anledningen till att tvister uppstår i entreprenadförhållanden och att tvister kan undvikas genom att precisera kontraktshandlingarna. Ett ÄTA-arbete berättigar till betalning om kraven för vad som utgör ett ÄTA-arbete är uppfyllda samt om arbetet har ett direkt samband med och är av samma natur som kontraktsarbetena. Formaliteterna för ett ÄTA-arbete måste vara uppfyllda för att ersättning ska utgå. Undantag från formaliteterna kan dock göras gällande, dessa är oskälighetsbedömningen och dolusregeln, vilket innebär att ersättning kan utgå även om formaliteterna inte är uppfyllda. Entreprenören kan bli berättigad till ersättning för faktisk mängd och inte det som föreskrivits i mängdregleringen om det finns bevis att faktisk mängd föreligger. Det är alltid entreprenörens skyldighet att bevisa att ett ÄTA-arbete föreligger för att ersättning skall utgå. / Each contract is unique because each project is different from other projects. What distinguishes the contracts is that the parties involved, agreements, execution of the work assignment and additional work will differ between each other. Since the contract law is not constitutional in Sweden, opportunities are given during a contracted work to prescribe changes to the original agreement, in order to achieve the best result as possible. In almost all contracts, additional work will arise. Additional work can be described as a work that are carried out in connection with and are of the same nature as the original contracted work. The additional work-system is regulated in AB 04, which is generally accepted as industry practice and is issued by the contract's contract committee. Additional work stands for changes-, additional- and resigning work. This constitutes a power of change for the purchaser where the right to order necessary additional work, or cancellation of contract work not yet performed. With this in mind, the contractor becomes both bound and entitled to carry out the additional work that meets the formalities. For an ordered additional work to exist, a written order is required by the purchaser, and the additional work needs to be of the same nature as the contracted work. Equal additional work has no written requirement, but when difficulties in proving verbal agreements exist, the contractor should, in order to secure the right to payment, still wait to start an equal additional work until received order in writing. This investigation has shown that the power of amendment is the reason why disputes arise in contractual relations and that disputes can be avoided by specifying the contract documents. An additional work entitles to payment if the requirements for what constitutes an additional work are fulfilled and that the work is directly related to and is of the same nature as the contract work. The formalities for an additional work must also be fulfilled for compensation to be paid. Exceptions to the formalities can, however, be made valid, these are the innocence assessment and the dolus rule, which means that compensation can be paid even if the formalities are not fulfilled. The contractor may be entitled to compensation for the actual quantity and not the amount prescribed in the quantity regulation, if there is evidence that the actual quantity exists. It is always the contractor's obligation to prove that an additional work exists for compensation to be paid.
3

Framgångsfaktorer för hantering av Ändrings-, Tilläggs- & Avgående arbeten (ÄTA) inom renovering och ombyggnadsprojekt / Factors that contributes to successful management of alteration labour, additional labour and retiring labour within renovation and redevelopment projects

Fransson, Tom, Petersmo, Kalle January 2019 (has links)
Purpose: Alteration labour, additional labour and retiring labour are the sort of extra work that the contractor can add in addition to the original order. The management of this type of construction work have comprehensive variation from project to project. This sort of work provides changes in both labour hours and project costs. In other words, a high amount of these will increase the project costs. The goal with this thesis is to identify the success factors that contributes to better management process of alteration labour, additional labour and retiring labour for renovation and redevelopment projects.  Method: This thesis has been made with qualitative research. Literature study, document analysis and semi structured interviews are the methods that have been used. The literature study provided insight in the already available research in this area. The document analysis gave understanding of the company and comprehension regarding the amount of alteration labour, additional labour and retiring labour for each project. Lastly the interviews provided profound knowledge to how the employees at Skanska Direkt manage their handling process, and which type of improvements they thought will make positive change.  Findings: The thesis has resulted in clear and concrete factors that contribute to the management process for alteration labour, additional labour and retiring labour. There have not been presented any new methods for this, however the success factors have been brought to light. Both the empiricism and theory show that a symbiosis between the design, the number of crewmembers, documentation and registration, the cooperation with the client and the possibility for the co-workers to understand and know the project is of most importance. Implications: By implementing the success factors presented in this report the amount of alteration labour, additional labour and retiring labour can be reduced. The labour that anyway emerge can be handled in a smarter and more efficient ways. The implications of this actions will for instance result in lower personnel costs, gainful cooperation’s between contractors and client, less risk for penalty expenses connected to delays. And no more than a successful company.  Limitations: The thesis only contains research including four different projects. There has been no comparison between new construction and redevelopment. The research has not taken the clients aspects into consideration. The result of this research study will be useful for average and large construction companies focusing on renovation and redevelopment projects.  Keywords: Alteration labour, additional labour, retiring labour, turnkey contract, general contract, renovation, redevelopment, project planning, construction documents, cooperation.
4

Utmaningar vid överlämnande inom byggarbetsmiljösamordning : Potentiella åtgärder för ett mer givande överlämnande / Challenges in handover within coordination of construction site safety : Potential improvements for a more useful handover

Bladh, Benjamin, Ullström, Dennis January 2024 (has links)
Work-related fatalities in Sweden in 2023, the construction industry accounted for 30%. In 2022, over 35,000 workplace accidents were reported despite legislation stipulating that construction project should appoint a coordinator of construction site safety for the Design and Construction Phases (BAS-P and BAS-U). To ensure safe and secure workplaces for every project, it is necessary for BAS-P to establish a well-developed work environment plan to hand over to BAS-U for continuation and updating during the project. The industry often considers this handover inadequate, leading to poorer working conditions at construction projects. The purpose of this study is to investigate the handover between BAS-P and BAS-U to present potential improvements that ensure sufficient information is handed over, thereby improving workplace safety in the future. The study will be conducted in the form of a literature review, qualitative interviews, and a document study at two construction projects in collaboration with Veidekke. From the results, it is evident that the handover can take place through a meeting or just an email. Templates for the meeting are often available but rarely used, and the time for a meeting is short. The templates for the handover meeting do not provide space to address all necessary information, and communication between the parties is often lacking. The conclusion confirms that the handover template needs to be structured, handover meetings should be required, and more people should attend the handover. Additionally, communication between the parties should exist already during the Design Phase to contribute to safer construction sites. To facilitate this, collaborative contracting is preferable.
5

En studie om tidig samverkansentreprenad / A study regarding Early Contractor Involvement

Kurspahic, Amar, Merhebi, Rachid January 2020 (has links)
Eftersom samhället ständigt utvecklas och det ställs allt högre krav på snabba lösningar och metoder måste byggbranschen möta detta behov och tänka från ett nytt perspektiv. I denna rapport har vi studerat de mest använda kontraktsformer totalentreprenad, utförandentreprenad och samverkansentreprenad. Samverkansentreprenad är en kontraktsform som inte är lika mycket beprövad som utförandeentreprenad och totalentreprenad. Det finns flera benämningar för samverkansentreprenad såsom partnering och tidig entreprenörmedverkan men dem är alla lika i hur beställaren jobbar med entreprenörer. I stora bygg och anläggningsprojekt med högteknisk komplexitet krävs det hög kompetens inom projektering. Dessa stora och komplexa projekt kan ibland vara problematiska då entreprenören i vissa fall inte har tillräckligt med teknisk kompetens vilket gör att det ofta uppstår stora förluster då ändring, tillägg och avgående arbeten samt andra oväntade händelser uppstår. Detta har fått många att tro på tidig entreprenörsinvolvering som lösningen av detta problem då beställaren kan dra nytta av entreprenörens erfarenheter. Därav syftet i rapporten har varit att undersöka möjligheten att höja effektiviteten samt förbättra ekonomin på ett bygg-och anläggningsprojekt med hjälp av samverkansentreprenad. Detta har gjorts genom litteraturstudier, intervjuer och möten med handledare på Trafikverket vid flertal tillfällen. Det som framkommit av studien om tidig samverkansentreprenad är att projekteringsprocessen blir väldigt lång men uppstarten av projekten blir effektiva. Däremot behöver modellen utvecklas mycket för att uppnå de resultat som efterfrågas. Det största problemet med tidig entreprenörmedverkan är att gemensamt komma överens om ett pris. / Because the society constantly is evolving and higher demand is made on fast solutions and methods therefore the building branch have to adapt and meet these needs and think from a new perspective. In this report we have studied the most common contract forms design plant and turnkey and Collaboration construction. Collaboration construction is a contract form that is not as proven like design plant and turnkey. There are several denominations for Collaboration construction such as partnering and early contractor involvement, they are all equal on how the purchaser is working with the contractor. In big construction and plant projects with high technical complexity it requires high competence in projection. These big projects can sometimes be problematic because the contractor has insufficient technical competence which causes big losses because of changes, additions and outgoing works and also other unexpected events. This has led many to believe that early contractor involvement could be the solutions to this problem since the purchaser could benefit from the contractor’s experience. Therefore, the purpose has been to investigate the opportunities to increase efficiency and improve the economy on a construction/plant project using interaction construction. This has been done through literature studies, interviews and meetings with our supervisor on Trafikverket at several occasions. The conclusion of this report is that early contractor involvement makes the design process very long, but the start-up of the projects become effective. However, this model needs to be developed to achieve the results requested. The biggest problem with early contractor involvement is to jointly agree on a price.
6

Quality of Detailed Construction Documents in Design-Bid-Build Contracts : Perceptions of Clients and Consultants / Kvalitet i bygghandlingar för utförandeentreprenader : Beställarnas och konsulternas uppfattningar

Lazic, Kamelia, Melek, Justyna January 2024 (has links)
The detailed design phase of construction projects marks a critical moment when conceptual ideas andmethods are developed into precise technical specifications, crucial for project execution. Existingresearch shows that insufficient and incomplete construction documents lead to poor integrationbetween design and production, resulting in conflicts and communication barriers. These shortcomingscompromise the integrity of the project and lead to rising costs for clients. Thus, there is a need forincreased commitment from both the client and the design consultant to ensure the quality of theconstruction documents provided to the contractor. This study identified the factors affecting the quality of construction documents in the context ofdesign-bid-build contracts, focusing specifically on the perceptions of clients and consultants in theSwedish infrastructure sector. Furthermore, the study evaluated the responsibilities of clients andconsultants, assessed compliance with governing guidelines and requirements, and suggestedopportunities for their development. Garvin’s eight dimensions of quality, ISO 9001:2015 andorganisational culture were applied as theoretical frameworks. The study employed both qualitativeand quantitative approaches, conducted through questionnaires, document analysis, and semistructured interviews. The results revealed several interrelated factors that influence the quality of construction documents,including competence and experience; quality processes and quality assurance; communication,coordination, and collaboration; budget and form of remuneration; clear documents from the client;and time schedules. Furthermore, the study showed a shared responsibility between clients andconsultants in ensuring the quality of construction documents. Inconsistent compliance with governingguidelines and requirements has been demonstrated. Factors challenging adherence to the guidelinesand requirements include time constraints, high workload, unclear instructions, communication gaps,and reliance on verbal agreements. Regarding the development of guidelines and requirements forpractical and realistic implementation, the study showed that guidelines should outline solutions andsteps for meeting the requirements, but also that the processes must be adapted to specific projects.Based on the conclusions, it is established that the factors influencing quality should be consideredfrom the beginning of the detailed design phase. Clients and consultants should be aware of theirresponsibilities. The focus should be on clear communication and documentation, realistic timeschedules, and adaptable processes to improve compliance with guidelines and the overall quality ofconstruction documents. / Detaljprojekteringsfasen i byggprojekt är en kritisk tidpunkt där konceptuella idéer och metoderutvecklas till tekniska specifikationer och är avgörande för projektutförandet. Befintlig forskning visaratt otillräckliga och bristfälliga bygghandlingar leder till dålig integration mellan design ochproduktion. Detta kan leda till konflikter och hindra kommunikation, vilket äventyrar projektetsintegritet och bidrar till tidsförseningar och stigande kostnader för beställaren. Således finns det ettbehov av ökat engagemang från både beställare och projekterande konsulter för att säkerställakvaliteten på bygghandlingarna som tillhandahålls entreprenören. Denna studie fördjupade sig i faktorer som påverkar kvaliteten på bygghandlingar inom ramen förutförandeentreprenader, med ett specifikt fokus på upplevelsen hos beställare och konsulter i densvenska infrastruktursektorn. Studien identifierade nyckelfaktorer som påverkar kvaliteten påbygghandlingar, utvärderade beställarens och konsulternas ansvar för kvalitet, bedömde efterlevnadenav styrande riktlinjer och krav samt utforskade möjligheter till utveckling av dessa. Garvins åttakvalitetsdimensioner, ISO 9001:2015 och organisationskultur användes som teoretiska ramverk.Studien utfördes genom kvalitativ och kvantitativ metodik via enkäter, semistrukturerade intervjueroch dokumentanalys. Resultatet visade flera sammankopplade faktorer som påverkar kvaliteten på bygghandlingar, blandannat kompetens och erfarenhet, kvalitetsprocess och kvalitetssäkring, kommunikation och samarbete,budget och ersättningsform, tydliga dokument från beställaren och tidplaner. Vidare visade studien attdet är ett delat ansvar mellan beställare och konsulter att säkerställa kvaliteten på bygghandlingar. Eninkonsekvent efterlevnad av styrande riktlinjer och krav har påvisats. Faktorer som utmanarefterlevnaden av riktlinjer och krav är tidsbegränsningar, hög arbetsbelastning, otydliga instruktioner,kommunikationsbrist och att förlita sig på muntliga överenskommelser. Gällande utveckling avriktlinjer och krav för praktisk och realistisk implementering, visade studien bland annat att riktlinjerbör beskriva lösningar och steg för hur kraven kan uppnås, men även att processerna ska varaanpassade till det specifika projektet. Utifrån slutsatserna konstaterades att hänsyn bör tas till depåverkande faktorerna redan i början av projekteringsfasen. Beställare och konsulter ska varamedvetna om sitt ansvar. Fokus ska ligga på tydlig kommunikation och dokumentation, realistiskatidsramar samt anpassningsbara processer för att förbättra efterlevnaden av riktlinjer och denövergripande kvaliteten på bygghandlingar.
7

En studie av hur entreprenadsumman i ett betongbroprojekt påverkas av ÄTA – arbeten och avvikelse : En fallstudie av 4 broprojekt utförda av Veidekke Entreprenad AB Anläggning Sydväst / A study of how the contract sum in a concrete bridge project is affected by contract changes and deviations : A case study of 4 concrete bridge projects done by Veidekke Entreprenad AB

Saleh, Nehad January 2020 (has links)
Anläggningsprojekt är idag allt fler på grund av att den infrastruktur som byggdes på mitten på 1900-talet inte längre uppfyller dagens ställda krav. I takt med att större entreprenader utförs idag, krävs även större resurser och bättre samspel mellan beställare och entreprenörer. Entreprenadsumman för ett betongbroprojekt är väldigt stark förknippat med mängden ÄTA–arbeten och avvikelser. ÄTA–arbeten kan gå i olika riktningar, till exempel från underentreprenör mot beställare och tvärtom. I denna studie ligger fokus på entreprenörens ÄTA–arbeten gentemot beställaren och avvikelser som uppstår i produktionen. Syftet med studien är att identifiera de vanligaste ÄTA–arbeten och avvikelser som förekommer i olika betongbroprojekt för att undersöka hur dessa påverkar entreprenadsumman samt hur de i framtiden skall hanteras av entreprenören så att de inte upprepas i kommande projekt. Till en början har en litteraturstudie gjorts för att öka kunskapen kring ämnet. Därefterhar en fallstudie utförts av fyra tidigare betongbroprojekt. Den centrala delen av fallstudien har varit en kvalitativ undersökning, med intervjuer samt en enkätundersökning. Det har hållits 10 intervjuer med olika platschefer, en jurist och en arbetschef, samtidigt har 55 tjänstemän från fallföretaget deltagit i enkätundersökningen. I den kvantitativa delen har en sammanställning gjorts av samtliga ÄTA–arbeten och avvikelser som uppstått i de betongbroprojekt som studerats. Därefter har de ÄTA–arbeten och avvikelser som upprepats i dessa betongbroprojekt identifierats. Studien visar att ÄTA–arbeten oftast uppstår på grund av brister i beställarens förfrågningsunderlag. Geotekniska undersökningar och tekniska lösningar föreskrivna av beställaren är det som vanligen föranleder ÄTA–arbeten. Även entreprenadformen är avgörande för mängd och typ av ÄTA–arbeten. I en utförandentreprenad är det mycket mer likställda ÄTA–arbeten och när det gäller en totalentreprenad är de vanligaste ÄTA–arbetena föreskrivna tilläggs- och ändringsarbeten. Det är sällan lönsamt med många ÄTA–arbeten i betongbroprojekten, däremot ökar det projektensomsättning vilket får ses som positiv. Avvikelser förekommer oftast på grund av dålig planering och kommunikation. Bristfälliga arbetsberedningar och missade kontroller är andra orsaker till att avvikelser förekommer. Det är oftast entreprenörens eget fel attdet uppstår avvikelser. Avvikelserna har då alltid en negativ inverkan på projektetsslutkostnad i och med att kostnaden inte läggs på entreprenadsumman, det vill säga att entreprenören avhjälper avvikelser på egen bekostnad. De vanligaste ÄTA–arbetena förekommer kring brokonstruktionens grundläggning,oftast på grund av att de geotekniska undersökningar som gjorts, har gjorts fel eller inte i tillräcklig omfattning. När det kommer till avvikelser är de vanligast i samband med armeringsarbeten och betonggjutningar. Dyrare avvikelser förekommer men inte i någon större utsträckning. Genom att lägga mer fokus på planering, kommunikation, involvering och upprätta bättre arbetsberedningar kan negativa effekter på entreprenadsumman på grund av ÄTA–arbeten och avvikelser undvikas. / Various plant projects are today more common because the infrastructure built in themid-1900s no longer meet today's set requirements. As major contracts are carried out today, greater resources and better interaction between client and contractor are also required. The contract sum for various concrete bridge projects is very strongly associated with the amount of contract changes and deviations. Contract changes can go between different entrepreneurs for example from a subcontractor against the clientand vice versa. In this study the focus is on contract changes from the main entrepreneur towards the client and deviations that occurs in the production. The purpose of the study is to identify the most common contract changes and deviations that occur in different concrete bridge projects to investigate how these affect the contract sum and how they should be handled by the entrepreneur in the future so that they are not repeated in upcoming projects. Initially a literature study has been done to increase knowledge about the subject. Then a case study has been carried out on four previous concrete bridge projects. The central part of the case study has been a qualitative investigation, where interviews have been held and a survey has been conducted. There have been 10 interviews with various site managers, a lawyer, and a supervisor, while 55 officials from the case company have participated in the survey. In the quantitative part, a compilation of contract changes and deviations that has occurred in the concrete bridge projects that was studied has been done. Then the contract changes and deviations that was repeated in all the studied concrete bridge projects has been identified. The study shows that contract changes occur most often because of deficiencies in the clients request documents. Geotechnical investigations and technical solutions prescribed by the client are what usually prompt contract changes. The contract form is also crucial for the amount and type of contract changes. In a contract that is based on AB 04 it is much more preserved contract changes and when it comes to a general contract based on ABT 06, the most common contract changes are prescribed alterations and additional works. It is rarely profitable with many contract changes in concrete bridge projects, yet it increases the revenue of the projects, which may be positive. Deviations occur most often due to poor planning and communication. Inadequate work preparations and missed controls are other reasons for the presence of deviations. It is usually the entrepreneur’s fault that there are a lot of deviations. Deviations always has a negative effect on the project’s final cost since the cost for it is not added to the contract sum, which means that the entrepreneur remedies deviations at their own expense. The most common contract changes occur around the groundwork of the bridge construction, usually because the geotechnical investigations carried out by the client, have been done wrong or not enough. When it comes to deviations the most common are in connection with reinforcement work and concrete castings. More expensive deviations occur but not to a greater extent. By focusing more on planning, communication, involvement and establishing better work preparations, negative effects on the contract sum due to contract changes and deviations can be avoided.

Page generated in 0.0861 seconds